This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19), dated 11-MAR-2025, specifically focusing on the CHT Aeration Blower 1A Tightness & Operational Test. The TGI includes detailed task instructions for multiple work groups, including contractor (22/KE), quality assurance (33/G1), test work (46/J5), and ship's force (EXSA) personnel. The task involves conducting a tightness and operational test with vibration cut, referencing technical procedure TP 59311-3-307KTR, which is part of the larger FY25 5C1 Dry-Docking Selected Restricted Availability (DSRA) Modernization Bundle 4 for the USS Blue Ridge at the Naval Base Yokosuka, Japan Regional Maintenance Center.

The document is marked FOUO (For Official Use Only) and includes administrative details such as preparation by Nemoto Souya and approval by Ohta Jason Y. on 11-FEB-2025 and 10-MAR-2025 respectively. The Zone Manager is identified as Takahashi Yasuhiko, and the Job Summary ID is 551G2107. While the TGI provides specific technical instructions for the aeration blower test, it is part of a broader naval ship repair and modernization effort scheduled to occur between 12-Jan-2026 and 15-May-2027.

View the file

Other files

File Type Posted
N6264925RA0520004.pdf PDF
N6264925RA0520003.pdf PDF
TGI_3819P55107T07_c0v0_redact.pdf PDF
TGI_3819P55107T06_c0v0_redact.pdf PDF
TGI_3819P55107T04_c0v0_redact.pdf PDF
TGI_3819P51602T10_c0v0_redact.pdf PDF
TGI_3819P51602T06_c0v0_redact.pdf PDF
TGI_3819P51602T02_c1v1_redact.pdf PDF
TGI_3819P51602T03_c0v0_redact.pdf PDF
TGI_3819P58316A01_c0v0_redact.pdf PDF
TGI_3819P55107T05_c0v0_redact.pdf PDF
TGI_3819P55107T09_c0v0_redact.pdf PDF
TGI_3819P51602T09_c0v0_redact.pdf PDF
TGI_3819P55107T08_c0v0_redact.pdf PDF
TGI_3819P55107T01_c0v0_redact.pdf PDF
TGI_3819P51602T07_c0v0_redact.pdf PDF
TGI_3819P51602T12_c0v0_redact.pdf PDF
TGI_3819P51602T04_c0v0_redact.pdf PDF
TGI_3819P51602T01_c0v0_redact.pdf PDF
N6264925RA0520002.pdf PDF
N6264925RA0520001.pdf PDF
TGI_3819P55107T01_c0v0_redact.pdf PDF
TGI_3819P55107T07_c0v0_redact.pdf PDF
TGI_3819P55107T05_c0v0_redact.pdf PDF
TGI_3819P51602T05_c0v0_redact.pdf PDF
TGI_3819P51602T03_c0v0_redact.pdf PDF
TGI_3819P51602T02_c1v1_redact.pdf PDF
TGI_3819P51602T12_c0v0_redact.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
Attachment IV RFI.docx DOCX document
Attachment II Proposal Sheet Generator v1.2 .xlsx XLSX spreadsheet
TGI_3819P55107T03_c0v0_redact.pdf PDF
TGI_3819P55107T04_c0v0_redact.pdf PDF
TGI_3819P51602T08_c0v0_redact.pdf PDF
TGI_3819P51602T04_c0v0_redact.pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
Attachment III GFP_List_rev1.xlsx XLSX spreadsheet
TGI_3819P55107A01_c0v0_redact.pdf PDF
TGI_3819P58316T01_c0v0_redact.pdf PDF
TGI_3819P55107T08_c0v0_redac.pdf PDF
TGI_3819P55107T09_c0v0_redac.pdf PDF
TGI_3819P51602T07_c0v0_redact.pdf PDF
TGI_3819P51602T11_c0v0_redact.pdf PDF
TGI_3819P51602T06_c0v0_redact.pdf PDF
TGI_3819P51602T01_c0v0_redact.pdf PDF
Exhibit (A) CDRL BUNDLE 4 signed.pdf PDF
Attachment V Contract data.pdf PDF
2.01 N6264925RA052 Solicitation.pdf PDF
TGI_3819P58316A01_c0v0_redact.pdf PDF
TGI_3819P51602A02_c2v1_redac.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

11-MAR-2025 0825

20.14.15.2.9020 (September 2024) ICN: 3819P55107 KeyOp: T06

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59311-3-307KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 59311

CU PHASE TITLE: CHT AERATION BLOWER 1A (T & OP), S/A 72976K - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 2

EXSAZBV2

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

NEMOTO, SOUYA 246.2 3152433482 11-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

OHTA, JASON Y. 246.2 3152435901 10-MAR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EXSA-ZBV2

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

TAKAHASHI, YASUHIKO U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

551G2107

Tightness & Operational Test for CHT AERATION BLOWER (T & OP) - KTR.

TGI Short Form

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

11-MAR-2025 0825

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P55107 KeyOp: T06

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59311-3-307KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 59311

CU PHASE TITLE: CHT AERATION BLOWER 1A (T & OP), S/A 72976K - KTR

FOUO Pg 2 of 2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TP 59311-3-307KTR CHT AERATION BLOWER (T &

OP) - KTR

LAT Y

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(V) Contractor work:

Accomplish/document the tightness & operational test with vib-cut in accordance with reference, TP 59311-3-307KTR.

22/KE PC N

(G) QA work:

Accomplish/document the tightness & operational test with vib-cut in accordance with reference, TP 59311-3-307KTR.

33/G1 QA N

Test work:

Conduct vibration analysis in accordance with reference, TP 59311-3-

307KTR.

46/J5 JN N

(S) S/F work:

Accomplish/document the tightness & operational test with vib-cut in accordance with reference, TP 59311-3-307KTR.

/ EXSA N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P55107 KEY OP: T06