TGI_3819P31002T02_c0v0_redact.pdf
PDF 95 KB Posted
- Solicitation number
- N6264925RA041
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge's Oily Waste Water System, dated 05-MAR-2025. The TGI provides detailed instructions for a tightness and operational test of repaired or reinstalled components of the Oily Waste Water System, focusing on visual inspections of mechanical, welded, and brazed joints. The document specifies tasks for contractors, quality assurance personnel, and ship's force, requiring a 30-minute inspection for external leakage with no permanent deformation of joints allowed. The instruction is part of the ship's maintenance process, referencing the Expanded Ship Work Breakdown Structure and Engineering Operational Sequencing System (EOSS) for system configuration and scope.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
05-MAR-2025 1020
20.14.15.2.9020 (September 2024) ICN: 3819P31002 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59321-3-300KTR TT T 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 59321
CU PHASE TITLE: OILY WASTE WATER SYS (T & OP), S/A 79243K - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
EE01L105
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 26-FEB-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 04-MAR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EE01-L105
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
310G0002
Tightness and Operational Test for All Repaired/Reinstalled Components for Oily Waste Water System - KTR.
TGI Short Form
05-MAR-2025 1020
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P31002 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59321-3-300KTR TT T 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 59321
CU PHASE TITLE: OILY WASTE WATER SYS (T & OP), S/A 79243K - KTR
FOUO Pg 2 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TM S9040-AA-IDX-
EXPANDED SHIP WORK
BREAKDOWN STRUCTURE
FOR ALL SHIPS AND
SHIP/COMBAT SYSTEMS
LAT N
2 TM EOSS ENGINEERING
OPERATIONAL SEQUENCING
SYSTEM (EOSS)
LAT N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Visually inspect all mechanical, welded &/or brazed joints of the OILY WASTE WATER SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time. No permanent deformation of brazed/welded joints allowed.
Actual Duration:____
Sign:_____________
Print:_____________
Date:____________ continued
22/KE PC N
Note: The scope of the OILY WASTE WATER SYS is as described in reference 1, ESWBS.
22/KE PC N
(G) QA work:
Visually inspect all mechanical, welded &/or brazed joints of the OILY WASTE WATER SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time.
Sign:_______________
Print:_______________
Date:_______________
33/G1 QA N
(S) S/F work:
Line up system in accordance with reference 2, EOSS. Visually inspect all mechanical, welded &/or brazed joints of the OILY WASTE WATER SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time.
Sign:_______________
Print:_______________
Date:_______________
/ EM01 N
MATERIAL REFERENCES
05-MAR-2025 1020
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P31002 KeyOp: T02
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59321-3-300KTR TT T 2 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 59321
CU PHASE TITLE: OILY WASTE WATER SYS (T & OP), S/A 79243K - KTR
FOUO Pg 3 of 3
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P31002 KEY OP: T02
File details come from the government source that posted it. Updated .