TGI_3819P31002A03_c3v2_redact.pdf
PDF 8 MB Posted
- Solicitation number
- N6264925RA041
About this file
This document is a Naval Solicitation for USS BLUE RIDGE (LCC-19) Ship Repair and Modernization Bundle 3 located in Yokosuka, Japan. The solicitation (N6264925RA041) is specifically for authorized sources to perform repair and maintenance work, with a performance period from 12 January 2026 through 13 December 2027 at Commander, Fleet Activities Yokosuka Naval Base.
Key details include a proposal submission deadline of 9 June 2025 at 10:00 AM Japan Standard Time, with mandatory pre-proposal access requirements. Interested offerors must request access to the detailed work specification package through DoD SAFE by emailing three specified contacts (Risa Sakurai, Ai Gillard, and Gil Lopez) by 2 June 2025. The solicitation is issued by the Department of the Navy Naval Supply Systems Command and is restricted to sources authorized to operate and conduct business in Japan, with the full work specification package only accessible through a secure government file-sharing platform with a 14-day access window.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: SA 79243K PP EDG#2 AY A 0 3
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
*(RE) F/O - S/A 79243K, ACCOMPLISH MDIFICATION OF VARIOUS PIPING FOR EDG NO. 2
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
HIDEKI KOMOTO 234. 070-7787-2047 17-FEB-2025
APPROVED BY: CODE PHONE DATE
HIDEO HARADA 234. 070-7787-2040 17-FEB-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Revise word from “Enclosure-07-161” to “Enclosure-07-165”.
CHANGE INSTRUCTIONS:
CH1: Add reference number 2.44. (02/26/2025) CH2: Revise Enclosure-11 of QA FORM 17.(03/05/2025) CH3: Revise word from “Enclosure-07-161” to “Enclosure-07-165”. (03/05/2025) on Procedure 5.1.5.3.
SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II AND III.
CLASS P-1 PIPING.
CLASS P-2 PIPING.
CLASS P-3b PIPING.
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: SA 79243K PP EDG#2 AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 3/2
LIST OF EFFECTIVE PAGES
SHT NO. CHG
NO.
SHT NO. CHG
NO.
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-22 Map-04 (1)
QA34A
(1)
QA28-
07 (1-2)
QA28-
14 (1-2)
J1-4 Map-05 (1-7)
QA28-
01 (1-3)
QA28-
08 (1)
QA28-
15 (1)
M1-7 QA20-01
(1-161)
QA28-
02 (1-2)
QA28-
09 (1)
QA28-
16 (1)
Sketch (1) QA20-02 (1-56)
QA28-
03 (1-2)
QA28-
10 (1)
QA28-
17 (1)
Map-01 (1-4)
QA20-03
(1-18)
QA28-
04 (1)
QA28-
11 (1)
QA28-
18 (1-2)
Map-02 (1-3)
QA20-04
(1-2)
QA28-
05 (1-2)
QA28-
12 (1-2)
QA28-
19 (1)
Map-03 (1)
QA17 (1-
2)
QA28-
06 (1-3)
QA28-
13 (1)
QA28-
20 (1)
1. SCOPE/PURPOSE
1.1 Title: S/A 79243K, Modification of Various Piping; accomplish
1.2 Location of work:
1.2.1 Emergency Generator Room No. 2 (7-109-1-E)
1.2.2 "E" Division Storeroom (9-118-1-A)
1.2.3 Engine Room (8-86-0-E)
1.2.4 Emergency Switch Gear Room No. 2 (6-109-1-E)
1.2.5 Shaft Alley (9-98-0-Q)
1.2.6 Auxiliary Fuel Oil Service Tank (7-116-1-F)
1.2.7 Stateroom (2) (3-113-3-L)
1.2.8 Officer Washroom, Water Closet, Shower, and Decontaminate Station (Female) (3-109-7-L)
1.2.9 Stateroom (3-111-1-L)
Remarks: Compartment name is changed to Fan Room (3-111-1-Q) by this S/A.
1.2.10 Passage (3-109-5-L)
1.2.11 Fan Room (3-111-1-Q)
1.2.12 Crew Living Space (6-98-0-L)
1.2.13 Stateroom (3-116-1-L)
1.2.14 AC & R Shop (4-109-3-Q)
1.2.15 Passage (4-109-01-L)
FOUO
SHIP: LCC-19 CHG/VER: 3/2
1.2.16 X1 Stateroom (3-120-1-A)
Remarks Compartment name is changed to Fan Room (3-120-1-Q) by this S/A.
1.2.17 Crew Living Space (5-109-0-L)
1.2.18 Deck Department Cleaning Gear Storeroom (6-118-1-Q)
Remarks: Compartment name is changed to 400 Hz Equipment Room (6-118-1-Q) by this S/A.
1.2.19 1ST LT/Deck Office (4-114-1-Q)
1.2.20 2 RD Deck Weather, Frames between 119 and 121, Starboard
1.2.21 HELO DET Admin Office (2-119-1-Q)
1.2.22 Used Lube Oil Tank (7-115-1-F)
1.2.23 JP5 (9-109-1-J)
1.2.24 Distillate Fuel or Ballast (9-121-1-F)
1.2.25 Underwater Hull, Frames between 109 and 111, Starboard
1.2.26 Passage 4-109-01-L
1.3 Identification:
1.3.1 Quantity (One Lot), 3,000 PSI Start Air Piping and 350 PSI Start Air Piping Remarks: See 2.3 and Mapping Plan Enclosure-02 for material and location details.
1.3.1.1 Quantity (4 EA), Globe Valve
Remarks: See Item Number V5 of 2.3
1.3.1.2 Quantity (One EA), Needle Valve
Remarks: See Item Number V8 of 2.3
1.3.1.3 Quantity (4 EA), Globe Valve
Remarks: See Item Number V9 of 2.3
1.3.1.4 Quantity (3 EA), Globe Valve
Remarks: See Item Number V11 of 2.3
1.3.1.5 Quantity (7 EA), Globe Valve
Remarks: See Item Number V12 of 2.3
1.3.1.6 Quantity (One EA), Ball Valve
Remarks: See Item Number V13 of 2.3
1.3.2 Quantity (One Lot), Halon System Piping
Remarks: See 2.8, 2.9 and Mapping Plan Enclosure-03 for material and location details.
1.3.3 Quantity (One Lot), HP Air Piping and Low Pressure (LP) Air Piping Remarks: See 2.11 and Mapping Plan Enclosure-04 for material and location details.
1.3.3.1 Quantity (One EA), Globe Valve
Remarks: See Item Number V1 of 2.11
FOUO
SHIP: LCC-19 CHG/VER: 3/2
1.3.4 Quantity (One Lot), Collecting, Holding, and Transfer (CHT) Piping Remarks: See 2.12 and Mapping Plan Enclosure-05 for material and location details.
1.3.5 Quantity (One Lot), Seawater Cooling Piping
Remarks: See 2.13 through 2.15 and Mapping Plan Enclosure-05 for material and location details.
1.3.5.1 Quantity (One EA), Existing Seawater Pump
Remarks: See Item Number R14 of 2.14
1.3.5.2 Quantity (One EA), New Seawater Pump
Remarks: See Item Number F45 of 2.15
1.3.5.3 Quantity (14 EA), Globe Valve
Remarks: See Item Number V1 of 2.13
1.3.5.4 Quantity (8 EA), Gate Valve
Remarks: See Item Number V2 of 2.13
1.3.5.5 Quantity (One EA), Gate Valve
Remarks: See Item Number V1 of 2.15
1.3.5.6 Quantity (One EA), Gate Valve
Remarks: See Item Number V2 of 2.15
1.3.5.7 Quantity (7 EA), Butterfly Valve
Remarks: See Item Number V4 of 2.15
1.3.5.8 Quantity (2 EA), Globe Valve
Remarks: See Item Number V5 of 2.15
1.3.5.9 Quantity (3 EA), Gate Valve
Remarks: See Item Number V6 of 2.15
1.3.5.10 Quantity (2 EA), Gate Valve
Remarks: See Item Number V7 of 2.15
1.3.5.11 Quantity (One EA), Globe Valve
Remarks: See Item Number V8 of 2.15
1.3.5.12 Quantity (One EA), Remote Operating Gear (ROG) for EDG2 ASW CLG OVBD DISCH COV 2-DGSW-V-11 (V2)
Mfr: Elliott MFG CO., Remarks: Consisting of F77 through F84 of 2.15
1.3.6 Quantity (One Lot), Fuel Oil (FO) Service Piping
Remarks: See 2.16 for material and location details.
1.3.6.1 Quantity (One EA), Ball Valve
Remarks: See Item Number V2 of 2.16
1.3.6.2 Quantity (One EA), Ball Valve
Remarks: See Item Number V3 of 2.16
1.3.6.3 Quantity (4 EA), Ball Valve
Remarks: See Item Number V5 of 2.16
FOUO
SHIP: LCC-19 CHG/VER: 3/2
1.3.7 Quantity (One Lot), Fuel Oil (FO) Filing and Transfer Piping Remarks: See 2.17 for material and location details.
1.3.7.1 Quantity (One EA), Gate Valve
Remarks: See Item Number V1 of 2.17
1.3.8 Quantity (One Lot), FO Air Escape, Overflow Piping
Remarks: See 2.18 for material and location details.
1.3.9 Quantity (One Lot), Potable Water Piping
Remarks: See 2.19 for material and location details.
1.3.9.1 Quantity (2 EA), Globe Valve
Remarks: See Item Number V1 of 2.19
1.3.10 Quantity (One Lot), Lube Oil (LO) Filing and Drain Piping Remarks: See 2.20 for material and location details.
1.3.10.1 Quantity (2 EA), Globe Valve
Remarks: See Item Number V1 of 2.20
1.3.11 Quantity (One Lot), Service Steam Piping
Remarks: See 2.21 for material and location details.
1.3.11.1 Quantity (One EA), Globe Valve
Remarks: See Item Number V1 of 2.21
1.3.11.2 Quantity (One EA), Globe Valve
Remarks: See Item Number V2 of 2.21
1.3.12 Quantity (One Lot), Oily Waste Transfer Piping
Remarks: See 2.22 for material and location details.
1.3.12.1 Quantity (4 EA), Ball Valve
Remarks: See Item Number V2 of 2.22
1.3.12.2 Quantity (3 EA), Gate Valve
Remarks: See Item Number V3 of 2.22
1.3.12.3 Quantity (3 EA), Gate Valve
Remarks: See Item Number V4 of 2.22
1.3.13 Quantity (One Lot), Plumbing Drain Piping
Remarks: See 2.23 for material and location details.
1.3.13.1 Quantity (One EA), Ball Valve
Remarks: See Item Number V1 of 2.23
1.3.14 Quantity (One Lot), Chilled Water Supply and Return Piping and Condensate Drain Piping Remarks: See 2.24 for material and location details.
1.3.14.1 Quantity (2 EA), Gate Valve
Remarks: See Item Number V1 of 2.24
1.3.14.2 Quantity (4 EA), Gate Valve
Remarks: See Item Number V2 of 2.24
FOUO
SHIP: LCC-19 CHG/VER: 3/2
1.3.14.3 Quantity (2 EA), Gate Valve
Remarks: See Item Number V3 (R3) of 2.24
1.3.15 Quantity (One Lot), Chilled Water Supply and Return Piping Remarks: See 2.25 for material and location details.
1.3.15.1 Quantity (One EA), Butterfly Valve
Remarks: See Item Number V1 of 2.25
1.3.15.2 Quantity (2 EA), Gate Valve
Remarks: See Item Number V2 of 2.25
1.3.16 Quantity (One Lot), Firemain Piping
Remarks: See 2.26 for material and location details.
1.3.16.1 Quantity (One EA), Butterfly Valve
Remarks: See Item Number V2 (R7) of 2.26
1.3.16.2 Quantity (One EA), Gate Valve
Remarks: See Item Number V3 (R8) of 2.26
1.3.17 Quantity (One Lot), Distilled Water Piping
Remarks: See 2.27 for material and location details.
1.3.17.1 Quantity (One EA), Globe Valve
Remarks: See Item Number V1 of 2.27
1.3.17.2 Quantity (2 EA), Gate Valve
Remarks: See Item Number V2 of 2.27
1.3.18 Quantity (One Lot), Jacket Water Piping
Remarks: See 2.28 and 2.29 for material and location details.
1.3.18.1 Quantity (2 EA), Butterfly Valve
Remarks: See Item Number V2 of 2.29
1.3.18.2 Quantity (2 EA), Gate Valve
Remarks: See Item Number V3 of 2.29
1.3.18.3 Quantity (2 EA), Globe Valve
Remarks: See Item Number V4 of 2.29
1.3.18.4 Quantity (2 EA), Gate Valve
Remarks: See Item Number V5 of 2.29
1.3.18.5 Quantity (4 EA), Gate Valve
Remarks: See Item Number V6 of 2.29
1.3.19 Quantity (One Lot), Aqueous Film Forming Foam (AFFF) Piping Remarks: See 2.30 for material and location details.
1.3.20 Quantity (One Lot), Countermeasure Wash Down (CMWD) Piping Remarks: See 2.31 for material and location details.
1.4 Security Classification: None.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard.
1.5.2 Potential Lead Hazard.
1.5.3 Dry Dock Work.
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 8/5/2027
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 513-
8974782
STARTING AIR INSTALLATION
EDG 2 (7-109-1-E)
A Y AL
L
4 TM S9086-
RK-STM-
010/CH-505
Piping System 6 N
5 TM S9505-
AM-GYD-
Submarine Fastening Criteria (Non- Nuclear)
8 N
6 TM S9086-
H7-STM-
010/CH-262
Lubricating Oils, Greases, Specialty Lubricants, and Lubrication Systems
12 N
7 MIL MIL-
STD-1627
Bending of Pipe or Tube for Ship Piping Systems
C N
8 DWG 507-
8620693
HALON MODIFICATIONS INCID
EDG 2 UPGRADE 7TH DK, FR
109-118, STBD
A Y AL
L
9 LAR
PSNSIMF-
0003-25
HALON UPDATES TO INCORP
NAVSEA COMMENTS
- Y AL
L
10 DWG 507-
6549329
INSTL HALON IN PMP RM & GEN
RM INSTL HALON F/E SYS EDG
RM NO.2
- Y AL
L
11 DWG 513-
8620692
HP/LP AIR SYSTEM
MODIFICATIONS INCID EDG NO.2
UPGRADE 1ST & 2ND PLATF, FR
86-118
A Y AL
L
12 DWG 505-
8577758
COLLECTION, HOLDING &
TRANSFER (CHT) INCDT TO
EDG2 UPGR 1ST PLATF FR 109-
114 (S)
A Y AL
L
13 DWG 209-
8576369
SEAWATER INSTRUMENTATION
EDG #2 GENERATOR UPGRADE
A Y AL
L
14 DWG 209-
8576350
DIESEL GENERATOR SEAWATER
COOLING PIPING REMOVAL EDG
#2 INCID GENERATOR UPGRADE
A Y AL
L
15 DWG 209-
8576351
DG SEAWATER PIPING
INSTALLATION - EDG #2
GENERATOR UPGRADE
B Y AL
L
16 DWG 300-
8576354
FO SERVICE PIPING MOD INCDT
GENERATOR UPGRADE EDG #2
B Y AL
L
17 DWG 511-
8576355
FUEL OIL FILL & TRANSFER
PIPING MODS INCDT
GENERATOR UPGRADE EDG #2
A Y AL
L
FOUO
SHIP: LCC-19 CHG/VER: 3/2
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
18 DWG 511-
8576356
FO AE, OVFL PP MODS INCDT
GENERATOR UPGRADE EDG #2
A Y AL
L
19 DWG 509-
8620700
POTABLE WATER SYSTEM
MODS INCID EDG 2 UPGRADE
3RD DECK & 2ND PLATFORM
A Y AL
L
20 DWG 300-
8576357
LUBE OIL FILL AND DRAIN MODS
EDG #2
B Y AL
L
21 DWG 514-
8620698
SERVICE STEAM
MODIFICATIONS INCIDENTAL TO
EDG 2 UPGRADE 1ST PLAT &
3RD DK, FR 10
A Y AL
L
22 DWG 508-
8576358
OILY WASTE TRANSFER PIPING
MODS - EDG #2 GENERATOR
UPGRADE
A Y AL
L
23 DWG 505-
8620702
PLUMBING DRAIN
MODIFICATIONS INCIDENTAL
EDG 2 UPGRADE 3RD DK - 1ST
PLATF, STBD
A Y AL
L
24 DWG 502-
8621392
CHILLED WATER &
CONDENSATE DRAIN
INSTALLATION 400HZ EQPT RM
(6-118-1-Q)
A Y AL
L
25 DWG 502-
8621394
CHILLED WATER MODIFICATION
INCID TO EDG2 INSTL 3RD & 4TH
DK FR 111-115 (S)
A Y AL
L
26 DWG 506-
8620703
FM & SW COOLING SYSTEM
PIPING MODS INCID EMER
DIESEL GEN NO.2 UPGRADE
A Y AL
L
27 DWG 517-
8576365
DISTILLED WTR PIPING MOD
INCID GENERATOR UPGRADE
EDG #2 / SSDG
A Y AL
L
28 DWG 300-
8576352
JACKET WATER PIPING
REMOVAL - EDG #2 GENERATOR
UPGRADE
A Y AL
L
29 DWG 300-
8576353
JACKET WATER PIPING
INSTALLATION - EDG #2
GENERATOR UPGRADE
- Y AL
L
30 DWG 507-
8620744
AFFF PIPING SUPPLY MODS
INCID EMER DIESEL GEN NO.2
UPGR 4TH DK, FR 107-111
A Y AL
L
31 DWG 506-
8786653
WASHDOWN
COUNTERMEASURE MOD INCID
GENSET UPGRADE 2ND DK, FR
119-121, STBD
- Y AL
L
32 PDD 103-
ELM-250166
Patch for Removed Hull Penetration Incid to SCD 9243
- Y AL
L
33 DWG 100-
ELM-250162
PATCHES FOR REMOVAL OF
OVBD DISCH FTG INCIDENTAL
TO SCD 9243
- Y AL
L
34 PDD 505-
ELM-210146
TEST GUIDANCE FOR REQD
ELEVATED NDT OF
INACCESSIBLE WELDING JOINT
ON PIPING SYS
- Y AL
L
35 TM S6430-
AE-TED-010
Piping Devices, Flexible Hose Assemblies
7 N
36 DWG 103-
2491034
1ST & 2ND PLATF PLTG AFT
FR98
H Y AL
L
37 DWG 101-
2491026
Webs FR 113 & 117 J Y AL L
38 DWG 114-
2491167
MISC STRUCT BHD BELOW 1ST
PLATF FR 98-121
J Y 15, 39 DWG 114-
2491158
TRANSV BHD FR 98 &109 K Y AL
L
FOUO
SHIP: LCC-19 CHG/VER: 3/2
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
40 DWG 104-
2491051
4TH DK PLTG FR 51 1/2 - 102 1/4 J Y AL
L
41 LAR SPFY-
0044-25
TYPOGRAPHICAL ERROR FOR
LABEL PLATE OF STARTING AIR
SYSTEM
- Y AL
L
42 DWG 507-
6549331
INSTL HALON IN PMP & GEN RM
HALON F/E SYS CONTROL
PANEL FAB DET
A Y AL
L
43 TM S9AA0-
AB-GOS-
010/GSO
General Specifications for Overhaul of Surface Ships (GSO)
11 N
44 LAR SRFY-
0011-25
CL 400 FTG IN 3000 PSI DESIGN
PRESS STG AIR PP
- Y AL
L
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish modification of 3,000 PSI start air piping and 350 PSI start air piping listed in 1.3.1 in accordance with 2.3, 2.41 and 2.44.
5.1.1 Disassemble and reassemble unions, using 505-6.7.2 of 2.4 and Appendix D of 2.5 for guidance.
5.1.2 Thread lubricants and compounds must be in accordance with 262-2.2.5 and Table 262-10-1 of 2.6.
5.1.3 Bend each new pipe in accordance with 2.7.
5.1.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.1.5 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.1.5.1 Accomplish the requirements of 009-09 of 2.1.
5.1.5.2 Accomplish nondestructive testing in accordance with Line 13.
5.1.5.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-07-1 through Enclosure-07-
165. Each joint identification number must be in accordance with Mapping Plan Enclosure-02.
5.1.6 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 4,050 PSIG, for each new and disturbed 3,000 PSI start air piping systems.
5.1.6.1 Document shop hydrostatic test results on QA Form 28 Enclosure-13-1.
5.1.7 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 473 PSIG, for each new and disturbed 350 PSI start air piping systems.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
5.1.7.1 Document shop hydrostatic test results on QA Form 28 Enclosure-13-2.
5.1.8 Accomplish a shop hydrostatic test of each complete hose assembly of start air piping system for evidence of external leakage and/or deformation, using clean fresh water at 2,250 PSIG for one minute to 5 minutes in accordance with Chapter 7 of 2.35, using Paragraph 505-11.1.3 of 2.4 for guidance. Allowable external leakage and/or deformation: None.
(I)(G) “HYDROSTATIC TEST”
5.1.8.1 Document shop test record on QA Form 28 Enclosure-13-3.
5.1.8.2 Install a new identification tag on each hose assembly in accordance with Paragraph 7-4 of 2.35.
5.1.9 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve listed in 1.3.1. Allowable leakage: None.
5.1.10 Cycle each valve listed in 1.3.1.1 through 1.3.1.6 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.1.11 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.2 Accomplish modification of halon system piping listed in 1.3.2 in accordance with 2.8, 2.9 and 2.32, using 2.10,
2.36 and 2.42 for guidance.
5.2.1 Bend each new pipe in accordance with 2.7.
5.2.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.2.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.2.3.1 Accomplish the requirements of 009-09 of 2.1.
5.2.3.2 Accomplish nondestructive testing in accordance with Line 13.
5.2.3.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-08-1 through Enclosure-08-
56. Each joint identification number must be in accordance with Mapping Plan Enclosure-03.
5.2.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 2,800 PSIG, for each new and disturbed CO2 actuation piping systems.
5.2.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-14-1.
5.2.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 1,600 PSIG, for each new and disturbed halon piping systems.
5.2.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-14-2.
5.2.6 Accomplish to dehydrate each halon system piping in accordance with Test Notes T-3 of 2.8 and 2.9.
5.2.6.1 Inspect dew point of each halon system piping (40 degrees F or less) in accordance with Test Notes T-3 of
2.8 and 2.9.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
5.2.7 Install each halon hose assembly and discharge nozzle piping listed in 1.3.2 in accordance with 2.8 and 2.9 as controlled assembly, using 2.10 for guidance.
5.2.7.1 Restore each mating surface exposed by removal. Repair by removing high spots, burrs, abrasions, and foreign matter, where removal can be accomplished by hand tools.
5.2.8 Connect each mechanical joint shown on Mapping Plan Enclosure-06.
5.2.8.1 Document the controlled assembly joints on QA Form 34A Enclosure-12-1.
(I) "CONTROLLED ASSEMBLY JOINT INSTALLATION"
5.2.9 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve listed in 1.3.2 and watertight/airtight structural boundary. Allowable leakage: None.
5.2.10 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.3 Accomplish modification of HP air piping and LP air piping listed in 1.3.3 in accordance with 2.11 and 2.32, using
2.37 for guidance.
5.3.1 Bend each new pipe in accordance with 2.7.
5.3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.3.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.3.3.1 Accomplish the requirements of 009-09 of 2.1.
5.3.3.2 Accomplish nondestructive testing in accordance with Line 13.
5.3.3.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-09-1 through Enclosure-09-
18. Each joint identification number must be in accordance with Mapping Plan Enclosure-04.
5.3.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 4,500 PSIG, for each new and disturbed HP air piping systems.
5.3.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-15-1.
5.3.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 202 PSIG, for each new and disturbed LP air piping systems.
5.3.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-15-2.
5.3.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve listed in 1.3.3 and watertight/airtight structural boundary. Allowable leakage: None.
5.3.7 Cycle each valve listed in 1.3.3.1 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.3.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.4 Accomplish modification of CHT piping listed in 1.3.4 in accordance with 2.12 and 2.33.
5.4.1 Bend each new pipe in accordance with 2.7.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
5.4.2 Accomplish the requirements of 009-09 of 2.1 for the certification process.
5.4.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.4.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.4.4.1 Accomplish nondestructive testing in accordance with Line(s) 9.
5.4.4.2 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-10-1. Each joint identification number must be in accordance with Mapping Plan Enclosure-05.
5.4.4.3 Accomplish the requirements of 009-09 of 2.1 for welding procedure of each joint shown on Mapping Plan Enclosure-05.
5.4.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of the watertight/airtight structural boundary. Allowable leakage: None.
5.4.5.1 Document the local air hose test on QA Form 17 Enclosure-11-1.
5.4.6 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 75 PSIG, for each new and disturbed CHT piping systems.
5.4.6.1 Document shop hydrostatic test results on QA Form 28 Enclosure-16-1.
5.4.7 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve listed in 1.3.4. Allowable leakage: None.
5.4.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.5 Accomplish modification of seawater cooling piping listed in 1.3.5 in accordance with 2.13 through 2.15 and 2.33.
5.5.1 Remove existing pump listed in 1.3.5.1 and install new pump listed in 1.3.5.2 in accordance with 2.14 and 2.15.
5.5.1.1 Align the piping to the pump. Piping must be supported independently and must not impose a strain.
5.5.2 Accomplish the requirements of modification and installation of each ROG listed in 1.3.5.12 in accordance with 2.15.
5.5.3 Bend each new pipe in accordance with 2.7.
5.5.4 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.5.5 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.5.5.1 Accomplish nondestructive testing in accordance with Line(s) 9.
5.5.5.2 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-10-2. Each joint identification number must be in accordance with Mapping Plan Enclosure-05.
5.5.5.3 Accomplish the requirements of 009-09 of 2.1 for welding procedure of each joint shown on Mapping Plan Enclosure-05.
5.5.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of the watertight/airtight structural boundary. Allowable leakage: None.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
5.5.6.1 Document the local air hose test on QA Form 17 Enclosure-11-2.
5.5.7 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed seawater cooling pump suction piping systems.
5.5.7.1 Document shop hydrostatic test results on QA Form 28 Enclosure-17-1.
5.5.8 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 54 PSIG, for each new and disturbed seawater cooling pump discharge piping systems.
5.5.8.1 Document shop hydrostatic test results on QA Form 28 Enclosure-17-2.
5.5.9 Cycle each valve listed in 1.3.5.3 through 1.3.5.11 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.5.9.1 Verify the remote operating gear listed in 1.3.5.12 for ease of operation and proper alignment by opening and closing the valve from deck box through 3 complete cycles. Allowable binding: None.
(V) “VALVE CYCLING”
5.5.9.2 Notify the Chief Test Engineer prior to cycling the valve listed in 1.3.5.12 with the remote operating gear.
5.5.10 Accomplish the requirements of 009-11 of 2.1 to install each new insulation and lagging to seawater cooling piping listed in 1.3.5 with associated fittings, using 2.13 and 2.15 for guidance.
5.5.11 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve listed in 1.3.5. Allowable leakage: None.
5.5.12 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.6 Accomplish modification of FO service piping listed in 1.3.6 in accordance with 2.16 and 2.32, using 2.38 for guidance.
5.6.1 Bend each new pipe in accordance with 2.7.
5.6.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.6.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.6.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed FO service piping systems.
5.6.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-18-1.
5.6.5 Accomplish a shop hydrostatic test of each complete hose assembly of FO service piping system for evidence of external leakage and/or deformation, using clean fresh water at 1,600 PSIG for one minute to 5 minutes in accordance with Chapter 7 of 2.35, using Paragraph 505-11.1.3 of 2.4 for guidance. Allowable external leakage and/or deformation: None.
(I)(G) “HYDROSTATIC TEST”
5.6.5.1 Document shop test record on QA Form 28 Enclosure-18-2.
5.6.5.2 Install a new identification tag on each hose assembly in accordance with Paragraph 7-4 of 2.35.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
5.6.6 Accomplish the requirements of 009-71 of 2.1 for air tightness test, using low pressure air at 50 PSIG, for each new and disturbed FO service piping systems.
5.6.6.1 Document shop hydrostatic test results on QA Form 28 Enclosure-18-3.
5.6.7 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each coupling listed in 1.3.6 and watertight/airtight structural boundary. Allowable leakage: None.
5.6.8 Cycle each valve listed in 1.3.6.1 through 1.3.6.3 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.6.9 Install each new silicone coated aluminized cloth spray shield to each mechanical joint of the FO service piping listed in 1.3.6 in accordance with ASTM-F1138.
5.6.10 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.7 Accomplish modification of FO filing and transfer piping listed in 1.3.7 in accordance with 2.17 and 2.32, using
2.36 for guidance.
5.7.1 Bend each new pipe in accordance with 2.7.
5.7.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.7.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.7.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 68 PSIG, for each new and disturbed FO filing and transfer systems.
5.7.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-19-1.
5.7.5 Accomplish the requirements of 009-71 of 2.1 for air tightness test, using low pressure air at 50 PSIG, for each new and disturbed FO filing and transfer systems.
5.7.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-19-2.
5.7.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each coupling and penetration sleeve listed in 1.3.7, and watertight/airtight structural boundary. Allowable leakage: None.
5.7.7 Cycle each valve listed in 1.3.7.1 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.7.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.8 Accomplish modification of FO air escape, overflow piping listed in 1.3.8 in accordance with 2.18.
5.8.1 Bend each new pipe in accordance with 2.7.
5.8.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.8.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
5.8.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed FO air escape, overflow piping systems.
5.8.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-20-1.
5.8.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each coupling and penetration sleeve listed in 1.3.8. Allowable leakage: None.
5.8.6 Accomplish following elevated non-destructive testing (ENDT) inspection for Class P-2 FO air escape, overflow piping system listed in 1.3.8.
5.8.6.1 Accomplish liquid penetrant test on final layer of each Class P-2 onboard weld joint in accordance with Paragraph 4.3.a of 2.34. The accept or reject criteria must be in accordance with Paragraph 4.3.a of 2.34.
(I)(G) “ELEVATED NDT INSPECTION”
5.8.6.2 The area of ENDT is shown on Sketch Enclosure-01.
5.8.7 Accomplish an unobstructed air flow test for FO air escape, overflow piping listed in 1.3.8 with pressure source at not greater than 100 PSIG to ensure free flow capability and to ensure removal of blanks, using compressed air in accordance with Paragraph 506h of 2.43. Allowable obstruction: None.
(V)(G) "UNOBSTRUCTED AIR FLOW TEST"
5.8.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.9 Accomplish modification of potable water piping listed in 1.3.9 in accordance with 2.19.
5.9.1 Accomplish the requirements of 009-87 of 2.1 for each cold potable water piping.
5.9.1.1 Accomplish the requirements of 009-09 of 2.1 for chlorination and bacteriological tests. Analysis and testing conducted by a qualified Japanese laboratory (accredited by ISO 17025 or equal) are authorized by the
SUPERVISOR.
5.9.1.2 Record results of chlorination and bacteriological tests on a Laboratory Analysis Record(s) and DD Form 686, and submit one legible copy, in hard copy or approved transferrable media, of completed record(s) and form(s) to the
SUPERVISOR.
5.9.2 Bend each new pipe in accordance with 2.7.
5.9.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.9.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.9.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 113 PSIG, for each new and disturbed cold potable water piping systems.
5.9.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-21-1.
5.9.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve listed in 1.3.9. Allowable leakage: None.
5.9.7 Cycle each valve listed in 1.3.9.1 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
(V) “VALVE CYCLING”
5.9.8 Accomplish the requirements of 009-11 of 2.1 to install each new insulation and lagging to potable water piping listed in 1.3.9 with associated fittings, using 2.19 for guidance.
5.9.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.10 Accomplish modification of LO filing and drain piping listed in 1.3.10 in accordance with 2.20.
5.10.1 Bend each new pipe in accordance with 2.7.
5.10.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.10.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.10.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using system fluid at 50 PSIG, for each new and disturbed LO filing and drain piping systems.
5.10.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-22-1.
5.10.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve listed in 1.3.10. Allowable leakage: None.
5.10.6 Cycle each valve listed in 1.3.10.1 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.10.7 Install each new silicone coated aluminized cloth spray shield to each mechanical joint of the LO filing and drain piping listed in 1.3.10 in accordance with ASTM-F1138.
5.10.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.11 Accomplish modification of service steam piping listed in 1.3.11 in accordance with 2.21 and 2.32, using 2.39 for guidance.
5.11.1 Bend each new pipe in accordance with 2.7.
5.11.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.11.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.11.4 Accomplish nondestructive testing in accordance with Line 13 for liquid penetrant testing accomplished to satisfy operational pressure test option.
5.11.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 101 PSIG, for each new and disturbed service steam piping systems.
5.11.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-23-1.
5.11.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each bulkhead sleeve listed in 1.3.10 and watertight/airtight structural boundary. Allowable leakage: None.
5.11.7 Cycle each valve listed in 1.3.11.1 and 1.3.11.2 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
(V) “VALVE CYCLING”
5.11.8 Accomplish the requirements of 009-11 of 2.1 to install each new insulation, lagging and reusable cover to service steam piping listed in 1.3.11 with associated fittings, using 2.21 for guidance.
5.11.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.12 Accomplish modification of oily waste transfer piping listed in 1.3.12 in accordance with 2.22.
5.12.1 Bend each new pipe in accordance with 2.7.
5.12.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.12.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.12.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 68 PSIG, for each new and disturbed oily waste transfer discharge piping systems.
5.12.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-24-1.
5.12.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed oily waste transfer suction piping systems.
5.12.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-24-2.
5.12.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve listed in 1.3.12. Allowable leakage: None.
5.12.7 Cycle each valve listed in 1.3.12.1 through 1.3.12.3 from full closed to full open to full closed 4 times.
Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.12.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.13 Accomplish modification of plumbing drain piping listed in 1.3.13 in accordance with 2.23 and 2.32.
5.13.1 Bend each new pipe in accordance with 2.7.
5.13.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.13.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.13.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed plumbing drain piping systems.
5.13.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-25-1.
5.13.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve and deck drain listed in 1.3.13, and watertight/airtight structural boundary. Allowable leakage: None.
5.13.6 Accomplish flow check of plumbing drain piping listed in 1.3.13, using clean, fresh water. Allowable external leakage: None.
(V)(G) "FLOW CHECK"
FOUO
SHIP: LCC-19 CHG/VER: 3/2
5.13.7 Cycle each valve listed in 1.3.13.1 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.13.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.14 Accomplish modification of chilled water supply and return piping and condensate drain piping listed in 1.3.14 in accordance with 2.24.
5.14.1 Bend each new pipe in accordance with 2.7.
5.14.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.14.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.14.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 200 PSIG, for each new and disturbed chilled water supply and return piping systems.
5.14.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-26-1.
5.14.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed condensate drain piping systems.
5.14.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-26-2.
5.14.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve. Allowable leakage: None.
5.14.7 Cycle each valve listed in 1.3.14.1 through 1.3.14.3 from full closed to full open to full closed 4 times.
Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.14.8 Accomplish the requirements of 009-11 of 2.1 to install each new insulation and lagging to chilled water supply and return piping and condensate drain piping listed in 1.3.14 with associated fittings, using 2.24 for guidance.
5.14.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.15 Accomplish modification of chilled water supply and return piping listed in 1.3.15 in accordance with 2.25 and 2.32, using 2.40 for guidance.
5.15.1 Bend each new pipe in accordance with 2.7.
5.15.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.15.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.15.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 200 PSIG, for each new and disturbed chilled water supply and return piping systems.
5.15.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-27-1.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
5.15.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve and watertight/airtight structural boundary. Allowable leakage: None.
5.15.6 Cycle each valve listed in 1.3.15.1 and 1.3.15.2 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.15.7 Accomplish the requirements of 009-11 of 2.1 to install each new insulation and lagging to chilled water supply and return piping listed in 1.3.15 with associated fittings, using 2.25 for guidance.
5.15.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.16 Accomplish modification of firemain piping listed in 1.3.16 in accordance with 2.26.
5.16.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.16.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.16.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 225 PSIG, for each new and disturbed firemain piping systems.
5.16.3.1 Document shop hydrostatic test results on QA Form 28 Enclosure-28-1.
5.16.4 Cycle each valve listed in 1.3.16.1 and 1.3.16.2 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.16.5 Accomplish the requirements of 009-11 of 2.1 to install each new insulation and lagging to firemain piping listed in 1.3.16 with associated fittings, using 2.26 for guidance.
5.16.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.17 Accomplish modification of distilled water piping listed in 1.3.17 in accordance with 2.27 and 2.32.
5.17.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.17.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.17.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed distilled water piping systems.
5.17.3.1 Document shop hydrostatic test results on QA Form 28 Enclosure-29-1.
5.17.4 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve and watertight/airtight structural boundary. Allowable leakage: None.
5.17.5 Cycle each valve listed in 1.3.17.1 and 1.3.17.2 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.17.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
5.18 Accomplish modification of jacket water piping listed in 1.3.18 in accordance with 2.28, 2.29 and 2.32, using
2.36 for guidance.
5.18.1 Bend each new pipe in accordance with 2.7.
5.18.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.18.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.18.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 52 PSIG, for each new and disturbed jacket water piping systems.
5.18.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-30-1.
5.18.5 Accomplish a shop hydrostatic test of each complete hose assembly of jacket water piping system for evidence of external leakage and/or deformation, using clean fresh water at 1,600 PSIG for one minute to 5 minutes in accordance with Chapter 7 of 2.35, using Paragraph 505-11.1.3 of 2.4 for guidance. Allowable external leakage and/or deformation: None.
(I)(G) “HYDROSTATIC TEST”
5.18.5.1 Document shop test record on QA Form 28 Enclosure-30-2.
5.18.5.2 Install a new identification tag on each hose assembly in accordance with Paragraph 7-4 of 2.35.
5.18.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve and watertight/airtight structural boundary. Allowable leakage: None.
5.18.7 Cycle each valve listed in 1.3.18.1 through 1.3.18.5 from full closed to full open to full closed 4 times.
Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.18.8 Accomplish the requirement of 009-11 of 2.1 for installation of each new insulation and lagging to the piping with associated fittings.
5.18.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.19 Accomplish modification of AFFF piping listed in 1.3.19 in accordance with 2.30, using 2.39 for guidance.
5.19.1 Bend each new pipe in accordance with 2.7.
5.19.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.19.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.19.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 225 PSIG, for each new and disturbed AFFF piping systems.
5.19.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-31-1.
5.19.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve and watertight/airtight structural boundary. Allowable leakage: None.
5.19.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
5.20 Accomplish modification of CMWD piping listed in 1.3.20 in accordance with 2.31.
5.20.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.20.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.20.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 225 PSIG, for each new and disturbed CMWD piping systems.
5.20.3.1 Document shop hydrostatic test results on QA Form 28 Enclosure-32-1.
5.20.4 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve. Allowable leakage: None.
5.20.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.21 Notes:
5.21.1 Planner: Code 234 H. Komoto, 070-7787-2047
Planner: Code 231B T. Ashina, 070-7787-2017 Planner: Code 232 T. Funaki, 070-7787-1970 Engineer: Code 250 I. Hayasaka, 080-5962-1347 Engineer: Code 260 Y. Yonesu, 070-7787-2096 Engineer: Code 260 S. Hamaguchi, 070-7787-2101
5.21.1 Project Engineering and Planning Manager (PEPM): Code 333 T. Yaginuma, 080-5419-0598
5.21.2 Opening, initial cleaning, closing, and installation/removal of FMEs of the following spaces will be covered by the following TGI No(s).
Auxiliary Fuel Service Tank (7-116-1-F): 3819P12333A01 (KTR TGI) Lube Oil Storage Tank (7-117-3-F): 3819P12333A01 (KTR TGI)
JP5 (9-109-1-J): 3819P12320A01 (KTR TGI)
5.21.3 Opening, initial cleaning, and closing of the following spaces will be covered by the following TGI No(s).
Distillate Fuel or Ballast (9-121-1-F): 3819P12306A01 (KTR TGI) Used Lube Oil Tank (7-115-1-F): 3819P14205A01 (KTR TGI)
5.21.4 Preservation work for new and disturbed surfaces of each space listed in 1.2.23 will be covered by TGI No.
3819P12320A01 (KTR TGI).
5.21.5 Preservation work for new and disturbed surfaces of each space listed in 1.2.24 will be covered by TGI No.
3819P12306A01 (KTR TGI).
5.21.6 Preservation work for new and disturbed exterior surfaces of underwater hull will be covered by ICN
3819P11001 (KTR TGI).
5.21.7 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkhead normally used to control air flow in the event of a shipboard fire. A non- flammable closure is required in accordance with COMNAVDEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
FOUO
SHIP: LCC-19 CHG/VER: 3/2
5.21.8 All Government Furnished Material (GFM) and Installing Activity Furnished (IAF) materials except hazmat material listed in each S/A drawing will be provided as kitted material.
5.21.9 Item No. F17 (Boss Outlet, Branch) of 2.3 is acceptable to change to Boss Pilot from direction by Code 260 per e-mail discussion between Code 260 and Code 234 on 14 FEB 2025.
5.21.10 JCN EE01-L105 is related to this TGI.
5.22 Government Furnished Material (GFM):
5.22.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.23 SRF-JRMC will provide the following service work: (TGI No. 3819P31002S02)
5.23.1 [C740] Crane and crane rigging service.
5.23.2 [X99E] Utility service, electrical.
5.23.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.23.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.23.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.23.6 [C133] QA inspection for (G) symbol(s).
5.23.7 [C134] Provide analysis for existing material.
5.23.8 [C135] QA inspection for (G) symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 3/2
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SA 79243K PP EDG#2 AY A 0 2
CU PHASE TITLE:
*(RE) F/O - S/A 79243K, ACCOMPLISH MDIFICATION OF VARIOUS PIPING FOR EDG NO. 2
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
CW 4-109-01-L IN CW RTN 4-109-01-L PP CW SPLY 4-109-01-L PP SW 9-98-0-Q IN SW 9-
98-0-Q PP POL CTL 7-109-1-E PP CW RTN 6-118-1-Q PP POTW 3-111-1-Q INPOTW
3-111-1-Q PP CW RTN 4-109-3-Q PP PLMB DR 3-113-3-L PP SS 6-98-0-L IN SS 6-
98-0-L PP AFFF 4-109-3-Q PPHALON 7-109-1-E PP CW RTN 5-109-0-L PP CW SPLY 5-
109-0-L PP CW 5-109-0-L IN SW CLG 7-109-1-E IN SW CLG 7-109-1-E PP SW 7-109-1-E
IN SEW 7-109-1-E IN SEW 7-109-1-E PP #2 EDG COOLING WTR PP CW SPLY 6-118-1-Q PP
CW RTN 3-111-1-Q PP CW 3-111-1-Q IN PLMB DR 3-109-5-L PP SS 3-109-7-L IN
SS 3-109-7-L PP AFFF 4-107-3-Q PPAFFF 7-109-1-E PP PLMB DR 5-109-0-L PP POTW
3-111-1-L IN POTW 3-111-1-L PP LPA 7-109-3 V- #2EDG LO 7-109-1-E PP CMWD
2ND DK WEA (S) PP FM 7-109-1-E PP CNDS DR 7-118-1-A PP CW SPLY 3-111-1-Q PP CW 4-
114-1-Q INPLMB DR 3-111-1-L PP SS 6-109-1-L IN SS 6-109-1-L PP CMWD 2-119-1-Q
PP CW 6-118-1-Q IN CW SPLY 4-114-1-Q PP SEW 6-109-1-E IN SEW 6-109-1-E PP PLMB
DR 4-109-3-Q PP DIST WT 7-109-1-E IN DIST WT 7-109-1-E PP PLMB DR 7-109-1-E PP
POTW 7-109-1-E PP LP AIR 8-86-0-E PP PLMB DR 4-109-01-L PP POTW 3-109-7-L IN
POTW 3-109-7-L PP DRY AIR 8-86-0-E PP HP AIR 7-109-1-E PP #2EDG EXH 7-
109-1-E PP CMPT 7-109-1-E MS CMPT 9-118-1-A MS CMPT 8-86-0-E MSCMPT 6-109-1-
E MS CMPT 9-98-0-Q MS AUX FO SVC 7-116-1-F TK CMPT 3-113-3-L MS CMPT
3-109-7-L MS CMPT 3-111-1-L MS CMPT 3-109-5-L MS CMPT 3-111-1-Q MS
CMPT 6-98-0-L MSCMPT 4-109-3-Q MS CMPT 4-109-01-L MS CMPT 3-120-1-A
MS CMPT 5-109-0-L MS CMPT 2-119-1-Q MS 2EDG 7-115-1-F TKJP5 STOR 9-109-1-J
TK FO/BLST 9-121-1-F TK UH FR98-AFT STBD UH #2EDG FO 7-109-1-E PP CNDS DR 7-
109-1-E PP CW RTN 4-114-1-Q PP CW 4-109-3-Q IN PLMB DR 3-109-7-L PP SS 3-111-1-Q
IN SS 3-111-1-Q PP POTW 3-113-3-L IN POTW 3-113-3-L PP CW SPLY 4-109-3-Q PP
PLMB DR 3-116-1-L PP PLMB DR 3-111-1-Q PP FO AE/OVFL 7-109-1-E PP
ATTACHMENT LIST:
FOUO
J-2
SHIP: LCC-19 CHG/VER: 3/2
1. ENCLOSURE-01 (3819P31002A03-Sketch.pdf) saved on 13-FEB-2025 0000.
2.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .