This document is a Task Group Instruction (TGI) for replacing Emergency Diesel Generator No. 2 on the USS BLUE RIDGE (LCC-19), part of an Extended Service Life Program ship service/emergency diesel generator generator-set upgrade. The project involves removing the existing Caterpillar 3508B diesel generator (750KW, 450VAC) and installing a new Caterpillar 3516E diesel generator (2000KW, 450VAC) in multiple locations including the Emergency Generator Room, Emergency Switch Gear Room, and underwater hull and freeboard areas.

The work is scheduled from January 12, 2026, to August 5, 2027, with the Naval Surface Warfare Center Philadelphia Division (NSWCPD) overseeing the project. Key technical requirements include precise measurements of crankshaft deflection, thrust clearance, coupling alignment, and flywheel runout. The instruction includes detailed procedures for equipment removal, installation, alignment, and lubrication oil flushing. Specific points of contact are provided, including the PMR Technical Representative and NSWCPD On-Site Installation Coordinator, with SRF-JRMC providing support services like crane operations, utilities, and quality assurance inspections.

View the file

Other files

File Type Posted
TGI_3819P31003A06_c0v0_redact.pdf PDF
TGI_3819P31003A05_c0v0_redact.pdf PDF
TGI_3819P31003A03_c0v0_redact.pdf PDF
TGI_3819P31003A02_c0v0.pdf PDF
TGI_3819P31002A04_c3v3.pdf PDF
TGI_3819P31001A01_c3v4.pdf PDF
TGI_3819P31002A06_c0v0_redact.pdf PDF
TGI_3819P31001A05_c0v0_redact.pdf PDF
TGI_3819P31001A02_c2v1_redact.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
Attachment II Price Proposal Form N6264925RA041_CLIN 0001 and CLIN 0003.xlsx XLSX spreadsheet
TGI_3819P31002A01_c0v0_redact.pdf PDF
TGI_3819P31001A06_c2v1.pdf PDF
N6264925RA041-0007.pdf PDF
TGI_3819P31002A04_c2v3.pdf PDF
TGI_3819P31001A01_c1v3_redact.pdf PDF
N6264925RA041-0004.pdf PDF
TGI_3819P31002A04_c1v2_redact.pdf PDF
N6264925RA041-0003.pdf PDF
N6264925RA041-0001.pdf PDF
TGI_3819P31003A03_c0v0_redact.pdf PDF
TGI_3819P31002A04_c0v2_redact.pdf PDF
TGI_3819P31001A04_c2v2.pdf PDF
TGI_3819P31003T09_c0v0_redact.pdf PDF
TGI_3819P31003T06_c0v0_redact.pdf PDF
TGI_3819P31002T12_c0v0_redact.pdf PDF
TGI_3819P31002T09_c0v0_redact.pdf PDF
TGI_3819P31002T08_c0v0_redact.pdf PDF
TGI_3819P31002T06_c0v0_redact.pdf PDF
TGI_3819P31002T05_c0v0_redact.pdf PDF
TGI_3819P31002T01_c0v0_redact.pdf PDF
TGI_3819P31001T06_c0v0_redacted.pdf PDF
Attachment II Price Proposal Form N6264925RA041.xlsx XLSX spreadsheet
2.01 N6264925RA041.pdf PDF
TGI_3819P31002A05_c1v0_redact.pdf PDF
TGI_3819P31002A03_c3v2_redact.pdf PDF
TGI_3819P31001A05_c0v0_redact.pdf PDF
TGI_3819P31001A02_c2v1_redact.pdf PDF
TGI_3819P31001A01_c0v3_redact.pdf PDF
TGI_3819P31003T04_c0v0_redact.pdf PDF
TGI_3819P31002T04_c0v0_redact.pdf PDF
TGI_3819P31001T11_c0v1_redacted.pdf PDF
TGI_3819P31001T08_c0v2_redacted.pdf PDF
TGI_3819P31001T07_c0v1_redacted.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
Attachment IV Request for Information Form.docx DOCX document
TGI_3819P31002T10_c0v0_redact.pdf PDF
TGI_3819P31003A05_c0v0_redact.pdf PDF
TGI_3819P31003A01_c0v0_redact.pdf PDF
TGI_3819P31002A01_c0v0_redact.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

FOUO: Public availability to be determined under 5 USC 552

TASK GROUP INSTRUCTION

AIM REV 20.11.4.0 (OCTOBER 2020)

TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:

NO.: SA 79243K EDG#2 AY A 0 0

SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P

CU PHASE TITLE:

*(RE) F/O – S/A 79243K, REPLACE EDG NO. 2, ESLP SS/EDG GENSET UPGRD

PREPARING ACTIVITY:

PREPARED BY: CODE PHONE DATE

KAZUKI UCHIMURA 233 080-9350-1432 17-FEB-2025

APPROVED BY: CODE PHONE DATE

MASAHIRO HOSONO 233 080-9350-1455 17-FEB-2025

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

CONCURRED BY: CODE PHONE DATE

REASON FOR WORK/NEED FOR CHANGE:

CHANGE INSTRUCTIONS:

SPECIAL REQUIREMENTS:

CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT Level II

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

ACCEPTANCE OF COMPLETED WORK

PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:

REQUIRED:☐YES ☒NO

RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:

TGI NO.: SA 79243K EDG#2 AY A 0

FOUO

SHIP: LCC-19 CHG/VER: 0/0

LIST OF EFFECTIVE PAGES

SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.

1-5 J1-2 M1-2

1. SCOPE/PURPOSE

1 Title: Emergency Diesel Generator No. 2, Extended Service Life Program Ship Service/Emergency Diesel Generator Generator-set Upgrade; replace

1.2 Location of Work:

1.2.1 Emergency Generator Room No. 2 (7-109-1-E)

1.2.2 Emergency Switch Gear Room No. 2 (6-109-1-E)

1.2.3 Underwater Hull Weather, Frames between 109 and 114, Starboard (Stbd)

1.2.4 Freeboard Weather, Frames between 109 and 114, Stbd

1.2.5 Dry Dock No. 6

1.3 Identification:

1.3.1 Quantity (One EA), Existing Emergency Diesel Generator Set No. 2 Engine Mfr: Caterpillar Inc Engine Mfr Id: 3508B Engine Configuration: Vee 8-Cylinder, 4-Stroke Cycle Diesel Generator Spec: 750KW, 450VAC, 60Hz, 3 Phase Remarks: See Item R1 of 2.3 for details

1.3.2 Quantity (One EA), New Emergency Diesel Generator Set No. 2 Mfr: Caterpillar Inc Engine Model: 3516E Engine Arrangement Number: 549-7519 Engine Configuration: Vee 16, 4 Stroke-Cycle-Diesel Generator Spec: 2000KW, 450VAC, 60Hz, 3 Phase Remarks: See Item One of 2.3 for details

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Dry Dock Work

1.5.2 Potential Asbestos Hazard.

1.5.3 Potential Lead Hazard

1.6 Contractor work start date: 1/12/2026

1.7 Contractor work completion date: 8/5/2027

2. REFERENCES:

FOUO

SHIP: LCC-19 CHG/VER: 0/0

REF.

NO.

DOCUMENT

/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV CHG

NO.

COPY

REQ’D

(Y/N)

SOURCE

DOC

(Y/N)

PARA SEC PG CHP

1 NSI FY25 Standard Items - ORG N 2 LI FY25 Local Standard Items - ORG N

3 DWG 345-

8574538

GENSET UPGRADE EQUIPMENT

ARRANGEMENT EDG RM 2 &

EMER SWITCHGEAR RM 2

B Y AL

L

4 DWG 113-

8578044

SS/EDG Genset UPGD FND Installation & Prefab Emergency Diesel Generator Rm 2

B Y AL

L

5 DWG 649-

DIMENSIONS - INSTALLATION

FOR LCC-19 PROGRAM

06 Y AL

L

6 PDD 300-

ELM-250197

ALIGNMENT PROCEDURE OF

DIESEL ENGINE & GEN SET

CPLG FOR UPGRADED EDG &

SSDG

- Y AL

L

7 PDD 300-

ELM-250198

FLUSING PROCEDURE OF

DIESEL ENGINE FOR UPGRADED

EDG & SSDG

- Y AL

L

3. APPENDICES:

3.1. Appendix “J” TGI Job Summary Information Sheet

3.2. Appendix "M" TGI Material List

3.3. Appendix “D” Deficiency Form

4. GENERAL REQUIREMENTS:

4.1 Not Applicable.

5. PROCEDURE:

5.1 Remove the equipment listed in 1.3.1 in accordance with 2.3.

5.1.1 Disassemble the equipment listed in 1.3.1 for unshipping.

5.2 Install the equipment listed in 1.3.2 in accordance with 2.3 and 2.4.

5.2.1 Disassemble and assemble the equipment for shipping in accordance with the procedure provided by OEM (CAT Hawthorne), using 2.5 for guidance.

5.2.1.1 Install each blanking plate onto the diesel engine until installation.

5.2.2 Measure and record the crankshaft deflection of the diesel engine in accordance with Notes 2 and 4-1 through 4-4 of 2.6.

(V) “CRANKSHAFT DEFLECTION” (First Measurement, Notes 4-1 of 2.6)

(V) “CRANKSHAFT DEFLECTION” (Second Measurement, Notes 4-2 of 2.6)

(V) “CRANKSHAFT DEFLECTION” (Third Measurement, Notes 4-3 of 2.6)

(V)(G) “CRANKSHAFT DEFLECTION” (Forth Measurement, Notes 4-4 of 2.6)

5.2.3 Measure and record the crankshaft thrust clearance of the diesel engine in accordance with Notes 3 and 4-1 through 4-4 of 2.6.

FOUO

SHIP: LCC-19 CHG/VER: 0/0

(V) “THRUST CLEARANCE” (First Measurement, Notes 4-1 of 2.6)

(V) “THRUST CLEARANCE” (Second Measurement, Notes 4-2 of 2.6)

(V) “THRUST CLEARANCE” (Third Measurement, Notes 4-3 of 2.6)

(V)(G) “THRUST CLEARANCE” (Forth Measurement, Notes 4-4 of 2.6)

5.2.4 Measure and record the coupling alignment of the equipment in accordance with Notes 6 and 7-1 of 2.6.

(V) “COUPLING ALIGNMENT” (First Measurement, Notes 7-1 of 2.6)

5.2.5 Accomplish the coupling alignment of the equipment in accordance with Notes 6, 7-2 and 7-3 of 2.6.

(V) “COUPLING ALIGNMENT” (Second Measurement, Notes 7-2 of 2.6)

(V) “COUPLING ALIGNMENT” (Third Measurement, Notes 7-3 of 2.6)

5.2.6 Measure and record the coupling alignment of the equipment in accordance with Notes 6 and 7-4 of 2.6.

(V)(G) “COUPLING ALIGNMENT” (Final Measurement, Notes 7-4 of 2.6)

5.2.7 Accomplish the requirements of 009-92 of 2.1 for equipment.

5.2.8 Measure and record the flywheel runout of the diesel engine in accordance with Notes 8 of 2.6.

(V)(G) “FLYWHEEL RUNOUT”

5.2.9 Drill and ream each generator support foot and foundation in accordance with Notes 5 of 2.6. Fit and install each new dowel.

5.3 Accomplish the requirements of 009-09 of 2.1 for the diesel engine of the equipment listed in 1.3.2.

5.4 Accomplish the lube oil flushing for the diesel engine of the equipment listed in 1.3.2 in accordance with 2.7.

(I)(G) “EXTERNAL FLUSHING”

(I)(G) “FINAL FLUSHING”

5.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

5.6 Notes:

5.6.1 Planner: Code 233.1 K. Uchimura, 080-9350-1432

Planner: Code 231B A. Suzuki, 243-0968 Planner: Code 231B M. Maeda, 243-6101 Planner: Code 232 T. Funaki, 243-2494

5.6.2 OEM (CAT Hawthorne) will provide the procedure to uncouple the gensets and remove them from the skid and to facilitate rigging onboard the ship. The blanking plate and lifting beams will be packaged with the gensets from the OEM. NSWCPD will have a contract with the OEM in place for support in bringing the gensets onboard and coupling the diesel and generator together and will assist in bringing the gensets onboard the ship.

5.6.3 Preservation work for new and disturbed exterior surfaces of underwater hull and freeboard will be covered by

ICN 3819P11001 (KTR TGI).

FOUO

SHIP: LCC-19 CHG/VER: 0/0

5.6.4 Periodic Maintenance Requirements (PMR) and Naval Surface Warfare Center Philadelphia Division (NSWCPD) will provide one person on-site to resolve any technical issues that may arise.

5.6.5 PMR Technical Representative:

Point of Contact: Mr. Edward (Bud) Twigg, 243-4242 Email Address: edward.twigg.ctr@srf.navy.mil

5.6.6 NSWCPD On Site Installation Coordinator (OSIC):

Point of Contact: Mr. Brian Lopez, 445-238-7002 Email Address: brian.o.lopez.civ@us.navy.mil

5.6.7 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

5.6.8 JCN EE01-L105 is related to this TGI.

5.7 Government Furnished Material (GFM):

5.7.1 All GFM listed in each S/A drawing will be provided as kitted material.

5.7.2 SRF-JRMC will provide GFM listed in Appendix “M”.

5.8 SRF-JRMC will provide the following service work: (TGI No. 3819P31002S02)

5.8.1 [C740] Crane and crane rigging service.

5.8.2 [X99E] Utilities service, electrical.

5.8.3 [X99M] Utilities service, including water supply, steam supply, and low pressure air supply except onboard blasting work.

5.8.4 [C106.1] Safety inspection for SRF-JRMC employees.

5.8.5 [C106.2] Gas free inspection for SRF-JRMC employees.

5.8.6 [C133] QA Inspection for (G) symbol(s).

mailto:edward.twigg.ctr@srf.navy.mil

FOUO

J-1

SHIP: LCC-19 CHG/VER: 0/0

APPENDIX "J"

TGI JOB SUMMARY INFORMATION SHEET

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

SA 79243K EDG#2 AY A 0 0

CU PHASE TITLE:

*(RE) F/O – S/A 79243K, REPLACE EDG NO. 2, ESLP SS/EDG GENSET UPGRD

PRIMARY COMPONENT:

COMPONENT UNIT LIST (FOR ASSEMBLIES):

#2 EDG GE #2 EDG ENGINE EN

ATTACHMENT LIST:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA ,TAKEHIDE

JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:

3819P31002 A06

TOTAL MAT’L COST TOTAL DURATION:

CU PHASE DESCRIPTION:

The purpose of this TGI to replace emergency diesel generator No. 2, extended service life program ship service/emergency diesel generator generator-set upgrade.

Location of Work:

Emergency Generator Room No. 2 (7-109-1-E) Emergency Switch Gear Room No. 2 (6-109-1-E) Underwater Hull Weather, Frames between 109 and 114, Starboard (Stbd) Freeboard Weather, Frames between 109 and 114, Stbd Dry Dock No. 6

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

5.1 ELEC , OMCH , SFTR , WELD , QA , RGRS , CARP ,

INSL , PNTR

22 KE PC

5.2 ELEC , OMCH , RGRS , SFTR , WELD , CARP , INSL ,

PNTR

22 KE PC

5.3 QA . 22 KE PC

5.4 OMCH , PFTR , RGRS , LBR , QA . 22 KE PC

5.5 PNTR , QA 22 KE PC

Electrical Work CFM: for banding material, fasteners, insulation tape, plastic bags, rope, and other consumable.

22 MQ CS

Rigging Work CFM: for staging for unshipping/shipping, fastener, transportation cost, mobile crane cost, forklift cost, material of temporary padeye, MT inspection cost, fire watch cost, gas, electrode, lead sampling/analysis cost, asbestos sampling/analysis cost, adhesive, anchor pin, tyvex suit, ---continue to below---

22 MQ CS

FOUO

J-2

SHIP: LCC-19 CHG/VER: 0/0

TASK NAME

SHOP TSD/WC TS CREW# MHRS

HIGH RAD

HOURS

RC

GRID#

---continued from above--- masking tape, plastic bag, all paints, thinner deck covering material, and MISC such as covering material and other consumable.

22 MQ CS

Machinery Work CFM: or marine chemist cost, dowel pin, gasket, muslin bag, lubricating oil, filter element, hose, and MISC such as rags, sandpapers, plastic bag/sheet, cleaner, lubricant, and etc.

22 MQ CS

Process Funding Document. 10 CT OM

FOUO

M-1

SHIP: LCC-19 CHG/VER: 0/0

APPENDIX “M”

TGI MATERIAL LIST

SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH

VERSION:

CASREP

CAT:

SA 79243K EDG#2 AY A 0 0

CU PHASE TITLE:

*(RE) F/O – S/A 79243K, REPLACE EDG NO. 2, ESLP SS/EDG GENSET UPGRD

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING

NUMBER

DOCUMENT/DRAWING TITLE REV

JOB ORDER: KEY OP:

3819P31002 A06

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

100 M INSULATI, ORDER FOR KTR,

ORIG C231B M. MAEDA, 243-

9Q 5640 008096312 NA 4 N 50455315 10/EA

101 M ADHESIVE, ORDER FOR KTR,

ORIG C231B M. MAEDA, 243-

9B 8040 002738708 NA 4 Y 50455071 1/GL

102 M TAPE,TEX, ORDER FOR KTR,

ORIG C231B M. MAEDA, 243-

9B 8315 002671632 NA 4 N 50455316 1/RO

103 M TAPE,TEX, ORDER FOR KTR,

ORIG C231B M. MAEDA, 243-

9B 8315 002671633 NA 4 N 50455318 1/RO

104 M CAP,SNAP, ORDER FOR KTR,

ORIG C231B M. MAEDA, 243-

9B 5325 007377648 NA 4 N 50455160

100/EA

105 M INSULATI, ORDER FOR KTR,

ORIG C231B A. SUZUKI, 243-

9Q 5640 008096312 NA 4 N 10/EA

106 M ADHESIVE, ORDER FOR KTR,

ORIG C231B A. SUZUKI, 243-

9B 8040 002738708 NA 4 Y 1/GL

107 M TAPE,TEX, ORDER FOR KTR,

ORIG C231B A. SUZUKI, 243-

9B 8315 002671632 NA 4 N 1/RO

NOTES:

FOUO

M-2

SHIP: LCC-19 CHG/VER: 0/0

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

109 M TAPE,TEX, ORDER FOR KTR,

ORIG C231B A. SUZUKI, 243-

9B 8315 002671633 NA 4 N 1/RO

110 M CAP,SNAP, ORDER FOR KTR,

ORIG C231B A. SUZUKI, 243-

9B 5325 007377648 NA 4 N

100/EA

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR APPENDIX "D"

DEFICIENCY FORM

☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One)

2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

LCC-19 SA 79243K EDG#2 AY A 0

4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:

3819P31002 A06

7. DESCRIPTION:

8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

9. CORRECTIVE ACTION:

10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:

FOR NON-NUCLEAR USE ONLY

11. RFD/RFW REQ’D ☐ LAR REQ'D ☐

ILS MOD REQ’D ☐

SRD/PLAN REV REQ'D ☐

DWG NO.: _____________________ S/A NO.: ___________________

12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:

SATISFACTORY:

13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

YES ☐ NO ☐

14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE:

15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

_________:YES ☐ NO ☐

16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.

COMPLETE (DR ONLY)

DL’s ISSUED

(DR ONLY)

FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____

☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR

1. SHIP/HULL NO.: 2a. DL or DR No.

(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:

LCC-19 SA 79243K EDG#2 AY A 0