This document is a Task Group Instruction (TGI) for a Modular Refrigeration Unit test on the USS Blue Ridge, dated 13-MAR-2025. The TGI details a tightness and operational test for the refrigeration unit, involving contractor work (22/KE), quality assurance work (33/G1), and support/facilities work. The document specifies tasks for accomplishing and documenting the test in accordance with reference document TP 51611-3-313KTR, with no material list items included. The instruction is part of the larger USS Blue Ridge FY25 5C1 Dry-Docking Selected Restricted Availability (DSRA) Modernization Bundle 4 project, which will be performed at the US Naval Base Yokosuka, Ship Repair Facility - Japan Regional Maintenance Center (SRF-JRMC) during the period of 12-Jan-2026 through 15-May-2027.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
13-MAR-2025 1051
20.14.15.2.9020 (September 2024) ICN: 3819P51602 KeyOp: T10
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51611-3-313KTR TT T 7 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51611
CU PHASE TITLE: MODULAR REFRIGERATION UNIT 6-58-2 (OP), S/A 83424K - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
EXSAZC54
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
MIZUSHIMA, MASAKI 246.2 3152434112 25-FEB-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 12-MAR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EXSA-ZC54
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
516G1002
Tightness & Operational Test for MODULAR REFRIGERATION UNIT - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
13-MAR-2025 1051
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P51602 KeyOp: T10
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51611-3-313KTR TT T 7 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51611
CU PHASE TITLE: MODULAR REFRIGERATION UNIT 6-58-2 (OP), S/A 83424K - KTR
FOUO Pg 2 of 2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 51611-3-313KTR MODULAR REFRIGERATION
UNIT (T & OP) - KTR
LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 51611-3-313KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 51611-3-313KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 51611-3-313KTR.
/ EXSA N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P51602 KEY OP: T10
File details come from the government source that posted it. Updated .