This document is a Task Group Instruction (TGI) for structural and preservation work related to inflatable life raft replacement on the USS BLUE RIDGE (LCC-19). The TGI details specific work to be performed at various locations on the ship, including main deck weather areas, staterooms, voids, and other compartments. The work involves load testing of liferail stanchions and synthetic rope guardline assemblies, visual inspections of new welds, and installation of new components.
Key technical requirements include performing a static load test of 3,000 pounds on top staples of stanchions, testing synthetic rope guardline assemblies under a 1,100-pound load, and conducting visual inspections of new welds. The work is part of a larger ship repair project scheduled from January 12, 2026 to April 2, 2027, to be executed at the Ship Repair Facility - Japan Regional Maintenance Center (SRF-JRMC). The TGI includes detailed material lists, mapping plans, and quality assurance documentation to ensure proper execution of the life raft replacement work.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: S/A 81028K LIFE RAFT AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
(RE) F/O - S/A 81028K, ACCOMPLISH STRL & PSVTN WORK FOR INFLATABLE LIFERAFT REPL
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
HIROYUKI TANAKA 231B 315-243-4491 28-FEB-2025
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B 315-243-4502 28-FEB-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: S/A 81028K LIFE RAFT AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-6 QA17
(1-3)
J1-2 M1-2 Map (1- 2)
1. SCOPE/PURPOSE
1.1 Title: S/A 81028K, Structural and Preservation Work for Inflatable Life Raft Replacement; accomplish
1.2 Location of Work:
1.2.1 Main Deck Weather, Frames between A and 41, Port and Starboard (Stbd)
1.2.2 Freeboard Weather, Frames between A and 41, Port and Stbd
1.2.3 Anchor and Line Handling Space (2-F-0-Q)
1.2.4 C7F First DMSION Office (2-14-6-Q)
1.2.5 Stateroom (2-16-2-A)
1.2.6 Officer WR, WC, SH, FW, and SW Decontamination Station No. One (2-20-2-L)
1.2.7 Stateroom (2-22-4-L)
1.2.8 Stateroom (2-24-2-L)
1.2.9 Stateroom (2-26-2-L)
1.2.10 Stateroom (2-28-2-L)
1.2.11 Inaccessible Void (2-29-2-V)
1.2.12 Void (2-31-2-V)
1.2.13 ACOS Stateroom (2-32-2-L)
1.2.14 N3 LCPO (2-36-4-Q)
1.2.15 Supplementary Plot (2-14-5-Q)
1.2.16 Officer WR, WC, SH Decontamination Station (2-18-5-L)
1.2.17 Stateroom (2-22-3-L)
1.2.18 Stateroom (2-24-3-L)
1.2.19 Stateroom (2-26-3-L)
1.2.20 Stateroom (2-28-1-L)
FOUO
SHIP: LCC-19 CHG/VER: 0/0
1.2.21 Executive Officer Stateroom (2-30-5-L)
1.2.22 Inaccessible Void (2-29-1-V)
1.2.23 Void (2-31-1-V)
1.2.24 Wardroom Storeroom (2-36-3-A)
1.2.25 COMMSEC Equipment (2-40-3-A)
1.3 Identification:
1.3.1 Quantity (One EA), Inaccessible Void (2-29-2-V)
1.3.2 Quantity (One EA), Inaccessible Void (2-29-1-V)
1.3.3 Quantity (One Lot), Structural and Preservation Work for S/A 81028K, Inflatable Life Raft Replacement
Remarks: See 2.4 through 2.9 for material and details, and Mapping Plan Enclosure-01 for location details
1.4 Security Classification:
1.4.1 Spaces - 1.2.4, 1.2.14, 1.2.15, and 1.2.21
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.5.2 Potential Lead Hazard
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 4/2/2027
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 100-
2491007
SPONSON & STRG FWD FR76½ G Y AL
L
4 DWG 600-
8781528
INFLATABLE LIFERAFT LIFELINE
AND RAIL MODS
- Y AL
L
5 DWG 601-
8781529
INFLATABLE LIFERAFT
REPLACEMENT 25 MAN
LIFERAFT REMOVALS
- Y AL
L
6 DWG 601-
8781530
50 MAN INFLATABLE LIFERAFT
INSTALLATION
- Y AL
L
7 DWG 606-
8781531
INFLATABLE LIFERAFT
REPLACEMENT DECK
COVERING MODIFICATION
- Y AL
L
8 LAR SRFY-
0021-25
FAB DET OF LIFERAIL STAN AND
INSTL OF WATERWAY SCUP
- Y AL
L
9 DWG 510-
2491623
WATERWAY SCUPPER
EXTENSION
B Y AL
L
FOUO
SHIP: LCC-19 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
10 LAR SRFY-
0076-25
THE MOUNTING METHOD OF
THE RETAINING STRAP ASSY
FOR THE NEW LIFE RAFT
- Y AL
L
11 DWG 804-
5184155
LIFERAILS, LIFELINES &
AWNING STANCHIONS (AL &
CRES) DETAILS & L/M
A N
12 MIL MIL-
STD-1689
Fabrication, Welding and Inspection of Ships Structure
A N
13 MIL MIL-
STD-2035
Nondestructive Testing Acceptable Criteria
A N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each space listed in 1.3.1 and 1.3.2, using 2.3 for guidance.
5.1.1 Notify SUPERVISOR 3 working days prior to start of waste liquid disposal operation.
5.1.2 Install new rust preventive compound conforming to MIL-PRF-16173, Grade 3.
5.2 Accomplish the structural and preservation work for S/A 81028K, inflatable life raft replacement listed in 1.3.3 in accordance with 2.4 through 2.9, using 2.3 and 2.10 for guidance.
5.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, B, and C, Lines One through 7.
5.2.2 Accomplish a load test of each new top staple of stanchion.
(I)(G) “LOAD TEST”
5.2.2.1 Test load must be 3,000 LBs (plus 150 LBs and minus 0 LBs).
5.2.2.2 Hold test load for 10 minutes.
5.2.2.3 No permanent deformation, cracks, separation or visible damage of top staple and stanchion is acceptable.
5.2.2.4 Document the test on QA Form 17 Enclosure-02-1.
5.2.3 Accomplish visual (VT) inspection of each new weld of staple of stanchion in accordance with 2.11 and Paragraphs 6.4 and 7.2 of 2.12. The accept or reject criteria must be in accordance with 2.11 and Paragraph 4 Class 3 of 2.13.
(I) “VT INSPECTION”
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.2.3.1 Document the VT inspection on QA Form 17 Enclosure-02-2.
5.2.4 Accomplish a load test of each synthetic rope guardline assembly.
(I)(G) “LOAD TEST”
5.2.4.1 Test load must be 1,100 LBs (plus 55 LBs and minus 0 LBs).
5.2.4.2 Hold test load for 10 minutes.
5.2.4.3 No permanent deformation, cracks, snapping, fraying or visible damage of synthetic rope guardline assembly is acceptable.
5.2.4.4 Document the test on QA Form 17, Enclosure-02-3.
5.2.5 Accomplish the requirements of 009-32 of 2.1.
5.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.4 Notes:
5.4.1 Planner: Code 231B H. Tanaka, 243-4491
Planner: Code 231B M. Hayashi, 243-6145 Planner: Code 233 M. Takemura, 080-9350-1458 Engineer: Code 250 K. Matsunari, 243-5816
5.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.4.3 Fabrication of tie down assembly will be covered by TGI No. 3819P58316H02 (SRF-JRMC TGI).
5.4.4 Removal and installation of life raft, tie down assembly, and hydrostatic release device will be covered by TGI No(s). 3819P58316U01 and 3819P58316R01 (SRF-JRMC TGI).
5.4.5 Opening, initial cleaning, and closing of each space listed in 1.2.12 and 1.2.23 will be covered by the following TGI No(s).
Void (2-31-1-V): 3819P12383A01 (KTR TGI) Void (2-31-2-V): 3819P12384A01 (KTR TGI)
5.4.6 JCN EXSA-ZC05 is related to this TGI.
5.5 Government Furnished Material (GFM):
5.5.1 All IAF material except hazmat listed in each S/A drawing will be provided as kitted material by SRF-JRMC.
5.5.2 SRF-JRMC will provide GFM listed in Appendix “M”.
5.6 SRF-JRMC will provide the following service work: (TGI No. 3819P58316S02).
5.6.1 [C740] Crane and crane rigging service.
5.6.2 [X99E] Utility service, electrical.
5.6.3 [X99M] Provide utility service, including water supply, steam supply, and low pressure air supply except onboard blasting work.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.6.6 [C133] QA Inspection for (G) symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
S/A 81028K LIFE RAFT AY A 0 0
CU PHASE TITLE:
(RE) F/O - S/A 81028K, ACCOMPLISH STRL & PSVTN WORK FOR INFLATABLE LIFERAFT REPL
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
MAIN DECK WEA PORT MS LIFE LINE MAIN DECK RZ MAIN DECK WEA STBD MS LIFE RAIL MAIN DECK
RZ VOID 2-29-1-V VD VOID 2-29-2-V VD
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P58316A01-Map.pdf) saved on 26-FEB-2025 0000.
2. ENCLOSURE-02 (3819P58316A01-QA17.docx) saved on 26-FEB-2025 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
KONDO ,SHINYA
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P58316 A01
TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish structural and preservation work for S/A 81028K, inflatable life raft replacement.
Location of Work:
Main Deck Weather, Frames between A and 41, Port and Starboard (Stbd) Freeboard Weather, Frames between A and 41, Port and Stbd Anchor and Line Handling Space (2-F-0-Q) C7F First DMSION Office (2-14-6-Q) Stateroom (2-16-2-A) Officer WR, WC, SH, FW, and SW Decontamination Station No. One (2-20-2-L) Stateroom (2-22-4-L) Stateroom (2-24-2-L) Stateroom (2-26-2-L) Stateroom (2-28-2-L) Inaccessible Void (2-29-2-V) Void (2-31-2-V) ACOS Stateroom (2-32-2-L)
N3 LCPO (2-36-4-Q)
Supplementary Plot (2-14-5-Q) Officer WR, WC, SH Decontamination Station (2-18-5-L) Stateroom (2-22-3-L) Stateroom (2-24-3-L) Stateroom (2-26-3-L) Stateroom (2-28-1-L) Executive Officer Stateroom (2-30-5-L) Inaccessible Void (2-29-1-V) Void (2-31-1-V) Wardroom Storeroom (2-36-3-A)
FOUO
J-2
SHIP: LCC-19 CHG/VER: 0/0
CU PHASE DESCRIPTION:
COMMSEC Equipment (2-40-3-A)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 STRL , PNTR , LBR 22 KE PC
5.2 SFTR , STML , WELD , INSL , ELEC , PNTR , RGRS , QA 22 KE PC
5.3 PNTR , QA 22 KE PC
Dewatering and Cleaning Work CFM: or marine chemist, and all paints, and misc.
22 MQ CS
Structural and Preservation Work CFM: For all paints, thinner, grits including disposal cost, firewatch cost, confined space watch cost, asbestos sampler cost and analysis cost for compartment insulation, lead sampling/analysis cost, fasteners, adhesive, and misc such as electrode, gases, covering materials, and other consumable.
22 MQ CS
Electrical Work CFM: for air compressor rental and fuel oil cost, asbestos take and analysis cost, fastener, plastic bag, insulation tape, cable band and other consumable materials.
22 MQ CS
Process Funding Document. 10 CT OM
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
S/A 81028K LIFE RAFT AY A 0 0
CU PHASE TITLE:
(RE) F/O - S/A 81028K, ACCOMPLISH STRL & PSVTN WORK FOR INFLATABLE LIFERAFT REPL
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P58316 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M BAR,META, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
9B 9510 001881690 NA 4 N 10/FT
002 M PLUG, 1-1/2"NPT, PLUG, 1-1/2"-
11-1/2 NPT, 1"LG, DEPTH OF
SLOT 3/8" MAX, SQUARE
SLOT, QQ-N-281, CL B, NICKEL
COPPER ALLOY GR 400
MONEL.
ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
LL9304947 NA 4 N 4/EA
003 M CORROSION PREVENTIV,
ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
9B 8030 002441294 NA 4 Y 40/DR
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
004 M RUBBER SCUPPER ASSEM,
RUBBER SCUPPER
ASSEMBLY, DIM A = 4", DIM B
= 8.-1/4", 18"LENGTH, IAW BIW
DWG: 8100-5220-0003 SHEET
11&12, PC 21 THRU 025 & 028,
CATALOG NUMBER: 54165-
005, 42179-035, 53048-030, 53239-081, 53110-011 & 53048-
ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
LL4896570 NA 4 N 8/EA
005 M STRIP,EL, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
9B 5999 013438667 NA 4 N 8/EA
006 M NUT,SLEE, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
9B 5310 014231667 NA 4 N 16/EA
007 M SCREW,CA, ORDER FOR KTR
ORIG: C231B, H.TANAKA, 243-
9B 5305 014535741 NA 4 N 16/EA
100 M INSULATI, ORIG: C-231B M.
HAYASHI 243-6145
ORDERED FOR KTR
9Q 5640 008096315 NA 4 N
150/EA
101 M INSULATI, 12SH / 1BX
5BX
ORIG: C-231B M. HAYASHI 243-
ORDERED FOR KTR
9Q 5640 008096312 NA 4 N 60/SH
102 M SOUND CO, 1BX
ORIG: C-231 M. HAYASHI 243-
ORDERED FOR KTR
9Q 5640 007565866 NA 4 N
210/SH
103 M CAP,SNAP, 100EA / PG
10PG
ORIG: C-231B M.HAYASHI 243-
ORDERED FOR KTR
9B 5325 007377648 NA 4 N
1000/E
A
104 M TAPE,TEX, ORIG: C-231B
M.HAYASHI 243-6145
ORDERED FOR KTR
9B 8315 002671632 NA 4 N 20/RO
105 M TAPE,TEX, ORIG: C-231B
M.HAYASHI 243-6145
ORDERED FOR KTR
9B 8315 002671633 NA 4 N 10/RO
106 M ADHESIVE, ORIG: C-231B
M.HAYASHI 243-6145
ORDERED FOR KTR
9B 8040 002738708 NA 4 Y 8/GL
107 M ANCHOR,P, ORIG: C-231B
M.HAYASHI 243-6145
ORDERED FOR KTR
9B 5342 010245124 NA 4 N
500/EA
108 M PLATE,MO, ORIG: C-231B
M.HAYASHI 243-6145
ORDERED FOR KTR
9B 5340 010245086 NA 4 N
200/EA
109 M ADHESIVE, ORIG: C-231B
M.HAYASHI 243-6145
ORDERED FOR KTR
9B 8040 009035081 NA 4 Y 5/KT
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 S/A 81028K LIFE RAFT AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P58316 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 S/A 81028K LIFE RAFT AY A 0
MAPPING PLAN
ENCLOSURE-01 SHEET 1 OF 23819P58316A01
PLAN VIEW
MAIN DK WEA, PORT
FR 1 - 12
PLAN VIEW
MAIN DK WEA, STBD
FR 1 - 12
LIFERAIL STAN ASSY
SEE ELEV 2-A
LIFERAIL STAN ASSY
SEE ELEV 2-B
MAPPING PLAN
ENCLOSURE-01 SHEET 2 OF 23819P58316A01
ELEVATION 2-A
LIFERAIL STAN ASSY
FR 5 - 8, PORT
ELEVATION 2-B
LIFERAIL STAN ASSY
FR 5 - 8, STBD
ST-1
ST-3
ST-4
ST-2
EXIST LIFERAIL ASSY
EXIST LIFERAIL ASSY
SG-1
SG-2
SG-3
SG-4
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
3819P58316A01 ENCLOSURE-02-1 TOTAL 3
TEST AND INSPECTION RECORD
QA FORM 17 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT
USS BLUE RIDGE LCC-19 EXSA-ZC05 KTR N/A Liferail Stanchion
6. REFERENCES (COMPONENT DETAIL/ASSEMBLY DRAWING AND REV)
A. JFMM Rev. D Chg-3 Vol IV Ch 13 B. Dwg 804-5184155 Rev. A C. Dwg 600-8781528 Rev. “-“
D. E. F.
7. PART DESCRIPTION/PIECE NO.: Staple on Liferail Stanchion, See Mapping Plan Enclosure-01
8. DESCRIPTION OF TEST AND/OR INSPECTION:
STATIC LOAD TEST FOR TOP STAPLE ON LIFERAIL STANCHION
Total of 2 EA top staple(s) on liferail stanchion in accordance with Reference C.
1. Rig the load indicating device to the top staple using rigging gear equipment (shackles, wire rope and etc).
2. Observe the load indicating device and slowly apply a static test load of 3,000 (+150, -0) LBs perpendicular to stanchion. Hold for 10 minutes.
3. Slowly release the test load and visually inspect the tested staple on the stanchion to meet the following acceptance criteria.
ACCEPTANCE CRITERIA
There must be no permanent deformation, cracks, separation or visible damage of staple and stanchion.
9. RESULTS:
Use Continuation Sheet-1.
10. CRAFTSMAN SIGNATURE DATE 11. QA INSPECTOR SIGNATURE DATE
12. RECORD HAS BEEN REVIEWED FOR COMPLETENESS
QA WCS SIGNATURE (QAO/QAS SIGNATURE FOR SUBSAFE/SOC/SFCC ONLY) DATE
3819P58316A01 ENCLOSURE-02-1 (Continuation Sheet-1) TOTAL 3
9. RESULTS (Continued):
TEST ITEM TEST LOAD TEST DURATION TEST RESULT
STAPLE No. ST-1 LBs Min SAT / UNSAT STAPLE No. ST-3 LBs Min SAT / UNSAT
TEST LOAD: 3,000 (+150, -0) LBs / TEST DURATION: 10 MINUTES (References A, B and C)
ACCEPTANCE CRITERIA
There must be no permanent deformation, cracks, separation or visible damage of staple and stanchion.
*TEST FIXTURE INFO:
3819P58316A01 ENCLOSURE-02-2 TOTAL 3
TEST AND INSPECTION RECORD
QA FORM 17 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT
USS BLUE RIDGE LCC-19 EXSA-ZC05 KTR N/A Liferail Stanchion
6. REFERENCES (COMPONENT DETAIL/ASSEMBLY DRAWING AND REV)
A. Dwg 804-5184155 Rev. A B. DWG 600-8781528 Rev. “-“ C. MIL-STD-1689 Rev. A
D. MIL-STD-2035 Rev. A E. F.
7. PART DESCRIPTION/PIECE NO.: Staple on Liferail Stanchion, See Mapping Plan Enclosure-01
8. DESCRIPTION OF TEST AND/OR INSPECTION:
Visual (VT) inspection of each new weld of staples (ST-1, ST-2, ST-3, and ST-4) in accordance with Reference A, Reference B, and Paragraphs 6.4 and 7.2 of Reference C. The accept or reject criteria must be in accordance with Reference A and Paragraph 4 Class 3 of Reference D.
9. RESULTS:
10. CRAFTSMAN SIGNATURE DATE 11. QA INSPECTOR SIGNATURE DATE
3819P58316A01 ENCLOSURE-02-3 TOTAL 3
TEST AND INSPECTION RECORD
QA FORM 17 Planning must fill in blocks identified by a prior to issuing
1. SHIP HULL NO. 2. JCN 3. LWC/SHOP 4. CWP/REC SER NO. 5. SYSTEM/COMPONENT
USS BLUE RIDGE LCC-19 EXSA-ZC05 KTR N/A Liferail Stanchion
6. REFERENCES (COMPONENT DETAIL/ASSEMBLY DRAWING AND REV)
A. JFMM Rev. D Chg-3 Vol IV Ch 13 B. Dwg 804-5184155 Rev. A C. DWG 600-8781528 Rev. “-“
D. E. F.
7. PART DESCRIPTION/PIECE NO.:
Synthetic Rope Guardline Assembly
8. DESCRIPTION OF TEST AND/OR INSPECTION:
STATIC LOAD TEST FOR SYNTHETIC ROPE GUARDLINE ASSEMBLY
Total of 4 AY synthetic rope guardline assembly in accordance with Reference C.
1. Rig one end of synthetic rope guardline assembly to appropriate fixture (bitt or ground structure) using rigging gear equipment (shackles, wire rope and etc.).
2. Rig the load indicating device to another end of synthetic rope guardline assembly using rigging gear equipment.
3. Observe the load indicating device and slowly apply a static test load of 1,100 (+55, -0) LBs to the synthetic rope guardline assembly. Hold for 10 minutes. Record test data below.
4. Slowly remove the test load and visually inspect the tested synthetic rope guardline assembly to meet the following acceptance criteria. Record test result below.
ACCEPTANCE CRITERIA
There must be no permanent deformation, cracks, snapping, fraying or visible damage of synthetic rope guardline assembly.
5. Remove all test equipment and rigging gear equipment after completion of this test.
9. RESULTS:
Use Continuation Sheet-1.
10. CRAFTSMAN SIGNATURE DATE 11. QA INSPECTOR SIGNATURE DATE
3819P58316A01 ENCLOSURE-02-3 (Continuation Sheet-1) TOTAL 3
9. RESULTS (Continued):
TEST ITEM TEST LOAD TEST DURATION TEST RESULT
GUARDLINE NO. SG-1 LBs Min SAT / UNSAT
GUARDLINE NO. SG-2 LBs Min SAT / UNSAT
GUARDLINE NO. SG-3 LBs Min SAT / UNSAT
GUARDLINE NO. SG-4 LBs Min SAT / UNSAT
REQUIRED TEST LOAD 1,100 (+55, -0) LBs / REQUIRED TEST DURATION 10 MINUTES (Reference A and B)
ACCEPTANCE CRITERIA
There must be no permanent deformation, cracks, separation, snapping, fraying or visible damage of synthetic rope lifeline assembly.
*TEST FIXTURE INFO: