TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: SA 79243K PP #1 EDG AY A 0 2
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH MODIFICATION OF VARIOUS PIPING FOR EDG NO.ONE
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
OKUTO MITSUI 234. 315-243-0976 17-FEB-2025
APPROVED BY: CODE PHONE DATE
HIDEO HARADA 234. 315-243-5176 17-FEB-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Add CFM.
Contents need to be revised.
CHANGE INSTRUCTIONS:
CH-1 Revised the procedure (Paragraph 5.25.3). (03/03/2025) CH-2 Revised CH-1 CHANGE INSTRUCTIONS from “Paragraph 5.25.3” to “Paragraph 5.23.5” (03/04/2025)
SPECIAL REQUIREMENTS:
CLASS P-1 PIPING.
CLASS P-2 PIPING.
CLASS P-3B PIPING.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II and III This Work Affects a Fire Zone Boundary. Fabrication and/or Staging of a Non-Flammable Closure is required.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: SA 79243K PP #1 EDG AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 2/1
LIST OF EFFECTIVE PAGES
SHT NO. CHG
NO.
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-25 Map-4 (1-4)
QA28-2
(1-2)
QA28-
10 (1)
QA28-
18 (1)
J1-4 Map-5 (1-3)
QA28-3
(1)
QA28-
11 (1)
QA28-
19 (1-2)
M1-8 Map-6 (1)
QA28-4
(1-3)
QA28-
12 (1)
QA34A-
1 (1-4)
Engrg Inst (1)
QA20-1
(1)
QA28-5
(1)
QA28-
13 (1)
QA34A-
2 (1)
Sketch (1- 6)
QA20-2
(1-18)
QA28-6
(1-3)
QA28-
14 (1-2)
Map-1 (1) QA20-3 (1-98)
QA28-7
(1-2)
QA28-
15 (1-2)
Map-2 (1- 2)
QA20-4
(1-152)
QA28-8
(1)
QA28-
16 (1-3)
Map-3 (1- 3)
QA28-1
(1-2)
QA28-9
(1-2)
QA28-
17 (1)
1. SCOPE/PURPOSE
1.1 Title: S/A 79243K, Modification of Various Piping for Emergency Diesel Generator (EDG) No. One Upgrade;
accomplish
1.2 Location of Work:
1.2.1 01 Level Weather, Frames between 36 and 37, Center
1.2.2 Fan Room (1-36-2-Q)
1.2.3 Fan Room (1-36-0-Q)
1.2.4 N7 Office (2-36-0-Q)
1.2.5 WR Storeroom (2-36-3-A)
1.2.6 Passage (2-40-0-L)
1.2.7 Main Deck Weather, Frames between 36 and 37, Center
1.2.8 Sponson, Third Deck Weather, between Frames 46 and 47, Port
1.2.9 Sponson, Third Deck Weather, between Frames 46 and 47, Starboard
1.2.10 Passage (3-30-01-L)
1.2.11 Wardroom Scullery (3-34-2-Q)
1.2.12 Wardroom Messroom (3-40-0-L)
1.2.13 Crew and Troop Messroom and FWD Battle Dressing Station (4-30-0-L)
1.2.14 Crew Sculley (4-36-0-Q)
FOUO
SHIP: LCC-19 CHG/VER: 2/1
1.2.15 Crew Messroom (4-40-0-L)
1.2.16 Crew Living Space (5-30-01-L)
1.2.17 Passage (5-37-1-L)
1.2.18 Crew Living Space (5-40-0-L)
1.2.19 Uptake Space (5-76-0-Q)
1.2.20 Passage (6-36-1-L)
1.2.21 SD Storeroom (6-18-0-A)
1.2.22 Emergency Switchgear Room No. One (6-30-2-E)
1.2.23 Main GSK / SD Storeroom (6-40-0-A)
1.2.24 Trunk (7-40-5-T)
1.2.25 SD Storeroom (7-18-0-A)
1.2.26 Emergency Generator Room No. One (7-30-0-E)
1.2.27 SD Storeroom (7-30-1-A)
1.2.28 Auxiliary Fuel Service Tank (7-39-5-F)
Remarks: Tank name is changed to Lube Oil Storage Tank by this S/A.
1.2.29 Lube Oil Storage Tank (7-39-7-F)
Remarks: Tank name is changed to Auxiliary Fuel Service Tank by this S/A.
1.2.30 Lube Oil Drain Tank (7-39-1-F)
1.2.31 Oily Water Drain Tank (7-39-2-F)
1.2.32 Used Lube Oil Tank (7-39-3-F)
1.2.33 Jacket Water Expansion Tank No. One
1.2.34 After Cooler Expansion Tank
1.2.35 Air Conditioning Machinery Room No. One and Refrigeration Machinery Room (7-40-0-E)
1.2.36 Escape Trunk (8-77-2-T)
1.2.37 Fire Room (8-76-0-E)
1.2.38 Distillate Fuel Marine Tank (8-48-1-F)
1.2.39 Distillate Fuel Marine Tank (8-48-2-F)
1.2.40 Distillate Fuel Overflow or Ballast (9-30-0-F)
1.2.41 Distillate Fuel Overflow or Ballast (9-30-1-F)
FOUO
SHIP: LCC-19 CHG/VER: 2/1
1.2.42 Reserve Feed Water Tank (9-79-2-W)
1.2.43 Underwater Hull Weather, Frames between 39 and 40, Port
1.3 Identification:
1.3.1 Quantity (One EA), Lube Oil Drain Tank
Tank No.: 7-39-1-F Capacity: 29 Gallons
1.3.2 Quantity (One EA), Oily Water Drain Tank
Tank No.: 7-39-2-F Capacity: 29 Gallons
1.3.3 Quantity (One EA), Used Lube Oil Tank
Tank No.: 7-39-3-F Capacity: 157 Gallons
1.3.4 Quantity (One Lot), Seawater Cooling System Piping
Remarks: See 2.4 through 2.10 for material and location details.
1.3.4.1 Quantity (One EA), Existing Seawater Pump
Remarks: See Item Number R1 of 2.4
1.3.4.2 Quantity (One EA), New Seawater Pump
Remarks: See Item Number F75 of 2.5
1.3.4.3 Quantity (One EA), Butterfly Valve
Remarks: See Item Number V1 of 2.5
1.3.4.4 Quantity (5 EA), Butterfly Valve
Remarks: See Item Number V2 of 2.5
1.3.4.5 Quantity (One EA), Gate Valve
Remarks: See Item Number V3 of 2.5
1.3.4.6 Quantity (One EA), Gate Valve
Remarks: See Item Number V4 of 2.5
1.3.4.7 Quantity (2 EA), Gate Valve
Remarks: See Item Number V5 of 2.5
1.3.4.8 Quantity (2 EA), Globe Valve
Remarks: See Item Number V9 of 2.5
1.3.4.9 Quantity (One EA), Globe Valve
Remarks: See Item Number V10 of 2.5
1.3.4.10 Quantity (One EA), Globe Valve
Remarks: See Item Number V11 of 2.5
1.3.4.11 Quantity (One EA), Globe Valve
Remarks: See Item Number V12 of 2.5
1.3.4.12 Quantity (2 EA), Globe Valve
Remarks: See Item Number V13 of 2.5
FOUO
SHIP: LCC-19 CHG/VER: 2/1
1.3.4.13 Quantity (One EA), Ball Valve
Remarks: See Item Number V14 of 2.5
1.3.4.14 Quantity (15 EA), Globe Valve
Remarks: See Item Number V1 of 2.6
1.3.4.15 Quantity (7 EA), Gate Valve
Remarks: See Item Number V2 of 2.6
1.3.5 Quantity (One Lot), Jacket Water System Piping
Remarks: See 2.14 for material and location details.
1.3.6 Quantity (One Lot), Fuel Oil (FO) System Piping
Remarks: See 2.10 and 2.15 for material and location details.
1.3.6.1 Quantity (One EA), Gate Valve
Remarks: See Item Number V1 of 2.15
1.3.6.2 Quantity (One EA), Gate Valve
Remarks: See Item Number V2 of 2.15
1.3.7 Quantity (One Lot), Lube Oil (LO) System Piping
Remarks: See 2.10 and 2.23 for material and location details.
1.3.7.1 Quantity (One EA), LO Fill Pump
Remarks: See Item Number F2 (R2) of 2.23
1.3.7.2 Quantity (One EA), LO Drain Pump
Remarks: See Item Number F3 (R3) of 2.23
1.3.7.3 Quantity (3 EA), Globe Valve
Remarks: See Item Number V1 of 2.23
1.3.7.4 Quantity (One EA), Needle Valve
Remarks: See Item Number V3 of 2.23
1.3.7.5 Quantity (One EA), Globe Valve
Remarks: See Item Number V4 of 2.23
1.3.7.6 Quantity (2 EA), Ball Valve
Remarks: See Item Number V5 of 2.23
1.3.7.7 Quantity (One EA), Globe Valve
Remarks: See Item Number V6 of 2.23
1.3.8 Quantity (One Lot), FO Supply / Return System Piping
Remarks: See 2.10 and 2.24 for material and location details.
1.3.8.1 Quantity (One EA), Emergency Pull Cable for Quick Closing Valve (Remarks: Item Number V1 of 2.24
1.3.8.2 Quantity (One EA), Ball Valve
Remarks: See Item Number V2 of 2.24
1.3.8.3 Quantity (3 EA), Ball Valve
Remarks: See Item Number V4 of 2.24
FOUO
SHIP: LCC-19 CHG/VER: 2/1
1.3.9 Quantity (One Lot), Chilled Water System Piping
Remarks: See 2.10 and 2.27 for material and location details.
1.3.9.1 Quantity (2 EA), Butterfly Valve
Remarks: See Item Number V1 of 2.27
1.3.9.2 Quantity (2 EA), Gate Valve
Remarks: See Item Number V2 of 2.27
1.3.9.3 Quantity (2 EA), Gate Valve
Remarks: See Item Number V3 of 2.27
1.3.10 Quantity (One Lot), Drain System Piping , FO Vent System Piping, Oily Water Vent System Piping Remarks: See 2.10, 2.29, and 2.30 for material and location details.
1.3.10.1 Quantity (One EA), Ball Valve
Remarks: See Item Number V1 of 2.29
1.3.11 Quantity (One Lot), Firemain / Seawater System Piping
Remarks: See 2.10 and 2.31 for material and location details.
1.3.11.1 Quantity (One EA), Gate Valve
Remarks: See Item Number V1 (R7) of 2.31
1.3.11.2 Quantity (One EA), Butterfly Valve
Remarks: See Item Number V2 (R8) of 2.31
1.3.11.3 Quantity (One EA), Butterfly Valve
Remarks: See Item Number V3 (R9) of 2.31
1.3.11.4 Quantity (One EA), Gate Valve
Remarks: See Item Number V4 (R10) of 2.31
1.3.11.5 Quantity (One EA), Globe Valve
Remarks: See Item Number V5 (R14) of 2.31
1.3.11.6 Quantity (One EA), Butterfly Valve
Remarks: See Item Number V6 of 2.31
1.3.12 Quantity (One Lot), Countermeasure Washdown (CMWD) System Piping Remarks: See 2.10, 2.32, and 2.33 for material and location details.
1.3.13 Quantity (One Lot), Halon System Piping
Remarks: See 2.34 and 2.35 for material and location details.
1.3.13.1 Quantity (One Lot), Halon System Piping and Hose Assembly for Onboard Shop Hydrostatic Test, Dehydration and Vacuum of Halon System Piping Listed in 1.3.13
Remarks: See 2.34 and Sheet 2 of 2.36 for details.
1.3.13.2 Quantity (One EA), Time Delay Bypass Valve (BPV-01)
Remarks: See Item Number V2 of 2.37
1.3.14 Quantity (One Lot), Aqueous Film Forming Foam (AFFF) System Piping Remarks: See 2.10, 2.38, and 2.39 for material and location details.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
1.3.15 Quantity (One Lot), Oily Waste Transfer System Piping
Remarks: See 2.10 and 2.40 for material and location details.
1.3.15.1 Quantity (One EA), Gate Valve
Remarks: See Item Number V1 of 2.40
1.3.16 Quantity (One Lot), Potable Water System Piping
Remarks: See 2.10 and 2.41 for material and location details.
1.3.16.1 Quantity (One EA), Gate Valve
Remarks: See Item Number V1 (R1) of 2.41
1.3.16.2 Quantity (One EA), Gate Valve
Remarks: See Item Number V2 (R2) of 2.41
1.3.17 Quantity (One Lot), FO Overflow System Piping
Remarks: See 2.10 and 2.43 for material and location details.
1.3.18 Quantity (One Lot), LO / Oily Water (OW) Drain Tank Air Escape System Piping Remarks: See 2.10 and 2.44 for material and location details.
1.3.19 Quantity (One Lot), High Pressure (HP) / Low Pressure (LP) Air System Piping Remarks: See 2.10, 2.45, and 2.46 for material and location details.
1.3.19.1 Quantity (One EA), High Pressure Air Compressor (HPAC) Remarks: See Item Number F13 (R7) of 2.45
1.3.19.2 Quantity (4 EA), Globe Valve
Remarks: See Item Number V1 of 2.45
1.3.19.3 Quantity (One EA), Globe Valve
Remarks: See Item Number V3 of 2.45
1.3.19.4 Quantity (One EA), Needle Valve
Remarks: See Item Number V4 of 2.45
1.3.19.5 Quantity (One EA), Globe Valve
Remarks: See Item Number V5 of 2.45
1.3.19.6 Quantity (3 EA), Globe Valve
Remarks: See Item Number V6 of 2.45
1.3.20 Quantity (One Lot), Starting Air System Piping
Remarks: See 2.10, 2.46, 2.48 through 2.50 for material and location details.
1.3.20.1 Quantity (2 EA), Globe Valve
Remarks: See Item Number V4 of 2.48
1.3.20.2 Quantity (4 EA), Globe Valve
Remarks: See Item Number V5 of 2.48
1.3.20.3 Quantity (One EA), Globe Valve
Remarks: See Item Number V6 of 2.48
1.3.20.4 Quantity (2 EA), Globe Valve
Remarks: See Item Number V7 of 2.48
FOUO
SHIP: LCC-19 CHG/VER: 2/1
1.3.20.5 Quantity (One EA), Needle Valve
Remarks: See Item Number V8 of 2.48
1.3.20.6 Quantity (4 EA), Globe Valve
Remarks: See Item Number V9 of 2.48
1.3.20.7 Quantity (3 EA), Globe Valve
Remarks: See Item Number V11 of 2.48
1.3.20.8 Quantity (7 EA), Globe Valve
Remarks: See Item Number V12 of 2.48
1.3.20.9 Quantity (One EA), Ball Valve
Remarks: See Item Number V13 of 2.48
1.3.21 Quantity (One Lot), Service Steam System Piping
Remarks: See 2.10 and 2.51 for material and location details.
1.3.22 Quantity (One Lot), Distilled Water System Piping
Remarks: See 2.10 and 2.52 for material and location details.
1.3.22.1 Quantity (One EA), Gate Valve
Remarks: See Item Number V1 of 2.52
1.3.23 Quantity (One Lot), Reserve Feed Water Tank Vent System Piping / Ship Service Steam Drain System Piping Remarks: See 2.53 for material and location details.
1.4 Security Classification:
1.4.1 Spaces – 1.2.4
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard.
1.5.2 Potential Lead Hazard.
1.5.3 Dry Dock Work.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 300-
7642398
INSTALLATION AND
FABRICATION OF DRAIN TANKS
FOR EMERGENCY DIESEL
GENSETS 1 & 2
A Y 1,4
1/12/2026
8/5/2027
FOUO
SHIP: LCC-19 CHG/VER: 2/1
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
4 DWG 209-
8576334
DIESEL GENERATOR SEAWATER
COOLING PIPING REMOVAL EDG
#1 INCID GENERATOR UPGRADE
A Y AL
L
5 DWG 209-
8576339
DG SEA WATER PIPING
INSTALLATION - EDG #1
GENERATOR UPGRADE
B Y AL
L
6 DWG 209-
8576366
SEAWATER INSTRUMENTATION
EDG #1 (7-30-0-E) GENERATOR
UPGRADE
B Y AL
L
7 LAR SRFY-
0254-24
SCD 9243 DWG DISCREPANCY
FOR SW COOLING PP WORK
- Y AL
L
8 LAR
NSWCPD-
0602-24
LCC19 SEA WATER PIPING 3
WAY VALVE MODIFICATION
- Y AL
L
9 LAR SRFY-
0014-25
DWG DISCREPANCY FOR SW
COOLING PIPING SYSTEM
- Y AL
L
10 PDD 103-
ELM-250166
Patch for Removed Hull Penetration Incid to SCD 9243
- Y AL
L
11 DWG 114-
2491155
TRANSV BHD FR 40, Pump RM BHD and Trunk BHD FR 44-45
K Y AL
L
12 DWG 101-
2491020
WEBS FR 42, 44, 46, 48 & 50 J Y AL
L
13 MIL MIL-
STD-1627
Bending of Pipe or Tube for Ship Piping Systems
C N
14 DWG 300-
8576337
JACKET WATER PIPING
REMOVAL EDG #1 INCID
GENERATOR UPGRADE
A Y AL
L
15 DWG 300-
8576344
FUEL OIL PIPING
MODIFICATIONS EDG #1
GENERATOR UPGRADE
B Y AL
L
16 DWG 103-
2491035
1st PLATF PLTG FR 8 - FR 52 F Y AL L
17 DWG 114-
2491166
MISC STRUCT BHD BELOW 1ST
PLATF FWD FR98
R Y 3,4 ,48
18 DWG 104-
2491047
5TH DK PLTG STEM - FR 51 1/2 H Y AL
L
19 DWG 103-
2491032
2ND PLTF PLATING FR 8-52 G Y AL
L
20 DWG 102-
2491030
INNER BOTTOM PLTG FR8-1/2 -
51-1/2
G Y AL
L
21 PDD 505-
ELM-210146
TEST GUIDANCE FOR REQD
ELEVATED NDT OF
INACCESSIBLE WELDING JOINT
ON PIPING SYS
- Y AL
L
22 TM S9AA0-
AB-GOS-
010/GSO
General Specifications for Overhaul of Surface Ships (GSO)
11 N
23 DWG 300-
8576345
LUBE OIL PIPING MODS - EDG #1
GENERATOR UPGRADE
A Y AL
L
24 DWG 300-
8576346
FUEL OIL SUPPLY & RETURN
PIPING MODS EDG #1
GENERATOR UPGRADE
A Y AL
L
25 TM S6430-
AE-TED-010
Piping Devices, Flexible Hose Assemblies
7 N
26 TM S9086-
RK-STM-
010/CH-505
Piping System 6 N
27 DWG 502-
8621393
CHILLED WATER MODIFICATION
INCID TO EDG1 INSTL 4TH DK FR
31-35 (S)
A Y AL
L
28 DWG 104-
2491050
4TH DK PLTG STEM - FR 51 1/2 J Y AL
L
FOUO
SHIP: LCC-19 CHG/VER: 2/1
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
29 DWG 505-
8620690
DRAIN MODIFICATIONS
INCIDENTAL EDG 1 UPGRADE
01-5TH DK, FR 36-40 P/S
A Y AL
30 LAR SRFY-
0267-24
DWG DISCREPANCY, PP SIZE &
SYS
- Y AL
31 DWG 506-
8620688
FM & SW COOLING SYSTEM
PIPING MODS INCID EMER
DIESEL GEN NO. 1 UPGRADE
32 DWG 506-
8620745
WASHDOWN
COUNTERMEASURE SYS MOD
INCID TO EDG 1 UPGRADE 2ND
DK, FR 38-42, P/S
33 LAR SRFY-
0253-24
S/A 79243K DWG DISCREPANCY
FOR CMWD PP WORK
34 DWG 507-
8577753
HALON PIPING MODIFICATION
INCIDENTAL EDG 1 UPGRADE
5TH DK-1ST PLATF, FR 30-35 (P
35 LAR
PSNSIMF-
0003-25
HALON UPDATES TO INCORP
NAVSEA COMMENTS
36 DWG 507-
6549330
INSTL HALON IN PUMP RM - GEN
RM HALON OP INST AND
DIAGRAMS
A Y 2
37 DWG 507-
6549331
INSTL HALON IN PMP & GEN RM
HALON F/E SYS CONTROL
PANEL FAB DET
38 DWG 507-
8787321
AFFF SPRINKLING MODS EDG
NO. 1 (7-30-0-E) 1ST & 2ND
PLATF, FR 30-40 (P/S)
39 LAR
PSNSIMF-
0921-24
AFFF SPRINKLING UPDATES TO
INCORP NAVSEA COMMENTS
40 DWG 508-
8576343
OILY WASTE TRANSFER
MODIFICATIONS - EDG #1
GENERATOR UPGRADE
41 DWG 509-
8620689
POTABLE WATER SYSTEM
MODS INCID EDG NO. 1
UPGRADE 3RD DECK THRU 2ND
PLATFORM
42 DWG 105-
2491053
3RD DK PLTG STEM - FR 52 M Y AL
43 DWG 511-
8576336
FUEL OIL OVERFLOW PIPING
MODS - EDG #1 GENEREATOR
UPGRADE
44 DWG 511-
8576341
LUBE OIL/OILY WASTE DRAIN
TANK AIR ESCAPE MODS EDG #1
- GENERATOR UPGRADE
45 DWG 513-
8577757
HP/LP AIR SYSTEM PIPING
MODS INCID EMER DIESEL GEN
NO. 1 UPGRADE
46 LAR SRFY-
0266-24
REVICING OF HP & STG AIR PP
ARR
47 DWG 101-
2491019
WEBS FR 32, 34,36, & 38 H Y AL
48 DWG 513-
8974781
STARTING AIR INSTALLATION
EDG 1 (7-30-0-E)
49 LAR SRFY-
0011-25
CL 400 FTG IN 3000 PSI DESIGN
PRESS STG AIR PP
50 LAR SRFY-
0044-25
TYPOGRAPHICAL ERROR FOR
LABEL PLATE OF STARTING AIR
SYSTEM
51 DWG 514-
8620738
STEAM MODIFICATIONS
INCIDENTAL TO EDG 1
UPGRADE MN-2ND DK, FR 36-41
FOUO
SHIP: LCC-19 CHG/VER: 2/1
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
52 DWG 517-
8576342
DISTILLED PIPING MODS IWO
VENT-EDG #1 GENERATOR
UPGRADE
53 DWG 208-
8574548
RSV FD & SHIP SVCE ST DR
INTRF INCID CABLEWAY MOD
SSDG & EDG FIRE ROOM
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1 through 1.3.3.
5.1.1 Accomplish the requirements of 009-107 of 2.1.
5.1.1.1 Ensure General Cleaning must be Level III.
5.1.2 Install new alloy steel nuts conforming to Item No. 14 in Material List of 2.3 for each tank listed in 1.3.1 and 1.3.2.
5.2 Accomplish modification of seawater cooling system piping listed in 1.3.4 with associated work in accordance with 2.4 through 2.10, using 2.11 and 2.12 for guidance.
5.2.1 Remove existing pump listed in 1.3.4.1 and install new pump listed in 1.3.4.2 in accordance with 2.4 and 2.5.
5.2.1.1 Align the piping to the pump. Piping must be supported independently and must not impose a strain.
5.2.2 Bend each new piping in accordance with 2.13.
5.2.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.2.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.2.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed seawater cooling pump suction piping systems.
5.2.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-13-1.
5.2.6 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 54 PSIG, for new and disturbed seawater cooling pump discharge piping systems.
5.2.6.1 Document shop hydrostatic test results on QA Form 28 Enclosure-13-2.
5.2.7 Accomplish clad weld of penetration sleeve on shell plating in accordance with 2.5.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.2.7.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) D, Lines One through 7.
5.2.7.2 Accomplish nondestructive testing in accordance with Line 10.
5.2.7.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-09-1. Each joint identification number must be in accordance with Mapping Plan Enclosure-03.
5.2.7.4 Accomplish the requirements of 009‐09 of 2.1 for welding procedure of each joint shown on Mapping Plan Enclosure‐03.
5.2.8 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.2.9 Cycle each valve listed in 1.3.4.3 through 1.3.4.15 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.2.10 Accomplish the requirements of 009-11 of 2.1 to install each new insulation and lagging to seawater cooling system piping listed in 1.3.4 with associated fittings, using 2.4 through 2.9 for guidance.
5.2.11 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.3 Accomplish removal of jacket water system piping listed in 1.3.5 with associated work in accordance with 2.14.
5.3.1 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.4 Accomplish modification of FO system piping listed in 1.3.6 with associated work in accordance with 2.10, 2.15, and Enclosure-01, using 2.16 through 2.20 and Enclosure-02 for guidance.
5.4.1 Bend each new piping in accordance with 2.13.
5.4.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.4.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.4.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed FO piping systems.
5.4.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-14-1.
5.4.5 Accomplish following elevated non-destructive testing (ENDT) inspection for Class P-2 FO overflow, vent and radar tank level indicator (RTLI) piping listed in 1.3.6.
5.4.5.1 Accomplish liquid penetrant test on final layer of each Class P-2 onboard weld joint in accordance with Paragraph 4.3.a of 2.21. The accept or reject criteria must be in accordance with Paragraph 4.3.a of 2.21.
(I)(G) “ELEVATED NDT INSPECTION”
5.4.5.2 The area of ENDT is shown on Enclosure-02.
5.4.6 Accomplish an unobstructed air flow test of FO overflow and vent piping listed in 1.3.6 prior to final tank closure with pressure source at not greater than 100 PSIG to ensure free flow capability and to ensure all blanks, caps or plugs have been removed, using compressed air in accordance with Section 506h of 2.22.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
(V)(G) “UNOBSTRUCTED AIR FLOW TEST”
5.4.7 Accomplish the requirements of 009-71 of 2.1 for a low pressure air tightness test, using low pressure air at 50 PSIG, for each field weld joint of new and disturbed FO piping systems.
5.4.7.1 Document air tightness test results on QA Form 28 Enclosure-14-2.
5.4.8 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.4.9 Accomplish the requirements of 009-71 of 2.1 for the drop test of each RTLI piping listed in 1.3.6.
5.4.10 Cycle each valve listed in 1.3.6.1 and 1.3.6.2 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.4.11 Install each new silicone coated aluminized cloth spray shield to each mechanical joint of the FO system piping listed in 1.3.6 in accordance with ASTM-F1138.
5.4.12 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.5 Accomplish modification of LO system piping listed in 1.3.7 with associated work in accordance with 2.10 and 2.23, using 2.16 and 2.17 for guidance.
5.5.1 Relocate each pump listed in 1.3.7.1 and 1.3.7.2 in accordance with 2.23.
5.5.1.1 Restore each mating surface exposed by removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by hand tool.
5.5.1.2 Align the piping to the pump. Piping must be supported independently and must not impose a strain.
5.5.2 Bend each new piping in accordance with 2.13.
5.5.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.5.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.5.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using lubricating oil at 50 PSIG, for new and disturbed LO piping systems.
5.5.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-15-1.
5.5.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.5.7 Accomplish flow check of each new LO drain piping using clean, fresh water. Allowable external leakage:
None.
(V)(G) “FLOW CHECK”
5.5.8 Cycle each valve listed in 1.3.7.3 and 1.3.7.7 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.5.9 Install each new silicone coated aluminized cloth spray shield to each mechanical joint of the LO system piping listed in 1.3.7 in accordance with ASTM-F1138.
5.5.10 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.6 Accomplish modification of fuel oil supply / return system piping with associated work listed in 1.3.8 in accordance with 2.10 and 2.24, using 2.17 for guidance.
5.6.1 Bend each new piping in accordance with 2.13.
5.6.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.6.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.6.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed fuel oil supply / return piping systems.
5.6.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-16-1.
5.6.5 Accomplish a shop hydrostatic test of each complete FO supply / return hose assembly evidence of external leakage and/or deformation, using clean fresh water at 1,250 PSIG for one minute to 5 minutes in accordance with Chapter 7 of 2.25, using Paragraph 505-11.1.3 of 2.26 for guidance. Allowable external leakage and/or deformation:
None.
(I)(G) “HYDROSTATIC TEST”
5.6.5.1 Document shop test record on QA Form 28 Enclosure-16-2.
5.6.5.2 Install a new identification tag on each hose assembly in accordance with Paragraph 7-4 of 2.25.
5.6.6 Accomplish the requirements of 009-71 of 2.1 for a low pressure air tightness test, using low pressure air at 50 PSIG, for each field weld joint of new and disturbed fuel oil supply / return piping systems.
5.6.6.1 Document air tightness test results on QA Form 28 Enclosure-16-3.
5.6.7 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.6.8 Disconnect, reroute, adjust, and connect each cable listed in 1.3.8.1 in accordance with 2.24.
5.6.8.1 Verify the remote operating gear for ease of operation and proper alignment by opening and closing each valve from its remote operating station through 3 complete cycles. Allowable sticking or binding: None.
(V) “VALVE CLOSING”
5.6.9 Cycle each valve listed in 1.3.8.2 and 1.3.8.3 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.6.10 Install each new silicone coated aluminized cloth spray shield to each mechanical joint of the fuel oil supply / return system piping listed in 1.3.8 in accordance with ASTM-F1138.
5.6.11 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.7 Accomplish modification of chilled water system piping listed in 1.3.9 in accordance with 2.10 and 2.27, using
2.28 for guidance.
5.7.1 Bend each new piping in accordance with 2.13.
5.7.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.7.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.7.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 125 PSIG, for new and disturbed chilled water piping systems.
5.7.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-17-1.
5.7.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.7.6 Cycle each valve listed in 1.3.9.1 through 1.3.9.3 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.7.7 Accomplish the requirements of 009-11 of 2.1 to install each new insulation and lagging to chilled water system piping listed in 1.3.9 with associated fittings, using 2.27 for guidance.
5.7.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.8 Accomplish modification of drain system piping, oily water tank vent system piping, and FO tank vent system piping listed in 1.3.10 in accordance with 2.10, 2.29 and 2.30, using Enclosure-02 for guidance.
5.8.1 Bend each new piping in accordance with 2.13.
5.8.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.8.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.8.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed drain piping systems.
5.8.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-18-1.
5.8.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed oily water tank vent piping systems.
5.8.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-18-2.
5.8.6 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed FO tank vent piping systems.
5.8.6.1 Document shop hydrostatic test results on QA Form 28 Enclosure-18-3.
5.8.7 Accomplish following elevated non-destructive testing (ENDT) inspection for Class P-2 oily water tank vent piping system and FO tank vent piping system listed in 1.3.10.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.8.7.1 Accomplish liquid penetrant test on final layer of each Class P-2 onboard weld joint in accordance with Paragraph 4.3.a of 2.21. The accept or reject criteria must be in accordance with Paragraph 4.3.a of 2.21.
(I)(G) “ELEVATED NDT INSPECTION”
5.8.7.2 The area of ENDT is shown on Enclosure-02.
5.8.8 Accomplish an unobstructed air flow test of oily water tank vent system piping and FO tank vent system piping listed in 1.3.10 prior to final tank closure with pressure source at not greater than 100 PSIG to ensure free flow capability and to ensure all blanks, caps or plugs have been removed, using compressed air in accordance with Section 506h of 2.22.
(V)(G) “UNOBSTRUCTED AIR FLOW TEST”
5.8.9 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.8.10 Accomplish flow check of each new drain piping using clean, fresh water. Allowable external leakage: None.
(V)(G) “FLOW CHECK”
5.8.11 Cycle each valve listed in 1.3.10.1 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.8.12 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.9 Accomplish modification of firemain / seawater system piping listed in 1.3.11 in accordance with 2.10 and 2.31.
5.9.1 Bend each new piping in accordance with 2.13.
5.9.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.9.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.9.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 225 PSIG, for new and disturbed firemain / seawater cooling piping systems upstream of reducing station.
5.9.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-19-1.
5.9.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 75 PSIG, for new and disturbed seawater cooling piping systems downstream of reducing station.
5.9.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-19-2.
5.9.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.9.7 Cycle each valve listed in 1.3.11.1 through 1.3.11.6 from full closed to full open to full closed 4 times.
Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.9.8 Accomplish the requirements of 009-11 of 2.1 to install each new insulation and lagging to firemain and seawater system piping listed in 1.3.11 with associated fittings, using 2.31 for guidance.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.9.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.10 Accomplish modification of CMWD system piping listed in 1.3.12 in accordance with 2.10, 2.32 and 2.33.
5.10.1 Bend each new piping in accordance with 2.13.
5.10.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.10.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.10.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 200 PSIG, for new and disturbed CMWD piping systems.
5.10.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-20-1.
5.10.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.10.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.11 Accomplish modification of halon system piping listed in 1.3.13 with associated work in accordance with 2.34 and 2.35, using 2.36 and Enclosure-04 for guidance.
5.11.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.11.1.1 Accomplish the requirements of 009-09 of 2.1.
5.11.1.2 Accomplish nondestructive testing in accordance with Lines 13.
5.11.1.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-10-1 through Enclosure- 10-18. Each joint identification number must be in accordance with Mapping Plan Enclosure-04.
5.11.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.11.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 1,600 PSIG, for new and disturbed halon discharge piping systems.
5.11.3.1 Document shop hydrostatic test results on QA Form 28 Enclosure-21-1.
5.11.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 2,800 PSIG, for new and disturbed CO2 actuation piping systems.
5.11.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-21-2.
5.11.5 Accomplish dehydration with vacuum for each halon system piping in accordance with Test Notes T-3 and T- 4 of 2.34.
5.11.6 Disconnect and reconnect each halon system piping and hose assembly listed in 1.3.13.1 and each valve listed in 1.3.13.2 for onboard hydrostatic test in accordance with 2.34, using 2.36 and 2.37 for guidance as controlled assembly.
5.11.6.1 Restore each mating surface exposed by removal. Repair by removing high spots, burrs, abrasions, and foreign matter, where removal can be accomplished by hand tools.
5.11.7 Connect each mechanical joint shown on Mapping Plan Enclosure-07.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.11.7.1 Document the controlled assembly joints on QA Form 34A Enclosure-32-1.
(I) "CONTROLLED ASSEMBLY JOINT INSTALLATION"
5.11.8 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve. Allowable leakage: None.
5.11.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.12 Accomplish modification of AFFF system piping listed in 1.3.14 in accordance with 2.10, 2.38 and 2.39.
5.12.1 Bend each new piping in accordance with 2.13.
5.12.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.12.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.12.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 225 PSIG, for new and disturbed AFFF piping systems.
5.12.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-22-1.
5.12.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each penetration sleeve. Allowable leakage: None.
5.12.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.13 Accomplish modification of oily waste transfer system piping listed in 1.3.15 in accordance with 2.10 and 2.40, using 2.16 and 2.19 for guidance.
5.13.1 Bend each new piping in accordance with 2.13.
5.13.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.13.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.13.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 67.5 PSIG, for new and disturbed oily waste transfer piping systems.
5.13.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-23-1.
5.13.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.13.6 Cycle each valve listed in 1.3.15.1 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.13.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.14 Accomplish modification of potable water system piping listed in 1.3.16 in accordance with 2.10 and 2.41, using 2.16, 2.18, 2.19, and 2.42 for guidance.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.14.1 Accomplish the requirements of 009-87 of 2.1 for potable water piping.
5.14.1.1 Accomplish the requirements of 009-09 of 2.1 for chlorination and bacteriological tests. Analysis and testing conducted by a qualified Japanese laboratory (accredited by ISO 17025 or equal) are authorized by the
SUPERVISOR.
5.14.1.2 Record results of chlorination and bacteriological tests on a Laboratory Analysis Record(s) and DD Form 686, and submit one legible copy, in hard copy or approved transferrable media, of completed record(s) and form(s) to the SUPERVISOR.
5.14.2 Bend each new piping in accordance with 2.13.
5.14.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.14.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.14.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 112.5 PSIG, for new and disturbed potable water piping systems.
5.14.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-24-1.
5.14.6 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.14.7 Cycle each valve listed in 1.3.16.1 and 1.3.16.2 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.14.8 Accomplish the requirements of 009-11 of 2.1 to install each new insulation and lagging to potable water system piping listed in 1.3.16 with associated fittings, using 2.41 for guidance.
5.14.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.15 Accomplish modification of FO overflow system piping listed in 1.3.17 in accordance with 2.10 and 2.43, using Enclosure-02 for guidance.
5.15.1 Bend each new piping in accordance with 2.13.
5.15.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.15.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.15.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed FO overflow piping systems.
5.15.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-25-1.
5.15.5 Accomplish following elevated non-destructive testing (ENDT) inspection for Class P-2 FO overflow system piping listed in 1.3.17.
5.15.5.1 Accomplish liquid penetrant test on final layer of each Class P-2 onboard weld joint in accordance with Paragraph 4.3.a of 2.21. The accept or reject criteria must be in accordance with Paragraph 4.3.a of 2.21.
(I)(G) “ELEVATED NDT INSPECTION”
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.15.5.2 The area of ENDT is shown on Enclosure-02.
5.15.6 Accomplish an unobstructed air flow test of FO overflow system piping listed in 1.3.17 prior to final tank closure with pressure source at not greater than 100 PSIG to ensure free flow capability and to ensure all blanks, caps or plugs have been removed, using compressed air in accordance with Section 506h of 2.22.
(V)(G) “UNOBSTRUCTED AIR FLOW TEST”
5.15.7 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.15.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.16 Accomplish modification of LO / OW drain tank air escape system piping listed in 1.3.18 in accordance with
2.10 and 2.44, using 2.16, 2.18, and Enclosure-02 for guidance.
5.16.1 Bend each new piping in accordance with 2.13.
5.16.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.16.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.16.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed LO drain air escape piping systems.
5.16.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-26-1.
5.16.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed OW drain air escape piping systems.
5.16.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-26-2.
5.16.6 Accomplish following elevated non-destructive testing (ENDT) inspection for Class P-2 LO/OW drain air escape piping listed in 1.3.18.
5.16.6.1 Accomplish liquid penetrant test on final layer of each Class P-2 onboard weld joint in accordance with Paragraph 4.3.a of 2.21. The accept or reject criteria must be in accordance with Paragraph 4.3.a of 2.21.
(I)(G) “ELEVATED NDT INSPECTION”
5.16.6.2 The area of ENDT is shown on Enclosure-02.
5.16.7 Accomplish an unobstructed air flow test of LO drain air escape system piping and OW drain air escape system piping listed in 1.3.18 prior to final tank closure with pressure source at not greater than 100 PSIG to ensure free flow capability and to ensure all blanks, caps or plugs have been removed, using compressed air in accordance with Section 506h of 2.22.
(V)(G) “UNOBSTRUCTED AIR FLOW TEST”
5.16.8 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.16.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.17 Accomplish modification of HP/LP air system piping listed in 1.3.19 with associated work in accordance with 2.10, 2.45, and 2.46, using 2.16, 2.18, 2.28, 2.42, and 2.47 for guidance.
5.17.1 Relocate each compressor listed in 1.3.19.1 in accordance with 2.45.
5.17.1.1 Restore each mating surface exposed by removal. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by hand tool.
5.17.2 Bend each new piping in accordance with 2.13.
5.17.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A and B, Lines One through 10.
5.17.3.1 Accomplish the requirements of 009-09 of 2.1.
5.17.3.2 Accomplish nondestructive testing in accordance with Lines 13.
5.17.3.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-11-1 through Enclosure- 11-98. Each joint identification number must be in accordance with Mapping Plan Enclosure-05.
5.17.4 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.17.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 4,500 PSIG, for new and disturbed HP air piping systems.
5.17.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-27-1.
5.17.6 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 203 PSIG, for new and disturbed LP air piping systems.
5.17.6.1 Document shop hydrostatic test results on QA Form 28 Enclosure-27-2.
5.17.7 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.17.8 Cycle each valve listed in 1.3.19.2 through 1.3.19.6 from full closed to full open to full closed 4 times.
Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.17.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.18 Accomplish modification of starting air system piping listed in 1.3.20 with associated work in accordance with 2.46, 2.48 through 2.50.
5.18.1 Bend each new piping in accordance with 2.13.
5.18.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.18.2.1 Accomplish the requirements of 009-09 of 2.1.
5.18.2.2 Accomplish nondestructive testing in accordance with Lines 13.
5.18.2.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-12-1 through Enclosure- 12-152. Each joint identification number must be in accordance with Mapping Plan Enclosure-06.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.18.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.18.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 4,050 PSIG, for new and disturbed 3000 PSIG starting air piping systems.
5.18.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-28-1.
5.18.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 473 PSIG, for new and disturbed 350 PSIG starting air piping systems.
5.18.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-28-2.
5.18.6 Accomplish a shop hydrostatic test of each complete starting air hose assembly evidence of external leakage and/or deformation, using clean fresh water at 2,250 PSIG for one minute to 5 minutes in accordance with Chapter 7 of 2.25, using Paragraph 505-11.1.3 of 2.26 for guidance. Allowable external leakage and/or deformation: None.
(I)(G) “HYDROSTATIC TEST”
5.18.6.1 Document shop test record on QA Form 28 Enclosure-28-3.
5.18.6.2 Install a new identification tag on each hose assembly in accordance with Paragraph 7-4 of 2.25.
5.18.7 Cycle each valve listed in 1.3.20.1 through 1.3.20.9 from full closed to full open to full closed 4 times.
Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.18.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.19 Accomplish modification of service steam system piping listed in 1.3.21 in accordance with 2.10 and 2.51.
5.19.1 Bend each new piping in accordance with 2.13.
5.19.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.19.2.1 Accomplish nondestructive testing in accordance with Line 13 for liquid penetrant testing accomplished to satisfy operational pressure test option for service steam system piping.
5.19.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.19.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 113 PSIG, for new and disturbed service steam piping systems.
5.19.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-29-1.
5.19.5 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.19.6 Accomplish the requirements of 009-11 of 2.1 to install each new insulation, lagging and reusable cover to service steam system piping listed in 1.3.21 with associated fittings, using 2.51 for guidance.
5.19.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.20 Accomplish modification of distillated water system piping listed in 1.3.22 with associated work in accordance with 2.52.
FOUO
SHIP: LCC-19 CHG/VER: 2/1
5.20.1 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.20.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.20.3 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed distillated water piping systems.
5.20.3.1 Document shop hydrostatic test results on QA Form 28 Enclosure-30-1.
5.20.4 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of each watertight/airtight structural boundary. Allowable leakage: None.
5.20.5 Cycle each valve listed in 1.3.22.1 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.20.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.21 Accomplish modification of reserve feed water tank vent system piping and service steam drain system piping listed in 1.3.23 in accordance with 2.53, using Enclosure-02 for guidance.
5.21.1 Bend each new piping in accordance with 2.13.
5.21.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
5.21.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.21.4 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using clean, fresh water at 50 PSIG, for new and disturbed reserve feed water tank vent piping systems.
5.21.4.1 Document shop hydrostatic test results on QA Form 28 Enclosure-31-1.
5.21.5 Accomplish the requirements of 009-71 of 2.1 for hydrostatic test, using feed water at 50 PSIG, for new and disturbed service steam drain piping systems.
5.21.5.1 Document shop hydrostatic test results on QA Form 28 Enclosure-31-2.
5.21.6 Accomplish following elevated non-destructive testing (ENDT) inspection for Class P-2 reserve feed water tank vent piping listed in 1.3.23.
5.21.6.1 Accomplish liquid penetrant test on final layer of each Class P-2 onboard weld joint in accordance with Paragraph 4.3.a of 2.21. The accept or reject criteria must be in accordance with Paragraph 4.3.a of 2.21.
(I)(G) “ELEVATED NDT INSPECTION”
5.21.6.2 The area of ENDT is shown on Enclosure-02.
5.21.7 Accomplish an unobstructed air flow test of reserve feed water tank vent system piping listed in 1.3.23 prior to final tank closure with pressure source at not greater than 100 PSIG to ensure free flow capability and to ensure all blanks, caps or plugs have been removed, using compressed air in accordance with Section 506h of 2.22.
(V)(G) “UNOBSTRUCTED AIR FLOW TEST”
5.21.8 Disconnect and connect each mechanical joint in accordance with 2.53…