Technical Exhibit H Div 04Masonry.pdf
PDF 2 MB Posted
- Attached to
- FORT BLISS JOB ORDER CONTRACT
- Solicitation number
- W911SG20R0042
About this file
This is a solicitation for a single-award Indefinite Delivery Indefinite Quantity Job Order Contract to provide real property sustainment, restoration, and modernization minor construction services at Fort Bliss, Texas. The contract will have a one-year base period and four one-year option periods, with a total estimated value between $75 million and $100 million. Firm-fixed-price task orders will range from $2,000 to $1 million. The NAICS code is 236220 for commercial and institutional building construction, and the small business size standard is $39.5 million annual receipts. The solicitation is open only to actively registered small businesses in SAM.gov. The performance period begins on or about July 1, 2021. The solicitation will be posted only on beta.sam.gov; prospective contractors must check the website frequently for amendments.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAINTENANCE OF UNIT MASONRY 040120 - 1
SECTION 040120 – MAINTENANCE OF UNIT MASONRY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes maintenance of unit masonry consisting of brick and terra cotta clay masonry restoration and cleaning as follows:
1. Unused anchor removal.
2. Repairing unit masonry, including replacing units.
3. Painting steel uncovered during the work.
4. Reanchoring veneers.
5. Repointing joints.
6. Preliminary cleaning, including removing plant growth.
7. Cleaning exposed unit masonry surfaces.
B. Owner-Furnished Material: Salvaged brick.
C. Related Sections:
1. Section 013591 "Historic Treatment Procedures."
2. Section 042000 "Unit Masonry" for new clay masonry construction.
3. Section 040140 "Maintenance of Stone Assemblies."
4. Section 071900 "Water Repellents" for water repellents applied to clay masonry.
5. Section 076200 "Sheet Metal Flashing and Trim" for metal flashing installed in or on restored clay masonry.
1.3 ALLOWANCES
A. Allowances for clay masonry restoration and cleaning are specified in Section 012100
"Allowances."
1. Perform clay masonry restoration and cleaning work under quantity allowances and only as authorized. Authorized work includes work required by Drawings and the
Specifications and only work authorized in writing by Architect.
2. Notify Architect weekly of extent of work performed that is attributable to quantity allowances.
3. Perform work that exceeds quantity allowances only as authorized by Change Orders.
MAINTENANCE OF UNIT MASONRY 040120 - 2
B. Provide preconstruction testing as part of testing and inspecting allowance.
C. Remove unused anchors.
D. Remove and replace brick as part of brick removal and replacement allowance.
E. Remove and replace terra cotta as part of terra cotta removal and replacement allowance.
F. Reanchor veneers as part of reanchoring veneers allowance.
G. Patch masonry units as part of masonry unit patching allowance.
H. Clean brickwork and terra cotta, including preliminary cleaning, including preliminary and final cleaning, as part of masonry cleaning allowance.
I. Repoint masonry as part of repointing masonry allowance.
1.4 UNIT PRICES
A. Work of this Section is affected by unit prices specified in Section 012200 "Unit Prices."
1. Unit prices apply to authorized work covered by quantity allowances or estimated quantities.
2. Unit prices apply to additions to and deletions from Work as authorized by Change
Orders.
1.5 DEFINITIONS
A. Very Low-Pressure Spray: Under 100 psi.
B. Low-Pressure Spray: 100 to 400 psi; 4 to 6 gpm.
C. Medium-Pressure Spray: 400 to 800 psi; 4 to 6 gpm.
D. High-Pressure Spray: 800 to 1200 psi; 4 to 6 gpm.
E. Saturation Coefficient: Ratio of the weight of water absorbed during immersion in cold water to weight absorbed during immersion in boiling water; used as an indication of resistance of masonry units to freezing and thawing.
1.6 PRECONSTRUCTION TESTING
A. Preconstruction Testing Service: Owner will engage or Engage a qualified testing agency to perform preconstruction testing on masonry units as follows.
1. Provide test specimens as indicated and representative of proposed materials and construction.
MAINTENANCE OF UNIT MASONRY 040120 - 3
2. Existing Brick and Terra Cotta: Test each type of existing masonry unit indicated for replacement, according to testing methods in ASTM C 67 for compressive strength, 24-hour cold-water absorption, 5-hour boil absorption, saturation coefficient, and initial rate of absorption (suction). Carefully remove five existing units from locations designated by Architect. Take testing samples from these units.
3. Existing Mortar: Test according to ASTM C 295, modified as agreed by testing service and Architect for Project requirements, to determine proportional composition of original ingredients, sizes and colors of aggregates, and approximate strength. Use X-ray diffraction, infrared spectroscopy, and differential thermal analysis as necessary to supplement microscopical methods. Carefully remove existing mortar from within joints at five locations designated by Architect or testing service.
4. Temporary Patch: As directed by Architect, provide temporary materials at locations from which existing samples were taken.
5. Replacement Brick and Terra Cotta: Test each proposed type of replacement masonry unit, according to sampling and testing methods in ASTM C 67 for compressive strength, 24-hour cold-water absorption, 5-hour boil absorption, saturation coefficient, and initial rate of absorption (suction).
1.7 ACTION SUBMITTALS
A. Product Data: For each type of product indicated. Include recommendations for application and use. Include test data substantiating that products comply with requirements.
B. Shop Drawings: For the following:
1. Full-size patterns with complete dimensions for new terra cotta units, specially molded brick shapes and brick arches and their jointing, showing relation of existing to new units.
2. Setting number of each new terra cotta unit and its location on the structure in annotated plans and elevations.
3. Provisions for expansion joints or other sealant joints.
4. Provisions for flashing, lighting fixtures, conduits, and weep holes as required.
5. Replacement and repair anchors. Include details of anchors within individual masonry units, with locations of anchors and dimensions of holes and recesses in units required for anchors.
C. Samples for Initial Selection: For the following:
1. Pointing Mortar: Submit sets of mortar for pointing in the form of sample mortar strips, 6 inches long by 1/4 inch or 1/2 inch wide, set in aluminum or plastic channels.
a. Have each set contain a close color range of at least three or six Samples of different mixes of colored sands and cements that produce a mortar matching the cleaned masonry when cured and dry.
b. Submit with precise measurements on ingredients, proportions, gradations, and sources of colored sands from which each Sample was made.
2. Patching Compound: Submit sets of patching compound Samples in the form of plugs
(patches in drilled holes) in sample units of masonry representative of the range of masonry colors on the building.
MAINTENANCE OF UNIT MASONRY 040120 - 4
a. Have each set contain a close color range of at least three or six. Samples of different mixes of patching compound that matches the variations in existing masonry when cured and dry.
3. Sealant Materials: See Section 079200 "Joint Sealants."
4. Include similar Samples of accessories involving color selection.
D. Samples for Verification: For the following:
1. Each type of masonry unit to be used for replacing existing units. Include sets of
Samples as necessary to show the full range of shape, color, and texture to be expected.
a. For each brick type, provide straps or panels containing at least four bricks.
Include multiple straps for brick with a wide range.
b. Patterns for Terra Cotta: Before manufacturing terra cotta units, submit the actual patterns from which molds will be made for casting new units. Package and ship to prevent loss or damage or make patterns available for inspection by Architect at fabrication plant.
c. For terra cotta, provide one of each shape, color, and texture of unit, suitable and ready for installation. Make this submittal after acceptance of patterns for terra cotta.
2. Each type of sand used for pointing mortar; minimum 1 lb of each in plastic screw-top jars.
a. For blended sands, provide Samples of each component and blend.
b. Identify sources, both supplier and quarry, of each type of sand.
3. Each type, color, and texture of pointing mortar in the form of sample mortar strips, 6 inches long by 1/4 inch or 1/2 inch wide, set in aluminum or plastic channels.
a. Include with each Sample a list of ingredients with proportions of each. Identify sources, both supplier and quarry, of each type of sand and brand names of cementitious materials and pigments if any.
4. Each type of masonry patching compound in the form of briquettes, at least 3 inches long by 1-1/2 inches wide. Document each Sample with manufacturer and stock number or other information necessary to order additional material.
5. Sealant Materials: See Section 079200 "Joint Sealants."
6. Accessories: Each type of anchor, accessory, and miscellaneous support.
1.8 INFORMATIONAL SUBMITTALS
A. Qualification Data: For restoration specialists, including field supervisors and restoration workers, terra cotta manufacturer, chemical-cleaner manufacturer and testing service.
B. Preconstruction Test Reports: For existing and replacement masonry units.
C. Quality-Control Program.
MAINTENANCE OF UNIT MASONRY 040120 - 5
D. Restoration Program.
E. Cleaning Program.
1.9 QUALITY ASSURANCE
A. Restoration Specialist Qualifications: Engage an experienced, preapproved masonry restoration and cleaning firm to perform work of this Section. Firm shall have completed work similar in material, design, and extent to that indicated for this Project with a record of successful in-service performance. Experience installing standard unit masonry is not sufficient experience for masonry restoration work.
1. At Contractor's option, work may be divided between two specialist firms: one for cleaning work and one for repair work.
2. Field Supervision: Restoration specialist firms shall maintain experienced full-time supervisors on Project site during times that clay masonry restoration and cleaning work is in progress. Supervisors shall not be changed during Project except for causes beyond the control of restoration specialist firm.
3. Restoration Worker Qualifications: Persons who are experienced and specialize in restoration work of types they will be performing. When masonry units are being patched, assign at least one worker among those performing patching work who is trained and certified by manufacturer of patching compound to apply its products.
B. Terra Cotta Manufacturer Qualifications: A firm regularly engaged in manufacturing custom architectural terra cotta units for building restoration purposes, of same type and of similar size, complexity, and tolerances as those required for the Work.
C. Chemical-Cleaner Manufacturer Qualifications: A firm regularly engaged in producing masonry cleaners that have been used for similar applications with successful results, and with factory-trained representatives who are available for consultation and Project-site inspection and assistance at no additional cost.
D. Source Limitations: Obtain each type of material for masonry restoration (face brick, cement, sand, etc.) from one source with resources to provide materials of consistent quality in appearance and physical properties.
E. Quality-Control Program: Prepare a written quality-control program for this Project to systematically demonstrate the ability of personnel to properly follow methods and use materials and tools without damaging masonry. Include provisions for supervising performance and preventing damage due to worker fatigue.
F. Restoration Program: Prepare a written, detailed description of materials, methods, equipment, and sequence of operations to be used for each phase of restoration work including protection of surrounding materials and Project site.
1. Include methods for keeping pointing mortar damp during curing period.
MAINTENANCE OF UNIT MASONRY 040120 - 6
2. If materials and methods other than those indicated are proposed for any phase of restoration work, add to the Quality-Control Program a written description of such materials and methods, including evidence of successful use on comparable projects, and demonstrations to show their effectiveness for this Project and worker's ability to use such materials and methods properly.
G. Cleaning Program: Prepare a written cleaning program that describes cleaning process in detail, including materials, methods, and equipment to be used, protection of surrounding materials, and control of runoff during operations.
1. If materials and methods other than those indicated are proposed for any phase of restoration work, add to the Quality-Control Program a written description of such materials and methods, including evidence of successful use on comparable projects, and demonstrations to show their effectiveness for this Project and worker's ability to use such materials and methods properly.
H. Cleaning and Repair Appearance Standard: Cleaned and repaired surfaces are to have a uniform appearance as viewed from 20 feet or 50 feet away by Architect. Perform additional paint and stain removal, general cleaning, and spot cleaning of small areas that are noticeably different, so that surface blends smoothly into surrounding areas.
I. Mockups: Prepare mockups of restoration and cleaning to demonstrate aesthetic effects and set quality standards for materials and execution and for fabrication and installation.
1. Masonry Repair: Prepare sample areas for each type of masonry material indicated to have repair work performed. If not otherwise indicated, size each mockup not smaller than 2 adjacent whole units or approximately 48 inches in least dimension. Erect sample areas in existing walls unless otherwise indicated, to demonstrate quality of materials, workmanship, and blending with existing work. Include the following as a minimum:
a. Replacement:
1) Four brick units replaced.
2) Four terra cotta units replaced.
b. Reanchoring Veneers: Install three masonry repair anchors in mockup wall assembly of each anchor type required.
c. Patching: Three small holes at least 1 inch in diameter as directed for each type of masonry material indicated to be patched, so as to leave no evidence of repair.
d. Widening Joints: Widen a joint in 2 separate locations, each approximately 12 inches long as directed.
2. Repointing: Rake out joints in 2 separate areas, each approximately 36 inches high by 48 inches wide as indicated for each type of repointing required and repoint one of the areas.
3. Cleaning: Clean an area approximately 25 sq. ft. as indicated for each type of masonry and surface condition.
a. Test cleaners and methods on samples of adjacent materials for possible adverse reactions. Do not use cleaners and methods known to have deleterious effect.
MAINTENANCE OF UNIT MASONRY 040120 - 7
b. Allow a waiting period of not less than seven days after completion of sample cleaning to permit a study of sample panels for negative reactions.
4. Approval of mockups does not constitute approval of deviations from the Contract
Documents contained in mockups unless Architect specifically approves such deviations in writing.
5. Approved mockups may become part of the completed Work if undisturbed at time of
Substantial Completion.
J. Pre-installation Conference: Conduct conference at Project site.
1. Review methods and procedures related to masonry restoration and cleaning including, but not limited to, the following:
a. Construction schedule. Verify availability of materials, Restoration Specialist's personnel, equipment, and facilities needed to make progress and avoid delays.
b. Materials, material application, sequencing, tolerances, and required clearances.
1.10 DELIVERY, STORAGE, AND HANDLING
A. Deliver masonry units to Project site strapped together in suitable packs or pallets or in heavy-duty cartons.
B. Deliver each piece of terra cotta with code mark or setting number on unexposed face, corresponding to Shop Drawings, using nonstaining paint.
C. Deliver other materials to Project site in manufacturer's original and unopened containers, labeled with manufacturer's name and type of products.
D. Store cementitious materials on elevated platforms, under cover, and in a dry location. Do not use cementitious materials that have become damp.
E. Store hydrated lime in manufacturer's original and unopened containers. Discard lime if containers have been damaged or have been opened for more than two days.
F. Store lime putty covered with water in sealed containers.
G. Store sand where grading and other required characteristics can be maintained and contamination avoided.
1.11 PROJECT CONDITIONS
A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit masonry restoration and cleaning work to be performed according to manufacturers' written instructions and specified requirements.
MAINTENANCE OF UNIT MASONRY 040120 - 8
B. Repair masonry units and repoint mortar joints only when air temperature is between 40 and 90 degrees F (4 and 32 degrees C) and is predicted to remain so for at least 7 days after completion of the Work unless otherwise indicated.
C. Cold-Weather Requirements: Comply with the following procedures for masonry repair and mortar-joint pointing unless otherwise indicated:
1. When air temperature is below 40 degrees F (4 degrees C), heat mortar ingredients, masonry repair materials, and existing masonry walls to produce temperatures between
40 and 120 degrees F (4 and 49 degrees C).
2. When mean daily air temperature is below 40 degree F (4 degree C), provide enclosure and heat to maintain temperatures above 32 degree F (0 degree C) within the enclosure for 7 days after repair and pointing.
D. Hot-Weather Requirements: Protect masonry repair and mortar-joint pointing when temperature and humidity conditions produce excessive evaporation of water from mortar and repair materials. Provide artificial shade and wind breaks and use cooled materials as required to minimize evaporation. Do not apply mortar to substrates with temperatures of 90 degree F
(32 degree C) and above unless otherwise indicated.
E. For manufactured repair materials, perform work within the environmental limits set by each manufacturer.
F. Clean masonry surfaces only when air temperature is 40 degree F (4 degree C) and above and is predicted to remain so for at least 7 days after completion of cleaning.
1.12 COORDINATION
A. Coordinate masonry restoration and cleaning with public circulation patterns at Project site.
Some work is near public circulation patterns and active railroad track. Public circulation patterns cannot be closed off entirely, and in places can be only temporarily redirected around small areas of work. Railroad traffic will not be stopped. Plan and execute the Work accordingly.
1.13 SEQUENCING AND SCHEDULING
A. Order replacement materials at earliest possible date to avoid delaying completion of the Work.
B. Order sand and gray Portland cement for pointing mortar immediately after approval of
Samples or mockups. Take delivery of and store at Project site a sufficient quantity to complete
Project.
C. Perform masonry restoration work in the following sequence:
1. Remove plant growth.
2. Inspect for open mortar joints and repair before cleaning to prevent the intrusion of water and other cleaning materials into the wall.
MAINTENANCE OF UNIT MASONRY 040120 - 9
3. Remove paint.
4. Clean masonry surfaces.
5. Where water repellents, specified in Section 071900 "Water Repellents," are to be used on or near masonry work, delay application of these chemicals until after pointing.
6. Rake out mortar from joints surrounding masonry to be replaced and from joints adjacent to masonry repairs along joints.
7. Repair masonry, including replacing existing masonry with new masonry materials.
8. Rake out mortar from joints to be repointed.
9. Point mortar and sealant joints.
10. After repairs and repointing have been completed and cured, perform a final cleaning to remove residues from this work.
11. Inspect for open mortar joints and repair before cleaning to prevent the intrusion of water and other cleaning materials into the wall.
12. Remove paint.
13. Clean masonry surfaces.
D. As scaffolding is removed, patch anchor holes used to attach scaffolding. Patch holes in masonry units to comply with "Masonry Unit Patching" Article. Patch holes in mortar joints to comply with "Repointing Masonry" Article.
1.14 TERRA COTTA MOLDS
A. On completion of the manufacturing of units, deliver one unused mold of each shape and size of unit delivered to Project site. Deliver to a location and at a time determined by Owner, to become property of Owner.
B. Have molds delivered carefully packed; protected from dirt, moisture, and breakage; so as to arrive in usable, undamaged condition and enable long-term storage and possible future use.
PART 2 - PRODUCTS
2.1 MASONRY MATERIALS
A. Face Brick: Provide face brick, including specially molded, ground, cut, or sawed shapes where required to complete masonry restoration work.
1. Provide units with colors, color variation within units, surface texture, size, and shape to match existing brickwork and with physical properties within 10 percent of those determined from preconstruction testing of selected existing units or as listed below:
a. Physical Properties per ASTM C 67:
1) Compressive Strength
2) 24-Hour Cold-Water Submersion Absorption
3) 5-Hour Boil Absorption
4) Saturation Coefficient
5) Initial Rate of Absorption
MAINTENANCE OF UNIT MASONRY 040120 - 10
b. For existing brickwork that exhibits a range of colors or color variation within units, provide brick that proportionally matches that range and variation rather than brick that matches an individual color within that range.
2. Provide units with colors, color variation within units, surface texture, and physical properties to match Architect's sample. Match existing units in size and shape.
3) 5-Hour Boil Absorption
b. For Architect's sample that exhibits a range of colors or color variation within units, provide brick that proportionally matches that range rather than brick that matches an individual color within that range.
3. Special Shapes:
a. Provide specially molded, 100 percent solid shapes for applications where core holes or "frogs" could be exposed to view or weather when in final position and where shapes produced by sawing would result in sawed surfaces being exposed to view.
b. Provide specially ground units, shaped to match patterns, for arches and where indicated.
c. Mechanical chopping or breaking brick, or bonding pieces of brick together by adhesive, are not acceptable procedures for fabricating special shapes.
4. Tolerances as Fabricated: Comply with tolerance requirements in ASTM C 216, Type FB or Comply with tolerance requirements in ASTM C 216, Type FBS.
5. Date Identification: Emboss in the clay body on an interior surface of each unit in easily read 1/2-inch high characters, "MADE". Manufacturer's name may also be embossed.
B. Building Brick: Provide building brick complying with ASTM C 62, of same vertical dimension as face brick, for masonry work concealed from view.
1. Grade SW where in contact with earth.
2. Grade SW, MW, or NW for concealed backup.
3. Date Identification: Emboss in the clay body on an interior surface of each unit in easily
C. Salvaged Brick: Obtain salvaged brick from Owner from location shown on Drawings. Clean off residual mortar.
D. Glazed Terra Cotta: Provide new terra cotta units to match existing terra cotta units in body composition, physical properties, color, gloss, surface texture, thickness, profile, dimensions, and composition of surface glaze.
MAINTENANCE OF UNIT MASONRY 040120 - 11
1. Manufacturers: Comply with Requirements.
2. Physical Properties: Provide units with tested physical properties within 10 percent of those determined from preconstruction testing of selected existing units or as listed below:
1) Compressive Strength:
3) 5-Hour Boil Absorption
3. Tolerances as Fabricated: Comply with tolerance requirements in ASTM C 212, Type FTX
4. Date Identification: Emboss in the clay body on an interior surface of each unit in easily
E. Brownstone Terra Cotta: Provide new, unglazed, brownstone terra cotta units to match existing terra cotta units in body composition, physical properties, colors, color variation within units, surface texture, unit profile, and dimensions.
1. Manufacturers: Comply with Requirements.
2. Physical Properties: Provide units with tested physical properties within 10 percent of those determined from preconstruction testing of selected existing units or as listed below:
3) 5-Hour Boil Absorption
3. Tolerances as Fabricated: Comply with tolerance requirements in ASTM C 212, Type FTX.
4. For existing terra cotta that exhibits a range of colors or color variation within units, provide terra cotta that proportionally matches that range and variation rather than terra cotta that matches an individual color within that range.
5. Date Identification: Emboss in the clay body on an interior surface of each unit in easily
2.2 MORTAR MATERIALS
A. Portland Cement: ASTM C 150, Type I or Type II, white or gray or both where required for color matching of exposed mortar.
http://www.specagent.com/LookUp/?ulid=1255&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1257&mf=95&src=wd
MAINTENANCE OF UNIT MASONRY 040120 - 12
1. Provide cement containing not more than 0.60 percent total alkali when tested according to ASTM C 114.
B. Hydrated Lime: ASTM C 207, Type S.
C. Factory-Prepared Lime Putty: ASTM C 1489.
D. Quicklime: ASTM C 5, pulverized lime.
E. Mortar Sand: ASTM C 144 unless otherwise indicated.
1. Color: Provide natural sand or ground marble, granite, or other sound stone of color necessary to produce required mortar color.
2. For pointing mortar, provide sand with rounded edges.
3. Match size, texture, and gradation of existing mortar sand as closely as possible. Blend several sands if necessary to achieve suitable match.
F. Mortar Pigments: Natural and synthetic iron oxides, compounded for mortar mixes. Use only pigments with a record of satisfactory performance in masonry mortars.
G. Water: Potable.
2.3 MANUFACTURED REPAIR MATERIALS
A. Masonry Patching Compound: Factory-mixed cementitious product that is custom manufactured for patching masonry.
1. Products: Comply with Requirements.
2. Use formulation that is vapor- and water permeable (equal to or more than the masonry unit), exhibits low shrinkage, has lower modulus of elasticity than the masonry units being repaired, and develops high bond strength to all types of masonry.
3. Use formulation having working qualities and retardation control to permit forming and sculpturing where necessary.
4. Formulate patching compound used for patching brick and terra cotta in colors and textures to match each masonry unit being patched. Provide sufficient number of or not less than three colors to enable matching the color, texture, and variation of each unit.
B. Terra Cotta Glaze Replacement: A high-solids, non-yellowing, fade-resistant, waterborne polyurethane or epoxy coating intended for exterior use as terra cotta glaze replacement.
Product shall be custom mixed by manufacturer to match color and gloss of existing terra cotta glaze.
2.4 PAINT REMOVERS
A. Alkaline Paste Paint Remover: Manufacturer's standard alkaline paste formulation for removing paint coatings from masonry.
http://www.specagent.com/LookUp/?ulid=1258&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1260&mf=95&src=wd
MAINTENANCE OF UNIT MASONRY 040120 - 13
B. Covered or Skin-Forming Alkaline Paint Remover: Manufacturer's standard covered or skin-forming alkaline formulation for removing paint coatings from masonry.
C. Solvent-Type Paint Remover: Manufacturer's standard water-rinsable, solvent-type gel formulation for removing paint coatings from masonry.
D. Low-Odor, Solvent-Type Paint Remover: Manufacturer's standard low-odor, water-rinsable solvent-type gel formulation, containing no methanol or methylene chloride, for removing paint coatings from masonry.
2.5 CLEANING MATERIALS
A. Water: Potable.
B. Hot Water: Water heated to a temperature of 140 to 160 degrees F (60 to 71 degrees C).
C. Job-Mixed Detergent Solution: Solution prepared by mixing 2 cups (0.5 L) of tetrasodium polyphosphate, 1/2 cup (125 mL) of laundry detergent, and 20 quarts (20 L) of hot water for every 5 gal. (20 L) of solution required.
D. Job-Mixed Mold, Mildew, and Algae Remover: Solution prepared by mixing 2 cups (0.5 L) of tetrasodium polyphosphate, 5 quarts (5 L) of 5 percent sodium hypochlorite (bleach), and 15 quarts (15 L) of hot water for every 5 gal. (20 L) of solution required.
E. Nonacidic Gel Cleaner: Manufacturer's standard gel formulation, with pH between 6 and 9, that contains detergents with chelating agents and is specifically formulated for cleaning masonry surfaces.
F. Nonacidic Liquid Cleaner: Manufacturer's standard mildly alkaline liquid cleaner formulated for removing mold, mildew, and other organic soiling from ordinary building materials, including polished stone, brick, aluminum, plastics, and wood.
G. Mild Acidic Cleaner: Manufacturer's standard mildly acidic cleaner containing no muriatic
(hydrochloric), hydrofluoric, or sulfuric acid; or ammonium bifluoride or chlorine bleaches.
http://www.specagent.com/LookUp/?ulid=1262&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1263&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1265&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1266&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1268&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1270&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1271&mf=95&src=wd
MAINTENANCE OF UNIT MASONRY 040120 - 14
H. Acidic Cleaner: Manufacturer's standard acidic masonry cleaner composed of hydrofluoric acid or ammonium bifluoride blended with other acids, detergents, wetting agents, and inhibitors.
I. Two-Part Chemical Cleaner: Manufacturer's standard system consisting of potassium or sodium hydroxide based, alkaline prewash cleaner and acidic afterwash cleaner that does not contain hydrofluoric acid.
2.6 ACCESSORY MATERIALS
A. Liquid Strippable Masking Agent: Manufacturer's standard liquid, film-forming, strippable masking material for protecting glass, metal, and polished stone surfaces from damaging effects of acidic and alkaline masonry cleaners.
B. Terra Cotta Anchors: Type and size indicated or, if not indicated, to match existing anchors in size and type. Fabricate anchors from Type 304 or Type 316 stainless steel.
C. Masonry Repair Anchors, Expansion Type: Mechanical fasteners designed for masonry veneer stabilization consisting of 1/4-inch diameter, Type 304 or Type 316 stainless-steel rod with brass expanding shells at each end and water-shedding washer in the middle. Expanding shells shall be designed to provide positive mechanical anchorage to veneer on one end and backup masonry on the other.
D. Masonry Repair Anchors, Spiral Type: Type 304 or Type 316 stainless-steel spiral rods designed to anchor to backing and veneer. Anchors are flexible in plane of veneer but rigid perpendicular to it.
1. Provide adhesive-installed anchors complete with manufacturer's standard epoxy adhesive and injection tubes, or other devices required for installation.
2. Provide driven-in anchors designed to be installed in drilled holes and relying on screw effect rather than adhesive to secure them to backup and veneer.
3. Products: Comply with Requirements.
E. Masonry Repair Anchors, Rod/Screen Tube Type: Stainless-steel screen tube with or without
Type 304 or Type 316 stainless-steel rod, adhesive installed by injection with manufacturer's standard epoxy adhesive, complete with other devices required for installation.
http://www.specagent.com/LookUp/?ulid=1273&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1274&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1276&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1277&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1278&mf=95&src=wd http://www.specagent.com/LookUp/?ulid=1279&mf=95&src=wd
MAINTENANCE OF UNIT MASONRY 040120 - 15
F. Sealant Materials:
1. Provide manufacturer's standard chemically curing, elastomeric sealant(s) of base polymer and characteristics indicated below that comply with applicable requirements in
Section 079200 "Joint Sealants."
a. Single-component, non-sag urethane sealant.
2. Colors: Provide colors of exposed sealants to match colors of masonry adjoining installed sealant unless otherwise indicated.
3. Ground-Mortar Aggregate: Custom crushed and ground pointing mortar sand or existing mortar retrieved from joints. Grind to a particle size that matches the adjacent mortar aggregate and color. Remove all fines passing the 100 sieve.
G. Joint-Sealant Backing:
1. Cylindrical Sealant Backings: ASTM C 1330, Type C (closed-cell material with a surface skin) or Type B (bicellular material with a surface skin), and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance.
2. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint surfaces at back of joint where such adhesion would result in sealant failure. Provide self-adhesive tape where acceptable.
H. Setting Buttons: Resilient plastic buttons, nonstaining to masonry, sized to suit joint thicknesses and bed depths of masonry units without intruding into required depths of pointing materials.
I. Masking Tape: Nonstaining, nonabsorbent material, compatible with pointing mortar, joint primers, sealants, and surfaces adjacent to joints; that will easily come off entirely, including adhesive.
J. Antirust Coating: Fast-curing, lead- and chromate-free, self-curing, universal modified-alkyd primer complying with MPI #79, Alkyd Anticorrosive Metal Primer or SSPC-Paint 20 or SSPC-
Paint 29 zinc-rich coating.
1. Use coating requiring no better than SSPC-SP 2, "Hand Tool Cleaning", SSPC-SP 3, "Power Tool Cleaning" or SSPC-SP 6/NACE No. 3, "Commercial Blast Cleaning" surface preparation according to manufacturer's literature or certified statement.
2. Use coating with a VOC content of 420 g/L (3.5 lb/gal.) or less when calculated according to 40 CFR 59, Subpart D (EPA Method 24).
K. Miscellaneous Products: Select materials and methods of use based on the following, subject to approval of a mockup:
1. Previous effectiveness in performing the work involved.
2. Little possibility of damaging exposed surfaces.
3. Consistency of each application.
4. Uniformity of the resulting overall appearance.
MAINTENANCE OF UNIT MASONRY 040120 - 16
5. Do not use products or tools that could do the following:
a. Remove, alter, or in any way harm the present condition or future preservation of existing surfaces, including surrounding surfaces not in contract.
b. Leave a residue on surfaces.
2.7 MORTAR MIXES
A. Preparing Lime Putty: Slake quicklime and prepare lime putty according to appendix to
ASTM C 5 and manufacturer's written instructions.
B. Measurement and Mixing: Measure cementitious materials and sand in a dry condition by volume or equivalent weight. Do not measure by shovel; use known measure. Mix materials in a clean, mechanical batch mixer.
1. Mixing Pointing Mortar: Thoroughly mix cementitious materials and sand together before adding any water. Then mix again adding only enough water to produce a damp, unworkable mix that will retain its form when pressed into a ball. Maintain mortar in this dampened condition for 15 to 30 minutes. Add remaining water in small portions until mortar reaches desired consistency. Use mortar within one hour of final mixing; do not retemper or use partially hardened material.
C. Colored Mortar: Produce mortar of color required by using specified ingredients. Do not alter specified proportions without Architect's approval.
1. Mortar Pigments: Where mortar pigments are indicated, do not exceed a pigment-to-cement ratio of 1:10 by weight.
D. Do not use admixtures in mortar unless otherwise indicated.
E. Mortar Proportions: Mix mortar materials in the following proportions:
1. Pointing Mortar for Brick: 1 part Portland cement, 2 parts lime, and 6 parts sand, 1 part
Portland cement, 6 parts lime, and 12 parts sand.
a. Add mortar pigments to produce mortar colors required.
2. Pointing Mortar for Terra Cotta: 1 part white Portland cement, 1 part lime, and 6 parts sand.
a. Add mortar pigments to produce mortar colors required.
3. Rebuilding (Setting) Mortar: Same as pointing mortar except mortar pigments are not required.
4. Rebuilding (Setting) Mortar: 1 part Portland cement, 2 parts lime, and 6 parts sand or part Portland cement, 6 parts lime, and 12 parts sand.
5. Rebuilding (Setting) Mortar: Comply with ASTM C 270, Proportion Specification, Type N unless otherwise indicated; with cementitious material limited to Portland cement and lime.
MAINTENANCE OF UNIT MASONRY 040120 - 17
2.8 CHEMICAL CLEANING SOLUTIONS
A. Dilute chemical cleaners with water to produce solutions not exceeding concentration recommended by chemical-cleaner manufacturer.
B. Acidic Cleaner Solution for Brick and Brownstone Terra Cotta: Dilute with water to produce hydrofluoric acid content of 3 percent or less, but not greater than that recommended by chemical-cleaner manufacturer.
C. Acidic Cleaner Solution for Glazed Terra Cotta: Dilute with water to concentration demonstrated by testing that does not etch or otherwise damage terra cotta surface, but not greater than that recommended by chemical-cleaner manufacturer.
PART 3 - EXECUTION
3.1 RESTORATION SPECIALISTS
A. Restoration Specialist Firms: Subject to compliance with requirements, provide masonry restoration and cleaning by one of the following or firms that may provide masonry restoration and cleaning.
3.2 PROTECTION
A. Protect persons, motor vehicles, surrounding surfaces of building being restored, building site, plants, and surrounding buildings from harm resulting from masonry restoration work.
1. Erect temporary protective covers over walkways and at points of pedestrian and vehicular entrance and exit that must remain in service during course of restoration and cleaning work.
B. Comply with chemical-cleaner manufacturer's written instructions for protecting building and other surfaces against damage from exposure to its products. Prevent chemical-cleaning solutions from coming into contact with people, motor vehicles, landscaping, buildings, and other surfaces that could be harmed by such contact.
1. Cover adjacent surfaces with materials that are proven to resist chemical cleaners used unless chemical cleaners being used will not damage adjacent surfaces. Use materials that contain only waterproof, UV-resistant adhesives. Apply masking agents to comply with manufacturer's written instructions. Do not apply liquid masking agent to painted or porous surfaces. When no longer needed, promptly remove masking to prevent adhesive staining.
2. Keep wall wet below area being cleaned to prevent streaking from runoff.
3. Do not clean masonry during winds of sufficient force to spread cleaning solutions to unprotected surfaces.
4. Neutralize and collect alkaline and acid wastes for disposal off Owner's property.
MAINTENANCE OF UNIT MASONRY 040120 - 18
5. Dispose of runoff from cleaning operations by legal means and in a manner that prevents soil erosion, undermining of paving and foundations, damage to landscaping, and water penetration into building interiors.
C. Prevent mortar from staining face of surrounding masonry and other surfaces.
1. Cover sills, ledges, and projections to protect from mortar droppings.
2. Keep wall area wet below rebuilding and pointing work to discourage mortar from adhering.
3. Immediately remove mortar in contact with exposed masonry and other surfaces.
4. Clean mortar splatters from scaffolding at end of each day.
D. Remove gutters and downspouts adjacent to masonry and store where indicated during masonry restoration and cleaning. Reinstall when masonry restoration and cleaning are complete.
1. Provide temporary rain drainage during work as indicated to direct water away from building.
3.3 UNUSED ANCHOR REMOVAL
A. Remove masonry anchors, brackets, wood nailers, and other extraneous items no longer in use unless identified as historically significant or indicated to remain.
1. Remove items carefully to avoid spalling or cracking masonry.
2. Where directed, if an item cannot be removed without damaging surrounding masonry, do the following:
a. Cut or grind off item approximately 3/4 inch beneath surface and core drill a recess of same depth in surrounding masonry as close around item as practical.
b. Immediately paint exposed end of item with two coats of antirust coating, following coating manufacturer's written instructions and without exceeding manufacturer's recommended dry film thickness per coat. Keep paint off sides of recess.
3. Patch the hole where each item was removed unless directed to remove and replace the masonry unit.
3.4 BRICK REMOVAL AND REPLACEMENT
A. At locations indicated, remove bricks that are damaged, spalled, or deteriorated or are to be reused. Carefully demolish or remove entire units from joint to joint, without damaging surrounding masonry, in a manner that permits replacement with full-size units.
1. When removing single bricks, remove material from center of brick and work toward outside edges.
B. Support and protect remaining masonry that surrounds removal area. Maintain flashing, reinforcement, lintels, and adjoining construction in an undamaged condition.
MAINTENANCE OF UNIT MASONRY 040120 - 19
C. Notify Architect of unforeseen detrimental conditions including voids, cracks, bulges, and loose units in existing masonry backup, rotted wood, rusted metal, and other deteriorated items.
D. Remove in an undamaged condition as many whole bricks as possible.
1. Remove mortar, loose particles, and soil from brick by cleaning with hand chisels, brushes, and water.
2. Remove sealants by cutting close to brick with utility knife and cleaning with solvents.
3. Store brick for reuse. Store off ground, on skids, and protected from weather.
4. Deliver cleaned brick not required for reuse to Owner unless otherwise indicated.
E. Clean bricks surrounding removal areas by removing mortar, dust, and loose particles in preparation for replacement.
F. Replace removed damaged brick with other removed brick and salvaged brick in good quality, where possible, or with new brick matching existing brick, including size. Do not use broken units unless they can be cut to usable size.
G. Install replacement brick into bonding and coursing pattern of existing brick. If cutting is required, use a motor-driven saw designed to cut masonry with clean, sharp, unchipped edges.
1. Maintain joint width for replacement units to match existing joints.
2. Use setting buttons or shims to set units accurately spaced with uniform joints.
H. Lay replacement brick with completely filled bed, head, and collar joints. Butter ends with sufficient mortar to fill head joints and shove into place. Wet both replacement and surrounding bricks that have ASTM C 67 initial rates of absorption (suction) of more than 30 g/30 sq. in. per min. (30 g/194 sq. cm per min.). Use wetting methods that ensure that units are nearly saturated but surface is dry when laid.
1. Tool exposed mortar joints in repaired areas to match joints of surrounding existing brickwork.
2. Rake out mortar used for laying brick before mortar sets and point new mortar joints in repaired area to comply with requirements for repointing existing masonry, and at same time as repointing of surrounding area.
3. When mortar is sufficiently hard to support units, remove shims and other devices interfering with pointing of joints.
3.5 TERRA COTTA REMOVAL AND REPLACEMENT
A. At locations indicated, remove terra cotta units that are damaged, spalled, or deteriorated.
Carefully demolish or remove entire units from joint to joint, without damaging surrounding masonry, in a manner that permits replacement with full-size units.
B. Support and protect remaining masonry that was supported by removed units. Maintain flashing, reinforcement, lintels, and adjoining construction in an undamaged condition.
C. Notify Architect of unforeseen detrimental conditions including voids, cracks, bulges, and loose units in existing masonry backup, rotted wood, rusted metal, and other deteriorated items.
MAINTENANCE OF UNIT MASONRY 040120 - 20
D. Clean masonry surrounding removal areas by removing mortar, dust, and loose particles in preparation for replacement.
E. Install replacement units into bonding and coursing pattern of existing units.
1. Do not cut or grind glazed terra cotta.
2. If minor cutting of replacement brownstone terra cotta is required, use a motor-driven grinder or saw designed to cut masonry with clean, sharp, unchipped edges. Do not cut or grind more than 1/8 inch along any edge.
3. Use setting buttons or shims to set units accurately spaced with uniform joints.
F. Set replacement units in a full bed of mortar. Replace existing anchors with new anchors of size and type indicated.
1. Embed anchors in mortar and fill voids behind units with mortar.
2. Tool exposed mortar joints in repaired areas to match joints of surrounding existing terra cotta.
3. Rake out mortar used for laying terra cotta before mortar sets and point new mortar joints in repaired area to comply with requirements for repointing existing masonry, and at same time as repointing of surrounding area.
4. When mortar is sufficiently hard to support units, remove shims and other devices interfering with pointing of joints.
3.6 REANCHORING VENEERS
A. Install masonry repair anchors in horizontal mortar joints and according to manufacturer's written instructions. Install at not more than 16 inches o.c. vertically and 32 inches o.c.
horizontally unless otherwise indicated. Install at locations to avoid penetrating flashing.
B. Recess anchors at least 5/8 inch from surface of mortar joint and fill recess with pointing mortar.
3.7 PAINTING STEEL UNCOVERED DURING THE WORK
A. Inspect steel exposed during masonry removal. Where Architect determines that it is structural, or for other reasons cannot be totally removed, prepare and paint it as follows:
1. Remove paint, rust, and other contaminants according to SSPC-SP 2, "Hand Tool
Cleaning", SSPC-SP 3, "Power Tool Cleaning" or SSPC-SP 6/NACE No. 3, "Commercial Blast Cleaning", as applicable to meet paint manufacturer's recommended preparation.
2. Immediately paint exposed steel with two coats of antirust coating, following coating manufacturer's written instructions and without exceeding manufacturer's recommended rate of application (dry film thickness per coat).
B. If on inspection and rust removal, the cross section of a steel member is found to be reduced from rust by more than 1/16 inch, notify Architect before proceeding.
MAINTENANCE OF UNIT MASONRY 040120 - 21
3.8 MASONRY UNIT PATCHING
A. Patch the following masonry units unless another type of replacement or repair is indicated:
1. Units indicated to be patched.
2. Units with holes.
3. Units with chipped edges or corners.
4. Units with small areas of deep deterioration.
B. Remove and replace existing patches unless otherwise indicated or approved by Architect.
C. Patching Bricks:
1. Remove loose material from masonry surface. Carefully remove additional material so patch will not have feathered edges but will have square or slightly undercut edges on area to be patched and will be at least 1/4 inch thick, but not less than recommended by patching compound manufacturer.
2. Mask adjacent mortar joint or rake out for repointing if patch will extend to edge of masonry unit.
3. Mix patching compound in individual batches to match each unit being patched.
Combine one or more colors of patching compound, as needed, to produce exact match.
4. Rinse surface to be patched and leave damp, but without standing water.
5. Brush-coat surfaces with slurry coat of patching compound according to manufacturer's written instructions.
6. Place patching compound in layers as recommended by patching compound manufacturer, but not less than 1/4 inch or more than 2 inches thick. Roughen surface of each layer to provide a key for next layer.
7. Trowel, scrape, or carve surface of patch to match texture and surrounding surface plane or contour of the masonry unit. Shape and finish surface before or after curing, as determined by testing, to best match existing masonry unit.
8. Keep each layer damp for 72 hours or until patching compound has set.
D. Patching Terra Cotta:
1. Remove deteriorated material as determined by sounding gently with a small hammer.
Carefully remove additional material so patch will not have feathered edges but will have square or slightly undercut edges on area to be patched and will be at least 1/4 inch thick, but not less than recommended by patching compound manufacturer.
2. Where mortar joints adjacent to patch are open, fill back of joints with pointing mortar and allow to cure before patching terra cotta. Leave space for pointing joints according to "Repointing Masonry" Article.
3. Mask adjacent mortar joint or rake out for repointing if patch will extend to edge of unit.
4. Rinse surface to be patched and leave damp, but without standing water.
5. Brush-coat surfaces with slurry coat of patching compound according to manufacturer's written instructions.
6. Place patching compound in layers as recommended by patching compound manufacturer, but not less than 1/4 inch or more than 2 inches thick. Roughen surface of each layer to provide a key for next layer.
7. Do not apply patching compound over mortar joints. If patching compound bridges mortar joints, cut out joints after patching compound hardens.
MAINTENANCE OF UNIT MASONRY 040120 - 22
8. Trowel, scrape, or carve surface of patch to match texture, details, and surrounding surface plane or contour of terra cotta. Shape and finish surface before or after curing, as determined by testing to best match existing terra cotta.
9. Keep each layer damp for 72 hours or until patching compound has set.
10. After final layer of patching compound has cured, apply glaze replacement according to manufacturer's written instructions. Apply two or more coats, as needed, to match glaze of adjacent terra cotta units.
3.9 WIDENING JOINTS
A. Do not widen a joint, except where indicated…