Technical Exhibit U Div 23 HVAC.pdf

PDF 4 MB Posted

Attached to
FORT BLISS JOB ORDER CONTRACT
Solicitation number
W911SG20R0042
Issued by

About this file

This solicitation is for a single-award Indefinite Delivery Indefinite Quantity Job Order Contract for real property sustainment, restoration, and modernization minor construction projects at Fort Bliss, Texas. The contract term consists of a 12-month base period and four 12-month option periods, with an estimated total value between $75-100 million. Firm-fixed price task orders will range from $2,000 to $1 million. This 100% small business set-aside acquisition uses NAICS code 236220 with a $39.5 million size standard. The solicitation is available only on beta.sam.gov; prospective contractors must register in SAM under NAICS 236220 to be eligible for award. Notification of any amendments will also be posted on beta.sam.gov.

View the file

Other files

File Type Posted
Attachment 7 Coefficient Non-PrePriced Items Texas - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
Attachment 6 Coefficient Other Than Normal Texas - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
Attachment 7a Coefficient Non-PrePriced Items New Mexico - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
SOLICITATION Conform Copy 0003 FORT BLISS JOC W911SG20R0042.pdf PDF
Attachment 9 RFIs 2 Aug 2021 W911SG20R0042.pdf PDF
Technical Exhibit A Division 1 General Requirements 2 Aug 2021.pdf PDF
SOLICITATION Amendment 0003 FORT BLISS JOC W911SG20R0042-0003.pdf PDF
Attachment 8 Historical Workload 2 Aug 2021 W911SG20R0042.pdf PDF
Attachment 5a Coefficient Normal New Mexico - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
Attachment 5 Coefficient Normal Texas - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
Attachment 6a Coefficient Other Than Normal New Mexico - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
SOLICITATION Conform Copy 0002 FORT BLISS JOC W911SG20R0042.pdf PDF
SOLICITATION Amendment 0002 FORT BLISS JOC W911SG20R0042-0002.pdf PDF
SOLICITATION Amendment 0001 FORT BLISS JOC W911SG20R0042-0001.pdf PDF
SOLICITATION Conform Copy 0001 FORT BLISS JOC W911SG20R0042.pdf PDF
Attachment 1 Consent Letter - Bliss JOC W911SG20R0042.docx DOCX document
Technical Exhibit AD Div 44 Pollution Control Equipment.pdf PDF
Attachment 6 Coefficient Other Than Normal - Bliss JOC W911SG20R0042.xlsx XLSX spreadsheet
Technical Exhibit Q Div 13 Special Construction.pdf PDF
Attachment 4a Notional Task Order Technical Drawings - Bliss JOC W911SG20R0042.pdf PDF
Technical Exhibit Z Div 32 Exterior Improvements.pdf PDF
Attachment 7 Coefficient Non-PrePriced Items - Bliss JOC W911SG20R0042.xlsx XLSX spreadsheet
Technical Exhibit AE Div 46 Water and Wastewater Equipment.pdf PDF
Technical Exhibit AB Div 34 Transportation.pdf PDF
Technical Exhibit C General Decision TX20210245.pdf PDF
Technical Exhibit T Div 22 Plumbing.pdf PDF
Technical Exhibit N Div 10 Specialties.pdf PDF
Technical Exhibit AA Div 33 Utilities.pdf PDF
Technical Exhibit J Div 06 Wood-Plastics-Composites.pdf PDF
Technical Exhibit F Div 02 Existing Conditions.pdf PDF
FORT BLISS JOC SOLICITATION W911SG20R0042.pdf PDF
Technical Exhibit O Div 11 Equipment.pdf PDF
Technical Exhibit B Areas of Fort Bliss with Historical Workload.pdf PDF
Technical Exhibit V Div 26 Electrical.pdf PDF
Technical Exhibit E General Decision NM20210045.pdf PDF
Technical Exhibit I Div 05 Metals.pdf PDF
Technical Exhibit K Div 07 Thermal and Moisture Protection.pdf PDF
Technical Exhibit S Div 21 Fire Suppression.pdf PDF
Technical Exhibit X Div 28 Electronic Safey and Security.pdf PDF
Attachment 4 Notional Task Order - Bliss JOC W911SG20R0042.pdf PDF
Technical Exhibit P Div 12 Furnishings.pdf PDF
Technical Exhibit Y Div 31 Earthwork.pdf PDF
Technical Exhibit H Div 04Masonry.pdf PDF
Technical Exhibit AC Div 35 Waterway.pdf PDF
Attachment 2 Specific Relevant Contracts - Bliss JOC W911SG20R0042.docx DOCX document
Attachment 3 Past Performance Questionnaire - Bliss JOC W911SG20R0042.docx DOCX document
Technical Exhibit L Div 08 Openings.pdf PDF
Technical Exhibit A Division 1 General Requirements.pdf PDF
Attachment 5 Coefficient Normal- Bliss JOC W911SG20R0042.xlsx XLSX spreadsheet
Technical Exhibit G Div 03 Concrete.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 230513 - 1

SECTION 230513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes general requirements for single-phase and polyphase, general-purpose, horizontal, small and medium, squirrel-cage induction motors for use on ac power systems up to 600 V and installed at equipment manufacturer's factory or shipped separately by equipment manufacturer for field installation.

1.3 COORDINATION

A. Coordinate features of motors, installed units, and accessory devices to be compatible with the following:

1. Motor controllers.

2. Torque, speed, and horsepower requirements of the load.

3. Ratings and characteristics of supply circuit and required control sequence.

4. Ambient and environmental conditions of installation location.

PART 2 - PRODUCTS

2.1 GENERAL MOTOR REQUIREMENTS

A. Comply with NEMA MG 1 unless otherwise indicated.

B. Comply with IEEE 841 for severe-duty motors.

2.2 MOTOR CHARACTERISTICS

A. Duty: Continuous duty at ambient temperature of 40 degrees C and at altitude of 3300 feet above sea level.

B. Capacity and Torque Characteristics: Sufficient to start, accelerate, and operate connected loads at designated speeds, at installed altitude and environment, with indicated operating sequence, and without exceeding nameplate ratings or considering service factor.

COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 230513 - 2

2.3 POLYPHASE MOTORS

A. Description: NEMA MG 1, Design B, medium induction motor.

B. Efficiency: Energy efficient, as defined in NEMA MG 1.

C. Service Factor: 1.15.

D. Multispeed Motors: Variable torque.

1. For motors with 2:1 speed ratio, consequent pole, single winding.

2. For motors with other than 2:1 speed ratio, separate winding for each speed.

E. Multispeed Motors: Separate winding for each speed.

F. Rotor: Random-wound, squirrel cage.

G. Bearings: Regreasable, shielded, antifriction ball bearings suitable for radial and thrust loading.

H. Temperature Rise: Match insulation rating.

I. Insulation: Class F.

J. Code Letter Designation:

1. Motors 15 HP and Larger: NEMA starting Code F or Code G.

2. Motors Smaller than 15 HP: Manufacturer's standard starting characteristic.

K. Enclosure Material: Cast iron for motor frame sizes 324T and larger; rolled steel for motor frame sizes smaller than 324T.

2.4 POLYPHASE MOTORS WITH ADDITIONAL REQUIREMENTS

A. Motors Used with Reduced-Voltage and Multispeed Controllers: Match wiring connection requirements for controller with required motor leads. Provide terminals in motor terminal box, suited to control method.

B. Motors Used with Variable Frequency Controllers: Ratings, characteristics, and features coordinated with and approved by controller manufacturer.

1. Windings: Copper magnet wire with moisture-resistant insulation varnish, designed and tested to resist transient spikes, high frequencies, and short time rise pulses produced by pulse-width modulated inverters.

2. Energy- and Premium-Efficient Motors: Class B temperature rise; Class F insulation.

3. Inverter-Duty Motors: Class F temperature rise; Class H insulation.

4. Thermal Protection: Comply with NEMA MG 1 requirements for thermally protected motors.

COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT 230513 - 3

C. Severe-Duty Motors: Comply with IEEE 841, with 1.15 minimum service factor.

2.5 SINGLE-PHASE MOTORS

A. Motors larger than 1/20 hp shall be one of the following, to suit starting torque and requirements of specific motor application:

1. Permanent-split capacitor.

2. Split phase.

3. Capacitor start, inductor run.

4. Capacitor start, capacitor run.

B. Multispeed Motors: Variable-torque, permanent-split-capacitor type.

C. Bearings: Prelubricated, antifriction ball bearings or sleeve bearings suitable for radial and thrust loading.

D. Motors 1/20 HP and Smaller: Shaded-pole type.

E. Thermal Protection: Internal protection to automatically open power supply circuit to motor when winding temperature exceeds a safe value calibrated to temperature rating of motor insulation. Thermal-protection device shall automatically reset when motor temperature returns to normal range.

PART 3 - EXECUTION

NOT USED

END OF SECTION 230513

EXPANSION FITTINGS AND LOOPS FOR PIPING 230516 - 1

SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR PIPING

A. Section Includes:

1. Flexible, ball-joint, packed expansion joints.

2. Slip-joint packed expansion joints.

3. Expansion-compensator packless expansion joints.

4. Flexible-hose packless expansion joints.

5. Metal-bellows packless expansion joints.

6. Rubber packless expansion joints.

7. Grooved-joint expansion joints.

8. Pipe loops and swing connections.

9. Alignment guides and anchors.

1.3 PERFORMANCE REQUIREMENTS

A. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures.

B. Capability: Products to absorb 200 percent of maximum axial movement between anchors.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Delegated-Design Submittal: For each anchor and alignment guide indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1. Design Calculations: Calculate requirements for thermal expansion of piping systems and for selecting and designing expansion joints, loops, and swing connections.

2. Anchor Details: Detail fabrication of each anchor indicated. Show dimensions and methods of assembly and attachment to building structure.

3. Alignment Guide Details: Detail field assembly and attachment to building structure.

4. Schedule: Indicate type, manufacturer's number, size, material, pressure rating, end connections, and location for each expansion joint.

EXPANSION FITTINGS AND LOOPS FOR PIPING 230516 - 2

1.5 INFORMATIONAL SUBMITTALS

A. Welding certificates.

B. Product Certificates: For each type of expansion joint, from manufacturer.

1.6 CLOSEOUT SUBMITTALS

A. Maintenance Data: For expansion joints to include in maintenance manuals.

1.7 QUALITY ASSURANCE

A. Welding Qualifications: Qualify procedures and personnel according to the following:

1. AWS D1.1/D1.1M, "Structural Welding Code - Steel."

2. ASME Boiler and Pressure Vessel Code: Section IX.

2.1 PACKED EXPANSION JOINTS

A. Flexible, Ball-Joint, Packed Expansion Joints:

1. Manufacturers: Comply with Requirements.

2. Standards: ASME Boiler and Pressure Vessel Code: Section II, "Materials"; and

ASME B31.9, "Building Services Piping," for materials and design of pressure-containing parts and bolting.

3. Material: Carbon-steel assembly with asbestos-free composition packing.

4. Design: For 360-degree rotation and angular deflection.

5. Minimum Pressure Rating: 250 psig at 400 deg F (1725 kPa at 204 deg C).

6. Angular Deflection for NPS 6 (DN 150) and Smaller: 30 degree minimum.

7. Angular Deflection for NPS 8 (DN 200) and Larger: 15 degree minimum.

8. End Connections for NPS 2 (DN 50) and Smaller: Threaded.

9. End Connections for NPS 2-1/2 (DN 65) and Larger: Flanged.

B. Slip-Joint Packed Expansion Joints:

2. Standard: ASTM F 1007.

3. Material: Carbon steel with asbestos-free PTFE packing.

4. Design: With internal guide and injection device for repacking under pressure. Include drip connection if used for steam piping.

5. Configuration: Single joint or Single joint with base and double joint with base class(es) unless otherwise indicated.

6. End Connections: Flanged or weld ends to match piping system.

EXPANSION FITTINGS AND LOOPS FOR PIPING 230516 - 3

2.2 PACKLESS EXPANSION JOINTS

A. Metal, Expansion-Compensator Packless Expansion Joints:

2. Minimum Pressure Rating: 150 psig or 175 psig unless otherwise indicated.

3. Configuration for Copper Tubing: Two-ply, phosphor-bronze bellows with copper pipe ends.

a. End Connections for Copper Tubing NPS 2 and Smaller: Solder joint or threaded.

b. End Connections for Copper Tubing NPS 2-1/2 to NPS 4: Threaded.

4. Configuration for Steel Piping: Two-ply, stainless-steel bellows; steel-pipe end connections; and carbon-steel shroud.

a. End Connections for Steel Pipe NPS 2 and Smaller: Threaded.

b. End Connections for Steel Pipe NPS 2-1/2 to NPS 4: Flanged or Weld.

B. Rubber, Expansion-Compensator Packless Expansion Joints:

2. Material: Twin reinforced-rubber spheres with external restraining cables.

3. Minimum Pressure Rating: 150 psig at 170 deg F unless otherwise indicated.

4. End Connections for NPS 2 and Smaller: Threaded.

C. Flexible-Hose Packless Expansion Joints:

2. Description: Manufactured assembly with inlet and outlet elbow fittings and two flexible-metal-hose legs joined by long-radius, 180-degree return bend or center section of flexible hose.

3. Flexible Hose: Corrugated-metal inner hoses and braided outer sheaths.

4. Expansion Joints for Copper Tubing NPS 2 and Smaller: Copper-alloy fittings with solder-joint end connections.

a. Bronze hoses and single-braid bronze sheaths with 450 psig at 70 deg F and 340 psig at 450 deg F ratings.

b. Bronze hoses and double-braid bronze sheaths with 700 psig at 70 deg F and 500 psig at 450 deg F ratings.

5. Expansion Joints for Copper Tubing NPS 2-1/2 to NPS 4: Copper-alloy fittings with threaded end connections.

a. Stainless-steel hoses and single-braid, stainless-steel sheaths with 300 psig at 70 deg F and 225 psig at 450 deg F ratings.

b. Stainless-steel hoses and double-braid, stainless-steel sheaths with 420 psig at 70 deg F and 315 psig at 450 deg F ratings.

EXPANSION FITTINGS AND LOOPS FOR PIPING 230516 - 4

6. Expansion Joints for Steel Piping NPS 2 and Smaller: Carbon-steel fittings with threaded end connections.

a. Stainless-steel hoses and single-braid, stainless-steel sheaths with 450 psig at 70 deg F and 325 psig at 600 deg F ratings.

b. Stainless-steel hoses and double-braid, stainless-steel sheaths with 700 psig at 70 deg F and 515 psig at 600 deg F ratings.

7. Expansion Joints for Steel Piping NPS 2-1/2 to NPS 6: Carbon-steel fittings with flanged or weld end connections.

a. Stainless-steel hoses and single-braid, stainless-steel sheaths with 200 psig at 70 deg F and 145 psig at 600 deg F ratings.

b. Stainless-steel hoses and double-braid, stainless-steel sheaths with 275 psig at 70 deg F and 200 psig at 600 deg F ratings.

8. Expansion Joints for Steel Piping NPS 8 to NPS 12: Carbon-steel fittings with flanged or weld end connections.

a. Stainless-steel hoses and single-braid, stainless-steel sheaths with 125 psig at 70 deg F and 90 psig at 600 deg F ratings.

b. Stainless-steel hoses and double-braid, stainless-steel sheaths with 165 psig at 70 deg F and 120 psig at 600 deg F ratings.

9. Expansion Joints for Steel Piping NPS 14 and Larger: Carbon-steel fittings with flanged or weld end connections.

a. Stainless-steel hoses and double-braid, stainless-steel sheaths with 165 psig at 70 deg F and 120 psig at 600 deg F ratings.

D. Metal-Bellows Packless Expansion Joints:

2. Standards: ASTM F 1120 and EJMA's "Standards of the Expansion Joint Manufacturers

Association, Inc."

3. Type: Circular, corrugated bellows with external tie rods.

4. Minimum Pressure Rating: 150 psig or 175 psig unless otherwise indicated.

5. Configuration: Single joint Single joint with base and double joint with base class(es) unless otherwise indicated.

6. Expansion Joints for Copper Tubing: Single, Single- or multi Multi-ply phosphor-bronze bellows, copper pipe ends, and brass shrouds.

a. End Connections for Copper Tubing NPS 2 and Smaller: Solder joint or threaded.

b. End Connections for Copper Tubing NPS 2-1/2 to NPS 4: Solder joint or threaded.

c. End Connections for Copper Tubing NPS 5 and Larger: Flanged.

EXPANSION FITTINGS AND LOOPS FOR PIPING 230516 - 5

7. Expansion Joints for Steel Piping: Single, Single- or multi Multi-ply stainless-steel bellows, steel pipe ends, and carbon-steel shroud.

a. End Connections for Steel Pipe NPS 2 and Smaller: Threaded.

b. End Connections for Steel Pipe NPS 2-1/2 and Larger: Flanged or Weld.

E. Rubber Packless Expansion Joints:

2. Standards: ASTM F 1123 and FSA's "Technical Handbook: Non-Metallic Expansion

Joints and Flexible Pipe Connectors."

3. Material: Fabric-reinforced rubber complying with FSA-NMEJ-703.

4. Arch Type: Single or multiple arches with external control rods.

5. Spherical Type: Single or multiple spheres with external control rods.

6. Minimum Pressure Rating for NPS 1-1/2 to NPS 4: 150 psig at 220 deg F.

7. Minimum Pressure Rating for NPS 5 and NPS 6: 140 psig at 200 deg F.

8. Minimum Pressure Rating for NPS 8 to NPS 12: 140 psig at 180 deg F.

9. Material for Fluids Containing Acids, Alkalies, or Chemicals: BR, CSM or EPDM

10. Material for Fluids Containing Gas, Hydrocarbons, or Oil: Buna-N or CR.

11. Material for Water: BR, Buna-N, CR, CSM, EPDM or NR.

12. End Connections: Full-faced, integral steel flanges with steel retaining rings.

2.3 GROOVED-JOINT EXPANSION JOINTS

A. Manufacturers: Comply with Requirements.

B. Description: Factory-assembled expansion joint made of several grooved-end pipe nipples, couplings, and grooved joints.

C. Standard: AWWA C606, for grooved joints.

D. Nipples: Galvanized, ASTM A 53/A 53M, Schedule 40, Type E or S, steel pipe with grooved ends.

E. Couplings: Five, Seven, 10 or 12, flexible type for steel-pipe dimensions. Include ferrous housing sections, Buna-N gasket suitable for diluted acid, alkaline fluids, and cold and hot water EPDM gasket suitable for cold and hot water, and bolts and nuts.

2.4 ALIGNMENT GUIDES AND ANCHORS

A. Alignment Guides:

2. Description: Steel, factory-fabricated alignment guide, with bolted two-section outer cylinder and base for attaching to structure; with two-section guiding spider for bolting to pipe.

EXPANSION FITTINGS AND LOOPS FOR PIPING 230516 - 6

B. Anchor Materials:

1. Steel Shapes and Plates: ASTM A 36/A 36M.

2. Bolts and Nuts: ASME B18.10 or ASTM A 183, steel hex head.

3. Washers: ASTM F 844, steel, plain, flat washers.

4. Mechanical Fasteners: Insert-wedge-type stud with expansion plug anchor for use in hardened Portland cement concrete, with tension and shear capacities appropriate for application.

a. Stud: Threaded, zinc-coated carbon steel.

b. Expansion Plug: Zinc-coated steel.

c. Washer and Nut: Zinc-coated steel.

5. Chemical Fasteners: Insert-type-stud, bonding-system anchor for use with hardened

Portland cement concrete, with tension and shear capacities appropriate for application.

a. Bonding Material: ASTM C 881/C 881M, Type IV, Grade 3, two-component epoxy resin suitable for surface temperature of hardened concrete where fastener is to be installed.

b. Stud: ASTM A 307, zinc-coated carbon steel with continuous thread on stud unless otherwise indicated.

c. Washer and Nut: Zinc-coated steel.

3.1 EXPANSION-JOINT INSTALLATION

A. Install expansion joints of sizes matching sizes of piping in which they are installed.

B. Install packed-type expansion joints with packing suitable for fluid service.

C. Install metal-bellows expansion joints according to EJMA's "Standards of the Expansion Joint Manufacturers Association, Inc."

D. Install rubber packless expansion joints according to FSA-NMEJ-702.

E. Install grooved-joint expansion joints to grooved-end steel piping

3.2 PIPE LOOP AND SWING CONNECTION INSTALLATION

A. Install pipe loops cold-sprung in tension or compression as required to partly absorb tension or compression produced during anticipated change in temperature.

B. Connect risers and branch connections to mains with at least five pipe fittings including tee in main.

EXPANSION FITTINGS AND LOOPS FOR PIPING 230516 - 7

C. Connect risers and branch connections to terminal units with at least four pipe fittings including tee in riser.

D. Connect mains and branch connections to terminal units with at least four pipe fittings including tee in main.

3.3 ALIGNMENT-GUIDE AND ANCHOR INSTALLATION

A. Install alignment guides to guide expansion and to avoid end-loading and torsional stress.

B. Install one or two guide(s) on each side of pipe expansion fittings and loops. Install guides nearest to expansion joint not more than four pipe diameters from expansion joint.

C. Attach guides to pipe and secure guides to building structure.

D. Install anchors at locations to prevent stresses from exceeding those permitted by ASME B31.9 and to prevent transfer of loading and stresses to connected equipment.

E. Anchor Attachments:

1. Anchor Attachment to Steel Pipe: Attach by welding. Comply with ASME B31.9 and ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications."

2. Anchor Attachment to Copper Tubing: Attach with pipe hangers. Use MSS SP-69, Type 24, U-bolts bolted to anchor.

F. Fabricate and install steel anchors by welding steel shapes, plates, and bars. Comply with

ASME B31.9 and AWS D1.1/D1.1M.

1. Anchor Attachment to Steel Structural Members: Attach by welding.

2. Anchor Attachment to Concrete Structural Members: Attach by fasteners. Follow fastener manufacturer's written instructions.

G. Use grout to form flat bearing surfaces for guides and anchors attached to concrete.

END OF SECTION 230516

SECTION 230593 - TESTING, ADJUSTING, AND BALANCING FOR HVAC

PART 1 – GENERAL

A. Section Includes:

1. Testing, adjusting, and balancing of air systems.

2. Testing, adjusting, and balancing of hydronic systems.

3. Measurement of final operating condition of HVAC systems.

4. Sound measurement of equipment operating conditions.

5. Vibration measurement of equipment operating conditions.

6. Testing, adjusting and balancing of smoke control systems.

1.3 REFERENCES

A. Associated Air Balance Council:

1. AABC MN-1 - National Standards for Testing and Balancing Heating, Ventilating, and Air Conditioning Systems.

B. American Society of Heating, Refrigerating and Air-Conditioning Engineers:

1. ASHRAE 111 - Practices for Measurement, Testing, Adjusting and Balancing of

Building Heating, Ventilation, Air-Conditioning and Refrigeration Systems.

2. ASHRAE 62.1, Section 7.2.2.

3. ASHRAE 90.1, Section 6.2.3 System Balancing.

1.4 SUBMITTALS

A. Prior to commencing Work, submit proof of latest calibration date of each instrument.

B. Test Reports: Indicate data on AABC MN-1 National Standards for Total System Balance forms.

C. Field Reports: Indicate deficiencies preventing proper testing, adjusting, and balancing of systems and equipment.

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 1

D. Prior to commencing Work, submit report forms or outlines indicating adjusting, balancing, and equipment data required. Include detailed procedures, agenda, sample report forms and copy of AABC National Project Performance Guaranty.

E. Submit draft copies of report for review prior to final acceptance of Project.

F. Furnish printed reports (not hand-written) in binder manuals, complete with table of contents page and indexing tabs, with cover identification at front and side. Include set of reduced drawings with air outlets and equipment identified to correspond with data sheets, and indicating thermostat locations.

1.5 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: Furnish final copy of testing, adjusting, and balancing report inclusion in operating and maintenance manuals.

1.6 QUALITY ASSURANCE

A. Prior to commencing Work, calibrate each instrument to be used. Upon completing Work, recalibrate each instrument to assure reliability.

1.7 QUALIFICATIONS

A. Agency: Company specializing in testing, adjusting, and balancing of systems specified in this section with minimum five years documented experience certified by AABC.

B. Perform Work under supervision of AABC Certified Test and Balance Engineer.

1.8 WARRANTY

A. National Project Performance Guarantee: Provide a guarantee on AABC's "National Standards for Testing and Balancing Heating, Ventilating, and Air Conditioning Systems" forms stating that AABC will assist in completing requirements of the Contract Documents if TAB firm fails to comply with the Contract Documents. Guarantee includes the following provisions:

1. The certified TAB firm has tested and balanced systems according to the Contract

Documents.

2. Systems are balanced to optimum performance capabilities within design and installation limits.

3. Warranty Period: Five (5) years.

B. Special Guarantee: Provide a guarantee on AABC forms stating that AABC will assist in completing requirements of the Contract Documents if TAB firm fails to comply with the Contract Documents. Guarantee shall include the following provisions:

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 2

1. The certified TAB firm has tested and balanced systems according to the Contract

Documents.

2. Systems are balanced to optimum performance capabilities within design and installation limits.

3. Warranty Period: Five (5) years.

NOT USED

3.1 EXAMINATION

A. Verify systems are complete and operable before commencing work. Verify the following:

1. Systems are started and operating in safe and normal condition.

2. Temperature control systems are installed complete and operable.

3. Proper thermal overload protection is in place for electrical equipment.

4. Final filters are clean and in place. If required, install temporary media in addition to final filters.

5. Duct systems are clean of debris.

6. Fans are rotating correctly.

7. Fire and volume dampers are in place and open.

8. Air coil fins are cleaned and combed.

9. Access doors are closed and duct end caps are in place.

10. Air outlets are installed and connected.

11. Duct system leakage is minimized.

12. Hydronic systems are flushed, filled, and vented.

13. Pumps are rotating correctly.

14. Proper strainer baskets are clean and in place or in normal position.

15. Service and balancing valves are open.

16. Drains are flushed and clean.

3.2 PREPARATION

A. Furnish instruments required for testing, adjusting, and balancing operations.

B. Make instruments available to owner to facilitate spot checks during testing.

3.3 INSTALLATION TOLERANCES

A. Air Handling Systems: Adjust to within plus or minus 10 percent of design.

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 3

B. Air Outlets and Inlets: Adjust total to within plus 10 percent and minus 5 percent of design to space. Adjust outlets and inlets in space to within plus or minus 10 percent of design.

C. Hydronic Systems: Adjust to within plus or minus 10 percent of design.

3.4 ADJUSTING

A. Verify recorded data represents actual measured or observed conditions.

B. Permanently mark settings of valves, dampers, and other adjustment devices allowing settings to be restored. Set and lock memory stops.

C. After adjustment, take measurements to verify balance has not been disrupted. If disrupted, verify correcting adjustments have been made.

D. Report defects and deficiencies noted during performance of services, preventing system balance.

E. Leave systems in proper working order, replacing belt guards, closing access doors, closing doors to electrical switch boxes, and restoring thermostats to specified settings.

F. At final inspection, recheck random selections of data recorded in report. Recheck points or areas as selected and witnessed by the Owner.

G. Check and adjust systems approximately six months after final acceptance and submit report.

3.5 AIR SYSTEM PROCEDURE

A. Adjust air handling and distribution systems to obtain required or design supply, return, and exhaust air quantities.

B. Make air quantity measurements in main ducts by Pitot tube traverse of entire cross sectional area of duct.

C. Measure air quantities at air inlets and outlets.

D. Adjust distribution system to obtain uniform space temperatures free from objectionable drafts.

E. Use volume control devices to regulate air quantities only to extent adjustments do not create objectionable air motion or sound levels. Effect volume control by using volume dampers located in ducts.

F. Vary total system air quantities by adjustment of fan speeds. Provide sheave drive changes if applicable to vary fan speed. Vary branch air quantities by damper regulation.

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 4

G. Provide system schematic with required and actual air quantities recorded at each outlet or inlet.

H. Measure static air pressure conditions on air supply units, including filter and coil pressure drops, and total pressure across fan. Make allowances for 50 percent loading of filters.

I. Adjust outside air automatic dampers, outside air, return air, and exhaust dampers for design conditions.

J. Measure temperature conditions across outside air, return air, and exhaust dampers to check leakage.

K. At modulating damper locations, take measurements and balance at extreme conditions.

Balance variable volume systems at maximum airflow rate, full cooling, and at minimum airflow rate, full heating.

L. Measure building static pressure and adjust supply, return, and exhaust air systems to obtain required relationship between each to maintain approximately 0.05 inches positive static pressure near building entries.

M. Check multi-zone units for motorized damper leakage. Adjust air quantities with mixing dampers set first for cooling, then heating, then modulating.

N. For variable air volume system powered units set volume controller to airflow setting indicated. Confirm connections properly made and confirm proper operation for automatic variable-air-volume temperature control.

O. On fan powered VAV boxes, adjust airflow switches for proper operation.

3.6 WATER SYSTEM PROCEDURE

A. Adjust water systems, after air balancing, to obtain design quantities.

B. Use calibrated Venturi tubes, orifices, or other metered fittings and pressure gauges to determine flow rates for system balance. Where flow-metering devices are not installed, base flow balance on temperature difference across various heat transfer elements in system.

C. Adjust systems to obtain prescribed pressure drops and flows through heat transfer elements prior to thermal testing. Perform balancing by measurement of temperature differential in conjunction with air balancing.

D. Effect system balance with automatic control valves fully open or in normal position to heat transfer elements.

E. Effect adjustment of water distribution systems by means of balancing cocks, valves, and fittings. Do not use service or shut-off valves for balancing unless indexed for balance point.

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 5

F. Where available pump capacity is less than total flow requirements or individual system parts, simulate full flow in one part by temporary restriction of flow to other parts.

3.7 PROCEDURES FOR SMOKE-CONTROL SYSTEM TESTING

A. Before testing smoke-control systems, verify that construction is complete and verify the integrity of each smoke-control zone boundary. Verify that windows and doors are closed and that applicable safing, gasket, and sealants are installed.

B. Measure and record wind speed and direction, outside-air temperature, and relative humidity on each test day.

C. Measure, adjust, and record airflow of each smoke-control system with all fans that are a part of the system.

D. Measure, adjust, and record the airflow of each fan. For ducted systems, measure the fan airflow by duct Pitot-tube traverse.

E. After air balancing is complete, perform the pressurization testing for each smoke-control zone.

F. Operational Tests:

1. Check the proper activation of each zoned smoke-control system in response to all means of activation, both automatic and manual.

2. Check automatic activation in response to fire alarm signals received from the building's fire alarm and detection system. Initiate a separate alarm for each means of activation to ensure that the proper operation of the correct zoned smoke-control system occurs.

3. Check and record the proper operation of fans, dampers, and related equipment for each separate zone of the smoke-control system.

G. Conduct additional tests required by authorities having jurisdiction. Unless required by authorities having jurisdiction, perform testing without the use of smoke or products that simulate smoke.

H. Prepare a complete report of observations, measurements, and deficiencies.

3.8 SCHEDULES

A. Equipment Requiring Testing, Adjusting, and Balancing:

1. Pumps.

2. Air Cooled Refrigerant Condensers/Condensing Units.

3. Packaged Roof Top Heating/Cooling Units.

4. Packaged Terminal Air Conditioning Units.

5. Unit Air Conditioners.

6. Computer Room Air Conditioning Units.

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 6

7. Air Coils.

8. Evaporative Humidifier.

9. Fan Coil Units.

10. Air Handling Units.

11. Fans.

12. Air Filters.

13. Air Terminal Units.

14. Air Inlets and Outlets.

15. Heat Exchangers.

B. Report Forms

1. Title Page:

a. Name of Testing, Adjusting, and Balancing Agency

b. Address of Testing, Adjusting, and Balancing Agency

c. Telephone and facsimile numbers of Testing, Adjusting, and Balancing Agency

d. Project name

e. Project location

f. Project Architect

g. Project Engineer

h. Project Contractor

i. Project altitude

j. Report date

2. Summary Comments:

a. Design versus final performance

b. Notable characteristics of system

c. Description of systems operation sequence

d. Summary of outdoor and exhaust flows to indicate building pressurization

e. Nomenclature used throughout report

f. Test conditions

3. Instrument List:

a. Instrument

b. Manufacturer

c. Model number

d. Serial number

e. Range

f. Calibration date

4. Electric Motors:

a. Manufacturer

b. Model/Frame

c. HP/BHP and kW

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 7

d. Phase, voltage, amperage; nameplate, actual, no load

e. RPM

f. Service factor

g. Starter size, rating, heater elements

h. Sheave Make/Size/Bore

5. V-Belt Drive:

a. Identification/location

b. Required driven RPM

c. Driven sheave, diameter and RPM

d. Belt, size and quantity

e. Motor sheave diameter and RPM

f. Center to center distance, maximum, minimum, and actual

6. Pump Data:

a. Identification/number

c. Size/model

d. Impeller

e. Service

f. Design flow rate, pressure drop, BHP and kW

g. Actual flow rate, pressure drop, BHP and kW

h. Discharge pressure

i. Suction pressure

j. Total operating head pressure

k. Shut off, discharge and suction pressures

l. Shut off, total head pressure

7. Air Cooled Condenser/Condensing Unit:

b. Location

c. Manufacturer

d. Model number

e. Serial number

f. Entering DB air temperature, design and actual

g. Leaving DB air temperature, design and actual

h. Number of compressors

8. Heat Exchanger:

c. Service

d. Manufacturer

e. Model number

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 8

f. Serial number

g. Steam pressure, design and actual

h. Primary water entering temperature, design and actual

i. Primary water leaving temperature, design and actual j.

Primary water flow, design and actual

k. Primary water pressure drop, design and actual

l. Secondary water leaving temperature, design and actual

m. Secondary water leaving temperature, design and actual

n. Secondary water flow, design and actual

o. Secondary water pressure drop, design and actual

9. Cooling Coil Data:

c. Service

d. Manufacturer

e. Air flow, design and actual

f. Entering air DB temperature, design and actual

g. Entering air WB temperature, design and actual

h. Leaving air DB temperature, design and actual

i. Leaving air WB temperature, design and actual

j. Water flow, design and actual

k. Water pressure drop, design and actual

l. Entering water temperature, design and actual

m. Leaving water temperature, design and actual

n. Saturated suction temperature, design and actual

o. Air pressure drop, design and actual

10. Heating Coil Data:

c. Service

d. Manufacturer

e. Air flow, design and actual

f. Water flow, design and actual

g. Water pressure drop, design and actual

h. Entering water temperature, design and actual

i. Leaving water temperature, design and actual

j. Entering air temperature, design and actual

k. Leaving air temperature, design and actual

l. Air pressure drop, design and actual

11. Unit Ventilator and Fan Coil Data:

b. Identification/number

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 9

c. Location

d. Model number

e. Size

f. Air flow, design and actual

g. Water flow, design and actual

h. Water pressure drop, design and actual

i. Entering water temperature, design and actual

j. Leaving water temperature, design and actual

k. Entering air temperature, design and actual

l. Leaving air temperature, design and actual

12. Air Moving Equipment:

a. Location

c. Model number

d. Serial number

e. Arrangement/Class/Discharge

f. Air flow, specified and actual

g. Return air flow, specified and actual

h. Outside air flow, specified and actual

i. Total static pressure (total external), specified and actual

j. Inlet pressure

k. Discharge pressure

l. Sheave Make/Size/Bore

m. Number of Belts/Make/Size

n. Fan RPM

13. Return Air/Outside Air Data:

b. Design air flow

c. Actual air flow

d. Design return air flow

e. Actual return air flow

f. Design outside air flow

g. Actual outside air flow

h. Return air temperature

i. Outside air temperature

j. Required mixed air temperature

k. Actual mixed air temperature

l. Design outside/return air ratio

m. Actual outside/return air ratio

14. Exhaust Fan Data:

c. Model number

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 10

d. Serial number

e. Air flow, specified and actual

f. Total static pressure (total external), specified and actual

g. Inlet pressure

h. Discharge pressure

i. Sheave Make/Size/Bore

j. Number of Belts/Make/Size

k. Fan RPM

15. Duct Traverse:

a. System zone/branch

b. Duct size

c. Area

d. Design velocity

e. Design air flow

f. Test velocity

g. Test air flow

h. Duct static pressure

i. Air temperature

j. Air correction factor

16. Duct Leak Test:

a. Description of ductwork under test

b. Duct design operating pressure

c. Duct design test static pressure

d. Duct capacity, air flow

e. Maximum allowable leakage duct capacity times leak factor

f. Test apparatus

1) Blower

2) Orifice, tube size

3) Orifice size

4) Calibrated

g. Test static pressure

h. Test orifice differential pressure

i. Leakage

17. Air Monitoring Station Data:

b. System

c. Size

d. Area

e. Design velocity

f. Design air flow

g. Test velocity

h. Test air flow

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 11

18. Flow Measuring Station:

c. Size

d. Manufacturer

e. Model number

f. Serial number

g. Design Flow rate

h. Design pressure drop

i. Actual/final pressure drop

j. Actual/final flow rate

k. Station calibrated setting

19. Terminal Unit Data:

b. Type, constant, variable, single, dual duct

c. Identification/number

d. Location

e. Model number

f. Size

g. Minimum static pressure

h. Minimum design air flow

i. Maximum design air flow

j. Maximum actual air flow

k. Inlet static pressure

20. Air Distribution Test Sheet:

a. Air terminal number

b. Room number/location

c. Terminal type

d. Terminal size

e. Area factor

f. Design velocity

g. Design air flow

h. Test (final) velocity

i. Test (final) air flow

j. Percent of design air flow

21. Sound Level Report:

b. Octave bands - equipment off

c. Octave bands - equipment on

d. RC level - equipment on

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 12

22. Vibration Test:

a. Location of points:

1) Fan bearing, drive end

2) Fan bearing, opposite end

3) Motor bearing, center (when applicable)

4) Motor bearing, drive end

5) Motor bearing, opposite end

6) Casing (bottom or top)

7) Casing (side)

8) Duct after flexible connection (discharge)

9) Duct after flexible connection (suction)

b. Test readings:

1) Horizontal, velocity and displacement

2) Vertical, velocity and displacement

3) Axial, velocity and displacement

c. Normally acceptable readings, velocity and acceleration

d. Unusual conditions at time of test

e. Vibration source (when non-complying)

END OF SECTION 230593

TESTING, ADJUSTING AND BALANCING FOR HVAC 230593 - 13

DUCT INSULATION 230713 - 1

SECTION 230713 - DUCT INSULATION

A. Section includes insulating the following duct services:

1. Indoor, concealed supply and outdoor air.

2. Indoor, exposed supply and outdoor air.

3. Indoor, concealed return located in unconditioned space.

4. Indoor, exposed return located in unconditioned space.

5. Indoor, concealed, Type I, commercial, kitchen hood exhaust.

6. Indoor, exposed, Type I, commercial, kitchen hood exhaust.

7. Indoor, concealed oven and warewash exhaust.

8. Indoor, exposed oven and warewash exhaust.

9. Indoor, concealed exhaust between isolation damper and penetration of building exterior.

10. Indoor, exposed exhaust between isolation damper and penetration of building exterior.

11. Outdoor, concealed supply and return.

12. Outdoor, exposed supply and return.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product indicated. Include thermal conductivity, water-vapor permeance thickness, and jackets (both factory- and field-applied if any).

B. LEED Submittals:

1. Product Data for Credit IEQ 4.1: For adhesives and sealants, documentation including printed statement of VOC content.

2. Laboratory Test Reports for Credit IEQ 4: For adhesives and sealants, documentation indicating that products comply with the testing and product requirements of the California Department of Health Services' "Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers."

C. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

1. Detail application of protective shields, saddles, and inserts at hangers for each type of insulation and hanger.

DUCT INSULATION 230713 - 2

2. Detail insulation application at elbows, fittings, dampers, specialties and flanges for each type of insulation.

3. Detail application of field-applied jackets.

4. Detail application at linkages of control devices.

D. Samples: For each type of insulation and jacket indicated. Identify each Sample, describing product and intended use. Sample sizes are as follows:

1. Sheet Form Insulation Materials: 12 inches square.

2. Sheet Jacket Materials: 12 inches square.

3. Manufacturer's Color Charts: For products where color is specified, show the full range of colors available for each type of finish material.

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified Installer.

B. Material Test Reports: From a qualified testing agency acceptable to authorities having jurisdiction indicating, interpreting, and certifying test results for compliance of insulation materials, sealers, attachments, cements, and jackets, with requirements indicated. Include dates of tests and test methods employed.

C. Field quality-control reports.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: Skilled mechanics who have successfully completed an apprenticeship program or another craft training program certified by the Department of Labor, Bureau of Apprenticeship and Training.

B. Surface-Burning Characteristics: For insulation and related materials, as determined by testing identical products according to ASTM E 84, by a testing agency acceptable to authorities having jurisdiction. Factory label insulation and jacket materials and adhesive, mastic, tapes, and cement material containers, with appropriate markings of applicable testing agency.

1. Insulation Installed Indoors: Flame-spread index of 25 or less, and smoke-developed index of 50 or less.

2. Insulation Installed Outdoors: Flame-spread index of 75 or less, and smoke-developed index of 150 or less.

C. Mockups: Before installing insulation, build mockups for each type of insulation and finish listed below to demonstrate quality of insulation application and finishes. Build mockups in the location indicated or, if not indicated, as directed by Architect. Use materials indicated for the completed Work.

DUCT INSULATION 230713 - 3

1. Ductwork Mockups:

a. One 10-foot section each of rectangular and round straight duct.

b. One each of a 90-degree mitered round and rectangular elbow, and one each of a

90-degree radius round and rectangular elbow.

c. One rectangular branch takeoff and one round branch takeoff from a rectangular duct. One round tee fitting.

d. One rectangular and round transition fitting.

e. Four support hangers for round and rectangular ductwork.

f. Each type of damper and specialty.

2. For each mockup, fabricate cutaway sections to allow observation of application details for insulation materials, adhesives, mastics, attachments, and jackets.

3. Notify Architect seven days in advance of dates and times when mockups will be constructed.

4. Obtain Architect's approval of mockups before starting insulation application.

5. Approval of mockups does not constitute approval of deviations from the Contract

Documents contained in mockups unless Architect specifically approves such deviations in writing.

6. Maintain mockups during construction in an undisturbed condition as a standard for judging the completed Work.

7. Demolish and remove mockups when directed.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Packaging: Insulation material containers shall be marked by manufacturer with appropriate ASTM standard designation, type and grade, and maximum use temperature.

1.7 COORDINATION

A. Coordinate sizes and locations of supports, hangers, and insulation shields specified in Section 230529 "Hangers and Supports for HVAC Piping and Equipment."

B. Coordinate clearance requirements with duct Installer for duct insulation application. Before preparing ductwork Shop Drawings, establish and maintain clearance requirements for installation of insulation and field-applied jackets and finishes and for space required for maintenance.

C. Coordinate installation and testing of heat tracing.

DUCT INSULATION 230713 - 4

1.8 SCHEDULING

A. Schedule insulation application after pressure testing systems and, where required, after installing and testing heat tracing. Insulation application may begin on segments that have satisfactory test results.

B. Complete installation and concealment of plastic materials as rapidly as possible in each area of construction.

2.1 INSULATION MATERIALS

A. Comply with requirements in "Duct Insulation Schedule, General," "Indoor Duct and Plenum Insulation Schedule," and "Aboveground, Outdoor Duct and Plenum Insulation Schedule" articles for where insulating materials shall be applied.

B. Products shall not contain asbestos, lead, mercury, or mercury compounds.

C. Products that come in contact with stainless steel shall have a leachable chloride content of less than 50 ppm when tested according to ASTM C 871.

D. Insulation materials for use on austenitic stainless steel shall be qualified as acceptable according to ASTM C 795.

E. Foam insulation materials shall not use CFC or HCFC blowing agents in the manufacturing process.

F. Flexible Elastomeric Insulation: Closed-cell, sponge- or expanded-rubber materials. Comply with ASTM C 534, Type II for sheet materials.

1. Products: Comply with Requirements.

G. Mineral-Fiber Blanket Insulation: Mineral or glass fibers bonded with a thermosetting resin.

Comply with ASTM C 553, Type II and ASTM C 1290, Type I or Type II with factory-applied vinyl jacket, Type III with factory-applied FSK jacket or Type III with factory-applied FSP jacket. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.

H. Mineral-Fiber Board Insulation: Mineral or glass fibers bonded with a thermosetting resin.

Comply with ASTM C 612, Type IA or Type IB. For duct and plenum applications, provide insulation without factory-applied jacket, with factory-applied ASJ or with factory-applied FSK jacket. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.

DUCT INSULATION 230713 - 5

I. Mineral-Fiber, Pipe and Tank Insulation: Mineral or glass fibers bonded with a thermosetting resin. Semirigid board material with factory-applied ASJ or FSK jacket complying with ASTM C 1393, Type II or Type IIIA Category 2, or with properties similar to ASTM C 612, Type IB. Nominal density is 2.5 lb/cu. ft. or more. Thermal conductivity (k-value) at 100 deg F is 0.29 Btu x in./h x sq. ft. x deg F or less. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.

J. Polyolefin: Unicellular, polyethylene thermal plastic insulation. Comply with ASTM C 534 or

ASTM C 1427, Type I, Grade 1 for tubular materials and Type II, Grade 1 for sheet materials.

2.2 FIRE-RATED INSULATION SYSTEMS

A. Fire-Rated Board: Structural-grade, press-molded, xonolite calcium silicate, fireproofing board suitable for operating temperatures up to 1700 deg F. Comply with ASTM C 656, Type II, Grade 6. Tested and certified to provide a 1 or 2-hour fire rating by an NRTL acceptable to authorities having jurisdiction.

B. Fire-Rated Blanket: High-temperature, flexible, blanket insulation with FSK jacket that is tested and certified to provide a 1 or 2-hour fire rating by an NRTL acceptable to authorities having jurisdiction.

2.3 ADHESIVES

A. Materials shall be compatible with insulation materials, jackets, and substrates and for bonding insulation to itself and to surfaces to be insulated unless otherwise indicated.

B. Flexible Elastomeric and Polyolefin Adhesive: Comply with MIL-A-24179A, Type II, Class I.

2. For indoor applications, adhesive shall have a VOC content of 50 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

3. Adhesive shall comply with the testing and product requirements of the California

Department of Health Services' "Standard Practice for the Testing of Volatile Organic Emissions from Various Sources Using Small-Scale Environmental Chambers."

C. Mineral-Fiber Adhesive: Comply with MIL-A-3316C, Class 2, Grade A.

2. For indoor applications, adhesive shall have a VOC content of 80 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

DUCT INSULATION 230713 - 6

3. Adhesive shall comply with the testing and product requirements of the California

D. ASJ Adhesive, and FSK Jacket Adhesive: Comply with MIL-A-3316C, Class 2, Grade A for bonding insulation jacket lap seams and joints.

calculated according to 40 CFR 59, Subpart D (EPA Method 24).

3. Adhesive shall comply with the testing and product requirements of the California

E. PVC Jacket Adhesive: Compatible with PVC jacket.

calculated according to 40 CFR 59, Subpart D (EPA Method 24).

3. Adhesive shall comply with the testing and product requirements of the California

2.4 MASTICS

A. Materials shall be compatible with insulation materials, jackets, and substrates; comply with MIL-PRF-19565C, Type II.

1. For indoor applications, use mastics that have a VOC content of 50 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

B. Vapor-Barrier Mastic: Water based; suitable for indoor use on below ambient services.

2. Water-Vapor Permeance: ASTM E 96/E 96M, Procedure B, 0.013 perm at 43-mil dry film thickness.

3. Service Temperature Range: Minus 20 to plus 180 deg F.

4. Solids Content: ASTM D 1644, 58 percent by volume and 70 percent by weight.

5. Color: White.

C. Vapor-Barrier Mastic: Solvent based; suitable for indoor use on below ambient services.

2. Water-Vapor Permeance: ASTM F 1249, 0.05 perm at 35-mil dry film thickness.

3. Service Temperature Range: 0 to 180 deg F.

4. Solids Content: ASTM D 1644, 44 percent by volume and 62 percent by weight.

DUCT INSULATION 230713 - 7

D. Vapor-Barrier Mastic: Solvent based; suitable for outdoor use on below ambient services.

2. Water-Vapor Permeance: ASTM F 1249, 0.05 perm at 30-mil dry film thickness.

3. Service Temperature Range: Minus 50 to plus 220 deg F.

4. Solids Content: ASTM D 1644, 33 percent by volume and 46 percent by weight.

E. Breather Mastic: Water based; suitable for indoor and outdoor use on above ambient services.

2. Water-Vapor Permeance: ASTM F 1249, 1.8 perms at 0.0625-inch dry film thickness.

3. Service Temperature Range: Minus 20 to plus 180 deg F.

4. Solids Content: 60 percent by volume and 66 percent by weight.

2.5 LAGGING ADHESIVES

A. Description: Comply with MIL-A-3316C, Class I, Grade A and shall be compatible with insulation materials, jackets, and substrates.

1. For indoor applications, use lagging adhesives that have a VOC content of 50 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

2. Products: Comply with Requirements.

3. Fire-resistant, water-based lagging adhesive and coating for use indoors to adhere fire-resistant lagging cloths over duct insulation.

4. Service Temperature Range: 0 to plus 180 deg F.

2.6 SEALANTS

A. FSK and Metal Jacket Flashing Sealants:

2. Materials shall be compatible with insulation materials, jackets, and substrates.

3. Fire- and water-resistant, flexible, elastomeric sealant.

4. Service Temperature Range: Minus 40 to plus 250 deg F.

5. Color: Aluminum.

6. For indoor applications, sealants shall have a VOC content of 420 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

7. Sealants shall comply with the testing and product requirements of the California

DUCT INSULATION 230713 - 8

B. ASJ Flashing Sealants, and Vinyl and PVC Jacket Flashing Sealants:

2. Fire- and water-resistant, flexible, elastomeric sealant.

3. Service Temperature Range: Minus 40 to plus 250 deg F.

4. Color: White.

5. For indoor applications, sealants shall have a VOC content of 420 g/L or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).

6. Sealants shall comply with the testing and product requirements of the California

2.7 FACTORY-APPLIED JACKETS

A. Insulation system schedules indicate factory-applied jackets on various applications. When factory-applied jackets are indicated, comply with the following:

1. ASJ: White, kraft-paper, fiberglass-reinforced scrim with aluminum-foil backing;

complying with ASTM C 1136, Type I.

2. ASJ-SSL: ASJ with self-sealing, pressure-sensitive, acrylic-based adhesive covered by a removable protective strip; complying with ASTM C 1136, Type I.

3. FSK Jacket: Aluminum-foil, fiberglass-reinforced scrim with kraft-paper backing;

complying with ASTM C 1136, Type II.

4. FSP Jacket: Aluminum-foil, fiberglass-reinforced scrim with polyethylene backing;

complying with ASTM C 1136, Type II.

5. Vinyl Jacket: White vinyl with a permeance of 1.3 perms when tested according to

ASTM E 96/E 96M, Procedure A, and complying with NFPA 90A and NFPA 90B.

2.8 FIELD-APPLIED FABRIC-REINFORCING MESH

A. Woven Glass-Fiber Fabric: Approximately 6 oz./sq. yd. with a thread count of 5 strands by 5 strands/sq. in. for covering ducts.

B. Woven Polyester Fabric: Approximately 1 oz./sq. yd.