FORT BLISS JOC SOLICITATION W911SG20R0042.pdf
PDF 556 KB Posted
- Attached to
- FORT BLISS JOB ORDER CONTRACT
- Solicitation number
- W911SG20R0042
About this file
This document is a solicitation for a single-award indefinite delivery indefinite quantity job order contract for real property sustainment, restoration, and modernization minor construction services at Fort Bliss, Texas. The contract will have a one-year base period and four one-year option periods, with performance beginning on or about July 1, 2021. The estimated value is between $75 million and $100 million in firm-fixed-price task orders ranging from $2,000 to $1 million. This is a 100% small business set-aside for North American Industry Classification System code 236220, with a small business size standard of $39.5 million annual revenue. The solicitation will be available only on beta.sam.gov; prospective contractors must register in the System for Award Management under NAICS 236220 to be eligible for award. The response deadline is May 10, 2021, with award anticipated shortly thereafter.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011425767
Construction services for a broad variety of small minor construction projects at Fort Bliss, Texas.
This is a 100% Small Business set-aside.
The contract aw arded as a result of this solicitation w ill be a single-aw ard Firm FIxed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Job Order Contract (JOC) consisting of a 12-month base performance period, and four 12-month option periods. The preponderance of the w ork under this contract w ill be the main cantonment area of Fort Bliss, Tx. Other areas are show n in Technical Exhibit B.
Reference Block 11 below : The time for commencement of w ork and the calendar days allocated for completion of w ork w ill be determined at the task order level. See Technical Exhibit A, Division 1, General Requirements for further details regarding the ordering process.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
08-Apr-2021
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MICC- FT BLISS
ISSUING OFFICE
FORT BLISS TX 79916-6812
W911SG
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W911SG20R0042 60
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W911SG20R0042
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Job JOC Normal Working Hours - Base Period
FFP
Normal Working Hours are Monday through Friday, 7:30 a.m. to 4:30 p.m. local time (excluding Federal Holidays).
The value inserted here is transferred from Attachment 5, Development of Coefficient for Normal Working Hours
FOB: Destination
PURCHASE REQUEST NUMBER: 0011425767
PSC CD: Z2JZ
NET AMT
0002 Job JOC Other Than Normal - Base Period
FFP
Other Than Normal Working Hours are anytime Monday through Friday, after 4:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.
The value inserted here is transferred from Attachment 6, Development of Coefficient for Other Than Normal Working Hours
FOB: Destination
0003 Job JOC Non-Pre-Priced - Base Period
FFP
The total non-prepriced line items allowable under this Program shall not exceed 10% of the total contract value. The value inserted here is transferred from Attachment 7, Development of Coefficient for Non-Pre-Priced.
1001 Job OPTION JOC Normal Working Hours - 1st Option
FFP
Normal Working Hours are Monday through Friday, 7:30 a.m. to 4:30 p.m. local time (excluding Federal Holidays).
The value inserted here is transferred from Attachment 5, Development of Coefficient for Normal Working Hours
1002 Job OPTION JOC Other Than Normal - 1st Option
FFP
Other Than Normal Working Hours are anytime Monday through Friday, after 4:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.
The value inserted here is transferred from Attachment 6, Development of Coefficient for Other Than Normal Working Hours
1003 Job OPTION JOC Non-Pre-Priced - 1st Option
FFP
The total non-prepriced line items allowable under this Program shall not exceed 10% of the total contract value. The value inserted here is transferred from Attachment 7, Development of Coefficient for Non-Pre-Priced.
2001 Job OPTION JOC Normal Working Hours - 2nd Option
FFP
Normal Working Hours are Monday through Friday, 7:30 a.m. to 4:30 p.m. local time (excluding Federal Holidays).
The value inserted here is transferred from Attachment 5, Development of Coefficient for Normal Working Hours
2002 Job OPTION JOC Other Than Normal - 2nd Option
FFP
Other Than Normal Working Hours are anytime Monday through Friday, after 4:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.
The value inserted here is transferred from Attachment 6, Development of Coefficient for Other Than Normal Working Hours
2003 Job OPTION JOC Non-Pre-Priced - 2nd Option
FFP
The total non-prepriced line items allowable under this Program shall not exceed 10% of the total contract value. The value inserted here is transferred from Attachment 7, Development of Coefficient for Non-Pre-Priced
3001 Job OPTION JOC Normal Working Hours - 3rd Option
FFP
Normal Working Hours are Monday through Friday, 7:30 a.m. to 4:30 p.m. local time (excluding Federal Holidays).
The value inserted here is transferred from Attachment 5, Development of Coefficient for Normal Working Hours
3002 Job OPTION JOC Other Than Normal - 3rd Option
FFP
Other Than Normal Working Hours are anytime Monday through Friday, after 4:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.
The value inserted here is transferred from Attachment 6, Development of Coefficient for Other Than Normal Working Hours
3003 Job OPTION JOC Non-Pre-Priced - 3rd Option
FFP
The total non-prepriced line items allowable under this Program shall not exceed 10% of the total contract value. The value inserted here is transferred from Attachment 7, Development of Coefficient for Non-Pre-Priced
4001 Job OPTION JOC Normal Working Hours - 4th Option
FFP
Normal Working Hours are Monday through Friday, 7:30 a.m. to 4:30 p.m. local time (excluding Federal Holidays).
The value inserted here is transferred from Attachment 5, Development of Coefficient for Normal Working Hours
4002 Job OPTION JOC Other Than Normal - 4th Option
FFP
Other Than Normal Working Hours are anytime Monday through Friday, after 4:30 p.m. local time, on weekends, and/or Federal Holidays when work is required to be performed on an emergency basis, or at the Government's convenience to minimize the impact on ongoing military operations.
The value inserted here is transferred from Attachment 6, Development of Coefficient for Other Than Normal Working Hours
4003 Job OPTION JOC Non-Pre-Priced - 4th Option
FFP
The total non-prepriced line items allowable under this Program shall not exceed 10% of the total contract value. The value inserted here is transferred from Attachment 7, Development of Coefficient for Non-Pre-Priced.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-JUL-2021 TO
30-JUN-2022
N/A W6CL DPW FT BLISS
DPW FORT BLISS
BLDG 777 CHAFEE RD
FT BLISS TX 79916
W45C21
0002 POP 01-JUL-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 01-JUL-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 01-JUL-2022 TO
30-JUN-2023
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 01-JUL-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 01-JUL-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-JUL-2023 TO
30-JUN-2024
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 01-JUL-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 01-JUL-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-JUL-2024 TO
30-JUN-2025
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 01-JUL-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
3003 POP 01-JUL-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-JUL-2025 TO
30-JUN-2026
N/A (SAME AS PREVIOUS LOCATION)
4002 POP 01-JUL-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
4003 POP 01-JUL-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
EXHIBIT/ATTACHMENT
DOCUMENT TYPE DESCRIPTION DATE
Exhibit A Division 1,General Requirements
Exhibit B Areas of Fort Bliss with Historical Workload Exhibit C Wage Decision TX20210245 Exhibit D Wage Decision NM20210025
Exhibit E Wage Decision NM20210045 Exhibit F Div 02 Existing Conditions Exhibit G Div 03 Concrete Exhibit H Div 04 Masonry Exhibit I Div 05 Metals Exhibit J Div 06 Wood-Plastics-Composites Exhibit K Div 07 Thermal & Moisture Protection Exhibit L Div 08 Openings Exhibit M Div 09 Finishes Exhibit N Div 10 Specialties Exhibit O Div 11 Equipment Exhibit P Div 12 Furnishings Exhibit Q Div 13 Special Construction Exhibit R Div 14 Conveying Systems Exhibit S Div 21 Fire Suppression Exhibit T Div 22 Plumbing Exhibit U Div 23 HVAC Exhibit V Div 26 Electrical Exhibit W Div 27 Communications Exhibit X Div 28 Electronic Safety & Security Exhibit Y Div 31 Earthwork Exhibit Z Div 32 Exterior Improvements Exhibit AA Div 33 Utilities Exhibit AB Div 34 Transportation Exhibit AC Div 35 Waterway Exhibit AD Div 44 Pollution Control Equipment Exhibit AE Div 46 Water & Wastewater Equipment Attachment 1 Consent Letters Attachment 2 Specific Relevant Contracts Format Attachment 3 Past Performance Questionnaire Attachment 4 Notional Task Orders Attachment 4a Technical Drawings Attachment 5 Development of Coefficient for Normal
Working Hours
Attachment 6 Development of Coefficient for Other than Normal Working Hours
Attachment 7 Development of Coefficient for Non Pre- Priced
Section 00100 - Bidding Schedule/Instructions to Bidders
INSTRUCTIONS TO OFFERORS
A. Proposal Submittal and Inquiries
Proposals shall be submitted electronically to the location and the date and time specified for closing below. This location is a secure site compliant with the requirements stipulated in FAR Subpart 5 for electronic commerce.
https://safe.apps.mil/ to miguel.a.medrano.civ@mail.mil and natalia.lerma.civ@mail.mil by 4:00 p.m. MST on 10 May 2021. All other inquiries regarding this solicitation shall be submitted through electronic email to miguel.a.medrano.civ@mail.mil and natalia.lerma.civ@mail.mil. The closing date and time for questions is 4:00 p.m. MST on 26 April 2021. No telephonic interaction will be allowed.
1. DoD SAFE User Instructions
a. DoD SAFE is a web-based tool that provides authenticated DoD CAC users and guests
(unauthenticated users) the capability to securely send and receive large files, including files that are too large to be transmitted via email. Guests can receive files from CAC users and (only if CAC users requested files) send files to CAC users. Notification is achieved via email. In order for a guest user to create a drop-off, they must receive a drop-off request from an authenticated user. To receive a drop-off request offerors must submit an email inquiry to miguel.a.medrano.civ@mail.mil and natalia.lerma.civ@mail.mil. They are the authenticated users for this solicitation.
b. Offerors shall not submit an inquiry earlier than 10 days prior to the date proposals are due and no later than 24 hours prior to the time and date proposals are due. A drop-off request is valid for 14 days.
Once the files are sent the recipient will have access to them for 7 days. The recipient will send a confirmation email indicating the proposal has been received. The maximum size of the package is 8 GB and 25 total documents per drop off. Documents shall not be packaged in an Adobe PDF Portfolio.
Please refer to the DoD SAFE website for further information.
B. General Instructions (Section 00100)
This procurement is being conducted under Federal Acquisition Regulation (FAR) Subpart 15, Contracting by Negotiations. Offers will be evaluated using the criteria under Section 00100, “Evaluation Factors for Award.”
Noncompliance with these Instructions may hamper the Government's ability to properly evaluate the proposal, and could result in the proposal being eliminated from further consideration for contract award.
1. The submission of a signed proposal as specified in this solicitation shall constitute the Offeror's understanding and acceptance of all terms and conditions of the solicitation. Accepted proposals shall remain in effect and valid for a period of 120 calendar days from the date set for closing.
2. These instructions prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure consistency in the submission of necessary information to provide for the comprehensive evaluation of proposals.
3. If an Offeror believes that the requirements in these instructions contain an error, an ambiguity, omission, or are otherwise deemed unsound, the Offeror shall immediately notify to miguel.a.medrano.civ@mail.mil and natalia.lerma.civ@mail.mil in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
4. The Government will retain one copy of all unsuccessful proposals. Proposals received in response to the original solicitation will be considered current and will be retained through contract award.
5. All referenced documents for this solicitation are available on the Beta.Sam.Gov Opportunities website.
Potential Offerors are encouraged to subscribe for real-time e-mail notifications when information is posted to the website for this solicitation.
6. Debriefings. The Contracting Officer (KO) will promptly notify Offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505.
The Contracting Officer will notify unsuccessful Offerors in the competitive range of the source selection decision in accordance (IAW) debriefing shall make their request IAW the requirements of FAR 15.505 or 15.506, as applicable.
C. Proposal Preparation Instructions
IMPORTANT: Failure to follow the below proposal preparation instructions may cause a proposal to be deemed unacceptable by the Government and thus eliminated from the competition without further consideration.
1. Offeror’s proposal shall consist of four (4) separate volumes: General, Technical Acceptability, Past Performance, and Price.
2. Proposal Format
a. Exceptions. Offerors are required to comply with all solicitation requirements, instructions and deliverables, representations and certifications, technical requirements, as well as those identified as evaluation factors or subfactors (Sections 00010 through 00700). Failure to satisfy a stated requirement may result in an offer being determined non-responsive and ineligible for award. If the Offeror takes exception to any of the requirements specified in this solicitation, the Offeror shall clearly describe the exception in the format supplied below.
Exceptions shall provide a complete explanation of why the exception was taken, what benefit accrues to the Government (if any), and its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. Strict adherence to the format below is required for an exception to be actionable. Failure on the Offeror’s part to comply with this condition does not constitute a failure on the part of the Government to evaluate and respond to an exception. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Offerors are cautioned that taking an exception may render the offer ineligible for award. It is recommended that the Offeror contact the KO through to miguel.a.medrano.civ@mail.mil and natalia.lerma.civ@mail.mil immediately/prior to solicitation closing upon identifying an area that may result in an exception. This information shall be provided in the format below.
Table 1 - Solicitation Exceptions Solicitation Document Page/Paragraph Requirement/Portion Rationale & Impact
Section 00010,00100, SOW, Specifications, Instructions to Offerors, Basis for Award
Solicitation Page and Paragraph Numbers
Identify the requirement or portion to which exception is taken
Describe the rationale and impact of the exception
The proposals shall be organized into four (4) volumes (separately titled attachments correlating to the volume titles above).With the exception of company logos on stationary, graphics, photographs, and color coding of spreadsheets and calculations for emphasis, proposals shall be printable as blank ink on white paper, in a 12-point font. Digital files shall be provided in Microsoft Word, PowerPoint, and/or Excel. A PDF file format is allowable for Volumes I, II, and III only. File names shall be provided in the format of “Volume #, Company Name – Initial” for the first submission. File name of later submissions (if necessary), shall follow the same naming convention with the exception of the extension of “Revision X” indicating the number of the revision.
Page limitations are as follows:
Table 2 – Page Limits
Volume Title Page Limits I General None II Technical Acceptability except Subfactor (c) 75
Subfactor (c) - Notional Task Order Requirements only 50 III Past Performance None IV Price None
b. Proposal Limitation. If the page limits listed above are exceeded, the pages in excess of the limit shall be removed and unread. The Government will not accept any changes to proposals after the closing date of the solicitation. . If discussions become necessary, page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be established at the appropriate time.
c. Page limits include all appendices, charts, graphs, diagrams, tables, photographs, drawings, etc., submitted as part of the proposal.
d. Page limits do not include cover sheets for proposal volumes, tables of content, glossary of terms, abbreviations and acronyms, indices title pages, cross reference indices, and section dividers and tables if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal. Pages will be counted if they contain any other information, i.e., diagrams, extraneous data, etc. Pages marked “This page intentionally left blank” will not be counted
e. Proposals shall be submitted on 8 ½ X 11” size paper. Larger illustrations and tables supporting proposal information can be 8-1/2 x 14” if it is necessary to enlarge text for legibility. Margins on all documents, regardless of type, shall be at least 1” on the top and bottom and ¾” on each side. All pages within each volume of the proposal shall be consecutively numbered. In the event a proposal contains an ambiguity in the numbering of pages, the Government may exercise its own discretion in counting pages.
f. Indexing. Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume.
g. Glossary of Abbreviations and Acronyms. Each volume shall contain a glossary of all terms, abbreviations and acronyms used, with a definition for each.
3. Proposal Content
a. Volume I – General
i. Offerors are required to submit a completed SF 1442 (including acknowledgment of Amendments) and Section 00600. Failure to follow the below Contract Proposal preparation instructions may cause your proposal to be deemed unacceptable by the Government.
ii. Submission Requirements. The General Volume shall be organized as follows and contain the identified information.
(1) Exceptions/Assumptions (if required): Identification and explanation of any exceptions or deviations.
Additionally, any assumptions used in the proposal preparation shall be identified and fully explained.
(2) SF 1442: The SF 1442 shall be submitted fully completed. The Offeror shall acknowledge any amendments to the solicitation in accordance with the instructions on the SF 1442 and FAR 52.215-1, Instructions to Offerors - Competitive Acquisition. The Offeror shall provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to their proposal and who can obligate it contractually. Also, identify those individuals authorized to negotiate with the Government.
(3) Section 00600 (Representations & Certifications): The Offeror shall ensure that Section 00600 is submitted thoroughly completed with all blocks in each certification/representation completed truthfully and completely.
b. Volume II – Technical Acceptability
i. The Technical Acceptability Volume shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims in the Offeror’s proposal. Legibility, clarity, and coherence are very important. Proposals will be evaluated against the Technical Acceptability subfactors defined in Section 00100, Evaluation Factors for Award. The proposal shall not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the Offeror intends to meet these requirements. Statements that the Offeror understands, can, or will comply with the SOW or General Requirements, (including referenced publications, technical data, etc.); statements paraphrasing the SOW or General Requirements or parts thereof (including applicable publications, technical data, etc.); and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., will be considered unacceptable. Offerors shall assume that the Government has no prior knowledge of their facilities and expertise, and will base its evaluation on the information presented in the Offeror's proposal.
Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.
ii. The Technical Acceptability Volume shall, at a minimum, be prepared in a form consistent with the evaluation criteria for award set forth in Section 00100 of this solicitation. The section shall be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the Offeror’s technical competence and ability to comply with the contract task requirements specified in Technical Exhibit (TE) A, Division 1, General Requirements. The Offeror shall address as specifically as possible the actual methodology that would be used for accomplishing the SOW or General Requirements tasks. The Technical Acceptability Volume shall be organized according to the following general outline:
(1) Table of Contents: The table of contents section shall include a list of table and drawings and across reference matrix, as applicable.
(2) Subfactor (a) – Mission Capability: It is imperative that the Offerors articulate their experience and understanding of how a Job Order Contract (JOC) operates. Provide a plan that incorporates methodology, processes and resources to manage the overall effort, mobilize and set up on the installation, respond to the Contracting Officer’s notification of a Task Order requirement for emergency repairs as well as routine work requirements, the methodology you would employ to estimate, and submit Task Order proposals, and Task Order management including an explanation of how you will monitor the prosecution and management of a high volume of awarded Task Orders simultaneously. The Plan must clearly demonstrate your understanding of the utilization of a unit price book for Task Order proposals. Demonstrate how your plan will satisfy both the technical and administrative requirements of this solicitation.
(3) Subfactor (b) - Proposed Staffing: Provide a staffing plan to include an organizational flow chart and narrative that describes your company’s hierarchy and accountability, key personnel you intend to perform critical functions under the awarded contract, and how those positions act as a team in providing complete management and oversight for the performance of the contract and all Task Orders.
The Government considers the following key positions to be the absolute minimum acceptable level of management staffing requirements: Project Manager, Superintendent, Quality Control Manager, and Estimator.
Key personnel employed under the awarded contract shall meet the minimum qualifications described in the paragraphs below. All personnel performing in the described positions shall be direct employees of the prime contractor; none of these functions is allowed to be subcontracted below the prime contractor.
The Plan shall discuss the Offeror’s retention and replacement program for these key positions, to include timelines for replacement and how the Offeror will execute those functions until a new employee is hired.
The Plan shall describe how the Offeror will provide additional resources during seasonal workload fluctuation.
The Plan shall include a description of work to be performed by in-house tradesmen (if used) and other team members, subcontractors, and suppliers.
Under this small business set-aside, Offerors are free to propose teaming arrangements, mentor/protégée agreements, partnerships, and joint ventures so long as they are official business arrangements allowable under the Small Business Act. Any arrangements proposed shall be sanctioned by the Small Business Administration, and the Contracting Officer will validate the eligibility of those arrangements as part of this sub-factor.
Project Manager (PM): This individual shall be a full-time, dedicated employee of the prime contractor and speak fluent English. The Project Manager shall possess a minimum of 10 years of experience in the Construction field, with at least five (5) of those 10 years of experience in construction management, and shall possess at least an associate’s degree in one of the following disciplines: Engineering, Architecture, Construction Science, Business Management, or Construction Management. The Project Manager shall have the maturity and business acumen to manage the entire effort, successfully plan and execute all task orders, and possess extensive understanding of and familiarity with the principles, methods, and techniques of architectural, civil, mechanical, and electrical engineering. The Project Manager shall be vested with the authority to commit the contractor and act as an official representative of the company. The Project Manager shall have documented work experience in Federal government construction contracts, and be completely familiar with all Federal regulations relative to conducting construction on a Federal installation, to include all environmental and preservation implications.
Superintendent: A separate and distinct superintendent shall be assigned to each awarded task order under this contract (FAR 52.236-6). The superintendent shall be present on the jobsite at any and all times work is being performed, to include delivery of materials and equipment. The superintendent shall be a dedicated employee of the prime contractor, speak fluent English, and be directly accountable to the PM. To avoid conflicts of interest, superintendents shall not perform dual functions on the same jobsite; e.g., superintendents shall not perform additional duties in a quality control management or safety officer role on a covered task order. Each superintendent shall possess a minimum of seven (7) years documented journeyman level work experience in the construction field, with no less than three (3) years of that experience being in a supervisory position. The individual(s) shall provide verification of credible qualifications through a recognized union in the construction trades environment. The superintendent shall remain with the task order until all construction work is completed, inspected, and accepted, and will be responsible for maintaining the approved progress schedule (schedule of values).
Quality Control Manager (QCM): This individual shall be a full-time, dedicated employee of the prime contractor, speak fluent English, and be directly accountable to the corporate level Quality Control Manager only. As the QCM, this individual shall be responsible for the overall quality of work performed under this contract, and possess knowledge of and show current license/certification in a 40-hour OSHA Safety Inspection Certification and the US Army Corps of Engineers Quality Control Training Course. The QCM and any utilized support staff shall remain autonomous to the corporate level Quality Control Manager, and not be influenced by other members of the on-site staff. The QCM shall have a minimum of five (5) years of experience in construction quality control in Department of Defense agency (i.e., Corps of Engineers, Air Force, Navy, Marine Corps, etc.) activities. The QCM SHALL NOT HAVE OTHER DUTIES THAN QUALITY CONTROL. Should the QCM fail to be dedicated solely to quality control functions identified herein, or be otherwise directed to perform outside these boundaries, this shall be construed as a contract violation.
The QCM shall possess adequate skills and experience to implement and enforce the Contractor's Quality Control Plan (see detailed Quality Control Plan requirements at TE A, Division 1, General Requirements).
There shall be only one QCM under the contract. An alternate QCM, meeting the same qualification standards stated herein, may be utilized during short absences of the QCM; however, an alternative QCM shall not perform in that capacity when the assigned QCM is present. The QCM and any quality control staff shall have adequate construction work experience to detect violations in all construction phases, and all disciplines (mechanical, electrical, plumbing, and civil) of construction quality control. The Government has determined that adequate construction work experience is expertise in all four disciplines (mechanical, electrical, plumbing, and civil), and show current license/certification in their respective areas of expertise (whether it be mechanical, electrical, plumbing or civil). The quality control support staff shall be directly accountable to the quality control management chain of command without influence from production.
Estimator: This individual shall be a full-time, dedicated employee of the prime contractor, speak fluent English, and be directly accountable to the Project Manager. The Estimator shall have a minimum of eight
(8) years of documented work experience estimating construction work in multiple construction disciplines, with no less than three (3) of the eight (8) years of experience utilizing commercially developed construction pricing guides. In the absence of the Project Manager, the Estimator shall prepare and negotiate task order proposals.
(4) Subfactor (c) - Notional Task Order Requirements: Attachment 4 and 4a provides a fictional workload scenario of five (5) notional Task Order projects that are typical of a JOC. These scenarios do not represent actual construction workload. Offerors are expected to apply those principles, processes and knowledge required herein to prepare a detailed proposal for each of the notional Task Orders. Responses must incorporate all roles and responsibilities, means and methods, and the requirements at TE A, Division 1, General Requirements of this solicitation. The Unit Price Book discussed at TE A Division 1, General Requirements shall be utilized to provide line items, take-off quantities, unit prices, etc., to support proposed task order prices. All requirements normally associated with actual Task Order proposal requests should be considered in the response. All five Task Order proposals must be supported by the Offeror’s rationale for selection of line items, critical path milestones, etc., in order to be acceptable for evaluation and consideration for award.
c. Volume III – Past Performance
i. The Government will perform a Confidence Assessment of the Offeror’s past performance to arrive at a confidence rating. The Confidence Assessment represents the evaluation of an Offeror's past work record to assess the Government's confidence in the Offeror's probability of successfully performing as proposed. Past Performance information described herein is required on the Offeror and all subcontractors, teaming partners, and/or joint venture partners proposed to perform. In addition, the Offeror shall detail the percentage of work performed by each subcontractor or partner based on the total proposed price. The Offeror shall submit, along with the information required in this paragraph, a consent letter (see Attachment 1), executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the Offeror so the Offeror can respond to such information. For each identified effort for a commercial customer, the Offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the Offeror's performance.
ii. The Offeror shall include documentation regarding their relevant past performance as it directly relates to the work being procured under this solicitation. The Offeror SHALL NOT go back any farther than six (6) years from the issue date of this solicitation for the submitted data. The past performance data shall document a successful history of past contract performance. This volume has no page limitation. Relevant efforts are defined as services/efforts that are the same as or similar to the effort (as compared to NAICS code 236220) required by the solicitation including work on an active military installation, work in occupied buildings, and work with same/similar state and federal construction codes. Projects considered relevant may include JOC, Simplified Acquisition Base Engineer Requirements (SABER) contracts, or Construction, Repair, Renovation, Sustainment, Restoration, and Modernization (SRM) contracts of at least $2 Million and a duration of no less than 60 days of performance. The Offeror is required to submit past performance data on its self as it directly relates to the work being procured under this solicitation. If the Offeror has no past performance data then it must so state. If it is relying on the past performance data of a joint venture or teaming partner that must also be stated and evidence submitted showing that such a joint venture exist for the purposes of this acquisition. Data concerning the Offeror shall be provided first, followed by each proposed major subcontractor, teaming partners, and/or joint venture partners in alphabetical order. In the case of a joint venture, the prime Offeror joint venture should demonstrate successful experience and past performance as that joint venture, as well as each member of the joint venture as applicable. Failure to provide the past performance data/information requested can result in a proposal being determined to be noncompliant and may be eliminated from further consideration.
iii. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the Offeror’s Past Performance Volume and information obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems, Defense Contract Management Agency (DCMA) and commercial sources. Offerors are reminded that both independent data and data provided by Offeror in their proposals may be used by the Government to evaluate Offeror past performance. However, the burden of providing thorough, complete, and current past performance information as requested in this paragraph remains with the Offeror. Proposals that do not contain the information requested by this paragraph risk rejection or a less than acceptable performance rating by the Government.
iv. In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)) and, as a result, will receive a "Neutral Confidence" rating for the Past Performance factor. All past performance comments received will be taken into account and could affect the overall rating.
The overall past performance evaluation is a subjective decision based on the whole of all data received.
v. Submission Requirements. The Offeror shall submit a Past Performance Volume containing the following:
(1) Table of Contents
(2) Consent Letters (Attachment 1): Executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing the release of past performance information so the Offeror can respond to such information.
(3) Client Authorization Letters: For each identified effort for a commercial customer authorizing release to the Government of requested information on the Offeror’s performance under a specific contract.
(4) Organization Structure Change History: Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc.
In many cases, these changes have taken place during the time of performance of relevant present or past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider present and past performance information provided by other sources as well as that provided by the Offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.
(5) Specific Relevant Contracts Format (Attachment 2): is limited to four (4) pages per reference. The Offeror shall provide documentation outlining the Offeror’s past performance with contracts, as a prime or major subcontractor, which is the same or similar in nature, size, and complexity to the services being procured under this solicitation. The submittal shall include specific narrative explanation and rationale supporting objectives achieved and assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this solicitation. For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. The Offerors shall also provide a copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed subcontractor. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination. Additionally, provide a narrative describing any litigation activity (i.e. bond claims, liquidated damages, insurance actions, or claims related to project performance, etc.) that the Offeror has been, or is currently party to involving its subcontractors, customers or any Surety within the past six (6) years. The narrative should include the Parties involved, the magnitude of the Claim and the resolution.
vi. Past Performance Questionnaire (Attachment 3): is for the contracts identified on each Specific Relevant Contract Reference. The Offeror shall forward a copy of the Past Performance Questionnaire to the points of contact responsible for monitoring performance under such contracts. The points of contact shall return the questionnaires directly to miguel.a.medrano.civ@mail.mil and natalia.lerma.civ@mail.mil no later than 4:00 pm MST, 10 May 2021. Any questionnaires not returned directly to miguel.a.medrano.civ@mail.mil and natalia.lerma.civ@mail.mil will not be reviewed and evaluated. The information contained in the questionnaires will be used to evaluate the Offeror’s past performance. New entities formed for the purpose of proposing on this solicitation (joint venture, teaming partners, or mentor protégé) that have no past performance history under that business arrangement are permitted to submit past performance information for the individual entities forming the arrangement.
d. Volume IV – Price
i. General. The Government reserves the right to require the submission of Other Than Certified Cost or Pricing Data as is deemed necessary to arrive at a fair and reasonable price. All information relating to the proposed cost/price data must be submitted in electronic format. Electronic versions of the Cost/Price proposal shall be submitted in MS Office Excel format only, and shall NOT be read only or password protected.
All formulas, lookup tables, and links shall be intact, and no links shall exist to files not included with the submission. Excel workbooks should not contain hidden spreadsheets. PDF or flat files will not be acceptable.
Failure to comply with these formatting requirements may result in rejection of the proposal. Offeror’s submittals shall be free of viruses, Trojans, spyware, and other malicious code for which appropriate detection and removal/quarantine software exists.
ii. The basis for pricing this JOC incorporates the use of a commercial cost estimating and project management software tool (e.g., WinEst, MS Project, e4Clicks) which employs a price modifier known as a coefficient. A coefficient is a numerical factor that is multiplied by the estimated total project costs to derive the final fixed-price Task Order price proposed to the Government. The coefficient includes various factors reflecting the contractor’s cost of doing business and operating a field office on Fort Bliss, TX (e.g., direct and indirect labor, field overhead, corporate overhead, equipment leases, transportation, training and certification, permits and licenses, profit) and a factor reflecting an evaluation of the accuracy of a contract-specified cost estimating tool to the local subcontractor/supplier market. This is generally done using a Unit Price Book (UPB) such as RSMeans, and is generally referred to as the “value of the book.” The Government uses e4Clicks as the RSMeans cost estimating tool. All estimates shall be submitted using a commercial cost estimating software and shall contain all of the line items found in the RSMeans bound volumes.
iii. Submission Requirements. The Offeror shall submit a Price Volume containing the following:
(1) Bondability Letter: The Offeror shall provide a letter from a qualifying surety that validates the ability to provide bonding at the contract’s program ceiling and specifies the Offeror’s aggregate and single project limits, remaining bond capacity, and impact anticipated from the proposed contract. The program ceiling is $20 Million/year for $100 Million/5-year contract.
(2) Section 00010 (Solicitation Contract Form): Section 00010 shall be submitted fully completed and error free. It shall contain the Offeror’s coefficient rates for the established Contract Line Items (CLINs).
(3) Development of Coefficients: This solicitation requires the development of three separate coefficient factors; (1) Normal Working Hours; (2) Other Than Normal Working Hours; and (3) Non-prepriced Items. The Government has determined the following allocation of CLIN values within the established annual ceiling / per category as shown below:
CLIN X001 Normal Working Hours (85% or $17,000,000.00) CLIN X002 Other Than Normal Working Hours (5% or $1,000,000.00) CLIN X003 Non-prepriced Items (Not-To-Exceed 10% or $2,000,000.00)
Note: Fort Bliss operates on a 5-day work week. Fort Bliss will provide a location for the contractor’s use on the installation. See TE A, Division 1, General Requirements, for additional details.
When developing coefficients for submission, Offerors shall utilize Attachments 5, 6, and 7 and consider the cost elements identified therein as the minimum types of costs to incorporate into their coefficients. Each cost proposed shall be accompanied by a correlating narrative explaining type, quantity, and rationale for the value proposed. This narrative shall clearly explain the methodologies, calculations, exceptions, and assumptions used in developing the coefficient to include information to validate the assumed “value of the book” plus all cost inputs for direct labor, operating costs, field overhead, bonding, equipment, corporate overhead, profit, etc.
Example: When proposing direct labor, provide a complete breakdown of labor by skill category, quantity of personnel in each skill category, a bare rate per hour, available hours, productive hours, application of fringe benefits and withholdings, and a total cost per line. The narrative accompanying this cost element must contain the rationale for the selection of the skill category, what duties and responsibilities will be performed by that/those individuals and cross reference back to the appropriate paragraph in the technical proposal…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .