FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: SA 79243K SSDG PP AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH MODIFICATION OF VARIOUS PIPING FOR SSDG
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
TAKAHIRO SHIBANO 234. 315-243-3583 15-FEB-2025
APPROVED BY: CODE PHONE DATE
HIDEO HARADA 234. 315-243-5176 15-FEB-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II AND III.
CLASS P-1 PIPING
CLASS P-2 PIPING
CLASS P-3b PIPING This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: SA 79243K SSDG PP AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-13 Sketch (1-3)
QA20-
02 (1- 24)
QA28-
05 (1-2)
QA28-
10 (1-2)
J1-2 Map-01 (1-4)
QA28-
01 (1-3)
QA28-
06 (1)
QA34A
(1)
M1-6 Map-02 (1)
QA28-
02 (1-2)
QA28-
07 (1)
Engrg Inst-01 (1)
Map-03 (1-3)
QA28-
03 (1)
QA28-
08 (1-3)
Engrg Inst-02 (1)
QA20-
01 (1- 172)
QA28-
04 (1-3)
QA28-
09 (1)
1. SCOPE/PURPOSE
1.1 Title: S/A 79243K, Modification of Various Piping for Ship Service Diesel Generator (SSDG); accomplish
1.2 Location of work:
1.2.1 Ship Service Diesel Generator No. One (5-121-1-E)
1.2.2 DK Department Cleaning Gear Storeroom (6-118-1-A)
1.2.3 400 HZ Equipment Room (6-118-1-Q)
1.2.4 Physical Fitness Room (5-121-2-L)
1.2.5 Ships Service Diesel Generator Vestibule (4-133-3-L)
1.2.6 Emergency Diesel Generator Room No. 2 (7-109-1-E)
1.2.7 JP5 (9-109-1-J)
1.2.8 "E" Division Storeroom (9-118-1-A)
1.2.9 SSDG Enclosed Operating Station (5-133-1-E)
1.2.10 Distillate Fuel or Ballast (9-127-1-F)
1.2.11 Used Lube Oil Sump Tank (6-122-1-F)
1.2.12 Jacket Water Tank (6-123-1-W)
1.2.13 Oily Waste Tank (6-124-1-F)
1.2.14 Grey Water Drain Tank (6-125-1-W)
1.2.15 Fuel Oil Drain Tank (6-126-1-F)
1.2.16 Distillate Fuel Overflow or Ballast (9-121-1-F)
1.2.17 Fuel Oil Service Tank No. 1A (5-122-1-F)
FOUO
SHIP: LCC-19 CHG/VER: 0/0
1.2.18 Fuel Oil Service Tank No. 1B (5-123-1-F)
1.2.19 Lube Oil Service Tank (5-124-1-F)
1.2.20 Trunk (6-117-0-T)
1.2.21 Escape Trunk (5-131-1-T)
1.3 Identification:
1.3.1 Quantity (One Lot), Start Air System Piping
Remarks: See 2.3 and 2.4 for material and location details.
1.3.1.1 Quantity (2 EA), Globe Valve
Remarks: See Item Number V4 of 2.3
1.3.1.2 Quantity (4 EA), Globe Valve
Remarks: See Item Number V5 of 2.3
1.3.1.3 Quantity (One EA), Globe Valve
Remarks: See Item Number V6 of 2.3
1.3.1.4 Quantity (3 EA), Globe Valve
Remarks: See Item Number V7 of 2.3
1.3.1.5 Quantity (One EA), Needle Valve
Remarks: See Item Number V8 of 2.3
1.3.1.6 Quantity (4 EA), Globe Valve
Remarks: See Item Number V9 of 2.3
1.3.1.7 Quantity (3 EA), Globe Valve
Remarks: See Item Number V11 of 2.3
1.3.1.8 Quantity (7 EA), Globe Valve
Remarks: See Item Number V12 of 2.3
1.3.1.9 Quantity (One EA), Ball Valve
Remarks: See Item Number V13 of 2.3
1.3.2 Quantity (One Lot), Halon System Piping
Remarks: See 2.8 through 2.10 for material and location details.
1.3.2.1 Quantity (One Lot), Halon System Piping and Hose Assembly for Onboard Shop Hydrostatic Test, Dehydration and Vacuum of Halon System Piping Listed in 1.3.2
Remarks: See 2.8 and Sheet 3, 5 and 6 of 2.11 for details.
1.3.2.2 Quantity (One EA), Time Delay Bypass Valve for Main Remote Actuation Station Remarks: See item Number V2 of 2.11
1.3.3 Quantity (One Lot), Aqueous Film Forming Foam (AFFF) System Piping Remarks: See 2.12 through 2.14 for material and location details.
1.3.4 Quantity (One Lot), Fuel Oil (FO) Service System Piping Remarks: See 2.14 through 2.16 for material and location details.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
1.3.5 Quantity (One Lot), FO Transfer System Piping
Remarks: See 2.17 for material and location details.
1.3.6 Quantity (One Lot), Jacket Water Drain System Piping
Remarks: See 2.18 for material and location details.
1.3.7 Quantity (One Lot), Low pressure (LP) Air System Piping Remarks: See 2.19 and Engrg Inst Enclosure-01 for material and location details.
1.3.7.1 Quantity (One EA), Globe Valve
Remarks: See Item Number V2 of 2.19
1.3.7.2 Quantity (3 EA), Globe Valve
Remarks: See Item Number V3 of 2.19
1.3.7.3 Quantity (One EA), Globe Valve
Remarks: See Item Number V5 of 2.19
1.3.8 Quantity (One Lot), Miscellaneous (MISC) System Piping
Remarks: See 2.20 and 2.21 for material and location details.
1.3.9 Quantity (One Lot), Seawater System Piping for Modification of Exhaust Remarks: See 2.24 for material and location details.
1.3.10 Quantity (One Lot), Seawater System Piping for Upgrade SSDG Remarks: See 2.25 through 2.29 and Engrg Inst Enclosure-02 for material and location details.
1.3.10.1 Quantity (One EA), SSDG Auxiliary Sea Water Cooling Pump Unit Remarks: See Item Number R16 of 2.25 and F43 of 2.26
1.3.10.2 Quantity (One EA), Gate Valve
Remarks: See Item Number V1 of 2.26
1.3.10.3 Quantity (3 EA), Gate Valve
Remarks: See Item Number V2 of 2.26
1.3.10.4 Quantity (One EA), Butterfly Valve
Remarks: See Item Number V3 of 2.26
1.3.10.5 Quantity (2 EA), Globe Valve
Remarks: See Item Number V5 of 2.26
1.3.10.6 Quantity (2 EA), Gate Valve
Remarks: See Item Number V6 of 2.26
1.3.10.7 Quantity (2 EA), Globe Valve
Remarks: See Item Number V7 of 2.26
1.3.10.8 Quantity (One EA), Ball Valve
Remarks: See Item Number V8 of 2.26
1.3.10.9 Quantity (12 EA), Globe Valve
Remarks: See Item Number V1 of 2.27
1.3.10.10 Quantity (6 EA), Gate Valve
FOUO
SHIP: LCC-19 CHG/VER: 0/0
Remarks: See Item Number V2 of 2.27
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard.
1.5.2 Potential Lead Hazard.
1.5.3 Dry Dock Work.
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date:8/5/2027
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 513-
8974783
STARTING AIR INSTALLATION
SSDG MACHY RM (5-121-1-E)
A Y AL
L
4 LAR SRFY-
0011-25
CL 400 FTG IN 3000 PSI DESIGN
PRESS STG AIR PP
- Y AL
L
5 MIL MIL-
STD-1627
BENDING OF PIPE OR TUBE FOR
SHIP PIPING SYSTEMS
C N
6 TM S6430-
AE-TED-010
Piping Devices, Flexible Hose Assemblies
7 N
7 TM S9086-
RK-STM-
010/CH-505
Piping System 6 N
8 DWG 507-
8620699
HALON MODIFICATIONS INCID
SSDG UPGRADE 5TH DK, FR 121-
134 (S)
A Y AL
L
9 LAR SRFY-
0275-24
CLEANLINESS LEVEL FOR CO2
ACT PP FOR HALON WORK
- Y AL
L
10 LAR
PSNSIMF-
0003-25
HALON UPDATES TO INCORP
NAVSEA COMMENTS
- Y AL
L
11 DWG 507-
7542662
FIRE EXTINGUISHING SYSTEM
HALON SYS INSTL INCDT SSDG
A Y AL
L
12 DWG 507-
8620737
AFFF PIPING MODS INCIDENTAL
TO SHIP SERVICE DIESEL
GENERATOR NO.1 UPGRADE
A Y AL
L
13 LAR
PSNSIMF-
0921-24
AFFF SPRINKLING UPDATES TO
INCORP NAVSEA COMMENTS
- Y AL
L
14 PDD 103-
ELM-250166
Patch for Removed Hull Penetration Incid to SCD 9243
- Y AL
L
15 DWG 300-
8576349
FUEL OIL SERVICE PIPING
REMOVAL - SSDG #1
GENERATOR UPGRADE
A Y AL
L
16 DWG 300-
8576359
FUEL OIL SERVICE PIPING INSTL
- SSDG #1 GENERATOR
UPGRADE
A Y AL
L
17 DWG 511-
8576361
FUEL OIL TRANS/STRIP
MODIFICATIONS - SSDG
GENERATOR UPGRADE
A Y AL
L
FOUO
SHIP: LCC-19 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
18 DWG 300-
8576362
JACKET WATER DRAIN TANK
PIPING MODIFICATION - SSDG #1
GENERATOR UPGRADE
A Y AL
L
19 DWG 513-
8620746
LP AIR SYSTEM MODIFICATIONS
INCIDENTAL TO SSDG UPGRADE
5TH DK & BLW FR 109-130 S
A Y AL
L
20 DWG 300-
8576375
MISC PIPING MODIFICATIONS
TANK TOP - SSDG #1
GENERATOR UPGRADE
A Y AL
L
21 LAR SRFY-
0278-24
ADDL MISK PP MOD FOR
LOWERING SSDG PIT
- Y AL
L
22 PDD 505-
ELM-210146
TEST GUIDANCE FOR REQD
ELEVATED NDT OF
INACCESSIBLE WELDING JOINT
ON PIPING SYS
- Y AL
L
23 TM S9AA0-
AB-GOS-
010/GSO
General Specifications for Overhaul of Surface Ships GSO 2016 Edition
11 N
24 DWG 209-
8576363
SEA WATER PIPING MODS IWO
NEW EXHAUST SSDG -
GENERATOR UPGRADE
A Y AL
L
25 DWG 209-
8576335
DIESEL GENERATOR
SALTWATER PIPING REMOVAL -
SSDG #1 GENERATOR UPGRADE
A Y AL
L
26 DWG 209-
8576348
DG SEA WATER PIPING
INSTALLATION - SSDG
GENERATOR UPGRADE
B Y AL
L
27 DWG 209-
8576373
SEAWATER INSTRUMENTATION
SSDG #1 GENERATOR UPGRADE
A Y AL
L
28 LAR
NSWCPD-
0602-24
LCC19 SEA WATER PIPING 3
WAY VALVE MODIFICATION
- Y AL
L
29 LAR SRFY-
0014-25
DWG DISCREPANCY FOR SW
COOLING PIPING SYSTEM
- Y AL
L
30 DWG 101-
2491015
FLOORS FR 123-STERN K Y 7
31 DWG 104-
7542709
STRL MD SSDG MCHY PIT AND
TN
A Y 1,4
32 LAR SRFY-
0044-25
TYPOGRAPHICAL ERROR FOR
LABEL PLATE OF STARTING AIR
SYSTEM
- Y AL
L
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish modification of start air system piping listed in 1.3.1 with associated work in accordance with 2.3, 2.4 and 2.32.
5.1.1 Bend each new pipe in accordance with 2.5.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.1.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.1.2.1 Accomplish the requirements of 009-09 of 2.1.
5.1.2.2 Accomplish nondestructive testing in accordance with Lines 13.
5.1.2.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-07-1 through Enclosure-07-
172. Each joint identification number must be in accordance with Mapping Plan Enclosure-04.
5.1.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.1.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 4,050 PSIG, for each new and disturbed 3,000 PSI start air piping systems.
5.1.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-09-1.
5.1.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 473 PSIG, for each new and disturbed 350 PSI start air piping systems.
5.1.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-09-2.
5.1.6 Accomplish a shop hydrostatic test of each complete hose assembly of start air piping system for evidence of external leakage and/or deformation, using clean fresh water at 2,250 PSIG for one minute to 5 minutes in accordance with Chapter 7 of 2.6, using Paragraph 505-11.1.3 of 2.7 for guidance. Allowable external leakage and/or deformation: None.
(I)(G) “HYDROSTATIC TEST”
5.1.6.1 Document shop test record on QA Form 28 Enclosure-09-3.
5.1.6.2 Install a new identification tag on each hose assembly in accordance with Paragraph 7-4 of 2.6 and 2.3.
5.1.7 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve. Allowable leakage: None.
5.1.8 Cycle each valve listed in 1.3.1.1 through 1.3.1.9, from fully closed to fully open to fully closed 4 times.
Allowable binding: None.
(V) “VALVE CYCLING”
5.1.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.2 Accomplish modification of halon system piping listed in 1.3.2 in accordance with 2.8 through 2.10.
5.2.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.2.1.1 Accomplish the requirements of 009-09 of 2.1.
5.2.1.2 Accomplish nondestructive testing in accordance with Lines 13.
5.2.1.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-08-1 through Enclosure-08-
24. Each joint identification number must be in accordance with Mapping Plan Enclosure-05.
5.2.2 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 1,600 PSIG, for each new and disturbed halon piping system.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.2.2.1 Document onboard shop hydrostatic test results on QA Form 28 Enclosure-10-1.
5.2.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 2,800 PSIG, for each new and disturbed CO2 piping system.
5.2.3.1 Document onboard shop hydrostatic test results on QA Form 28 Enclosure-10-2.
5.2.4 Accomplish dehydration and vacuum for each halon system piping in accordance with Test Notes T-3 of 2.8.
5.2.5 Disconnect and reconnect each halon system piping and hose assembly listed in 1.3.2.1 and valve listed in
1.3.2.2 for onboard hydrostatic test, dehydration and vacuum of halon system piping listed in 1.3.2 in accordance with 2.8, using 2.11 for guidance as controlled assembly.
5.2.5.1 Restore each mating surface exposed by removal. Repair by removing high spots, burrs, abrasions, and foreign matter, where removal can be accomplished by hand tools.
5.2.6 Connect each mechanical joint shown on Mapping Plan Enclosure-06.
5.2.6.1 Document the controlled assembly joints on QA Form 34A Enclosure-19-1.
(I) "CONTROLLED ASSEMBLY JOINT INSTALLATION"
5.2.7 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
5.2.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.3 Accomplish modification of AFFF system piping listed in 1.3.3 with associated work in accordance with 2.12 through 2.14, using 2.30 for guidance.
5.3.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.3.2 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 203 PSIG, for each new and disturbed AFFF piping systems.
5.3.2.1 Document shop hydrostatic test results on QA Form 28 Enclosure-11-1.
5.3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
5.3.4 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of the watertight/airtight structural boundary. Allowable leakage: None.
5.3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.4 Accomplish modification of FO service system piping listed in 1.3.4 in accordance with 2.14 through 2.16, using
2.31 for guidance.
5.4.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.4.2 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed FO service piping systems.
5.4.2.1 Document shop hydrostatic test results on QA Form 28 Enclosure-12-1.
5.4.3 Accomplish a shop hydrostatic test of each complete hose assembly of FO service piping system for evidence of external leakage and/or deformation, using clean fresh water at 1,600 PSIG for one minute to 5 minutes
FOUO
SHIP: LCC-19 CHG/VER: 0/0
in accordance with Chapter 7 of 2.6, using Paragraph 505-11.1.3 of 2.7 for guidance. Allowable external leakage and/or deformation: None.
(I)(G) “HYDROSTATIC TEST”
5.4.3.1 Document shop test record on QA Form 28 Enclosure-12-2.
5.4.3.2 Install a new identification tag on each hose assembly in accordance with Paragraph 7-4 of 2.6 and 2.16.
5.4.4 Accomplish the requirements of 009-71 of 2.1 for a low pressure air tightness test, using low pressure air at 50 PSIG, for each field weld joint of new and disturbed FO service piping systems.
5.4.4.1 Document air tightness test results on QA Form 28 Enclosure-12-3.
5.4.5 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
5.4.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of the watertight/airtight structural boundary. Allowable leakage: None.
5.4.7 Install each new silicone coated aluminized cloth spray shield to each mechanical joint of the FO service system piping listed in 1.3.4 in accordance with ASTM-F1138.
5.4.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.5 Accomplish modification of FO transfer system piping listed in 1.3.5 in accordance with 2.17.
5.5.1 Bend each new pipe in accordance with 2.5.
5.5.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.5.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed FO transfer piping systems.
5.5.3.1 Document shop hydrostatic test results on QA Form 28 Enclosure-13-1.
5.5.4 Accomplish the requirements of 009-71 of 2.1 for a low pressure air tightness test, using low pressure air at 50 PSIG, for each field weld joint of new and disturbed FO transfer piping systems.
5.5.4.1 Document air tightness test results on QA Form 28 Enclosure-13-2.
5.5.5 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
5.5.6 Install each new silicone coated aluminized cloth spray shield to each mechanical joint of the FO transfer system piping listed in 1.3.5 in accordance with ASTM-F1138.
5.5.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.6 Accomplish modification of jacket water drain system piping listed in 1.3.6 in accordance with 2.18.
5.6.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.6.2 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 68 PSIG, for each new and disturbed jacket water drain piping systems.
5.6.2.1 Document shop hydrostatic test results on QA Form 28 Enclosure-14-1.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.6.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
5.6.4 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve. Allowable leakage: None.
5.6.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.7 Accomplish modification of LP air system piping listed in 1.3.7 in accordance with 2.19 and Enclosure-01.
5.7.1 Bend each new pipe in accordance with 2.5.
5.7.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.7.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 203 PSIG, for each new and disturbed LP air piping systems.
5.7.3.1 Document shop hydrostatic test results on QA Form 28 Enclosure-15-1.
5.7.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
5.7.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve. Allowable leakage: None.
5.7.6 Cycle each valve listed in 1.3.7.1 through 1.3.7.3, from fully closed to fully open to fully closed 4 times.
Allowable binding: None.
(V) “VALVE CYCLING”
5.7.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.8 Accomplish modification of MISC system piping listed in 1.3.8 in accordance with 2.20 and 2.21.
5.8.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.8.2 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed lube oil (LO) drain piping systems.
5.8.2.1 Document shop hydrostatic test results on QA Form 28 Enclosure-16-1.
5.8.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed oily waste transfer piping systems.
5.8.3.1 Document shop hydrostatic test results on QA Form 28 Enclosure-16-2.
5.8.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed funnel drain piping systems.
5.8.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-16-3.
5.8.5 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
5.8.6 Accomplish following elevated non-destructive testing (ENDT) inspection for Class P-2 MISC system (each tank overflow, air escape and sounding tube (TLI)) piping listed in 1.3.8.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.8.6.1 Accomplish liquid penetrant test on final layer of each Class P-2 onboard weld joint in accordance with Paragraph 4.3.a of 2.22. The accept or reject criteria must be in accordance with Paragraph 4.3.a of 2.22.
(l)(G) "ELEVATED NDT INSPECTION"
5.8.6.2 The area of ENDT is shown on Sketch Enclosure-03.
5.8.7 Accomplish an unobstructed air flow test for MISC system (each tank overflow and air escape) piping listed in
1.3.8 with pressure source at not greater than 100 PSIG to ensure free flow capability and to ensure removal of blanks, using compressed air in accordance with Paragraph 506h of 2.23. Allowable obstruction: None.
(V)(G) “UNOBSTRUCTED AIR FLOW TEST”
5.8.8 Accomplish the requirements of 009-71 of 2.1 for the drop test of each sounding tube (TLI) assembly listed in 1.3.8.
5.8.9 Accomplish flow check of LO drain and funnel drain system piping listed in 1.3.8, using clean, fresh water.
Allowable leakage: None.
(V)(G) “FLOW CHECK”
5.8.10 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.9 Accomplish modification of seawater system piping listed in 1.3.9 in accordance with 2.24.
5.9.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.9.2 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 243 PSIG, for each new and disturbed seawater piping systems.
5.9.2.1 Document shop hydrostatic test results on QA Form 28 Enclosure-17-1.
5.9.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
5.9.4 Accomplish the requirements of 009-11 of 2.1 to install each new insulation and lagging to seawater system piping listed in 1.3.9 with associated fittings, using 2.24 for guidance.
5.9.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.10 Accomplish modification of seawater system piping listed in 1.3.10 with associated work in accordance with
2.25 through 2.29 and Enclosure-02.
5.10.1 Bend each new pipe in accordance with 2.5.
5.10.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.10.3 Remove existing and install each new pump unit listed in 1.3.10.1, using 2.25 and 2.26 for guidance.
5.10.3.1 Align each piping to the pump. Piping must be supported independently and must not impose a strain.
5.10.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for each new and disturbed seawater suction piping systems.
5.10.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-18-1.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.10.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 54 PSIG, for each new and disturbed seawater discharge piping systems.
5.10.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-18-2.
5.10.6 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
5.10.7 Cycle each valve listed in 1.3.10.2 through 1.3.10.10, from fully closed to fully open to fully closed 4 times.
Allowable binding: None.
(V) “VALVE CYCLING”
5.10.8 Accomplish the requirements of 009-11 of 2.1 to install each new insulation and lagging to seawater system piping listed in 1.3.10 with associated fittings, using 2.25 through 2.29 for guidance.
5.10.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.11 Notes:
5.11.1 Planner: Code 234 T. Shibano, 243-3583
Planner: Code 231B Y. Yoshihara, 243-9984 Planner: Code 231B N. Kurokawa, 243-0108 Planner: Code 232 M. Fudo, 243-4512 Planner: Code 233 K. Uchimura, 080-9350-1432 Planner: Code 234 Y. Yajima, 243-0977 Engineer: Code 250 I. Hayasaka, 243-4334 Engineer: Code 260 K. Sakai, 243-4342 Engineer: Code 260 Y. Yonesu, 243-6805 Engineer: Code 260 A. Ishiwata, 243-4344 Engineer: Code 260 S. Hamaguchi, 243-4343
5.11.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.11.3 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.11.4 All Government Furnished Material (GFM) and Installing Activity Furnished (IAF) materials except hazmat material listed in each S/A drawing will be provided as kitted material.
5.11.5 Opening, initial cleaning, and closing of each space listed in 1.2.10 through 1.2.16 will be covered by the following TGIs.
Used Lube Oil Sump (6-122-1-F): 3819P12345A01 (KTR TGI) Oily Waste Tank (6-124-1-F): 3819P12346A01 (KTR TGI) Grey Water Tank (6-125-1-W): 3819P12353A01 (KTR TGI) Fuel Oil Drain Tank (6-126-1-F): 3819P12347A01 (KTR TGI) Distillate Fuel Overflow or Ballast (9-121-1-F): 3819P12306A01 (KTR TGI) Distillate Fuel or Ballast (9-127-1-F): 3819P12308A01 (KTR TGI) Jacket Water Tank (6-123-1-W): 3819P31003 A01 (KTR TGI)
5.11.6 Opening, initial cleaning, closing, and installation/removal of FMEs of each space listed in 1.2.17 through
1.2.19 will be covered by the following TGI.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
Fuel Oil Service Tank No. 1A (5-122-1-F): 3819P12301A01 (KTR TGI) Fuel Oil Service Tank No. 1B (5-123-1-F): 3819P12301A01 (KTR TGI) Lube Oil Service Tank (5-124-1-F): 3819P31003 A01(KTR TGI)
5.11.7 Item No. F21 (Boss Outlet, Branch) of 2.3 is acceptable to change to Boss Pilot from direction by Code 260 per e-mail discussion between Code 260 and Code 234 on 14 FEB 2025.
5.11.8 JCN EE01-L107 is related to this TGI.
5.12 Government Furnished Material (GFM):
5.12.1 SRF-JRMC will provide GFM listed in Appendix “M”.
5.13 SRF-JRMC will provide the following service work: (TGI No. 3819P31003S02)
5.13.1 [C740] Crane and crane rigging service.
5.13.2 [X99E] Utility service, electrical.
5.13.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.13.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.13.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.13.6 [C133] QA inspection for (G) symbol(s).
5.13.7 [C134] Analysis for existing material.
5.13.8 [C135] QA inspection for (G) symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SA 79243K SSDG PP AY A 0 0
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH MODIFICATION OF VARIOUS PIPING FOR SSDG
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
HLN ACTCO2 4-133-3-L PP FO/BLST 9-121-1-F TK WO 6-124-1-F TK SNDG TUBE 5-121-1-E TL
SNDG TUBE 5-121-1-E TL SNDG TUBE 5-121-1-E TL SNDG TUBE 5-121-1-E TL SNDG TUBE 6- 123-1-W TL SNDG TUBE 6-126-1-F TL FO/BLST 9-127-1-F TK AFFF 5-121-1-E PP FOS 5-121-1-E
PP PLMB DR 5-121-1-E PP SW 5-121-1-E PP FM 5-121-1-E PP CNDS DR 5-121-1-E PP
AIR FLASK NORM FL AIR FLASK STBY FL SNDG TUBE 5-121-1-E TL HP AIR 6-118-
1-Q PP LP AIR 6-118-1-Q PP SNDG TUBE 6-122-1-F TL SNDG TUBE 6-124-1-F TL POT
WTR 6-123-1-W TK SNDG TUBE 6-125-1-W TL LP AIR 5-121-1-E PPPOTW 5-121-1-E PP HP AIR 9-118-1-A PP SW 5-121-1-E IN LP AIR 7-109-1-E PPFOS 5-121-1-E SF FO AE/OVFL 5-121-1-E PP FW AE/OVFL 5-121-1-E PP LO AE/OVFL 5-121-1-E PP WO AE/OVFL 5-121-1-E PP WW AE/OVFL
5-121-1-E PP SSDG FO 5-121-1-E PP SSDG JW 5-121-1-E PP SSDG LO 5-121-1-E PP SSDG
SW 5-121-1-E PP BLST 5-121-1-E PP FO 5-121-1-E PP HP AIR 5-121-1-E PP HALON 5-121-
1-E PP POL CTL 5-121-1-E PP CMPT 5-121-1-E MS
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P31003A03-ENGRG INST-01.pdf) saved on 11-FEB-2025 0000.
2. ENCLOSURE-02 (3819P31003A03-ENGRG INST-02.pdf) saved on 13-FEB-2025 0000.
3. ENCLOSURE-03 (3819P31003A03-Sketch.pdf) saved on 13-FEB-2025 0000.
4. ENCLOSURE-04 (3819P31003A03-MAP-01.pdf) saved on 11-FEB-2025 0000.
5. ENCLOSURE-05 (3819P31003A03-MAP-02.pdf) saved on 11-FEB-2025 0000.
6. ENCLOSURE-06 (3819P31003A03-MAP-03.pdf) saved on 13-FEB-2025 0000.
7. ENCLOSURE-07 (3819P31003A03-QA20-01.docx) saved on 14-FEB-2025 0000.
8. ENCLOSURE-08 (3819P31003A03-QA20-02.docx) saved on 13-FEB-2025 0000.
9. ENCLOSURE-09 (3819P31003A03-QA28-01.docx) saved on 11-FEB-2025 0000.
10. ENCLOSURE-10 (3819P31003A03-QA28-02.docx) saved on 11-FEB-2025 0000.
11. ENCLOSURE-11 (3819P31003A03-QA28-03.docx) saved on 11-FEB-2025 0000.
12. ENCLOSURE-12 (3819P31003A03-QA28-04.docx) saved on 11-FEB-2025 0000.
13. ENCLOSURE-13 (3819P31003A03-QA28-05.docx) saved on 11-FEB-2025 0000.
14. ENCLOSURE-14 (3819P31003A03-QA28-06.docx) saved on 11-FEB-2025 0000.
15. ENCLOSURE-15 (3819P31003A03-QA28-07.docx) saved on 11-FEB-2025 0000.
16. ENCLOSURE-16 (3819P31003A03-QA28-08.docx) saved on 11-FEB-2025 0000.
17. ENCLOSURE-17 (3819P31003A03-QA28-09.docx) saved on 13-FEB-2025 0000.
18. ENCLOSURE-18 (3819P31003A03-QA28-10.docx) saved on 11-FEB-2025 0000.
19. ENCLOSURE-19 (3819P31003A03-QA34A.docx) saved on 14-FEB-2025 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P31003 A03
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish modification of various piping for SSDG.
Location of Work:
Ship Service Diesel Generator No. One (5-121-1-E) DK Department Cleaning Gear Storeroom (6-118-1-A) 400 HZ Equipment Room (6-118-1-Q) Physical Fitness Room (5-121-2-L) Ships Service Diesel Generator Vestibule (4-133-3-L)
FOUO
J-2
SHIP: LCC-19 CHG/VER: 0/0
CU PHASE DESCRIPTION:
Emergency Diesel Generator Room No. 2 (7-109-1-E)
JP5 (9-109-1-J)
"E" Division Storeroom (9-118-1-A) Distillate Fuel or Ballast (9-127-1-F) Used Lube Oil Sump Tank (6-122-1-F) Jacket Water Tank (6-123-1-W) Oily Waste Tank (6-124-1-F) Grey Water Drain Tank (6-125-1-W) Fuel Oil Drain Tank (6-126-1-F) Distillate Fuel Overflow or Ballast (9-121-1-F) Fuel Oil Service Tank No. 1A (5-122-1-F) Fuel Oil Service Tank No. 1B (5-123-1-F) Lube Oil Service Tank (5-124-1-F) Trunk (6-117-0-T) Escape Trunk (5-131-1-T) SSDG Enclosed Operating Station (5-133-1-E)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 PFTR , WELD , IMCH , OMCH , SFTR , PNTR , INSL ,
QA , BLRM
22 KE PC
5.2 PFTR , WELD , PNTR , OMCH , QA 22 KE PC
5.3 PFTR , WELD , PNTR , QA 22 KE PC
5.4 PFTR , WELD , PNTR , BLRM , QA , INSL OMCH 22 KE PC
5.5 PFTR , WELD , INSL , PNTR , INSL , QA , OMCH 22 KE PC
5.6 PFTR , WELD , PNTR , QA 22 KE PC
5.7 PFTR , WELD , PNTR , RGRS , INSL , QA , OMCH 22 KE PC
5.8 PFTR , WELD 4, PNTR , ELEC , QA 22 KE PC
5.9 PFTR , INSL , WELD , PNTR , RGRS , QA 22 KE PC
5.10 PFTR , INSL , BLRM , SFTR , IMCH , WELD , PNTR ,
RGRS , QA , OMCH
22 KE PC
Piping Work CFM: marine chemist cost, fire watch cost, tank watch cost, lead analysis cost, welding rod, air compressor rental cost, fuel oil cost, brazing rod, flux, acetylene gas, oxygen gas, argon gas, nitrogen gas, paint, label plate cost, pipe hanger, gasket sheet, saw blade, plastic bag, tape, covering material, NDT cost and MISC.
22 MQ CS
Structural Work CFM: for paints, thinner, fire watch cost, confined space watch cost, asbestos sampling/analysis cost, adhesive, anchor pin, air compressor rental cost and fuel oil cost for air hose test, and misc such as electrode, temporary covering material, tyvex suit, plastic bag, masking tape, and other consumable.
22 MQ CS
Machinery Work CFM: for Gasket and MISC. 22 MQ CS
Electrical Work CFM: for insulation tape, plastic bags, rope, and other consumable.
22 MQ CS
Lagging Work CFM: for asbestos sampler and analysis cost, paints, covering material, tyvek suit, and MISC such as other consumable material.
22 MQ CS
Process Funding Document. 10 CT OM
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SA 79243K SSDG PP AY A 0 0
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH MODIFICATION OF VARIOUS PIPING FOR SSDG
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P31003 A03
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M COUPLING,PIPE, COUPLING,
1"IPS, CN 70-30
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 014214718 NA 4 N 50455173 10/EA
002 M COUPLING,PIPE, COUPLING,
3/4"IPS, CN 70-30
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 014214716 NA 4 N 50455174 10/EA
003 M COUPLING,PIPE, COUPLING,
1/2"IPS, CN 70-30
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 014214717 NA 4 N 50455176 10/EA
004 M COUPLING,TUBE, COUPLING,
3/4"IPS, CN 90-10, SW
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 014635878 NA 4 N 50455178 15/EA
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
005 M ELBOW,PIPE, "ELBOW,
3/4""IPS, CN 90-10, SW
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
3583"
9B 4730 014637038 NA 4 N 50455180 20/EA
006 M COUPLING,TUBE, COUPLING,
CN 90-10, 2"IPS, BW
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 005423290 NA 4 N 50455181 10/EA
007 M COUPLING,TUBE, COUPLING,
CN 90-10, 1-1/2"IPS, BW
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 007225467 NA 4 N 50455182 3/FV
008 M COUPLING, COUPLING, PIPE,
SOCKET WELD,
SIZE: 3/8"IPS,
MATL: CU-NI 90/10,
PSRESSURE: 400PSI,
DWG: 803-6397430,
PREMIER COPPER P/N:
99150060
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9C 4730 LL4462577 NA 4 N 50457557 20/EA
009 M COUPLING,TUBE, COUPLING,
1/4"IPS, CN 90-10
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 014635868 NA 4 N 50455184 10/PG
010 M ELBOW,PIPE, ELBOW, 3/8"IPS,
CN 90-10, 90D, SR
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 016051412 NA 4 N 50455186 10/EA
011 M COUPLING,TUBE, COUPLING,
2"IPS, CN 90-10
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 005423290 NA 4 N 50455187 30/EA
012 M SLEEVE,, SLEEVE, BUTT
WELD, 1-1/4"IPS, CU-NI 90/10,
200 PSI, DWG 810-1385880
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9C 4730 LL4903762 NA 4 N 50457558 30/EA
013 M COUPLING,TUBE, COUPLING,
1-1/2"IPS, CN 90-10
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 007225467 NA 4 N 50455190 10/FV
014 M COUPLING,TUBE, COUPLING,
2-1/2"IPS, CN 90-10
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 007225471 NA 4 N 50455191 10/PG
015 M COUPLING,TUBE, COUPLING,
4"IPS, CN 90-10
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9B 4730 007225474 NA 4 N 50455192 10/EA
FOUO
M-3
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
016 M BACKINGR, BACKING RING, 4"
IPS, CU-NI 90/10, 200 PSIG,
MIL-STD-22
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9C 4730 LL4558786 NA 4 N 50457559 10/EA
017 M BACKING, BACKING RING,
SIZE:2"IPS,
MATL: CU-NI 90/10,
PRESSURE: 200PSIG,
SPEC: MIL-STD-22
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9C 4730 LL4558779 NA 4 N 50457560 20/EA
018 M BACKING, BACKING RING, 1-
1/2"IPS, CNA 90/10, 200PSIG
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9C 4730 LL4558777 NA 4 N 50457561 30/EA
019 M SLEEVE,, SLEEVE, 4"IPS, BUTT
WELD, CU-NI 70-30, 200PSI,
DWG: 810-1385880
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9C 4730 LL4462305 NA 4 N 50457562 30/EA
020 M BACKING, BACKING RING.
4"IPS, CNA 70/30, 200PSIG
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9C 4730 LL4358122 NA 4 N 50457563 30/EA
021 M BACKING, BACKING RING,
2"IPS, CNA 70/30, 200PSIG
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9C 4730 LL4558817 NA 4 N 50457564 20/EA
022 M SLEEVE,, SLEEVE, 2"IPS, BUTT
WELD, CNA 70-30, 200 PSI,
810-1385880
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9C 4730 LL4462301 NA 4 N 50457565 20/EA
023 M BOSS, PI, BOSS, PILOT,
1/4"IPS, SOCKET WELD,
COPPER NICKEL 70-30, 400
PSI
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
9C 4730 LL4464623 NA 4 N 3/EA
400 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 4" IPS,
SIZE: 4-1/2" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORIG:C234 Y.YAJIMA, 243-0977
ORDERED FOR KTR
9B 5640 LL9607848 NA 4 N 50457566 8/EA
FOUO
M-4
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
401 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 6" IPS,
SIZE: 6-5/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN
ORIG:C-234 Y.YAJIMA, 243-
ORDERED FOR KTR
9B 5640 LL9607850 NA 4 N 50457567 3/EA
402 M ADHESIVE, ADHESIVE FOR
CLOTH,
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 8040 002738708 NA 4 Y 50455089 6/GL
403 M ADHESIVE, ADHESIVE FOR
PLASTIC TUBE
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 8040 008419773 NA 4 Y 50455175 6/PT
403 M ADHESIVE, ADHESIVE FOR
PLASTIC TUBE
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 8040 008419773 NA 4 Y 6/PT
404 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 4-1/8" OD TUBE,
SIZE: 4-1/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5640 LL9607847 NA 4 N 50457568 2/EA
405 M INSULATI, ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5970 LL9607844 NA 4 N 50457569 12/EA
406 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013, FOR SIZE: 2-1/2" IPS,
SIZE: 2-7/8" ID X 3/4" THK X 6FT
LG, UI: EA/6 FT(ONE
CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN, **GSA ADVANTAGE
ITEM**
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5970 LL9607845 NA 4 N 50457570 2/EA
FOUO
M-5
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
407 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 8" IPS,
SIZE: 8-5/8" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5640 LL9607851 NA 4 N 50457571 2/EA
408 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 3/4" IPS,
SIZE: 1-1/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
**GSA ADVANTAGE ITEM**
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5640 LL9607842 NA 4 N 50457572 3/EA
409 M INSULATI, ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5970 LL4783095 NA 4 N 50457573 2/EA
410 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013, FOR SIZE: 3" IPS,
SIZE: 3-1/2"ID X 3/4" THK X 6 FT
LG, UI: EA/6 FT(ONE
CONTINUOUS LENGTH
REQUIRED), MATL: NON-
HALOGEN,
DO NOT CROSS NSN: 5640-01-
607-0098(SIMC: X3),
ORIG:C-234 Y.YAJIMA, 243-
ORDERED FOR KTR
9B 5640 LL9607846 NA 4 N 50457574 2/EA
411 M SHIELD,SAFETY,PIPE, SHIELD,
7 INCH WIDE,
ORIG: CODE 234 Y.YAJIMA,
243-0977
ORDERED FOR KTR
9B 4730 010100999 NA 4 N 50455193 1/EA
412 M SHIELD,SAFETY,PIPE, SHIELD,
6 INCH WIDE,
ORIG: CODE 234 Y.YAJIMA,
243-0977
ORDERED FOR KTR
9B 4730 010100998 NA 4 N 50455194 1/EA
413 M SHEET,NONMETALLIC,P,
SHIELD, 4 INCH WIDE,
ORIG: CODE 234 Y.YAJIMA,
243-0977
ORDERED FOR KTR
9B 9390 013753347 NA 4 N 50455339 1/RO
414 M SHIELD,SAFETY,PIPE, 5"WIDE
ORI: C234 Y.YAJIMA, 243-0977
ORDERED FOR KTR
9B 4730 010100997 NA 4 N 50455195 1/EA
FOUO
M-6
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
415 M CLOTH,PLAIN WEAVE, GLASS
CLOTH, L/W
ORDER FOR KTR
C234 Y.YAJIMA, 243-0977
9B 8305 001487363 NA 4 N 50455340 1/RO
500 M INSULATI, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9Q 5640 008096312 NA 4 N 50455342 5/EA
501 M SOUND CO, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9Q 5640 007565866 NA 4 N 50455343 5/SH
502 M TAPE,TEX, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 8315 002671632 NA 4 N 50455344 1/RO
503 M CAP, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9Z 5340 LL4601470 NA 4 N 50457575 50/EA
504 M ADHESIVE, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 8040 002738708 NA 4 Y 50455092 1/GL
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SA 79243K SSDG PP AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P31003 A03
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SA 79243K SSDG PP AY A 0
Kouhei.Sakai.ja Line
Kouhei.Sakai.ja_1 Line
Kouhei.Sakai.ja_2 Line
Kouhei.Sakai.ja_3 Line
Kouhei.Sakai.ja_4 Line
Kouhei.Sakai.ja_5 Line
Kouhei.Sakai.ja_6 Line
Kouhei.Sakai.ja_7 Line
Kouhei.Sakai.ja_8 Pencil
Kouhei.Sakai.ja_9 Pencil
Kouhei.Sakai.ja_10 Pencil
Kouhei.Sakai.ja_11 Pencil
Kouhei.Sakai.ja_12 Line
Kouhei.Sakai.ja_13 Line
Kouhei.Sakai.ja_14 Text Box
WEB FR117
Kouhei.Sakai.ja_15 Line
Kouhei.Sakai.ja_16 Line
Kouhei.Sakai.ja_17 Text Box
WEB FR113
Kouhei.Sakai.ja_18 Text Box
ENGRG INST
ENCLOSURE-01
Kouhei.Sakai.ja_19 Text Box
SHEET 1 OF 1
Kouhei.Sakai.ja_20 Text Box 3819P31003A03
3819P31003A03 ENGRG INST
ENCLOSURE-02
SHEET 1 OF 1
Takahiro.Shibano.ja Rectangle
Takahiro.Shibano.ja_1 Rectangle
Takahiro.Shibano.ja_2 Text Box ENDT areas are red frame
Takahiro.Shibano.ja_3 Text Box
SKETCH
Takahiro.Shibano.ja_4 Text Box
ENCLOSURE-03
Takahiro.Shibano.ja_5 Text Box 3819P31003A03
Takahiro.Shibano.ja_6 Text Box
SHEET 1 OF 3
Takahiro.Shibano.ja_7
Closed view of Sheet 9 (Elevation 66-D) of 2.20
Takahiro.Shibano.ja_8
Takahiro.Shibano.ja_9 Rectangle
Takahiro.Shibano.ja_10 Rectangle
Takahiro.Shibano.ja_11 Rectangle
Takahiro.Shibano.ja_12 Polygonal Line
Takahiro.Shibano.ja_13 Rectangle
Takahiro.Shibano.ja_14 Rectangle
Takahiro.Shibano.ja_15 Rectangle
Takahiro.Shibano.ja_16 Rectangle
Takahiro.Shibano.ja_17 Rectangle
Takahiro.Shibano.ja_18 Text Box ENDT areas are red frame
Takahiro.Shibano.ja_19 Text Box
SKETCH
Takahiro.Shibano.ja_20 Text Box
ENCLOSURE-03
Takahiro.Shibano.ja_21 Text Box 3819P31003A03
Takahiro.Shibano.ja_22 Text Box
SHEET 2 OF 3
Takahiro.Shibano.ja_23
Closed view of Sheet 10 (Elevation 77-D) of 2.20
Takahiro.Shibano.ja_24
Takahiro.Shibano.ja_25 Text Box ENDT area is red frame
Takahiro.Shibano.ja_26 Text Box
SKETCH
Takahiro.Shibano.ja_27 Text Box
ENCLOSURE-03
Takahiro.Shibano.ja_28 Text Box 3819P31003A03
Takahiro.Shibano.ja_29 Text Box
SHEET 3 OF 3
Takahiro.Shibano.ja_30
Closed view of Sheet 11 (Elevation 87-D) of 2.20
BHD AT CENTERLINE
"4" L
3819P31003A03
124 123
SSDG MACHINERY ROOM
5-121-1-E
NE\IDIESEL ENGINE
PLAN 1-A
START AIR INSTALLATION
5TH DECK, FR 121-125, STBD
II「P
1屹 NPS
TRANSV BHD 121
賽NPS
1 NPS
"A'’しー , , 2 , ,
MAPPING PLAN
ENCLOSURE-04
蛉NPS
J"A"
FRAME RE FERENCE LI NE
□-し 121 ) ) 118 □✓D
”2',L
/:言E p::T「DRM
_ __ _ � s-------
TRANSV BHD 121
E-DIV STRM
9-118-1-A
TRANSV BHD 118
¾ NPS
THIS JT ID NUMBER
IS COVERED BY
ICN 3819P31002
PLAN 1-B
START AIR INSTALLATION
2ND PLATF, FR 118-121, STBD
J "A"
SHEET 1 OF 4
1 30
1 29 1 28 1 27
EXST HALON
1 26
BOTTLE _ _\
1 25
SSDG ND, 1
5- 1 2 1 - 1 -E
4TH DK
1 是
SSDG EDS
]5- 1 33- 1 -E c!, I
- ' コ
[』 n
BHD 口//
1 麗 \
I Ill " I
叶'I
三_ぎ
Jw TANK l
SVCE PLAT
FR 133
, 一 \へI/<
"B,, EXST蛉CO2
ACTUATIじN
� I , I • □T 22" DIA じじMBusTIDN
AIR
(N[WSSDGNul
□---------s l □[/ `D e N
□2
EXST HALON CYL
(TYP)
NEW DIESEL EXHAUST PP
喝
ー」>ーc s
N
い
日 じ ー」 D
A
N
H
I
ロ
T ーS
T x s
E
VハE
1||
SSDG ND. 1
5- 1 2 1 -1-E
5TH DK
PLAN 1-A
HALON INSTALLATION
5TH DECK, FR 125-133 (S)
SECTION 1-B
HALON INSTALLATION
5TH DECK, FR 132 LKG AFT (S)
3819P31003A03
MAPPING PLAN
ENCLOSURE-05
SHEET 1 OF 1
Takahiro.Shibano.ja_31
CJ-2
Takahiro.Shibano.ja_32 Line
Takahiro.Shibano.ja_33 Oval
Takahiro.Shibano.ja_34 Text Box
CJ-1
Takahiro.Shibano.ja_35 Line
Takahiro.Shibano.ja_36 Oval
Takahiro.Shibano.ja_37 Text Box
CJ-3
Takahiro.Shibano.ja_38 Line
Takahiro.Shibano.ja_39 Oval
Takahiro.Shibano.ja_40 Oval
Takahiro.Shibano.ja_41 Line
Takahiro.Shibano.ja_42 Text Box
CJ-4
Takahiro.Shibano.ja_43 Text Box For halon piping Location: Ships Service Diesel Generator No. One (5-121-1-E)
Takahiro.Shibano.ja_44 Text Box 3819P31003A03
Takahiro.Shibano.ja_45 Text Box
SHEET 1 OF 3
Takahiro.Shibano.ja_46 Text Box
MAPPING PLAN
Takahiro.Shibano.ja_47
ENCLOSURE-06
Takahiro.Shibano.ja_48 Line
Takahiro.Shibano.ja_49 Line
Takahiro.Shibano.ja_50 Text Box
CJ-7
Takahiro.Shibano.ja_51 Text Box
CJ-6
Takahiro.Shibano.ja_52 Text Box
CJ-8
Takahiro.Shibano.ja_53 Text Box
CJ-5
Takahiro.Shibano.ja_54 Oval
Takahiro.Shibano.ja_55 Oval
Takahiro.Shibano.ja_56 Line
Takahiro.Shibano.ja_57 Line
Takahiro.Shibano.ja_58 Line
Takahiro.Shibano.ja_59 Line
Takahiro.Shibano.ja_60 Text Box For CO2 piping Location: Ships Service Diesel Generator Vestibule (4-133-3-L)
Takahiro.Shibano.ja_61 Text Box 3819P31003A03
Takahiro.Shibano.ja_62 Text Box
SHEET 2 OF 3
Takahiro.Shibano.ja_63 Text Box
ENCLOSURE-06
Takahiro.Shibano.ja_64
MAPPING PLAN
Takahiro.Shibano.ja_65
CJ-9
Takahiro.Shibano.ja_66 Text Box
CJ-11
Takahiro.Shibano.ja_67 Text Box
CJ-10
Takahiro.Shibano.ja_68 Line
Takahiro.Shibano.ja_69 Line
Takahiro.Shibano.ja_70 Line
Takahiro.Shibano.ja_71 Oval
Takahiro.Shibano.ja_72 Oval
Takahiro.Shibano.ja_73 Oval
Takahiro.Shibano.ja_74 Oval
Takahiro.Shibano.ja_75 Text Box Closed view of CJ-9 through CJ-11
Takahiro.Shibano.ja_76 Rectangle
Takahiro.Shibano.ja_77 Text Box For CO2 piping Location: Ships Service Diesel Generator No. One (5-121-1-E)
Takahiro.Shibano.ja_78 Line
Takahiro.Shibano.ja_79 Polygonal Line
Takahiro.Shibano.ja_80 Polygonal Line
Takahiro.Shibano.ja_81 Polygonal Line
Takahiro.Shibano.ja_82 Text Box
ENCLOSURE-06
Takahiro.Shibano.ja_83 Text Box 3819P31003A03
Takahiro.Shibano.ja_84 Text Box
SHEET 3 OF 3
Takahiro.Shibano.ja_85
MAPPING PLAN
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
3819P31003A03 ENCLOSURE-07-1 TOTAL 172
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
12 Feb 2025
7. SYSTEM
Start Air System
8. COMPONENT
Start Air Piping
9. DWG NO.
Mapping Plan Enclosure-04
10. CWP STEP NO.
5.1.2.3
11. JOINT ID
PJ-1
12. JOINT DESIGN
P-14
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
THE ACTION HAS BEEN PERFORMED IN ACCORDANCE WITH THE SPECIFIED
REQUIREMENTS.
3819P31003A03 ENCLOSURE-07-1 TOTAL 172
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A03 ENCLOSURE-07-2 TOTAL 172
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L107
4. CWP/REC…