This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19), specifically focused on the Potable Water System Tightness and Operational Test. The instruction details a technical inspection process for the potable water system, requiring visual inspections of all mechanical, welded, and brazed joints at Normal Operating Pressure (NOP) and Normal Operating Temperature (NOT). The inspection must verify no external leakage for a minimum of 30 minutes, with no permanent deformation of joints allowed. The task involves three primary work groups: Contractor (22/KE PC), Quality Assurance (33/G1 QA), and Ship's Force (EXSA), each responsible for conducting visual inspections according to specific references, including the Expanded Ship Work Breakdown Structure and the Engineering Operational Sequencing System (EOSS).

View the file

Other files

File Type Posted
TGI_3819P31002A06_c0v0_redact.pdf PDF
TGI_3819P31001A05_c0v0_redact.pdf PDF
TGI_3819P31001A02_c2v1_redact.pdf PDF
EXHIBIT - Contract Data Requirements List (CDRL)_R1.pdf PDF
Attachment II Price Proposal Form N6264925RA041_CLIN 0001 and CLIN 0003.xlsx XLSX spreadsheet
TGI_3819P31002A01_c0v0_redact.pdf PDF
TGI_3819P31003A06_c0v0_redact.pdf PDF
TGI_3819P31003A05_c0v0_redact.pdf PDF
TGI_3819P31003A03_c0v0_redact.pdf PDF
TGI_3819P31003A02_c0v0.pdf PDF
TGI_3819P31002A04_c3v3.pdf PDF
TGI_3819P31001A01_c3v4.pdf PDF
TGI_3819P31001A06_c2v1.pdf PDF
N6264925RA041-0007.pdf PDF
TGI_3819P31002A04_c2v3.pdf PDF
TGI_3819P31001A01_c1v3_redact.pdf PDF
N6264925RA041-0004.pdf PDF
TGI_3819P31002A04_c1v2_redact.pdf PDF
N6264925RA041-0003.pdf PDF
N6264925RA041-0001.pdf PDF
TGI_3819P31002A06_c0v0_redact.pdf PDF
TGI_3819P31002A05_c1v0_redact.pdf PDF
TGI_3819P31002A03_c3v2_redact.pdf PDF
TGI_3819P31001A05_c0v0_redact.pdf PDF
TGI_3819P31001A02_c2v1_redact.pdf PDF
TGI_3819P31001A01_c0v3_redact.pdf PDF
TGI_3819P31003T04_c0v0_redact.pdf PDF
TGI_3819P31002T04_c0v0_redact.pdf PDF
TGI_3819P31001T11_c0v1_redacted.pdf PDF
TGI_3819P31001T08_c0v2_redacted.pdf PDF
TGI_3819P31001T07_c0v1_redacted.pdf PDF
Attachment VIII Source of Repair Instruction.pdf PDF
Attachment IV Request for Information Form.docx DOCX document
TGI_3819P31002T10_c0v0_redact.pdf PDF
TGI_3819P31003A03_c0v0_redact.pdf PDF
TGI_3819P31002A04_c0v2_redact.pdf PDF
TGI_3819P31001A04_c2v2.pdf PDF
TGI_3819P31003T09_c0v0_redact.pdf PDF
TGI_3819P31003T06_c0v0_redact.pdf PDF
TGI_3819P31002T12_c0v0_redact.pdf PDF
TGI_3819P31002T09_c0v0_redact.pdf PDF
TGI_3819P31002T08_c0v0_redact.pdf PDF
TGI_3819P31002T06_c0v0_redact.pdf PDF
TGI_3819P31002T05_c0v0_redact.pdf PDF
TGI_3819P31002T01_c0v0_redact.pdf PDF
TGI_3819P31001T06_c0v0_redacted.pdf PDF
Attachment II Price Proposal Form N6264925RA041.xlsx XLSX spreadsheet
2.01 N6264925RA041.pdf PDF
TGI_3819P31003A05_c0v0_redact.pdf PDF
TGI_3819P31003A01_c0v0_redact.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

03-MAR-2025 1009

20.14.15.2.9020 (September 2024) ICN: 3819P31001 KeyOp: T09

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 11 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 53311

CU PHASE TITLE: POTABLE WATER SYS (T & OP), S/A 79243K - KTR

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

EE01L106

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

OHTA, JASON Y. 246.2 3152435901 20-FEB-2025

APPROVED BY: CODE: PHONE: DATE:

OHTA, JASON Y. 246.2 3152435901 26-FEB-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EE01-L106

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

310G0001

Tightness & Operational Test for Potable Water System - KTR.

TGI Short Form

03-MAR-2025 1009

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P31001 KeyOp: T09

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 11 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 53311

CU PHASE TITLE: POTABLE WATER SYS (T & OP), S/A 79243K - KTR

FOUO Pg 2 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 TM S9040-AA-IDX-

EXPANDED SHIP WORK

BREAKDOWN STRUCTURE

FOR ALL SHIPS AND

SHIP/COMBAT SYSTEMS

LAT N

2 TM EOSS ENGINEERING

OPERATIONAL SEQUENCING

SYSTEM (EOSS)

LAT N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

(V) Contractor work:

Visually inspect all mechanical, welded &/or brazed joints of the POTABLE WATER SYSTEM at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time. No permanent deformation of brazed/welded joints allowed.

Actual Duration:____

Sign:_____________

Print:_____________

Date:_____________ continued

22/KE PC N

Note: The scope of the POTABLE WATER SYS is as described in reference 1, ESWBS.

22/KE PC N

(G) QA work:

Visually inspect all mechanical, welded &/or brazed joints of the POTABLE WATER SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time.

Sign:_______________

Print:_______________

Date:_______________

33/G1 QA N

(S) S/F work:

Line up system in accordance with reference 2, EOSS. Visually inspect all mechanical, welded &/or brazed joints of the POTABLE WATER SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time.

Sign:_______________

Print:_______________

Date:_______________

/ EXSA N

MATERIAL REFERENCES

03-MAR-2025 1009

20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P31001 KeyOp: T09

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 53311-3-300KTR TT T 11 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

LCC-19 USS BLUE RIDGE 19P 53311

CU PHASE TITLE: POTABLE WATER SYS (T & OP), S/A 79243K - KTR

FOUO Pg 3 of 3

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 3819P31001 KEY OP: T09