Technical Exhibit AE Div 46 Water and Wastewater Equipment.pdf

PDF 120 KB Posted

Attached to
FORT BLISS JOB ORDER CONTRACT
Solicitation number
W911SG20R0042
Issued by

About this file

This technical specification outlines requirements for double wall glass fiber reinforced underground oil/water separator tanks. Key details include specifications for tank materials, dimensions, appurtenances and accessories. Required components comprise 100% resin and glass fiber reinforcement tanks, vertical-tube polypropylene coalescer media, anchor straps and turnbuckles, manways, inlet and outlet fittings, ladders, and sludge baffles. Installers must be qualified and trained or certified by the tank manufacturer. Tanks must undergo testing and be installed and operated according to manufacturer manuals.

This federal contract opportunity is a solicitation for a single award Indefinite Delivery Indefinite Quantity Job Order Contract for Real Property Sustainment, Restoration and Modernization minor construction at Fort Bliss, Texas. The base period of performance is 12 months with four 12-month option periods valued between $75-100 million. Task orders will range from $2,000 to $1 million. The North American Industry Classification code is 236220 and it is 100% set aside for small businesses with a size standard of $39.5 million. The solicitation is available via beta.sam.gov and prospective contractors must register in SAM under NAICS 236220 to be eligible for award.

View the file

Other files

File Type Posted
Attachment 7 Coefficient Non-PrePriced Items Texas - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
Attachment 6 Coefficient Other Than Normal Texas - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
Attachment 7a Coefficient Non-PrePriced Items New Mexico - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
SOLICITATION Conform Copy 0003 FORT BLISS JOC W911SG20R0042.pdf PDF
Attachment 9 RFIs 2 Aug 2021 W911SG20R0042.pdf PDF
Technical Exhibit A Division 1 General Requirements 2 Aug 2021.pdf PDF
SOLICITATION Amendment 0003 FORT BLISS JOC W911SG20R0042-0003.pdf PDF
Attachment 8 Historical Workload 2 Aug 2021 W911SG20R0042.pdf PDF
Attachment 5a Coefficient Normal New Mexico - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
Attachment 5 Coefficient Normal Texas - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
Attachment 6a Coefficient Other Than Normal New Mexico - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
SOLICITATION Conform Copy 0002 FORT BLISS JOC W911SG20R0042.pdf PDF
SOLICITATION Amendment 0002 FORT BLISS JOC W911SG20R0042-0002.pdf PDF
SOLICITATION Amendment 0001 FORT BLISS JOC W911SG20R0042-0001.pdf PDF
SOLICITATION Conform Copy 0001 FORT BLISS JOC W911SG20R0042.pdf PDF
Attachment 1 Consent Letter - Bliss JOC W911SG20R0042.docx DOCX document
Technical Exhibit AD Div 44 Pollution Control Equipment.pdf PDF
Attachment 6 Coefficient Other Than Normal - Bliss JOC W911SG20R0042.xlsx XLSX spreadsheet
Technical Exhibit Q Div 13 Special Construction.pdf PDF
Attachment 4a Notional Task Order Technical Drawings - Bliss JOC W911SG20R0042.pdf PDF
Technical Exhibit Z Div 32 Exterior Improvements.pdf PDF
Attachment 7 Coefficient Non-PrePriced Items - Bliss JOC W911SG20R0042.xlsx XLSX spreadsheet
Technical Exhibit AB Div 34 Transportation.pdf PDF
Technical Exhibit C General Decision TX20210245.pdf PDF
Technical Exhibit T Div 22 Plumbing.pdf PDF
Technical Exhibit N Div 10 Specialties.pdf PDF
Technical Exhibit AA Div 33 Utilities.pdf PDF
Technical Exhibit J Div 06 Wood-Plastics-Composites.pdf PDF
Technical Exhibit F Div 02 Existing Conditions.pdf PDF
FORT BLISS JOC SOLICITATION W911SG20R0042.pdf PDF
Technical Exhibit O Div 11 Equipment.pdf PDF
Technical Exhibit B Areas of Fort Bliss with Historical Workload.pdf PDF
Technical Exhibit V Div 26 Electrical.pdf PDF
Technical Exhibit E General Decision NM20210045.pdf PDF
Technical Exhibit I Div 05 Metals.pdf PDF
Technical Exhibit K Div 07 Thermal and Moisture Protection.pdf PDF
Technical Exhibit S Div 21 Fire Suppression.pdf PDF
Technical Exhibit X Div 28 Electronic Safey and Security.pdf PDF
Attachment 4 Notional Task Order - Bliss JOC W911SG20R0042.pdf PDF
Technical Exhibit P Div 12 Furnishings.pdf PDF
Technical Exhibit U Div 23 HVAC.pdf PDF
Technical Exhibit Y Div 31 Earthwork.pdf PDF
Technical Exhibit H Div 04Masonry.pdf PDF
Technical Exhibit AC Div 35 Waterway.pdf PDF
Attachment 2 Specific Relevant Contracts - Bliss JOC W911SG20R0042.docx DOCX document
Attachment 3 Past Performance Questionnaire - Bliss JOC W911SG20R0042.docx DOCX document
Technical Exhibit L Div 08 Openings.pdf PDF
Technical Exhibit A Division 1 General Requirements.pdf PDF
Attachment 5 Coefficient Normal- Bliss JOC W911SG20R0042.xlsx XLSX spreadsheet
Technical Exhibit G Div 03 Concrete.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 462513 – OIL / WATER SEPARATORS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes material specifications and installation instructions for double wall glass fiber reinforced underground oil/water separator tank.

1.3 QUALITY ASSURANCE

A. Installer Qualifications: A qualified installer who employs workers for this Project who are competent in techniques required by manufacturer for;

1. Engage an installer who employs workers for this Project who are trained or certified by manufacturer for installation techniques required.

B. Governing Standards, as applicable:

1. Underwriters Laboratories, Inc. (U.L.) Standard 2215.

2. U.S. Coast Guard Test Method 46 CFR 162.050 for separator shell integrity.

PART 2 - PRODUCTS

2.1 MANUFACTURER

A. Manufacturer: Comply with project requirements.

2.2 DOUBLE WALL FIBERGLASS REINFORCED PLASTIC (FRP) UNDERGROUND OIL /

WATER SEPARATOR TANKS

A. Materials:

1. Tanks shall be manufactured with 100% resin and glass fiber reinforcement. No sand fillers.

2. Separator coalescer media shall be a polypropylene vertical-tube coalescer.

3. Coalescer tubes and associated internal mounting hardware shall be rustproof.

OIL / WATER SEPARATORS TANKS 462513 - 1

B. Tank Dimensions:

1. Tank shall have nominal capacity as required.

2. Tank shall have nominal outside diameter as required.

3. Tank shall be double walled UGST.

2.3 APPURTENANCES AND ACCESSORIES

A. Anchor Straps and Turnbuckles:

1. Straps shall be FRP anchor straps as supplied by tank manufacturer. Turnbuckles shall also be supplied by the manufacturer and shall be stainless steel.

2. Number and location of straps shall be specified in current literature by tank manufacturer.

B. Manways:

1. All manways are to be 22" diameter manways, minimum width UL listed cover.

2. Manway extensions tubes shall be FRP.

3. Manway shall be extended to grade, with manway cover at grade.

C. Inlet Fitting

1. All separators shall be equipped with one FRP, factory-installed, flanged inlet nozzle.

2. All threaded fittings shall have machine tolerances in accordance with ANSI Standard for each fitting size.

3. Location is shown on separator drawings.

D. Outlet Nozzle and Clean-Water collector

1. All separators shall be equipped with one FRP, factory-installed, flanged outlet nozzle and clean-water collector.

2. Location is shown on separator drawings.

E. Ladders shall be standard ladder as supplied by tank manufacturer (aluminum or fiberglass).

F. Fittings:

1. Single fittings on a UL-listed separator shall be located along the top centerline of the separator or in a manway lid.

2. Duplex fittings shall be located on each side of the separator’s centerline.

3. All NPT fittings shall withstand a minimum of 150 foot-pounds of torque and 1,000 foot-pounds of bending, both with a 2:1 safety factor.

4. All FRP nozzles shall be flat-faced, flanged and gusseted, and conform to ANSI B16.5

150# bolting pattern.

5. Each interstitial space monitor fitting or reservoir fitting shall consist of a 4” NPT fitting.

OIL / WATER SEPARATORS TANKS 462513 - 2

G. Sludge Baffle

1. All separators shall have a FRP grate on which the coalescer packs will be placed to keep sludge build-up from interfering with the coalescer media.

PART 3 - EXECUTION

3.1 TESTING

A. Separator shall be tested according to the Installation Manual and Operating Guidelines.

3.2 INSTALLATION

A. Separator shall be installed according to the Installation Manual and Operating Guidelines and the Oil/Water Separator Operating & Maintenance Manual in effect at the time of installation.

B. Contractor shall be trained by the tank manufacturer, the state or other approved agency.

3.3 OPERATION AND MAINTENANCE

A. Separator shall be operated and undergo maintenance according to the Oil/Water Separator Operating & Maintenance Manual in effect at the time of installation.

END OF SECTION 462513