TGI_3819P31003A01_c0v0_redact.pdf
PDF 2 MB Posted
- Solicitation number
- N6264925RA041
About this file
This Task Group Instruction (TGI) details structural, sheet metal, preservation, and insulation work for a Ship Service Diesel Generator (SSDG) upgrade on the USS BLUE RIDGE (LCC-19). The work will be performed across multiple compartments and tanks, including the SSDG No. One, SSDG Enclosed Operating Station, Escape Trunk, Physical Fitness Room, Fan Room, Crew Living Space, and various fuel, water, and waste tanks. The project involves drilling holes, welding, installing new duct and compartment insulation, conducting non-destructive testing, and applying preservation coatings.
The instruction specifies detailed technical requirements, including cleanliness standards for piping systems, fire zone boundary modifications, and specific welding and inspection procedures. The work is scheduled to begin on 1/12/2026 and is set to be completed by 8/5/2027. The project will be executed by a contractor under the supervision of SRF-JRMC (Ship Repair Facility Japan Maintenance Activity), with various quality assurance, safety, and utility support services to be provided by the facility. The instruction includes multiple appendices detailing materials, job summaries, and quality control documentation.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: SA 79243 SSDG STRUCT AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH STRL, SH METAL, & PSVTN WORK FOR SSDG UPGRADE
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
YUUICHI YOSHIHARA 231B. 315-243-9984 17-FEB-2025
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 17-FEB-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II AND III
CLASS P-2 PIPING
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: SA 79243 SSDG STRUCT AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-8 Engrg Inst (1)
J1-2 Map (1)
M1-6 QA20
(1-10) Engrg Inst (1- 2)
1. SCOPE/PURPOSE
1.1 Title: S/A 79243K, Structural, Sheet Metal, Preservation, and Insulation Work for Ship Service Diesel Generator (SSDG) Generator Set Upgrade; accomplish
1.2 Location of Work:
1.2.1 SSDG No. One (5-121-1-E)
1.2.2 SSDG Enclosed Operating Station (5-133-1-E)
1.2.3 Escape Trunk (5-131-1-T)
1.2.4 Physical Fitness Room (5-121-2-L)
1.2.4.1 SSDG Exhaust Trunk
1.2.5 Fan Room (5-119-0-Q)
1.2.6 Crew Living Space (5-109-0-L)
1.2.7 Freeboard Weather, Frames between 129 and 132, Starboard (Stbd)
1.2.8 Used Lube Oil Sump (6-122-1-F)
1.2.9 Jacket Water Tank (6-123-1-W)
1.2.10 Oily Waste Tank (6-124-1-F)
1.2.11 Grey Water Tank (6-125-1-W)
1.2.12 Fuel Oil Drain Tank (6-126-1-F)
1.2.13 Distillate Fuel Overflow or Ballast (9-121-1-F)
1.2.14 Distillate Fuel or Ballast (9-127-1-F)
1.2.15 Distillate Fuel or Ballast (9-121-2-F)
1.2.16 Distillate Fuel or Ballast (9-127-2-F)
1.2.17 Trunk (6-117-0-T)
1.2.18 DK Department Cleaning Gear Storeroom (6-118-1-A)
FOUO
SHIP: LCC-19 CHG/VER: 0/0
1.2.19 Damage Control Shop (4-129-1-Q)
1.2.20 Damage Control Shop Office (4-125-1-Q)
1.2.21 LD CTR No. 51 (4-133-6-Q)
1.2.22 Metalsmith Shop (4-133-2-Q)
1.2.23 Damage Control Repair Station 1A Annex (3-133-6-Q)
1.2.24 Passage (3-133-4-L)
1.2.25 Fuel Oil Service Tank No. 1A (5-122-1-F)
1.2.26 Fuel Oil Service Tank No. 1B (5-123-1-F)
1.2.27 Lube Oil Service Tank (5-124-1-F)
1.2.28 Underwater Hull Weather, Frames between 101 and 128, Port
1.2.29 Underwater Hull Weather, Frames between 101 and 129, Stbd
1.2.30 Fan Room (5-121-4-Q)
1.3 Identification:
1.3.1 Quantity (One EA), Lube Oil Service Tank
Tank No.: 5-124-1-F Capacity: 721 Gallons
1.3.2 Quantity (One EA), Jacket Water Tank
Tank No.: 6-123-1-W Capacity: 259 Gallons
1.3.3 Quantity (One Lot), Structural, Sheet Metal, Preservation, and Insulation Work for S/A 79243K SSDG Generator Set Upgrade
Remarks: See 2.3 through 2.22, Engrg Inst Enclosure-01, and Engrg Inst Enclosure-02 for material and detail
1.3.3.1 Quantity (1,510 SF), SSDG Pit in 5-121-1-E
Remarks: The area including all structure members, foundation, grating frames and support, deck fittings, bulkhead fittings, piping, piping hangers, top side of manhole covers, and boundary bulkheads
1.3.3.2 Quantity (50 SF), Entire Interior Surface of Jacket Water Tank (6-123-1-W)
Remarks: The area includes tank side of manhole cover plate(s), AVHC cover plate(s), and bolting ring
1.3.4 Quantity (One Lot), Piping Work for S/A 79243K SSDG Generator Set Upgrade
Remarks: See 2.21 for detail
1.3.4.1 Quantity (One EA), Gate Valve
FOUO
SHIP: LCC-19 CHG/VER: 0/0
Size: 1/2 Inch IPS Item No.: V1 (Label Plate No. L2) of 2.21
1.3.4.2 Quantity (2 EA), Globe Valve
Size: 1/4 Inch OD Item No.: V2 (Label Plate No. L3 and L4) of 2.21
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.5.2 Potential Lead Harzard
1.5.3 Dry Dock Work
1.5.4 Critical Coated Area: CCNY-LCC19-072-25 for the area listed in 1.3.3.1 and 1.3.3.2.
1.6 Contractor work start date:1/12/2026
1.7 Contractor work completion date: 8/5/2027
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 104-
8578012
SCD 9243 SS/EDG GENSET
UPGRADE STRUCTURAL
REMOVALS SSDG SSDG NO. 1
(5-121-1-E)
A Y AL
L
4 DWG 145-
8578060
SCD 9243 SHIPPING ACCESS
SSDG RM NO 1 (5-121-1-E)
SS/EDG UPGRADE
A Y AL
L
5 DWG 145-
8578061
SCD 9243 C&A & LABEL PLATE
MODS EXPANSION TANKS NO.
1A & 1B SSDG NO. 1 5-121-1-E
A Y AL
L
6 DWG 104-
8578063
SCD 9243 SS/EDG GENSET
UPGRADE STRUCTURAL
INSTALLATIONS SSDG NO. 1 (5-
121-1-E)
B Y AL
L
7 DWG 113-
8578064
SCD 9243 FOUNDATION
REMOVALS SSDG NO. 1 (5-121-1-
E) SS/EDG UPGRADE
A Y AL
L
8 DWG 113-
8578065
SCD 9243 SS/EDG GENSET
UPGD FOUNDATION
INSTALLATION & PREFAB SSDG
B Y AL
L
9 DWG 603-
8578068
SCD 9243 GRATING
MODIFICATIONS SSDG MCHRY
RM (5-121-1-E) SS/EDG
UPGRADE
A Y AL
L
10 DWG 104-
8578069
SCD 9243 STRUCTURAL
MODIFICATIONS EXHAUST
PIPING SHIP SERVICE DIESEL
GENERATOR
A Y AL
L
11 DWG 123-
8974323
SCD 9243 HATCH, SCUTTLE,
MANHOLE & LADDER
MODIFICATIONS FOR SSDG
- Y AL
L
FOUO
SHIP: LCC-19 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
12 DWG 113-
8974328
SCD 9243 SS/EDG GENSET
UPGRADE WATER TRAP
FOUNDATION (3-133-6-Q)
- Y AL
L
13 LAR SRFY-
0008-25
Modification & correction for discrepancies
- Y AL
L
14 DWG 603-
2492591
STD DETS-FL FRAMING-MACHY
SP
F Y AL
L
15 DWG 603-
2492595
HR & HANGER MCHRY SP DET C Y AL
L
16 DWG 803-
8499809
MANHOLES, WATERTIGHT &
OILTIGHT
- N
17 DWG 805-
1626726
FLUSH W.T. & O.T. BOLTED
PLATE MANHOLE 15" X 23" & 15"
X 18"
F N
18 PDD 167-
ELM-160649
SRF-JRMC STD ELM
REFERENCE DWG FOR
MANHOLE
- Y AL
L
19 DWG 804-
1927788
PSNS TYPE DRAWING LABELS
AND LABEL PLATES
Q N
20 DWG 501-
8620521
SCD 9243 HVAC MODIFICATIONS
SSDG INTERFERENCE 5TH DK
FR 121-137 (P & S)
A Y AL
L
21 DWG 300-
8576360
SCD 9243 COMBUSTION AIR
MODIFICATIONS - SSDG
GENERATOR UPGRADE
B Y AL
L
22 DWG 605-
8578062
SCD 9243 ESLP SS/EDG GENSET
UPGRADE SDG PAINT
INSULATION & DECK COVERING
MODS
A Y AL
L
23 TM T9074-
AS-GIB-
010/271
Requirements for Nondestructive Testing Methods
1 N
24 MIL MIL-
STD-2035
Nondestructive Testing Acceptable Criteria
A N
25 TM T-9630-
AB-MMD-
Corrosion Control Assessment and Maintenance Manual (CCAMM)
3 N
26 TM NAVSEA
4790/14
Tank and Void Structural and Coating Condition Survey (MRC G1N5)
- N
27 MIL MIL-
STD-1627
Bending of Pipe or Tube for Ship Piping Systems
C N
3. APPENDICES:
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Pump out, clean and dry each bilge space located in 1.2.1 to free from oil, debris, and other foreign matter.
5.2 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1 and 1.3.2.
5.2.1 Accomplish the requirements of 009-107 of 2.1.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.2.1.1 Accomplish the requirements of 009-09 of 2.1 for each tank listed in 1.3.1.
5.2.1.2 Ensure General Cleaning must be Level II for each tank listed in 1.3.1.
5.2.1.3 Ensure General Cleaning must be Level III for each tank listed in 1.3.2.
5.3 Accomplish each structural, sheet metal, preservation, and insulation work listed in 1.3.3 in accordance with 2.1 through 2.22, Enclosure-01, and Enclosure-02.
5.3.1 Drill hole(s) on each existing exhaust pipe support located in 1.2.4 for gas free inspection.
5.3.2 Accomplish build up weld of remaining hole(s) on each exhaust pipe support.
5.3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A and C Lines One through 7.
5.3.4 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of the watertight/airtight structural boundary. Allowable leakage: None.
5.3.5 Accomplish the requirements of 009-25 of 2.1 for a completion air test of each exhaust trunk. Test pressure must be 2 PSIG. Allowable drop in pressure: None.
5.3.6 Temporary access must be in accordance with 2.4, 2.13, and Enclosure-01.
5.3.6.1 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-04-1 through Enclosure-04-
10. Each joint identification number must be in accordance with Mapping Plan Enclosure-03.
5.3.6.2 Accomplish the requirements of 009-09 of 2.1 for welding procedure of each joint shown on Mapping Plan Enclosure-03.
5.3.6.3 Accomplish ultrasonic (UT) inspection of each new weld of each shell plate in accordance with Paragraph 6 of 2.23. The accept or reject criteria must be in accordance with Paragraph 8, Class One of 2.24.
(I)(G) “UT INSPECTION”
5.3.7 Accomplish the requirements of 009-11 of 2.1 to install new duct and compartment insulation.
5.3.7.1 Accomplish the requirements of 009-12 of 2.1.
5.3.7.2 Accomplish the requirements of 009-32 of 2.1 for receiving surface and top surface where new insulation is installed.
5.3.8 Accomplish the requirements of 009-32 of 2.1.
5.3.9 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line(s) 13, for each area listed in 1.3.3.1.
5.3.10 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 8, for each area listed in 1.3.3.2.
5.3.10.1 Submit new coating data applied to the SUPERVISOR in accordance with 2.25 and 2.26.
5.4 Accomplish each piping work listed in 1.3.4 in accordance with 2.21.
5.4.1 Bend new pipe in accordance with 2.27.
5.4.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.4.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A Lines One through 7.
5.4.4 Cycle each valve listed in 1.3.4.1 and 1.3.4.2 from full closed to full open to full closed 4 times. Allowable sticking or binding: None.
(V) “VALVE CYCLING”
5.5 Confirm that all personnel have exited the space prior to closure of the space listed in 1.2.4.1. Designate one person to account for all personnel who may have entered the space.
5.6 Accomplish the requirements of 009-32 on 2.1 for each new and disturbed surface.
5.7 Notes:
5.7.1 Planner: Code 231B Y. Yoshihara, 243-9984
Planner: Code 231B S. Ootsubo, 243-7152 Planner: Code 231B N. Kurokawa, 243-0108 Planner: Code 231B K. Yoshida, 243-0163 Planner: Code 231B A. Suzuki, 243-0968 Planner: Code 232 M. Fudo, 243-4512 Planner: Code 233 K. Uchimura, 080-9350-1432 Planner: Code 234 T. Shibano, 243-3583 Planner: Code 234 Y. Yajima, 243-0977 Engineer: Code 250 I. Hayasaka, 243-4334
5.7.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.7.3 2.26 is available on P:\C200\C225\Enclosures\C231\Tank and Void Structural and Coating Condition Survey
(MRC G1N5).
5.7.4 Opening, initial cleaning, and closing of each space listed in 1.2.8, and 1.2.10 through 1.2.16 will be covered by the following TGI No(s).
Used Lube Oil Sump (6-122-1-F): 3819P12345A01 (KTR TGI) Oily Waste Tank (6-124-1-F): 3819P12346A01 (KTR TGI) Grey Water Tank (6-125-1-W): 3819P12353A01 (KTR TGI) Fuel Oil Drain Tank (6-126-1-F): 3819P12347A01 (KTR TGI) Distillate Fuel Overflow or Ballast (9-121-1-F): 3819P12306A01 (KTR TGI) Distillate Fuel or Ballast (9-127-1-F): 3819P12308A01 (KTR TGI) Distillate Fuel or Ballast (9-121-2-F): 3819P12307A01 (KTR TGI) Distillate Fuel or Ballast (9-127-2-F): 3819P12309A01 (KTR TGI)
5.7.5 Opening, initial cleaning, closing, and installation/removal of FMEs of each space listed in 1.2.25 and 1.2.26 will be covered by the following TGI No(s).
Fuel Oil Service Tank No. 1A (5-122-1-F): 3819P12301A01 (KTR TGI) Fuel Oil Service Tank No. 1B (5-123-1-F): 3819P12301A01 (KTR TGI)
5.7.6 Steam cleaning and preservation of interior surface of skeg will be covered by TGI No. 3819P11001A01 (KTR
TGI).
5.7.7 Preservation work for disturbed exterior surfaces of underwater hull and freeboard will be covered by TGI No.
3819P11001A01 (KTR TGI).
5.7.8 Preservation work for new and disturbed surfaces of each space listed 1.2.8 and 1.2.10 through 1.2.14 will be covered by the following TGI No(s).
FOUO
SHIP: LCC-19 CHG/VER: 0/0
Used Lube Oil Sump (6-122-1-F): 3819P12345A01 (KTR TGI) Oily Waste Tank (6-124-1-F): 3819P12346A01 (KTR TGI) Grey Water Tank (6-125-1-W): 3819P12353A01 (KTR TGI) Fuel Oil Drain Tank (6-126-1-F): 3819P12347A01 (KTR TGI) Distillate Fuel Overflow or Ballast (9-121-1-F): 3819P12306A01 (KTR TGI) Distillate Fuel or Ballast (9-127-1-F): 3819P12308A01 (KTR TGI)
5.7.9 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.7.10 Provision of oily/chemical water barge will be coordinated by Project Team.
5.7.11 JCN EE01-L107 is related to this TGI.
5.8 Government Furnished Material (GFM):
5.8.1 All installing activity furnished (IAF) material and manufactured item (MN) material except hazardous material listed in each S/A drawing will be provided as kitted material by SRF-JRMC.
5.8.2 SRF-JRMC will provide GFM listed in Appendix ”M”.
5.9 SRF-JRMC will provide the following service work: (TGI No. 3819P31003S02).
5.9.1 [C740] Crane and crane rigging service.
5.9.2 [X99E] Utility service, electrical.
5.9.3 [X99M] Utilities service, including water supply, steam supply, and low pressure air supply except onboard blasting work.
5.9.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.9.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.9.6 [C133] QA inspection for (G) symbol(s) and review of coating application data.
5.9.7 [C135] QA inspection for (G) symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SA 79243 SSDG STRUCT AY A 0 0
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH STRL, SH METAL, & PSVTN WORK FOR SSDG UPGRADE
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
CMPT 5-121-1-E IN POT WTR 6-123-1-W TK CMPT 5-121-1-E MS VNT E4-124-1 DT VNT
S4-124-2 DT #1 SSDG COMB AIR DT CMPT 5-133-1-E MS CMPT 5-121-2-L MS
TRUNK 5-121-2-L MS FB FR 98-153 STBD FB FB FR 98-153 PORT FB WO 6-122-1-F
TK WO 6-124-1-F TK WW 6-125-1-W TKWO 6-126-1-F TK FO/BLST 9-121-1-F TK
FO/BLST 9-127-1-F TK FO/BLST 9-121-2-F TK FO/BLST 9-127-2-F TK TRUNK 6-117-
0-T MS CMPT 6-118-1-A MS CMPT 4-133-6-Q MS CMPT 3-133-6-Q MS FO
SVC 5-122-1-F TK FO SVC 5-123-1-F TK CMPT 5-121-2-L IN LO SVC 5-124-1-F TK VNT
S5-123-2 DT VNT SS 3-136-1 DT VNT R5-136-2 DT
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P31003A01-Engrg Inst-01.pdf) saved on 13-FEB-2025 0000.
2. ENCLOSURE-02 (3819P31003A01-Engrg Inst-02.pdf) saved on 13-FEB-2025 0000.
3. ENCLOSURE-03 (3819P31003A01-Map.pdf) saved on 13-FEB-2025 0000.
4. ENCLOSURE-04 (3819P31003A01-QA20.docx) saved on 17-FEB-2025 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P31003 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish structural work, sheet metal work, preservation work, and insulation work for S/A 79243K ship service diesel generator (SSDG) generator set upgrade.
Location of Work:
SSDG No. One (5-121-1-E) SSDG Enclosed Operating Station (5-133-1-E) Escape Trunk (5-131-1-T) Physical Fitness Room (5-121-2-L) SSDG Exhaust Trunk Fan Room (5-119-0-Q) Crew Living Space (5-109-0-L) Freeboard Weather, Frames between 129 and 132, Starboard (Stbd) Used Lube Oil Sump (6-122-1-F) Jacket Water Tank (6-123-1-W) Oily Waste Tank (6-124-1-F) Grey Water Tank (6-125-1-W) Fuel Oil Drain Tank (6-126-1-F) Distillate Fuel Overflow or Ballast (9-121-1-F) Distillate Fuel or Ballast (9-127-1-F) Distillate Fuel or Ballast (9-121-2-F) Distillate Fuel or Ballast (9-127-2-F) Trunk (6-117-0-T) DK Department Cleaning Gear Storeroom (6-118-1-A) Damage Control Shop (4-129-1-Q)
FOUO
J-2
SHIP: LCC-19 CHG/VER: 0/0
CU PHASE DESCRIPTION:
Damage Control Shop Office (4-125-1-Q) LD CTR No. 51 (4-133-6-Q) Metalsmith Shop (4-133-2-Q) Damage Control Repair Station 1A Annex (3-133-6-Q) Passage (3-133-4-L) Fuel Oil Service Tank No. 1A (5-122-1-F) Fuel Oil Service Tank No. 1B (5-123-1-F) Lube Oil Service Tank (5-124-1-F) Underwater Hull Weather, Frames between 101 and 128, Port Underwater Hull Weather, Frames between 101 and 129, Stbd Fan Room (5-121-4-Q)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 PNTR , LBR 22 KE PC
5.2 SFTR , LBR , RGRS , QA 22 KE PC
5.3 SFTR , WELD , SMTL , IMCH , OMCH , ELEC , PFTR ,
INSL , CARP , PNTR , RGRS , LBR , QA
22 KE PC
5.4 PFTR , WELD , QA 22 KE PC
5.5 SFTR 22 KE PC
5.6 PNTR , QA 22 KE PC
Dewatering and Cleaning Work CFM: for marine chemist, gaskets, fasteners, all paints, thinner, tank watch cost, and
MISC.
22 MQ CS
Structure Work CFM: for fire watch cost, confined space watch cost, marine chemist cost, label plate cost, UT inspection cost, deck covering, asbestos sampler/analysis cost for deck covering, air compressor rental cost and fuel oil cost for air hose test, gaskets and fasteners, compound, and MISC such as ---continue to below---
22 MQ CS
---continued to from above--- electrode, gases, temporary closure/covering/safety equipment material, tape, and other consumable.
22 MQ CS
Sheet Metal Work CFM:for firewatch cost, asbestos sampler/ analysis cost for compartment and duct insulation, misc such as electrode, gases, fastener, covering material, and consumable.
22 MQ CS
Electrical Work CFM: for banding material, fasteners, insulation tape, plastic bags, rope, and other consumable.
22 MQ CS
Piping Work CFM: for fire watch cost and MISC such as other consumable material.
22 MQ CS
Lagging Work CFM: for asbestos sampler and analysis cost, covering material, tyvek suit, and MISC such as other consumable material.
22 MQ CS
Preservation Work CFM: for all paints, thinners, stud pin, adhesive, tyvex suit, grits including disposal cost, fire watch cost, confined space watch cost, sampler/analysis cost for asbestos/lead, dryer/fuel oil cost/compressor rental cost for blast machine, and MISC such as covering material and other consumable.
22 MQ CS
Process Funding Document 10 CT OM
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SA 79243 SSDG STRUCT AY A 0 0
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH STRL, SH METAL, & PSVTN WORK FOR SSDG UPGRADE
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
1 501-5287967 2 5287967 J
3 LAR SRFY-0008-25
JOB ORDER: KEY OP:
3819P31003 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M INSULATI, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9Q 5640 008096312 NA 4 N 50455319
200/EA
002 M SOUND CO, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9Q 5640 007565866 NA 4 N 50455321 80/SH
003 M TAPE,TEX, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 8315 002671632 NA 4 N 50455322 17/RO
004 M TAPE,TEX, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 8315 002671633 NA 4 N 50455323 3/RO
005 M CAP, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9Z 5340 LL4601470 NA 4 N 50457513
500/EA
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
006 M CAP,SNAP, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 5325 007377648 NA 4 N 50455162
200/EA
007 M ADHESIVE, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 8040 002738708 NA 4 Y 50455076 13/GL
060 1 M SCREW, HEX CAP, 3/8",
SCREW, HEX CAP. SIZE: 3/8"-
16UNC-2A X 1"LG,
MATL: ZINC COATED CARBON
STEEL, ASTM A449 TYPE I,
SECTION 6 ITEM 17 FOR DUCT
HANGER
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 5305 LL9301548 NA 4 N 50/EA
061 1 M NUT,STL,HEX, SECTION 6
ITEM 18 FOR DUCT HANGER
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
1H 5310 016922315 X3 NA 4 N 50455441 50/EA
062 1 M TAPE,INSULATION,ELE,
SECTION 6 ITEM 22 FOR DUCT
HANGER
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 5970 005506498 NA 4 N 50455442 1/RO
063 1 M BAR,METAL, SECTION 6 ITEM
25 FOR DUCT HANGER
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 9530 005422585 NA 4 N 50455260 40/FT
064 1 M STRIP,METAL, SECTION 6
ITEM 27 FOR DUCT HANGER
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 9515 002043974 NA 4 N 50455257 40/FT
065 1 M BAR,METAL, SECTION 6 ITEM
28 FOR DUCT HANGER
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 9510 012447695 NA 4 N 50455443 40/FT
066 1 M ANGLE,STRUCTURAL,
SECTION 6 ITEM 35 FOR DUCT
HANGER
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 9520 002774903 NA 4 N 50455255 40/FT
067 1 M ANGLE,STRUCTURAL,
SECTION 12 ITEM 6 FOR DUCT
FLANGE
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 9540 005422700 NA 4 N 50455223 40/FT
068 1 M ANGLE,STRUCTURAL,
SECTION 12 ITEM 5 FOR DUCT
FLANGE
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 9540 005422696 NA 4 N 50455446 40/FT
FOUO
M-3
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
069 1 M RUBBER SHEET,SOLID,
SECTION 12 ITEM 22 FOR
DUCT FLANGE
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 9320 002440192 NA 4 N 50455220 27/FT
070 1 M SCREW, HEX CAP, 1/4",
SCREW, HEX CAP. SIZE: 1/4"-
20UNC-2A X 1-1/4"LG, MATL:
ZINC COATED CARBON
STEEL, ASTM A449 TYPE I,
ITEM NO. 23 OF 501-5287967 J
SEC 12
ORDERED FOR KTR
ORIG: C231B S. OOTSUBO,
243-7152
9B 5305 LL9811454 NA 4 N
1000/E
A
071 1 M NUT,SELF, SECTION 12 ITEM
27 FOR DUCT FLANGE
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 5310 013954695 NA 4 N 50455165
1000/E
A
072 1 M ANGLE,STRUCTURAL,
SECTION 12 ITEM 8 FOR DUCT
FLANGE
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 9520 002775988 NA 4 N 50455253 80/FT
073 1 M ANGLE,STRUCTURAL,
SECTION 12 ITEM 9 FOR DUCT
FLANGE
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 9520 002774902 NA 4 N 50455250 80/FT
074 1 M SHEET,ME, SECTION 12 ITEM
4 FOR DUCT FLANGE
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 9515 002375417 NA 4 N 50455324 2/SH
075 1 M SCREW, HEX CAP, 3/8",
SCREW, HEX CAP. SIZE: 3/8"-
16UNC-2A X 1-1/4"LG, MATL:
ZINC COATED CARBON
STEEL, ASTM A449 TYPE I,
ITEM NO. 24 OF 501-5287967 J
SEC 12
SECTION 12 ITEM 24 FOR
DUCT FLANGE
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 5305 LL9811455 NA 4 N
500/EA
076 1 M NUT,SELF, SECTION 12 ITEM
28 FOR DUCT FLANGE
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 5310 013587622 NA 4 N 50455166
500/EA
077 1 M SEALER,CHEMICAL, SECTION
5 ITEM 11 FOR DUCT SEALING
ORIG: C231B S. OOTSUBO 243-
9B 6850 010234535 NA 4 Y 50455447 1/BK
FOUO
M-4
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
078 M INSULATI, COMPARTMENT
INSULATION FOR
INSTALLATION OF DUCT
HANGER
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9Q 5640 008096312 NA 4 N 50455325 20/EA
079 M SOUND CO, COMPARTMENT
INSULATION FOR
INSTALLATION OF DUCT
HANGER
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9Q 5640 007565866 NA 4 N 50455326 20/SH
080 M TAPE,TEX, COMPARTMENT
INSULATION FOR
INSTALLATION OF DUCT
HANGER
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 8315 002671632 NA 4 N 50455327 3/RO
081 M TAPE,TEX, COMPARTMENT
INSULATION FOR
INSTALLATION OF DUCT
HANGER
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 8315 002671633 NA 4 N 50455329 1/RO
082 M ADHESIVE, COMPARTMENT
INSULATION FOR
INSTALLATION OF DUCT
HANGER
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 8040 002738708 NA 4 Y 50455079 4/GL
083 M CAP,SNAP, FOR DUCT
INSULATION
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 5325 007377648 NA 4 N 50455167 50/EA
084 M CAP, FOR DUCT INSULATION
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9Z 5340 LL4601470 NA 4 N 50457516
300/EA
085 M PLATE,MO, FOR DUCT
INSULATION
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 5340 010245086 NA 4 N 50455168
400/EA
086 M ADHESIVE, FOR DUCT
INSULATION
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 8040 009035081 NA 4 Y 50455245 4/KT
087 M CLOTH,PL, FOR DUCT
INSULATION
ORIG: C231B S. OOTSUBO 243-
ORDER FOR KTR
9B 8305 001487363 NA 4 N 50455331 1/RO
088 M ADHESIVE, ”ARMACELL
REQUIRED”
FOR DUCT INSULATION
ORIG: C231B S. OOTSUBO 243-
9B 8040 005508835 NA 4 Y 50455246 4/GL
FOUO
M-5
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
089 2 M ROUND NWT PRESSED FL,
ROUND NWT PRESSED
FLANGE, 11”DIA, CRES 316L,
0.063" THK, ASTM-A-240
FINISH-2, OD OF DUCT + 2-
1/2”, WITH HOLE IAW SECTION
12 NOTE 6.
ORDER FOR KTR
ORIG: C231B, S. OOTSUBO,
243-7152
FOR ITEM 18 OF 8620521 REV
A TERMINAL ADJUSTABLE
BLAST
NA 4 N 3/SE
100 3 M BEAM,STRUCTURAL T-SH,
FOR DWG 104-8578063,
BEAM, STRUCTURAL T-
SHAPE, SIZE: 4" X 4" X 5LBS,
MATL: STEEL, OS,T-BEAM,MIL-
S-22698,ABS GR-A, ASTM A36,
QTY: 10 FT (ONE
CONTINUOUS LENGTH
REQUIRED) X 1 EA,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
LL4601720 NA 4 N 10/FT
101 3 M PLATE,ME, FOR DWG 104-
8578063 & 104-8578065, SIZE: 1 FT X 2 FT,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9515 002375333 NA 4 N 50455229 2/SF
102 3 M PLATE,ME, FOR DWG 104-
8578069 & 104-8578069, ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9515 002336261 NA 4 N 50455332 1/PM
103 3 M PLATE,ME, FOR DWG 104-
8578069 & 104-8578069, SIZE: 5 FT X 20 FT,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9515 001533184 NA 4 N 50455230
100/SF
104 3 M BEAM,STRUCTURAL, FOR
DWG 104-8578069,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9520 002780932 NA 4 N 50455449 20/FT
450 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 4-1/8" OD TUBE,
SIZE: 4-1/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5640 LL9607847 NA 4 N 50457517 3/EA
FOUO
M-6
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
451 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013, FOR 5" IPS, SIZE: 5-
5/8" ID X 3/4" THK X 6 FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED), MATL:
NON-HALOGEN, 2EA/BOX
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5640 LL9607849 NA 4 N 50457518 3/EA
452 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 1" IPS,
SIZE: 1-3/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
**GSA ADVANTAGE ITEM**
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 5970 LL4783096 NA 4 N 50457519 2/EA
453 M SEALING COMPOUND, ORDER
FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 8030 001742588 NA 4 Y 50455247 2/GL
454 M ADHESIVE, ADHESIVE FOR
PLASTIC TUBE
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 8040 008419773 NA 4 Y 50455172 2/PT
455 M ADHESIVE, ADHESIVE FOR
CLOTH,
ORDER FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9B 8040 002738708 NA 4 Y 50455082 2/GL
456 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 4" IPS,
SIZE: 4-1/2" ID X 3/4" THK X 6
FT LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN,
ORIG:C234 Y.YAJIMA, 243-0977
ORDERED FOR KTR
9B 5640 LL9607848 NA 4 N 50457521 3/EA
457 M INSULATI, INSULATION, PIPE,
BRAND: K-FLEX ECO,
SPECIFICATION COMPLIANCE:
EB 4013,
FOR SIZE: 6" IPS,
SIZE: 6-5/8" ID X 3/4" THK X 6FT
LG,
UI: EA/6 FT(ONE CONTINUOUS
LENGTH REQUIRED),
MATL: NON-HALOGEN
ORIG:C-234 Y.YAJIMA, 243-
ORDERED FOR KTR
9B 5640 LL9607850 NA 4 N 50457522 2/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SA 79243 SSDG STRUCT AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P31003 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SA 79243 SSDG STRUCT AY A 0
3819P31003A01 ENCLOSURE-01 Sheet 1 of 2
AutoCAD SHX Text SUBJECT: SUPPLEMENTAL INFO FOR NDT INSPECTION & MOD OF CUT LINE OF SUPPLEMENTAL INFO FOR NDT INSPECTION & MOD OF CUT LINE OF NDT INSPECTION & MOD OF CUT LINE OF STGR FOR TEMP ACCESS HOLE INCID TO SCD 9243 TEMP ACCESS HOLE INCID TO SCD 9243 ICN; 3819P31003 ; 3819P31003 3819P31003 JCN; EE01-L107 ; EE01-L107 EE01-L107 ORIGINATOR; C250 I.HAYASAKA GINATOR; C250 I.HAYASAKA INATOR; C250 I.HAYASAKA ; C250 I.HAYASAKA C250 I.HAYASAKA I.HAYASAKA DATE; 1/28/2025 1/28/2025 /28/2025 28/2025 /2025 2025 REFERENCES: (a) LAR NO. SRFY-0008-25, MODIFICATION & CORRECTION FOR DISCREPANCIES LAR NO. SRFY-0008-25, MODIFICATION & CORRECTION FOR DISCREPANCIES SRFY-0008-25, MODIFICATION & CORRECTION FOR DISCREPANCIES MODIFICATION & CORRECTION FOR DISCREPANCIES (b) LCC19-145-8578060 "A", SHIPPING ACCESS SSDG RM NO. 1 (5-121-1-E) SS/EDG UPGRADE LCC19-145-8578060 "A", SHIPPING ACCESS SSDG RM NO. 1 (5-121-1-E) SS/EDG UPGRADE SHIPPING ACCESS SSDG RM NO. 1 (5-121-1-E) SS/EDG UPGRADE - OQE IS REQUIRED (SEE NOTE NO. 3) - OQE IS REQUIRED (SEE NOTE NO. 3) - 3) - 3) - ) - NOTES: 1. THE PURPOSE OF THIS ENGINEERING INSTRUCTION IS TO PROVIDE SUPPLEMENTAL INFORMATION FOR NDT THE PURPOSE OF THIS ENGINEERING INSTRUCTION IS TO PROVIDE SUPPLEMENTAL INFORMATION FOR NDT TO PROVIDE SUPPLEMENTAL INFORMATION FOR NDT NDT INSPECTION & MODIFICATION OF CUT LINE OF STRINGER FOR TEMPORARY ACCESS HOLE INCIDENTAL TO TEMPORARY ACCESS HOLE INCIDENTAL TO SCD 9243 OF USS BLUE RIDGE (LCC 19). OF USS BLUE RIDGE (LCC 19). BLUE RIDGE (LCC 19). (LCC 19). LCC 19). ). 2. ALL WELDING AND INSPECTION FOR STEEL MATERIALS SHALL BE CONDUCTED IN ACCORDANCE WITH ALL WELDING AND INSPECTION FOR STEEL MATERIALS SHALL BE CONDUCTED IN ACCORDANCE WITH SRF-JRMC PROCESS INSTRUCTION NO. 100-2 OR TABLE 2 OF NAVSEA STD ITEM NO. 009-12 RESPECTIVELY. VT INSPECTION SHALL BE REQUIRED IN ACCORDANCE WITH PARAGRAPH 6.4 OF IN ACCORDANCE WITH PARAGRAPH 6.4 OF MIL-STD-1689. . 3. FOR WELDS REFERENCED TO THIS NOTE, UT INSPECTION SHALL BE REQUIRED BY SECTION I.E.(2) OF FOR WELDS REFERENCED TO THIS NOTE, UT INSPECTION SHALL BE REQUIRED BY SECTION I.E.(2) OF E.(2) OF .(2) OF 2) OF ) OF TABLE-III OF MIL-STD-1689 AND PERFORMED IN ACCORDANCE WITH NOTE 2. QA FORM-20 SHALL BE NOTE 2. QA FORM-20 SHALL BE 2. QA FORM-20 SHALL BE . QA FORM-20 SHALL BE REQUIRED FOR EACH WELD AND UT INSPECTION AS OBJECTIVE QUALITY EVIDENCE (OQE) RECORD RETENTION FOR PRIMARY HULL STRUCTURAL WELDING IN ACCORDANCE WITH COMUSFLTFORCOMINST 4790.3 (JFMM), VOLUME-V, PART I, PARAGRAPH 2.2.4.d.(3). 4. FOR INFORMATION OF HULL STRUCTURE NOT SHOWN ON THIS INSTRUCTION, SEE REF (a) & (b). ALL FOR INFORMATION OF HULL STRUCTURE NOT SHOWN ON THIS INSTRUCTION, SEE REF (a) & (b). ALL a) & (b). ALL ) & (b). ALL & (b). ALL . ALL ALL EXISTING STRUCTURE'S MATERIALS SHOWN ON THIS INSTRUCTION ARE MEDIUM STEEL (MS, MIL-S-22698).
AutoCAD SHX Text_1
ENGRG INST
3819P31003A01 ENCLOSURE-01 Sheet 2 of 2
AutoCAD SHX Text_2
AutoCAD SHX Text_3
AutoCAD SHX Text_4
AutoCAD SHX Text_5
AutoCAD SHX Text_6
FWD
AutoCAD SHX Text_7
REF LINE
AutoCAD SHX Text_8 B
AutoCAD SHX Text_9
AutoCAD SHX Text_10 INSTL SHELL PLTG (EXPANDED) EXPANDED) ) STBD, LKG INBD FOR INFO NOT SHOWN, SEE REF (a) & (b)
AutoCAD SHX Text_11
EL 2-A 2-A2-A-AA
AutoCAD SHX Text_12
5TH DECK
AutoCAD SHX Text_13 STGR-16A 14 x 6 3/4 x 30# I-T
AutoCAD SHX Text_14 STGR-16B 14 x 6 3/4 x 30# I-T
AutoCAD SHX Text_15 STGR-17 12 x 6 1/2 x 27# I-T
AutoCAD SHX Text_16
4TH DECK
AutoCAD SHX Text_17 STGR-18 12 x 6 1/2 x 27# I-T
AutoCAD SHX Text_18 STGR-19 12 x 6 1/2 x 27# I-T
AutoCAD SHX Text_19 B
AutoCAD SHX Text_20
AutoCAD SHX Text_21 B
AutoCAD SHX Text_22
AutoCAD SHX Text_23 B
AutoCAD SHX Text_24
AutoCAD SHX Text_25 B
AutoCAD SHX Text_26
AutoCAD SHX Text_27
STGR (TYP)
AutoCAD SHX Text_28
PLAN 2-B
AutoCAD SHX Text_29
B2(S)V.2 (S)V.2 S)V.2 )V.2 V.2 2 NOTE 3 TYP
AutoCAD SHX Text_30
AutoCAD SHX Text_31
AutoCAD SHX Text_32
AutoCAD SHX Text_33
AutoCAD SHX Text_34
FWD
AutoCAD SHX Text_35
REF LINE
AutoCAD SHX Text_36
SHELL
AutoCAD SHX Text_37 STGR-16A, 16B 14 x 6 3/4 x 30# I-T
AutoCAD SHX Text_38 STGR-17, 18, 19 12 x 6 1/2 x 27# I-T
AutoCAD SHX Text_39
TEMP ACCESS REUSED
AutoCAD SHX Text_40
ENGRG INST
AutoCAD SHX Text_41
1" (TYP)
3819P31003A01 ENCLOSURE-02 Sheet 1 OF 1
AutoCAD SHX Text_42 SUBJECT: SUPPLEMENTAL INFO FOR ADDITIONAL CHOCK SUPPLEMENTAL INFO FOR ADDITIONAL CHOCK ICN; 3819P31003 ; 3819P31003 3819P31003 JCN; EE01-L107 ; EE01-L107 EE01-L107 ORIGINATOR; C250 I.HAYASAKA GINATOR; C250 I.HAYASAKA INATOR; C250 I.HAYASAKA ; C250 I.HAYASAKA C250 I.HAYASAKA I.HAYASAKA DATE; 1/31/2025 1/31/2025 /31/2025 31/2025 /2025 2025 REFERENCE: (a) LAR NO. SRFY-0008-25, MODIFICATION & CORRECTION FOR DISCREPANCIES LAR NO. SRFY-0008-25, MODIFICATION & CORRECTION FOR DISCREPANCIES MODIFICATION & CORRECTION FOR DISCREPANCIES NOTES: 1. THE PURPOSE OF THIS ENGINEERING INSTRUCTION IS TO PROVIDE SUPPLEMENTAL INFORMATION FOR THE PURPOSE OF THIS ENGINEERING INSTRUCTION IS TO PROVIDE SUPPLEMENTAL INFORMATION FOR TO PROVIDE SUPPLEMENTAL INFORMATION FOR ADDITIONAL CHOCK DIRECTED BY LAR RESPONSE IN REF (a) INCIDENTAL TO SCD 9243. . 2. ALL SNIPES SHALL BE 1/2 x 1/2. ALL SNIPES SHALL BE 1/2 x 1/2. 3. ALL WELDING AND INSPECTION FOR STEEL MATERIALS SHALL BE CONDUCTED IN ACCORDANCE WITH ALL WELDING AND INSPECTION FOR STEEL MATERIALS SHALL BE CONDUCTED IN ACCORDANCE WITH SRF-JRMC PROCESS INSTRUCTION NO. 100-2 OR TABLE 2 OF NAVSEA STD ITEM NO. 009-12 RESPECTIVELY. VT INSPECTION SHALL BE REQUIRED IN ACCORDANCE WITH PARAGRAPH 6.4 OF ELY. VT INSPECTION SHALL BE REQUIRED IN ACCORDANCE WITH PARAGRAPH 6.4 OF IN ACCORDANCE WITH PARAGRAPH 6.4 OF MIL-STD-1689. . 4. FOR INFORMATION OF HULL STRUCTURE NOT SHOWN ON THIS INSTRUCTION, SEE REF (a).FOR INFORMATION OF HULL STRUCTURE NOT SHOWN ON THIS INSTRUCTION, SEE REF (a).a).).
AutoCAD SHX Text_43
ENGRG INST
AutoCAD SHX Text_44
LIST OF MATERIAL
AutoCAD SHX Text_45
PC NOC NO
AutoCAD SHX Text_46
DESCRIPTIONESCRIPTION
AutoCAD SHX Text_47
QTYTY
AutoCAD SHX Text_48
MATERIAL
AutoCAD SHX Text_49
SPECPEC
AutoCAD SHX Text_50
REMARKSEMARKS
AutoCAD SHX Text_51
AutoCAD SHX Text_52 1 3/4 x 3/16 FB M/F PLATE, 7.65#PLATE, 7.65#LATE, 7.65#
AutoCAD SHX Text_53
1 SF
AutoCAD SHX Text_54
STEEL (OS)
AutoCAD SHX Text_55
MIL-S-22698 GR A
AutoCAD SHX Text_56 4 x 4 x 5# T OS
AutoCAD SHX Text_57 CHOCK FOR HORIZ STIF FOR INFO NOT SHOWN, SEE DET 55-B IN Attachment-1 OF REF (a).
AutoCAD SHX Text_58
DET 1-AT 1-A1-A
AutoCAD SHX Text_59
TRANSV BHD FR 121
AutoCAD SHX Text_60 VERT STIF 6 x 4 x 11# T, MS (TYP)
AutoCAD SHX Text_61 3/16
AutoCAD SHX Text_62
AutoCAD SHX Text_63
CHOCK (TYP)
3819P31003A01 ENCLOSURE-03 Sheet 1 OF 1
AutoCAD SHX Text_64
AutoCAD SHX Text_65
AutoCAD SHX Text_66
AutoCAD SHX Text_67
AutoCAD SHX Text_68
FWD
AutoCAD SHX Text_69
REF LINE
AutoCAD SHX Text_70
SHELL PLTG (EXPANDED) EXPANDED) ) STBD, LKG INBD
AutoCAD SHX Text_71
EL 1-A 1-A1-A-AA
AutoCAD SHX Text_72
5TH DECK
AutoCAD SHX Text_73 STGR-16A 14 x 6 3/4 x 30# I-T, MS
AutoCAD SHX Text_74 STGR-16B 14 x 6 3/4 x 30# I-T, MS
AutoCAD SHX Text_75 STGR-17 12 x 6 1/2 x 27# I-T, MS
AutoCAD SHX Text_76
4TH DECK
AutoCAD SHX Text_77 STGR-18 12 x 6 1/2 x 27# I-T, MS
AutoCAD SHX Text_78 STGR-19 12 x 6 1/2 x 27# I-T, MS
AutoCAD SHX Text_79
TEMP ACCESS REUSED
AutoCAD SHX Text_80
HJ-1-1
AutoCAD SHX Text_81
HJ-1-2
AutoCAD SHX Text_82
HJ-1-4
AutoCAD SHX Text_83
HJ-1-6
AutoCAD SHX Text_84
HJ-1-81-8-8
AutoCAD SHX Text_85
HJ-1-3
AutoCAD SHX Text_86
HJ-1-71-7-7
AutoCAD SHX Text_87
HJ-1-91-9-9
AutoCAD SHX Text_88
HJ-1-5
AutoCAD SHX Text_89
HJ-1-101-10-10
AutoCAD SHX Text_90
MAPPING PLAN
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
3819P31003A01 ENCLOSURE-04-1 TOTAL 10
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC-19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
17 FEB 2025
7. SYSTEM
PRIMARY STRUCTURE
8. COMPONENT
STRINGER
9. DWG NO.
DWG 145-8578060 REV. A & Engrg Inst Enclosure-01
10. CWP STEP NO.
5.3.6.1
11. JOINT ID
HJ-1-1
12. JOINT DESIGN
B2(S)V.2
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
MIL-STD-1689A
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
THE ACTION HAS BEEN PERFORMED IN ACCORDANCE WITH THE SPECIFIED
REQUIREMENTS.
3819P31003A01 ENCLOSURE-04-1 TOTAL 10
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A01 ENCLOSURE-04-2 TOTAL 10
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC-19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
17 FEB 2025
7. SYSTEM
PRIMARY STRUCTURE
8. COMPONENT
STRINGER
9. DWG NO.
DWG 145-8578060 REV. A & Engrg Inst Enclosure-01
10. CWP STEP NO.
5.3.6.1
11. JOINT ID
HJ-1-2
12. JOINT DESIGN
B2(S)V.2
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
MIL-STD-1689A
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A01 ENCLOSURE-04-2 TOTAL 10
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A01 ENCLOSURE-04-3 TOTAL 10
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC-19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
17 FEB 2025
7. SYSTEM
PRIMARY STRUCTURE
8. COMPONENT
STRINGER
9. DWG NO.
DWG 145-8578060 REV. A & Engrg Inst Enclosure-01
10. CWP STEP NO.
5.3.6.1
11. JOINT ID
HJ-1-3
12. JOINT DESIGN
B2(S)V.2
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
MIL-STD-1689A
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A01 ENCLOSURE-04-3 TOTAL 10
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A01 ENCLOSURE-04-4 TOTAL 10
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC-19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
17 FEB 2025
7. SYSTEM
PRIMARY STRUCTURE
8. COMPONENT
STRINGER
9. DWG NO.
DWG 145-8578060 REV. A & Engrg Inst Enclosure-01
10. CWP STEP NO.
5.3.6.1
11. JOINT ID
HJ-1-4
12. JOINT DESIGN
B2(S)V.2
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
MIL-STD-1689A
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A01 ENCLOSURE-04-4 TOTAL 10
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A01 ENCLOSURE-04-5 TOTAL 10
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC-19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
17 FEB 2025
7. SYSTEM
PRIMARY STRUCTURE
8. COMPONENT
STRINGER
9. DWG NO.
DWG 145-8578060 REV. A & Engrg Inst Enclosure-01
10. CWP STEP NO.
5.3.6.1
11. JOINT ID
HJ-1-5
12. JOINT DESIGN
B2(S)V.2
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
MIL-STD-1689A
3…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .