This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19), dated 05-MAR-2025, focused on the Fuel, Filling, and Transfer System (S/A 79243K-KTR). The TGI provides detailed instructions for a tightness and operational test of the fuel system, with specific tasks for contractors, quality assurance, and ship's force personnel.

The key tasks involve visually inspecting all mechanical, welded, and brazed joints of the Fuel, Filling, and Transfer System at Normal Operating Pressure (NOP) and Normal Operating Temperature (NOT) for external leakage over a 30-minute period. Referenced documents include the Expanded Ship Work Breakdown Structure (TM S9040-AA-IDX010) and the Engineering Operational Sequencing System (EOSS). The document is marked FOUO (For Official Use Only) and is part of the preparation for maintenance work on the USS Blue Ridge, with the work to be performed by various teams including contractors and quality assurance personnel.

View the file

Other files

File Type Posted
TGI_3819P31003A01_c0v0_redact.pdf PDF
TGI_3819P31002A05_c2v0.pdf PDF
TGI_3819P31002A03_c3v2_redact.pdf PDF
TGI_3819P31002A02_c1v1_redact.pdf PDF
TGI_3819P31001A06_c2v1.pdf PDF
TGI_3819P31001A04_c2v2.pdf PDF
TGI_3819P31001A03_c0v0_redact.pdf PDF
Attachment II Price Proposal Form N6264925RA041_CLIN 0002 and CLIN 0004.xlsx XLSX spreadsheet
N6264925RA041-0010.pdf PDF
TGI_3819P31003A04_c1v1.pdf PDF
TGI_3819P31002A05_c2v0.pdf PDF
N6264925RA041-0009.pdf PDF
N6264925RA041-0008.pdf PDF
N6264925RA041-00006.pdf PDF
TGI_3819P31003A04_c1v1.pdf PDF
TGI_3819P31001A01_c2v4.pdf PDF
N6264925RA041-0005.pdf PDF
N6264925RA041-0002.pdf PDF
TGI_3819P31003A05_c0v0_redact.pdf PDF
TGI_3819P31003A01_c0v0_redact.pdf PDF
TGI_3819P31002A01_c0v0_redact.pdf PDF
TGI_3819P31001A03_c0v0_redact.pdf PDF
TGI_3819P31003T05_c0v0_redact.pdf PDF
TGI_3819P31002T02_c0v0_redact.pdf PDF
TGI_3819P31001T09_c0v0_redacted.pdf PDF
TGI_3819P31001T05_c0v0_redacted.pdf PDF
Attachment V Contract Data Sheet.pdf PDF
TGI_3819P31003A06_c0v0_redact.pdf PDF
TGI_3819P31003A04_c0v0_redact.pdf PDF
TGI_3819P31003A02_c0v0_redact.pdf PDF
TGI_3819P31002A02_c1v1_redact.pdf PDF
TGI_3819P31001A06_c1v1_redact.pdf PDF
TGI_3819P31003T08_c0v0_redact.pdf PDF
TGI_3819P31003T07_c0v0_redact.pdf PDF
TGI_3819P31003T03_c0v0_redact.pdf PDF
TGI_3819P31003T02_c0v0_redact.pdf PDF
TGI_3819P31002T07_c0v0_redact.pdf PDF
TGI_3819P31002T03_c0v0_redact.pdf PDF
TGI_3819P31001T10_c0v1_redacted.pdf PDF
TGI_3819P31001T03_c0v0_redacted.pdf PDF
TGI_3819P31001T02_c0v1_redacted.pdf PDF
TGI_3819P31001T01_c0v0_redacted.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL).pdf PDF
Attachment VII Warranty Tracking Information.pdf PDF
Attachment VI Quality Assurance Surveillance Plan (QASP).pdf PDF
Attachment III Government Furnished Property (GFP-GFM listings).xlsx XLSX spreadsheet
TGI_3819P31003A03_c0v0_redact.pdf PDF
TGI_3819P31002A04_c0v2_redact.pdf PDF
TGI_3819P31001A04_c2v2.pdf PDF
TGI_3819P31003T09_c0v0_redact.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

05-MAR-2025 0947

20.14.15.2.9020 (September 2024) ICN: 3819P31003 KeyOp: T10

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 54111-3-300KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 54111

CU PHASE TITLE: FUEL, FILLING, AND TRANSFER SYS (T & OP), S/A 79243K - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

EE01L107

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

OHTA, JASON Y. 246.2 3152435901 03-MAR-2025

APPROVED BY: CODE: PHONE: DATE:

OHTA, JASON Y. 246.2 3152435901 04-MAR-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EE01-L107

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

310G0003

Tightness & Operational Test for FUEL, FILLING, AND TRANSFER SYS - KTR.

TGI Short Form

05-MAR-2025 0947

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P31003 KeyOp: T10

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 54111-3-300KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 54111

CU PHASE TITLE: FUEL, FILLING, AND TRANSFER SYS (T & OP), S/A 79243K - KTR

FOUO Pg 2 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TM S9040-AA-IDX-

EXPANDED SHIP WORK

BREAKDOWN STRUCTURE

FOR ALL SHIPS AND

SHIP/COMBAT SYSTEMS

LAT N

2 TM EOSS ENGINEERING

OPERATIONAL SEQUENCING

SYSTEM (EOSS)

LAT N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(V) Contractor work:

Visually inspect all mechanical, welded &/or brazed joints of the FUEL, FILLING, AND TRANSFER SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time. No permanent deformation of brazed/welded joints allowed.

Actual Duration:___

Sign:___________

Print:___________

Date:___________ continued

22/KE PC N

Note: The scope of the FUEL, FILLING, AND TRANSFER SYS is as described in reference 1, ESWBS.

22/KE PC N

(G) QA work:

Visually inspect all mechanical, welded &/or brazed joints of the FUEL, FILLING, AND TRANSFER SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time.

Sign:_______________

Print:_______________

Date:_______________

33/G1 QA N

(S) S/F work:

Line up system in accordance with reference 2, EOSS. Visually inspect all mechanical, welded &/or brazed joints of the FUEL, FILLING, AND TRANSFER SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time.

Sign:_______________

Print:_______________

Date:_______________

/ EM04 N

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

05-MAR-2025 0947

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P31003 KeyOp: T10

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 54111-3-300KTR TT T 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 54111

CU PHASE TITLE: FUEL, FILLING, AND TRANSFER SYS (T & OP), S/A 79243K - KTR

FOUO Pg 3 of 3

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ICN: 3819P31003 KEY OP: T10

File details come from the government source that posted it. Updated .