Technical Exhibit AB Div 34 Transportation.pdf

PDF 175 KB Posted

Attached to
FORT BLISS JOB ORDER CONTRACT
Solicitation number
W911SG20R0042
Issued by

About this file

This solicitation is for an indefinite delivery indefinite quantity job order contract to provide real property sustainment, restoration and modernization minor construction services at Fort Bliss, Texas. The contract has a base period of 12 months and four 12-month option periods, with an estimated value between $75 million and $100 million. Task orders will range from $2,000 to $1 million. This is a 100% small business set-aside for NAICS code 236220, with a size standard of $39.5 million. The solicitation is available on beta.sam.gov and prospective contractors must register in SAM under NAICS 236220 to be eligible for award. Notification of any amendments will also be posted to beta.sam.gov.

View the file

Other files

File Type Posted
Attachment 7 Coefficient Non-PrePriced Items Texas - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
Attachment 6 Coefficient Other Than Normal Texas - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
Attachment 7a Coefficient Non-PrePriced Items New Mexico - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
SOLICITATION Conform Copy 0003 FORT BLISS JOC W911SG20R0042.pdf PDF
Attachment 9 RFIs 2 Aug 2021 W911SG20R0042.pdf PDF
Technical Exhibit A Division 1 General Requirements 2 Aug 2021.pdf PDF
SOLICITATION Amendment 0003 FORT BLISS JOC W911SG20R0042-0003.pdf PDF
Attachment 8 Historical Workload 2 Aug 2021 W911SG20R0042.pdf PDF
Attachment 5a Coefficient Normal New Mexico - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
Attachment 5 Coefficient Normal Texas - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
Attachment 6a Coefficient Other Than Normal New Mexico - Bliss JOC 2 Aug 2021 W911SG20R0042.xlsx XLSX spreadsheet
SOLICITATION Conform Copy 0002 FORT BLISS JOC W911SG20R0042.pdf PDF
SOLICITATION Amendment 0002 FORT BLISS JOC W911SG20R0042-0002.pdf PDF
SOLICITATION Amendment 0001 FORT BLISS JOC W911SG20R0042-0001.pdf PDF
SOLICITATION Conform Copy 0001 FORT BLISS JOC W911SG20R0042.pdf PDF
Attachment 1 Consent Letter - Bliss JOC W911SG20R0042.docx DOCX document
Technical Exhibit AD Div 44 Pollution Control Equipment.pdf PDF
Attachment 6 Coefficient Other Than Normal - Bliss JOC W911SG20R0042.xlsx XLSX spreadsheet
Technical Exhibit Q Div 13 Special Construction.pdf PDF
Attachment 4a Notional Task Order Technical Drawings - Bliss JOC W911SG20R0042.pdf PDF
Technical Exhibit Z Div 32 Exterior Improvements.pdf PDF
Attachment 7 Coefficient Non-PrePriced Items - Bliss JOC W911SG20R0042.xlsx XLSX spreadsheet
Technical Exhibit AE Div 46 Water and Wastewater Equipment.pdf PDF
Technical Exhibit C General Decision TX20210245.pdf PDF
Technical Exhibit T Div 22 Plumbing.pdf PDF
Technical Exhibit N Div 10 Specialties.pdf PDF
Technical Exhibit AA Div 33 Utilities.pdf PDF
Technical Exhibit J Div 06 Wood-Plastics-Composites.pdf PDF
Technical Exhibit F Div 02 Existing Conditions.pdf PDF
FORT BLISS JOC SOLICITATION W911SG20R0042.pdf PDF
Technical Exhibit O Div 11 Equipment.pdf PDF
Technical Exhibit B Areas of Fort Bliss with Historical Workload.pdf PDF
Technical Exhibit V Div 26 Electrical.pdf PDF
Technical Exhibit E General Decision NM20210045.pdf PDF
Technical Exhibit I Div 05 Metals.pdf PDF
Technical Exhibit K Div 07 Thermal and Moisture Protection.pdf PDF
Technical Exhibit S Div 21 Fire Suppression.pdf PDF
Technical Exhibit X Div 28 Electronic Safey and Security.pdf PDF
Attachment 4 Notional Task Order - Bliss JOC W911SG20R0042.pdf PDF
Technical Exhibit P Div 12 Furnishings.pdf PDF
Technical Exhibit U Div 23 HVAC.pdf PDF
Technical Exhibit Y Div 31 Earthwork.pdf PDF
Technical Exhibit H Div 04Masonry.pdf PDF
Technical Exhibit AC Div 35 Waterway.pdf PDF
Attachment 2 Specific Relevant Contracts - Bliss JOC W911SG20R0042.docx DOCX document
Attachment 3 Past Performance Questionnaire - Bliss JOC W911SG20R0042.docx DOCX document
Technical Exhibit L Div 08 Openings.pdf PDF
Technical Exhibit A Division 1 General Requirements.pdf PDF
Attachment 5 Coefficient Normal- Bliss JOC W911SG20R0042.xlsx XLSX spreadsheet
Technical Exhibit G Div 03 Concrete.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAFFIC SIGNALS 344113- 1

SECTION 344113 – TRAFFIC SIGNALS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Furnish and install a complete and functional traffic signals and traffic signal controls in accordance with the plans. The traffic signals and appurtenant items shall comply with AASHTO LTS-5 and AASHTO RSDG-3.

1.3 ACTION SUBMITTALS

A. Drawings showing equipment layout including the Traffic Signals, Wig-Wag warning signals (if applicable), and Traffic Arms (if applicable).

B. Traffic signals and traffic signal supports.

C. Control diagrams and programming flow charts showing complete control details of the traffic signals.

PART 2 - PRODUCTS

2.1 TRAFFIC SIGNALS

A. Provide traffic signals with light emitting diode (LED) signal modules as shown on the drawings. The term "LED signal module" in this text shall refer to an array of LEDs and lens that are capable of providing a circular signal indication as specified herein and shown on the drawings. All LED signal modules shall conform to the Equipment Standards of the Institute of Transportation Engineers (ITE), chapter 2a. The arrangement and size of signal indications for each LED signal module shall be as shown on the drawings and shall be in conformance with

MUTCD.

TRAFFIC SIGNALS 344113- 2

2.2 TRAFFIC SIGNAL SUPPORTS

A. The design and installation of all traffic control supports shall be in accordance with AASHTO LTS-5 and applicable local and state standard specifications. Traffic signal supports consist of tubular members, mast arms, pole shaft, base plates, anchor bolts assemblies, foundations as well as associated connections and appurtenances. Loading evaluations shall be consistent with local and state guidelines. Ice and wind loads shall be determined based on the geographic location of the installation in accordance with AASHTO guidelines. Group loading analysis shall be consistent with local and state guidelines and section 1.2.6 of AASHTO LTS-5.

Allowable stress shall be consistent with local and state guideline and section 1.4 of AASHTO LTS-5. Fatigue calculations shall be consistent with local and state guideline and section 1.9.6 of AASHTO LTS-5. It is the Contractor's responsibility to conduct soil borings for foundation design; otherwise, conservative soils assumptions shall be used in calculating foundation requirements. If local and state guidelines provide foundations designs for design conditions, these guidelines may be used provided all loading and design conditions fall within guideline parameters. Before forming and placing concrete, each foundation excavation shall be inspected and evaluated for the actual soil conditions encountered. Do not proceed with the work until the excavation is inspected and evaluated. If necessary, revise the foundation design based on the soil conditions encountered. Before submitting the revised design for approval, obtain the signature and seal of a Professional Engineer registered in the State.

B. Foundation locations may be changed to avoid underground obstructions. All design calculations as well as shop drawings shall be submitted for review and acceptance prior to installation.

PART 3 - EXECUTION

3.1 EXAMINATION

A. After becoming familiar with all details of the work, verify that site conditions are in agreement with the contract drawings. Prepare a report describing any differences in site conditions or conditions that will affect performance of the system to the Owner. Do not take any corrective action without written permission from the Owner

3.2 INSTALLATION

A. Oversight

1. The Contractor designated Technical Specialist shall oversee installation

B. Installation Schedule

1. Before beginning any site work, provide a schedule of all installation and testing activities. The project activities in the proposed schedule shall be arranged in chronological order. All installation and testing activities, specifically those requiring outages, shall be coordinated with the Owner. No site work shall be done without an approved schedule by the Owner.

TRAFFIC SIGNALS 344113- 3

C. Wiring

1. Furnish and install all cables and conduits for all wiring interconnecting contractor furnished, and where indicated on the drawings, Owner furnished equipment.

D. Grounding

1. Provide adequate grounding system for the Traffic Signal supports. Test installed ground rods as specified in IEEE 142.

E. Enclosure Penetrations

1. Enclosure penetrations shall be from the bottom unless the system design requires penetrations from other directions. Penetrations of interior enclosures involving transitions of conduit from interior to exterior, and penetrations on exterior enclosures shall be sealed with rubber silicone sealant to preclude the entry of water. The conduit riser shall terminate in a hot-dipped galvanized metal cable terminator. The terminator shall be filled with an approved sealant as recommended by the cable manufacturer and in a manner that does not damage the cable.

F. Cold Galvanizing

1. Field welds and/or brazing on factory galvanized boxes, enclosures, conduits, etc., shall be coated with a cold galvanized paint containing at least 95 percent zinc by weight.

G. Other Requirements

1. Install the system in accordance with the standards for safety included in NFPA 70 and the appropriate installation instructions from the manufacturers of the equipment.

Components within the system shall be configured with appropriate service points to pinpoint system trouble in less than 20 minutes.

END OF SECTION 344113

PARKING BUMPERS 347113 - 1

SECTION 347113 – PARKING BUMPERS

A. Drawings and General Provisions of the Contract, including General and Supplementary Condition and Division 01 Specification Sections, apply to this Section.

A. Section includes wheel stops.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. LEED Submittals:

1. Product Data for Credit MR4: For products having recycled content, documentation indicating percentages by weight of postconsumer and preconsumer recycled content.

Include statement indicating cost for each product having recycled content.

C. Samples for Initial Selection: For each type of exposed finish requiring color selection.

D. Samples for Verification: For wheel stops, 6 inches long, showing color and cross section; with fasteners.

2.1 PARKING BUMPERS

A. Concrete Wheel Stops: Precast, steel-reinforced, air-entrained concrete, 4000 psi (27.6-MPa) minimum compressive strength, dimensions as specified. Provide chamfered corners, transverse drainage slots on underside, and a minimum of 2 factory-formed or drilled vertical holes through wheel stop for anchoring to substrate.

1. Surface Appearance: Free of pockets, sand streaks, honeycombs, and other obvious defects. Corners shall be uniform, straight, and sharp.

2. Mounting Hardware: Galvanized steel, spike or dowel, 1/2 inch diameter, 10 inch minimum length, or hardware as standard with wheel-stop manufacturer.

PARKING BUMPERS 347113 - 2

B. Resilient Wheel Stops: Solid, integrally colored, 96 percent postconsumer or commingled postconsumer and preconsumer recycled material; UV stabilized, size as specified. Provide chamfered corners and a minimum of 2 factory-formed or drilled vertical holes through wheel stop for anchoring to substrate.

1. Color: As specified.

2. Mounting Hardware: Galvanized-steel, spike or dowel, 1/2 inch diameter, 10 inch minimum length, or hardware as standard with wheel-stop manufacturer.

3. Adhesive: As recommended by wheel-stop manufacturer for adhesion to pavement.

C. Timber Wheel Stops

1. Timber bumpers shall be pressure treated in conformation with Section 58 “Preservative Treatment of Lumber, Timber and Piling”, and AWPA Standards.

2. Mounting Hardware: Galvanized-steel, spike or dowel, 1/2 inch diameter, 10 inch minimum length, or hardware as standard with wheel-stop manufacturer.

3. Nominal Size: 6 inches high, 8 inches wide, 6 feet long.

4. Profile: Manufacturer's standard cross section with sloped vertical faces, square ends, and drainage slots.

3.1 DELIVERY, STORAGE AND HANDLING

A. The Contractor is responsible for handling and protection of all materials after arrival at destination.

B. Any damage must be reported immediately to the Engineer.

3.2 EXAMINATION

A. Verify that pavement is in suitable condition to begin installation according to manufacturer’s written instructions.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.3 INSTALLATION

A. General: Install wheel stops according to manufacturer’s written instructions unless otherwise indicated.

B. Install wheel stops in bed of adhesive before anchoring.

PARKING BUMPERS 347113 - 3

C. Securely anchor wheel stops to pavement with hardware in each preformed vertical hole in wheel stop as recommended in writing by manufacturer. Recess head of hardware beneath top of wheel stop.

END OF SECTION 347113

VEHICLE BARRIERS 347113.17 - 1

SECTION 347113.17 – VEHICLE BARRIERS

1.2 DESCRIPTION

A. This section includes passive High-Security Vehicle Barricades of walls and fixed bollards of crash resistance rating.

1.3 SYSTEM DESCRIPTION

A. Barricade system mounted in the ground as detailed on the drawings

1.4 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

Indicate dimensions, required clearances, 10-07M method of field assembly, and location and size of each field connection.

C. Certificate: Test reports confirming compliance with specified resistive rating.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of units required for this Project.

B. Source Limitations: Obtain parking control equipment through one source from a single manufacturer.

1.6 PERFORMANCE

A. Performance Evaluation. All passive vehicle barriers shall be certified for their resistance to ramming according to “Test Method of Vehicle Crash Testing of Perimeter Barriers and Gates” SD-STD-02.01 Revision in effect at the time of bid.

VEHICLE BARRIERS 347113.17 - 2

B. The system shall have been certified by the United States Department of State to have a performance evaluation per Department of State D.O.S. Specification SDSDT- 0201 of the following:

1. STOPPING CAPACITY.

2. Normal Operation: Vehicle barrier(s) shall provide excellent security and positive control of normal traffic in both directions by providing an almost insurmountable obstacle to non-armored or non-tracked vehicles.

3. The Vehicle Barrier(s) System shall be designed to stop a vehicle attacking from either direction.

4. High Energy Attack: Vehicle barrier(s) shall have been shown by certified dynamic non-linear analysis to be capable of stopping and immobilizing non-armored or non-tracked vehicles. The Bollard system shall be designed to destroy the front suspension system, steering linkage, engine crankcase and portions of the drive train.

5. The Vehicle barrier(s) shall be capable of stopping and destroying a vehicle(s) weighing:

15,000 pounds at the following designated speeds:

a. K4 = 30 mph

b. K8 = 40 mph

c. K12 = 50 mph

1.7 COORDINATION

A. Coordinate installation of anchorages for parking control equipment. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.

1.8 APPLICABLE PUBLICATIONS

A. Department of State D.O.S. Specification SDSDT- 0201.

NOT USED

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances, critical dimensions, and other conditions affecting performance.

VEHICLE BARRIERS 347113.17 - 3

B. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

A. Install Gate in concrete foundation pad as outlined in manufactures installation instructions.

3.3 FIELD QUALITY CONTROL

A. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.

END OF SECTION 347113.17

VEHICLE GUARD RAILS 347113.26- 1

SECTION 347113.26 – VEHICLE GUARD RAILS

1.2 GENERAL

A. This work shall consist of constructing metal beam guard railing, and/or cable railing at the locations and in conformance with the details shown on the plans, as specified, and as directed by the Engineer.

B. The type of railing to be constructed will be specified in the special provisions or shown on the plans.

2.1 MATERIALS

A. General Requirements

1. Welding shall conform to the requirements in AWS D1.1. Welds on exposed surfaces shall be ground flush with the adjacent surfaces.

2. All completed steel components and hardware for railings shall be galvanized in conformance with the requirements in AASHTO Designation: M 180.

3. After galvanizing, all elements of the railing shall be free of fins, abrasions, rough or sharp edges and other surface defects and shall not be kinked, twisted or bent. If straightening is necessary, it shall be done by methods approved by the Engineer. Kinks, twists or bends in railing elements may be cause for rejection of the railing elements.

4. Abraded or damaged galvanized surfaces of steel railing and posts, and ends of steel railing cut after galvanizing, shall be cleaned and regalvanized.

5. Mortar shall consist of one part Portland cement and 3 parts sand.

6. Mortar shall be cured by either the water method or the curing compound method.

B. Metal Beam Guard Railing

1. The rail elements, backup plates, terminal sections, end and return caps, bolts, nuts and other fittings shall conform to the requirements in AASHTO Designation: M 180. The rail elements, backup plates, terminal sections, end and return caps shall conform to Class A, Type 1 W-Beam guard railing as shown in AASHTO Designation: M 180. The edges and center of the rail element shall contact each post block. Rail element joints shall be

VEHICLE GUARD RAILS 347113.26- 2

lapped not less than 121/2 inches and bolted. The rail metal, in addition to conforming to the requirements in AASHTO Designation: M 180, shall withstand a cold bend, without cracking, of 180 degrees around a mandrel of a diameter equal to 2.5 times the thickness of the plate

2. Two certified copies of mill test reports of each heat from which the rail element is formed shall be furnished to the Engineer.

3. Bolts shall have shoulders of such shape that will prevent the bolts from turning. Holes in rail elements shall be of similar shape as the bolt shoulder.

4. Steel posts shall be fabricated from steel conforming to the requirements in ASTM Designation: A 36/A 36M, unless otherwise specified. Two certified copies of mill test reports of each heat of steel from which steel posts are formed or fabricated shall be furnished to the Engineer.

5. The grades and species of wood posts and blocks shall be No. 1 timbers (also known as No. 1 structural) Douglas fir or No. 1 timbers Southern yellow pine. Wood posts and blocks shall be graded in conformance with the provisions in Section 57-2, "Structural Timber," of the Standard Specifications, except allowances for shrinkage after mill cutting shall in no case exceed 5 percent of the American Lumber Standards minimum sizes, at the time of installation.

6. Wood posts and blocks shall be rough or S4S, at the option of the Contractor. Only one type of post and block shall be used for any one continuous length of guard railing. The size tolerance of rough sawn blocks in the direction of the bolt holes shall be not more than ±1/4 inch.

7. After fabrication, wood posts and blocks shall be pressure treated in conformance with Section 58, "Preservative Treatment of Lumber, Timber and Piling," and AWPA Use Category System: UC4A, Commodity Specification A.

8. Breakaway wood guard rail terminal posts may be field bored to provide the 23/8-inch diameter hole as shown on the plans.

9. Railing parts furnished under these specifications shall be interchangeable with similar parts regardless of source.

C. Cable Railing

1. Cable railing shall consist of cables supported by pipe posts set in either concrete footings or post pockets in the tops of retaining walls or other structures, as shown on the plans.

2. Pipe for posts and braces shall be standard steel pipe as indicate on the plans.

3. Truss rods, post tops, cable clamps, eye bolts, thimbles and other required fittings shall be commercial quality steel, malleable iron or wrought iron. All post tops shall be watertight. The eye of the eye bolts shall be either drop forged or formed with a full penetration weld, at the Contractor's option. The eye shall develop 100 percent of the bolt strength.

4. Turnbuckles shall be commercial quality, and shall have jaw or eye ends as shown on the plans. Turnbuckles shall have 2,700 pounds minimum, breaking strength. At the option of the Contractor, turnbuckles shall be steel pipe type or drop forged steel.

5. Crimped sleeve clamps and stop sleeve clamps shall be nonferrous metal, shall develop the strength of the cable and shall be the color of the cable.

6. Cable shall be wire strand or rope with a minimum diameter of 1/4 inch, and a minimum breaking strength of at least 1,800 pounds. Cable shall be galvanized in conformance with the requirements in Federal Specification RR-W-410D.

VEHICLE GUARD RAILS 347113.26- 3

destination. All materials shall be unloaded and handled with a forklift or crane using nylon slings.

A. Metal Beam Guard Railing

1. Workmanship shall be equivalent to good commercial practice and all edges, bolt holes and surfaces shall be free of torn metal, burrs, sharp edges and protrusions.

2. Rail elements shall be spliced at intervals not to exceed 12.5 feet and the splices shall be made at posts, unless otherwise shown on the plans.

3. The rail elements at joints shall have full bearing. When the radius of curvature is 150 feet or less, the rail elements shall be shaped in the shop. The radius of curvature shall be stenciled on the back of each section of rail elements in numerals 21/2 inches in height.

4. At the option of the Contractor, metal beam guard railing shall be constructed using either steel posts or wood posts, both with wood blocks, for line posts. Only one type of line post shall be used for any one continuous length of guard railing.

5. Where field cutting or boring is performed after treatment, all cuts and holes shall be thoroughly swabbed, sprayed or brushed with 2 applications of the same type of preservative as initially used, or treated with copper naphthenate as specified in AWPA Standard M4. Application of preservative in the field shall conform to the provisions in the last paragraph in Section 58-1.04, "Wood Preservative for Manual Treatment."

6. Wood posts shall be driven, with or without pilot holes, or shall be placed in drilled holes, at the option of the Contractor. Any space around wood posts shall be backfilled with selected earth, free of rock, placed in layers approximately 0.33-foot thick and each layer shall be moistened and thoroughly compacted.

7. Steel posts shall be driven. If ground conditions are such that pilot holes are necessary to prevent damage to posts during driving, any space around steel posts after driving shall be filled with dry sand or pea gravel.

8. At the Contractor's option, steel foundation tubes with soil plates attached, shall be either driven, with or without pilot holes, or placed in drilled holes. Any space around the steel foundation tubes shall be backfilled with selected earth, free of rock, placed in layers approximately 4 inches thick and each layer shall be moistened and thoroughly compacted. Wood terminal posts shall be inserted into the steel foundation tubes by hand.

Before the wood terminal posts are inserted, the inside surfaces of the steel foundation tubes to receive the wood posts shall be coated with a grease which will not melt or run at a temperature of 149 degrees F or less. The edges of the wood terminal posts may be slightly rounded to facilitate insertion of the post into the steel foundation tubes.

9. Posts shall be placed at equal intervals, as shown on the plans, except that the end posts may be spaced closer to adjacent posts if directed by the Engineer.

VEHICLE GUARD RAILS 347113.26- 4

10. The bolted connection of the rail element to the post shall withstand a 5,000-pound pull at right angles to the line of the railing.

11. All metal work shall be fabricated in the shop, and no punching, cutting or welding will be permitted in the field. Rail elements shall be lapped so that the exposed ends will not face approaching traffic.

12. Terminal sections shall be installed in conformance with the manufacturer's recommendations.

13. Metal beam guard railing shall be connected to bridge railings, barriers, retaining walls, abutments and other flat concrete surfaces in conformance with the details shown on the plans.

14. End anchor assemblies and rail tensioning assemblies for metal beam guard railing shall be constructed as shown on the plans.

15. Surplus excavated material remaining after the guard railing has been constructed shall be disposed of in a uniform manner along the adjacent roadway as directed by the Engineer.

B. Cable Railing

1. Workmanship shall be equivalent to good commercial practice.

2. All work shall conform to the plans.

3. The cables shall be tensioned to provide taut railings between posts.

4. Post footings shall be constructed of Class 3 or minor concrete conforming to the provisions in Section 033000 CAST IN PLACE CONCRETE.

END OF SECTION 347113.26

DELINEATORS AND REFLECTORS 347119 - 1

SECTION 347119 – DELINEATORS AND REFLECTORS

1.2 GENERAL

A. This work consists of the installation and furnishing of delineators and reflectors in accordance with these specifications and in conformity with the lines, grades and details shown on the plans.

2.1 DELINEATORS

A. Steel Posts:

1. Details for each type of delineator are shown on the plans. Posts and reflectors shall conform to the requirements shown on the plans.

B. Flexible Posts:

1. Flexible posts shall be manufactured from an impact resistant flexible material and shall conform to the following requirements:

a. Workmanship. The posts shall exhibit good workmanship and shall be free of burrs, discoloration, contamination, and other objectionable marks or defects which affect appearance or serviceability.

b. Base Anchoring. The posts shall be designed to facilitate a permanent installation that resists overturning, twisting, and displacement from wind and impact forces.

It shall have an anchoring depth of 18 to 24 inches. Actual depth shall be as recommended by the manufacturer, or as directed by the Engineer. If soil conditions prohibit anchoring depth to less than 18 inches, the anchor shall be embedded in concrete, as specified by the manufacturer and as directed by the Engineer. The posts or below-ground anchors shall be capable of being driven into an earth shoulder or roadside with or without a pilot hole. Installation shall be accomplished with typical maintenance equipment.

DELINEATORS AND REFLECTORS 347119 - 2

c. Reflective Elements. Posts shall be shaped to accommodate the installation of reflective elements. Reflective elements shall be 3 inches square for Type I, 3 inches by 6 inches for Type II, and 3 inches by 9 inches for Type III (hazard marker) delineators. Reflective material shall be Type IV reflective sheeting. The top of the reflective element shall be mounted no more than 2 inches from the top of the post, with the reflective element facing in the direction of the oncoming traffic. The reflective element shall be mounted in accordance with the manufacturer’s recommendations to prevent loss of the reflective element during the life of the post. The reflective element shall be protected from scratches, abrasions, and other physical damage during shipping and driving by an easily removable “masking” sheet.

d. Marking. The tops of the posts on the side away from traffic shall be date-stamped showing the month and year of fabrication. The numerals shall be at least 1/4 inch in height and shall be either die stamped, or legibly stamped with permanent ink. In addition, each post shall be marked with a black horizontal stripe to denote an 18 inch embedment depth.

e. Dimensions.

1) Width. The post shall have a minimum width of 23/8 inches and a maximum width of 4-1/2 inches facing traffic.

2) Length. The post shall be of such length to provide a height of 48 inches above the edge of the pavement and to provide the required anchoring depth.

f. Physical Properties and Performance Requirements. Flexible posts shall conform to the following physical properties and performance requirements.

g. Heat Resistance: The post shall be conditioned a minimum of two hours in an oven at 140 degrees F ± 3 degrees F. The conditioned post shall be capable of straightening itself within five minutes when bent 90 degrees at the midpoint for each of four bends. The conditioning temperature shall be maintained while the test on each post is completed.

1) Cold Resistance: The post shall be conditioned a minimum of two hours at -5 degrees F ± 3 degrees F in an environmentally controlled test chamber.

Testing shall be performed in the environmental chamber.

2) The post shall not be adversely affected when a person, standing approximately at the center of the post, bends the free half of the post to a 90 degree angle with the remaining section being stood upon. The post shall return to its original shape within 60 seconds for each of four separate bends.

3) A steel ball weighing 2 pounds shall be dropped a distance of 5 feet through a virtually frictionless vertical guide to impact the surface of the post. The surface of the post being struck by the steel ball shall be in a horizontal position, with the post supported and held in position at both ends. The post shall be subjected to five impact tests concentrated near the middle of the post. Fracturing, cracking, or splitting of the post shall constitute failure.

4) Colorfastness: Post shall be exposed for 500 hours in a Carbon-Arc Type weatherometer (ASTM G23, Method 1). The post shall show no signs of delamination, distress, or discoloration, and the reflective sheeting shall not be removable from the post without damage.

DELINEATORS AND REFLECTORS 347119 - 3

5) Impact Resistance: The post shall be manufactured from an impact resistant material and be so designed that an installed post is capable of self erecting and remaining serviceable after being subjected to a series of direct impacts by a typical passenger sedan at temperatures of 40 °F or above. The posts to be tested shall be installed in accordance with the recommendations of the manufacturer. The posts shall be furnished complete with attached reflectors proposed for use. Posts shall be capable of withstanding a series of ten impacts head on (90 degrees) into traffic face of the post at a speed of 35 mph. Posts shall also be capable of withstanding a series of five impacts at an angle of 75 degrees to the traffic face of the post at speeds of 55 mph. The impacting vehicle shall suffer little or no damage during the impact test series. After each impact, the post shall:

a. Remain intact and securely anchored.

b. Return to its original vertical orientation within an angle of 10 degrees from vertical.

c. Show minimal signs of distress (cracking, loss of rigidity).

d. Retain a minimum of 50 percent of its original amount of reflective sheeting.

e. Each post, prior to and after installation, shall be visibly free of bends or twists.

h. The posts shall have a minimum tensile strength of 1,100 pounds per square inch, as determined in accordance with ASTM D 638.

i. The color of the posts shall be Interstate Green in accordance with Federal Standard No. 595B, Color Number 14109, unless otherwise specified.

j. Sampling and Acceptance. Prior to shipment of the posts, the manufacturer shall submit certified test reports and test data, developed by an approved testing laboratory which attests to the fact that their marker post complies in all respects with requirements covered in the specifications.

2.2 MEDIAN BARRIER REFLECTOR

A. Details for the median barrier reflector are shown on the plans. Reflectivity shall conform to the State Department of Transportation specifications.

destination. All materials shall be unloaded and handled with a forklift or crane using nylon slings.

DELINEATORS AND REFLECTORS 347119 - 4

A. Construction Requirements

1. Spacing, location, color of reflectors and placement of delineator posts shall be as shown on the plans.

2. The Contractor shall install reflector strips in conformance with manufacturer’s recommendations.

3. The length of each reflector strip shall be 34 inches, unless otherwise approved.

4. The Contractor shall adjust the spacing between reflector strips as recommended by the manufacturer to fit the location called for in the Contract. Cutting of the reflector strips will not be permitted.

END OF SECTION 347119

MANUFACTURED AIRFIELD CONTROL TOWERS 347323 - 1

SECTION 347323 – MANUFACTURED AIRFIELD CONTROL TOWERS

A. Section Includes:

1. Prefabricated mobile control tower booth

2. Free-standing steel support tower and stair system

1.3 PERFORMANCE REQUIREMENTS

A. Structural Performance:

1. Control Booth: Control Booths shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated according to

ASCE/SEI 7:

a. Live Loads: 50 psf.

b. Wind Loads: Per Local Codes

2. Support Tower: Tower shall be designed and fabricated in accordance with the following loads and stresses:

a. Deflection: Not to exceed 1/360 of the span

b. Wind Load, Seismic Load, and Lateral Deflection shall be limited to that allowable by the 2006 IBC

c. Design criteria shall comply with specific requirements for appropriate application live load and required top of deck height.

B. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.

1. Temperature Change (Range): 120 degrees F, ambient; 180 degrees F, material surfaces.

MANUFACTURED AIRFIELD CONTROL TOWERS 347323 - 2

1.4 SUBMITTALS

A. Product Data: For each type of product indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for control booths.

B. Shop Drawings: For control booths. Include plans, evaluations, sections, details, attachments to other work, electrical schedule, and service entrance location.

C. Samples for Initial Selection: For control booths with factory-applied color finishes.

D. Delegated-Design Submittal: For control booths indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1. Professional Engineer shall be licensed in California.

E. Welding Certificates

F. Maintenance Data: For control booths to include in maintenance manual.

G. Warranty: Sample of special warranty.

1.5 QUALITY ASSURANCE

A. Support Tower:

1. System manufacturer shall be an established firm with a minimum of ten years of documented experience in design and fabrication of custom steel structural systems.

2. System shall be designed under the direct supervision of a professional engineer, licensed in California, and experienced in the design of towers in accordance with specifications and applicable building codes.

3. Installation contractor shall be a company experienced in installing aircraft tower systems.

B. Welding Qualifications: Qualify procedures and personnel according to the following:

1. AWS D1.1/D1.1M, “Structural Welding Code – Steel”

2. AWS D1.2/D1.2M, “Structural Welding Code – Aluminum”

3. AWS D1.3, “Structural Welding Code – Sheet Steel

C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

D. Safety Glazing Products: Category II materials complying with testing requirements in 16 CFR 1201.

1. Subject to compliance with requirements, obtain safety glazing products permanently marked with certification label of manufacturer acceptable to authorities having jurisdiction.

MANUFACTURED AIRFIELD CONTROL TOWERS 347323 - 3

E. Pre-installation Conference: Conduct conference at Project Site.

1.6 COORDINATION

A. Coordinate installation of anchorages for control booths. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors that are to be imbedded in concrete or masonry. Deliver such items to Project Site in time for installation.

2.1 MATERIALS

A. Aluminum: Alloy and temper recommended by aluminum producer and manufacturer for type of use and finish indicated, and as follows:

1. Sheet: ASTM B209

2. Extruded Shapes: ASTM B221

3. Rolled Tread Plate: ASTM B632/B 632/M, Alloy 6061-T4 or Alloy 6061-T6.

B. Zinc Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, commercial quality, G90 coating designation; mill phosphatized.

C. Galvanized, Rolled Steel Tread Plate: ASTM A 786/A 786M, rolled from steel plate complying with ASTM A 572/A 572M, Grade 55; hot-dip galvanized according to ASTM A 123/A 123M

D. Steel Structural Tubing: ASTM A 500, Grade B.

E. Steel Plates, Shapes, and Bars: ASTM A 36/A 36M

F. Steel Mechanical Tubing: ASTM A 513, welded steel mechanical tubing

G. Zinc-Coated (Galvanized) Steel: Hot-dip galvanized according to ASTM A 123/A 123M

H. Stainless- Steel Sheet: ASTM A 666, Type 304

I. Plastic Laminate: NEMA LD 3, HGS or HGL grade

J. Plywood: DOC PS 1, Exterior grade

K. Particleboard: ANSI A208.1, Grade M-2

L. Clear Float glass: ASTM C 1036, Type I, Class I, Quality q3

MANUFACTURED AIRFIELD CONTROL TOWERS 347323 - 4

M. Insulating Glass: Units complying with ASTM E 774 for Class CBA and consisting of two lites of 2.5-mm-thick tinted tempered glass and dehydrated air space, with a minimum total overall unit thickness of 7/16 inch and with manufacturer’s standard duel seal.

N. Anchorages: Anchor bolts; hot-dip galvanized according to ASTM A 153/A 153M or ASTM F

2.2 PREFABRICATED CONTROL TOWER BOOTH EQUIPMENT

A. Provide the following equipment at each tower:

1. Voice Switch Console for two controller positions

2. Two or three sets of VHF radios (transmitter & receivers)

3. Two or three sets of UHF radios (transmitter & receivers)

4. Two or three VHF omni-directional antennas

5. Two or three UHF omni-directional antennas

6. One set of weather sensors (WIND, DASI, Temp/Dwpt) with position displays

7. One 12-channel digital recorder system

8. Two or three sets of flight strip bays and holders

9. One or two sets of FAA approved binoculars

10. One ATIS Voice Announcer System with associated VHF transmitter and antenna

11. Required interface cabling (control cables, RF cables, etc.) and connectors

12. UPS System for uninterruptible power backup

B. Thru- Wall HVAC Unit: Wall-mounted, thermostatically controlled, 230-V, 11,600 Btu/h cooling and 11,600 Btu/h heating capacity with fan-forced operation. Enclose in enameled-steel cabinet

2.3 PREFABRICATED CONTROL TOWER SHELTER

A. Provide control tower shelter for two or three controller positions as follows:

1. Actual shelter dimensions = 23' L x 9' H x 8.5' W (exterior); 12' L x 7' H x 7' W

2. 15 degree slope glass per FAA specs; 360 degree visual

3. Two 2.5K BTU HVAC units

4. Dual axle mobile- Approx weight = 8,000lbs

5. Easy access side door

6. Input power connections for 220VAC/ 100A service

7. Internal Power Panel with numerous 110VAC/20 outlets

2.4 FABRICATION

A. Fabricate control booths completely in factory.

B. Preglaze windows and doors at factory.

MANUFACTURED AIRFIELD CONTROL TOWERS 347323 - 5

C. Prewire control booths at factory, ready for connection to service at Project Site.

D. Fabricate control booths with removable lifting eye centered in roof.

2.5 CONTROL BOOTH SUPPORT TOWER

A. Tower Support: Provide hydraulic lift to 40 feet.

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Before erection proceeds, survey elevations and locations of concrete-bearing surfaces and locations of anchor rods, bearing plates, and other embedments to receive structural framing, with erector present, for compliance with requirements and metal building system manufacturer’s tolerances.

C. Prepare written report, endorsed by Installer, listing conditions detrimental to performance of the

Work.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Provide temporary shores, guys, braces, and other support during erection to keep structural framing secure, plumb, and in alignment against temporary construction loads and loads equal to intensity to design loads. Remove temporary supports when permanent structural framing, connections, and bracing are in place unless otherwise indicated.

3.3 ERECTION OF STRUCTURAL TOWER SYSTEMS

A. Erect tower system according to manufacturer’s written erection instructions and erection drawings.

B. Do not field cut, drill, or alter structural members without written approval from tower system manufacturer’s professional engineer.

C. Set structural framing accurately in locations and to elevations indicated, according to AISC specifications referenced in this Section. Maintain structural stability of frame during erection.

MANUFACTURED AIRFIELD CONTROL TOWERS 347323 - 6

D. Base and Bearing Plates: Clean concrete bearing surfaces of bond-reducing materials, and roughen surfaces prior to setting plates. Clean bottom surface of plates.

1. Set plates for structural members on wedges, shims, or setting nuts as required.

2. Tighten anchor rods after supported members have been positioned and plumbed. Do not remove wedges or shims but, if protruding, cut off flush with edge of plate before packing with grout.

3. Promptly pack grout solidly between bearing surfaces and plates so no voids remain.

Neatly finish exposed surfaces; protect grout and allow to cure. Comply with manufacturer’s written installation instructions for shrinkage-resistant grouts.

E. Align and adjust structural framing before permanently fastening. Before assembly, clean bearing surfaces and other surfaces that will be in permanent contact with framing. Perform necessary adjustments to compensate for discrepancies in elevations and alignment.

1. Level and plumb individual members of structure.

F. Assemble stairs, landings and railings with positive anchorage to framing, and in accordance with manufacturer’s instructions.

3.2 INSTALLATION OF CONTROL BOOTH

A. Install control booths according to manufacturer’s written instructions.

B. Set control booth plumb and aligned. Level baseplates true to plane with full bearing on tower platform.

C. Fasten control booth securely to tower platform.

D. Connect electrical power service to power distribution system according to requirements specified in Division 26 Sections.

3.3 ADJUSTING

A. Adjust doors, operable windows, and hardware to operate smoothly, easily, properly, and without binding. Confirm that locks engage accurately and securely without forcing or binding.

B. Lubricate hardware and other moving parts.

C. After completing installation, inspect exposed finishes and repair damaged finishes.

END OF SECTION 347323

File details come from the government source that posted it. Updated .