This document is a Task Group Instruction (TGI) for a diesel exhaust system piping modification on the USS Blue Ridge (LCC-19), specifically focusing on Emergency Diesel Generator (EDG) No. One. The work is scheduled to take place between January 12, 2026, and August 5, 2027, with the primary objective of replacing and modifying the diesel exhaust system piping across multiple ship compartments.
The scope of work includes fabricating 38 backing rings made of CRES 321 material, installing one water trap, and replacing two globe valves. The project involves complex piping work across various ship locations, including the Emergency Generator Room, passages, store rooms, crew spaces, and diesel exhaust piping spaces. Special requirements include working with potential asbestos and lead hazards, maintaining specific welding standards, and ensuring non-destructive testing of all welds. The work affects fire zone boundaries and requires the fabrication of non-flammable closures, with multiple quality assurance and inspection steps outlined in detailed welding process control records.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: SA79243K #1 EDG EXH AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH DIESEL EXHAUST SYSTEM PIPING OF EDG NO.ONE
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
KEIICHI FURUKAWA 234. 315-243-2242 12 FEB 2025
APPROVED BY: CODE PHONE DATE
HIDEO HARADA 234. 315-243-5176 12 FEB 2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
CLASS P-1 PIPING.
CLASS P-2 PIPING.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III.
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: SA79243K #1 EDG EXH AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/3
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 QA20
(1-89)
J1-2 M1-2 Map (1)
1. SCOPE/PURPOSE
1.1 Title: S/A 79243K Diesel Exhaust System Piping of Emergency Diesel Generator (EDG) No. One; accomplish
1.2 Location of Work:
1.2.1 Emergency Generator Room No. One (7-30-0-E)
1.2.2 Passage (6-36-1-L)
1.2.3 Store Room (6-36-3-A)
1.2.4 Crew Living Space (STAFF) (5-30-01-L)
1.2.5 Crew and Troop Mess Room and FWD Battle Dressing STA (4-30-0-L)
1.2.6 Diesel Exhaust Piping Space (4-31-3-Q)
1.2.7 Diesel Exhaust Piping Space & Deck Gear Locker (3-31-3-Q)
1.2.8 Battle Dressing Storeroom (4-39-1-A)
1.2.9 Passage (5-37-1-L)
1.2.10 Freeboard Weather, Frames between 36 and 38, Starboard
1.3 Identification:
1.3.1 Quantity (One Lot), Diesel Exhaust System Piping, EDG No. One Remarks: See 2.3 through 2.6 for material and detail.
1.3.1.1 Quantity (38 EA), Backing Ring
Size: 20 Inch IPS Material: CRES 321 Specification: MIL-STD-22
1.3.1.2 Quantity (One EA), Water Trap
1.3.1.3 Quantity (2 EA), Globe Valve
Remarks: See Item Number V1 of 2.3
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
FOUO
SHIP: LCC-19 CHG/VER: 0/3
1.5.1 Potential Lead Hazard
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 8/5/2027
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 300-
8574535
DIESEL EXHAUST SYSTEM
PIPING MODS EMERGENCY
DIESEL GENERATOR NO. 1
A Y AL
L
4 DWG 300-
8574550
DISEL EXHAUST SYSTEM PIPING
MODS EMERGENCY DIESEL
GENERATOR NO. One
A Y AL
L
5 PDD 300-
ELM-250161
PATCH FOR REMOVED STRL
PEN OF EXHAUST PIPE INCID TO
EDG #1 UPGRADE
- Y AL
L
6 PDD 103-
ELM-250166
Patch for Removed Hull Penetration Incid to SCD 9243
- Y AL
L
7 DWG 100-
2491004
SHELL PLATING & STRINGERS
STEM-FR51-1/2 - 102-1/4 ABV 4TH
DK
F Y AL
L
8 DWG 104-
2491047
5TH DK PLTG STEM - FR 51 1/2 H Y AL
L
9 MIL MIL-
STD-22D
Weldeds Joint Design D Y SH
10 MIL MIL-
STD-1627
Bending of Pipe or Tube for Ship Piping Systems
C N
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1. Not Applicable.
5. PROCEDURE:
5.1 Accomplish the piping work for diesel exhaust system piping listed in 1.3.1 in accordance with 2.3 through 2.6 and Enclosure-01, using 2.7 and 2.8 for guidance.
5.1.1 Fabricate each new backing ring listed in 1.3.1.1 in accordance with Figure-63 of 2.9.
5.1.2 Bend each new piping in accordance with 2.10.
5.1.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.1.3.1 Accomplish the requirements of 009-09 of 2.1.
FOUO
SHIP: LCC-19 CHG/VER: 0/3
5.1.3.2 Accomplish nondestructive testing in accordance with Line 13.
5.1.3.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-02-1 through Enclosure-02-
89. Each joint identification number must be in accordance with Mapping Plan Enclosure-01.
5.1.4 Accomplish the requirements of 009-25 of 2.1 for a completion air test of water trap listed 1.3.1.2. Test pressure must be 2 PSIG. Allowable leakage: None.
5.1.5 Cycle each valve listed in 1.3.1.3 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.1.6 Accomplish the requirements of 009-11 of 2.1 to install each new insulation, lagging and reusable cover to diesel exhaust piping with associated fittings, using 2.3 and 2.4 for guidance.
5.1.6.1 Accomplish the requirements of 009-32 of 2.1 for top surface where new insulation and lagging are installed.
5.1.7 Accomplish the requirements of 009-12 of 2.1 including Table 2, Column(s) A and D, Lines One through 7.
5.1.8 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of the watertight/airtight structural boundary. Allowable leakage: None.
5.2 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.3 Notes:
5.3.1 Planner: Code 234 K. FURUKAWA, 243-2242
Planner: Code 234 O. MITSUI, 243-0976 Planner: Code 231B T. OOSERA, 243-9935 Planner: Code 231B Y. ARAKAWA, 243-4496 Planner: Code 231B M. HAGA, 243-2513 Planner: Code 231B A. SUZUKI, 243-0968 Planner: Code 232 T. NONAKA, 243-4507 Engineer: Code 260.3 S. IRIKURA, 243-4336
5.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598.
5.3.3 Preservation work for new and disturbed surfaces of each space listed in 1.2.6 will be covered by TGI No.
3819P13408A01 (KTR TGI).
5.3.4 Preservation work for new and disturbed exterior surfaces of freeboard will be covered by TGI No.
3819P11001A01 (KTR TGI).
5.3.5 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.3.6 SRF-JRMC will review and approve a Contractor submitted drawing or sketch and will issue additional documents with QA Form(s) relating to actual location of temporary access(es) for documentation of welding, nondestructive testing, and compartment testing when OQE(s) are required.
FOUO
SHIP: LCC-19 CHG/VER: 0/3
5.3.7 Calibration for new spring hanger will be covered by TGI No. 3819P31001C01.
5.3.8 Item No. F12 (Boss Outlet, Branch) of 2.3 is acceptable to change to Boss Pilot from direction by Code 260 per e-mail discussion between Code 260 and Code 234 on 14 FEB 2025.
5.3.9 JCN EE01-L106 is related to this TGI.
5.4 Government Furnished Material (GFM):
5.4.1 All GFM listed in each S/A drawing will be provided as kitted material and listed in Appendix “M” by SRF-JRMC.
5.5 SRF-JRMC will provide the following service work: (TGI No. 3819P31001S02)
5.5.1 [C740] Crane and crane rigging service.
5.5.2 [X99E] Utility service, electrical.
5.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.5.6 [C133] QA inspection for (G) symbol(s).
5.5.7 [C135] QA inspection for (G) symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/3
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SA79243K #1 EDG EXH AY A 0 3
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH DIESEL EXHAUST SYSTEM PIPING OF EDG NO.ONE
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
CMPT 4-30-0-L MSCMPT 7-30-0-E MSCMPT 3-31-3-Q MS CMPT 6-36-3-A MSCMPT 4-31-3-Q
MS CMPT 6-36-1-L MS#1EDG EXH 3-31-3-Q PP #1EDG EXH 7-30-0-E PP CMPT 5-30-01-L
MS #1EDG EXH 4-30-0-L PP #1EDG EXH 4-31-3-Q PP #1EDG EXH 5-30-01-L PP #1EDG EXH 6-
36-1-L PP #1EDG EXH 6-36-3-A PP
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P31001A01-MAP.pdf) saved on 12-FEB-2025 0000.
2. ENCLOSURE-02 (3819P31001A01-QA20.docx) saved on 14-FEB-2025 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P31001 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish EDG exhaust piping work for S/A 79243K.
Location of Work:
See Paragraph 1.2 in TGI 3819P31001A01
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 BLRM: HRs, INSL: HRs, PFTR: HRs, WELD: HRs, PNTR:
HRs, SFTR: HRs, SMTL: HRs, CARP: HRs, IMCH: HRs, RGRS:
HRs, OMCH: HRs, QA: HRs
22 KE PC
5.2 PNTR: HRs, QA: HRs 22 KE PC
Structure Work CFM for fire watch and confined space watch, air compressor rental cost and fuel oil cost for air hose test, electrode, gases, temporary closure, all deck covering material, paints, thinner, grits, disposal cost, lead sampling/analysis cost, asbestos sample and analyze cost for compartment insulation and underlayment
22 MQ CS
Temporary Access Work CFM for fire watch cost, air compressor rental cost and fuel oil cost for air hose test, and MISC such as electrode, gases, temporary closure, covering material, and other consumable.
22 MQ CS
Piping Work CFM: for NDT cost, sample cost for lead paint and MISC such as pipe hanger, covering material, tape, painting material, saw blade and etc.
22 MQ CS
Boiler Work CFM: for covering material, fire watch cost, lead sampling/analysis cost, sampler/analyze, fire watch cost, asbestos sampler/analysis cost, paint, and MISC
22 MQ CS
Process Funding Document. 10 CT OM
FOUO
J-2
SHIP: LCC-19 CHG/VER: 0/3
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
Version-1: admin change required [C234 N. Izumi, 2/12/2025] -/- /N.
V-01 0 0 0
Version-2: admin change required [C234 N. Izumi, 2/13/2025] -/- /N.
V-02 0 0 0
Version-3: admin change required [C234 H. Harada, 2/15/2025] - /-/N.
V-03 0 0 0
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/3
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SA79243K #1 EDG EXH AY A 0 3
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH DIESEL EXHAUST SYSTEM PIPING OF EDG NO.ONE
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P31001 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M CLOTH,PLAIN WEAVE,
ORDERED FOR KTR
ORIG: C234 K.FURUKAWA,
243-2242
H/W GLASS CLOTH (NATURAL)
9B 8305 001487364 NA 4 N 50455252 11/RO
002 M CEMENT,INSULATION,H,
INSUL CEMENT FINISH
ORDERED FOR KTR
ORIG: C234 K.FURUKAWA,
243-2242
9Q 5640 002264540 NA 4 Y 50455254 7/BG
003 M ADHESIVE, ORDERED FOR
KTR
ORIG: C234 K.FURUKAWA,
243-2242
ADHESIVE
9B 8040 002738708 NA 4 Y 50455025 10/GL
101 M INSULATI, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9Q 5640 008096312 NA 4 N 50455256 4/EA
102 M TAPE,TEX, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 8315 002671632 NA 4 N 50455258 1/RO
103 M TAPE,TEX, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 8315 002671633 NA 4 N 50455259 1/RO
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/3
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
104 M CAP,SNAP, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 5325 007377648 NA 4 N 50455015 30/EA
105 M ADHESIVE, MATERIAL ORDER
FOR KTR
ORIG: C231B M.HAGA 243-2513
9B 8040 002738708 NA 4 Y 50455029 1/GL
400 M PLATE,METAL, PLATE, METAL,
SPEC: ASTM A240,
THICKNESS: 3/16",
SIZE: 6 FT X 8 FT,
MATL: CRES 321,
ORDER FOR KTR
ORIG: C226 T.YAMAGUCHI,
070-7787-2060
NA 4 N 48/SF
401 M BOSS, PILOT, 1/2", BOSS,
PILOT, 1/2", SW, CRES 321,
3000PSI
*** P/N WAS CHANGED FROM
695740 TO 695704. PER VAC
ON 15 APR 2017. INFO SEE
9005122 ATTACHMENT ***
ORDERED FOR KTR
ORIG:C234 O.MITSUI 070-7787-
LL9005341 NA 4 N 1/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SA79243K #1 EDG EXH AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P31001 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SA79243K #1 EDG EXH AY A 0
3819P31001A01 SHEET 1 OF 5
MAPPING PLAN
ENCLOSURE-01
3819P31001A01 SHEET 2 OF 5
3819P31001A01 SHEET 3 OF 5
3819P31001A01 SHEET 4 OF 5
3819P31001A01 SHEET 5 OF 5
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
3819P31001A01 ENCLOSURE-02-1 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L106
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
11 Feb 2025
7. SYSTEM
EDG Exhaust System
8. COMPONENT
EDG No. One Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-01
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-400
12. JOINT DESIGN
P-16
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
THE ACTION HAS BEEN PERFORMED IN ACCORDANCE WITH THE SPECIFIED
REQUIREMENTS.
3819P31001A01 ENCLOSURE-02-1 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-2 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L106
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
11 Feb 2025
7. SYSTEM
EDG Exhaust System
8. COMPONENT
EDG No. One Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-01
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-401
12. JOINT DESIGN
P-3
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-2 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-3 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L106
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
11 Feb 2025
7. SYSTEM
EDG Exhaust System
8. COMPONENT
EDG No. One Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-01
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-402
12. JOINT DESIGN
P-3
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-3 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-4 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L106
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
11 Feb 2025
7. SYSTEM
EDG Exhaust System
8. COMPONENT
EDG No. One Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-01
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-403
12. JOINT DESIGN
P-3
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-4 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-5 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L106
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
11 Feb 2025
7. SYSTEM
EDG Exhaust System
8. COMPONENT
EDG No. One Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-01
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-404
12. JOINT DESIGN
PT1S.1
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-5 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-6 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L106
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
11 Feb 2025
7. SYSTEM
EDG Exhaust System
8. COMPONENT
EDG No. One Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-01
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-405
12. JOINT DESIGN
PT1S.1
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-6 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-7 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L106
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
11 Feb 2025
7. SYSTEM
EDG Exhaust System
8. COMPONENT
EDG No. One Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-01
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-406
12. JOINT DESIGN
PT1S.1
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-7 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-8 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L106
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
11 Feb 2025
7. SYSTEM
EDG Exhaust System
8. COMPONENT
EDG No. One Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-01
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-407
12. JOINT DESIGN
P-3
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-8 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-9 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L106
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
11 Feb 2025
7. SYSTEM
EDG Exhaust System
8. COMPONENT
EDG No. One Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-01
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-408
12. JOINT DESIGN
P-70
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-9 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-10 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L106
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
11 Feb 2025
7. SYSTEM
EDG Exhaust System
8. COMPONENT
EDG No. One Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-01
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-409
12. JOINT DESIGN
P-14
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-10 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-11 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L106
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
11 Feb 2025
7. SYSTEM
EDG Exhaust System
8. COMPONENT
EDG No. One Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-01
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-410
12. JOINT DESIGN
P-15
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-11 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-12 TOTAL 89
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L106
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
11 Feb 2025
7. SYSTEM
EDG Exhaust System
8. COMPONENT
EDG No. One Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-01
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-411
12. JOINT DESIGN
P-3
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31001A01 ENCLOSURE-02-12 TOTAL 89
WELDIN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .