TGI_3819P31003T02_c0v0_redact.pdf
PDF 98 KB Posted
- Solicitation number
- N6264925RA041
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) dated 05-MAR-2025 for USS BLUE RIDGE (LCC-19), specifically focused on the Ship Service Diesel Generator (SSDG) #1 Support Systems Tightness and Operational Test. The TGI provides detailed instructions for contractor, quality assurance (QA), and ship's force personnel to conduct visual inspections of mechanical, welded, and brazed joints for external leakage testing.
The task involves inspecting all mechanical joints of the SSDG #1 Support System at Normal Operating Pressure (NOP) and Normal Operating Temperature (NOT) for 30 minutes, with no allowance for permanent deformation of brazed/welded joints. Reference documents include the Expanded Ship Work Breakdown Structure (TM S9040-AA-IDX010) and Engineering Operational Sequencing System (EOSS). The instruction is part of the USS BLUE RIDGE's maintenance and repair process, with the work to be performed under project 19P, system 34211, and is marked as For Official Use Only (FOUO).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
05-MAR-2025 0902
20.14.15.2.9020 (September 2024) ICN: 3819P31003 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 34211-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 34211
CU PHASE TITLE: SSDG #1, SUPPORT SYS (T & OP), S/A 79243K - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
EE01L107
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 11-DEC-2024
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 04-MAR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EE01-L107
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
310G0003
Tightness & Operational Test for All Repaired/Reinstalled Components for SSDG #1, SUPPORT SYS (T & OP) - KTR.
TGI Short Form
05-MAR-2025 0902
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P31003 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 34211-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 34211
CU PHASE TITLE: SSDG #1, SUPPORT SYS (T & OP), S/A 79243K - KTR
FOUO Pg 2 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TM S9040-AA-IDX-
EXPANDED SHIP WORK
BREAKDOWN STRUCTURE
FOR ALL SHIPS AND
SHIP/COMBAT SYSTEMS
LAT N
2 TM EOSS ENGINEERING
OPERATIONAL SEQUENCING
SYSTEM (EOSS)
LAT N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Visually inspect all mechanical, welded &/or brazed joints of the SSDG #1 SUPPORT SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time. No permanent deformation of brazed/welded joints allowed.
Actual Duration:____
Sign:____________
Print:____________
Date:____________ continued below
22/KE PC N
Note: The scope of the SSDG #1 SUPPORT SYS is as described in reference 1, ESWBS.
22/KE PC N
(G) QA work:
Visually inspect all mechanical, welded &/or brazed joints of the SSDG #1 SUPPORT SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time.
Sign:_______________
Print:_______________
Date:_______________
33/G1 QA N
(S) S/F work:
Line up system in accordance with reference 2, EOSS. Visually inspect all mechanical, welded &/or brazed joints of the SSDG #1 SUPPORT SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time.
Sign:_______________
Print:_______________
Date:_______________
/ EM01 N
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
05-MAR-2025 0902
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P31003 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 34211-3-300KTR TT T 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 34211
CU PHASE TITLE: SSDG #1, SUPPORT SYS (T & OP), S/A 79243K - KTR
FOUO Pg 3 of 3
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ICN: 3819P31003 KEY OP: T02