TGI_3819P31003T04_c0v0_redact.pdf
PDF 98 KB Posted
- Solicitation number
- N6264925RA041
About this file
This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge, specifically focused on performing a Tightness and Operational Test for the Sewage System. The TGI is dated 05-MAR-2025 and is associated with component number 59311-3-300KTR, with a total planned duration of 2 hours and 24 man-hours. The task involves visual inspection of mechanical, welded, and/or brazed joints of the sewage system at Normal Operating Pressure (NOP) and Normal Operating Temperature (NOT), with requirements to check for no external leakage over a 30-minute period plus additional time. Three work groups are involved in the task: Contractor work, Quality Assurance (QA) work, and Shore/Force (S/F) work, each with specific inspection responsibilities. The document references two key documents: an Expanded Ship Work Breakdown Structure and an Engineering Operational Sequencing System (EOSS) for system configuration and inspection guidance.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
05-MAR-2025 0928
20.14.15.2.9020 (September 2024) ICN: 3819P31003 KeyOp: T04
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59311-3-300KTR TT T 11 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 59311
CU PHASE TITLE: SEWAGE SYS (T & OP), S/A 79243K - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
EE01L107
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 03-MAR-2025
APPROVED BY: CODE: PHONE: DATE:
OHTA, JASON Y. 246.2 3152435901 04-MAR-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EE01-L107
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
310G0003 24 2 $0.00
Tightness & Operational Test for Sewage System - KTR.
TGI Short Form
05-MAR-2025 0928
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P31003 KeyOp: T04
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59311-3-300KTR TT T 11 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 59311
CU PHASE TITLE: SEWAGE SYS (T & OP), S/A 79243K - KTR
FOUO Pg 2 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TM S9040-AA-IDX-
EXPANDED SHIP WORK
BREAKDOWN STRUCTURE
FOR ALL SHIPS AND
SHIP/COMBAT SYSTEMS
LAT N
2 TM EOSS ENGINEERING
OPERATIONAL SEQUENCING
SYSTEM (EOSS)
LAT N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Visually inspect all mechanical, welded &/or brazed joints of the SEWAGE SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time. No permanent deformation of brazed/welded joints allowed.
Actual Duration:____
Sign:_____________
Print:_____________
Date:_____________ continued
22/KE PC N
Note: The scope of the SEWAGE SYS is as described in reference 1, ESWBS.
22/KE PC N
(G) QA work:
Visually inspect all mechanical, welded &/or brazed joints of the SEWAGE SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time.
Sign:_______________
Print:_______________
Date:_______________
33/G1 QA N
(S) S/F work:
Line up system in accordance with reference 2, EOSS. Visually inspect all mechanical, welded &/or brazed joints of the SEWAGE SYS at NOP and NOT for no external leakage for 30 minutes plus sufficient length of time.
Sign:_______________
Print:_______________
Date:_______________
/ ES01 N
MATERIAL REFERENCES
05-MAR-2025 0928
20.14.15.2.9020 (September 2024) (Continued) ICN: 3819P31003 KeyOp: T04
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 59311-3-300KTR TT T 11 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 59311
CU PHASE TITLE: SEWAGE SYS (T & OP), S/A 79243K - KTR
FOUO Pg 3 of 3
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P31003 KEY OP: T04
File details come from the government source that posted it. Updated .