Attachment 4a Notional Task Order Technical Drawings - Bliss JOC W911SG20R0042.pdf
PDF 34 MB Posted
- Attached to
- FORT BLISS JOB ORDER CONTRACT
- Solicitation number
- W911SG20R0042
About this file
This solicitation is for a single award Indefinite Delivery Indefinite Quantity Job Order Contract for Real Property Sustainment, Restoration and Modernization minor construction work at Fort Bliss, Texas. The contract will have a 12-month base period and four 12-month option periods, with an estimated total value between $75-100 million. Firm fixed price task orders issued under the contract will range from $2,000 to $1 million. Work will include site work, demolition and reconstruction, mechanical system replacements and controls, infrastructure preservation, renovation, finish replacements, and some vertical construction across the 1,700 square mile installation. This 100% small business set-aside acquisition is being conducted by the Mission and Installation Contracting Command - Fort Hood under NAICS code 236220 with a size standard of $39.5 million. The solicitation is only available on the beta SAM website and prospective contractors must register in SAM under the specified NAICS code to be eligible for award.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Notional Task Order 1 Air Field
Notional Task Order 5 Site D, 26 miles from
Main Cantonment
Notional Task Order 3 Range M, 35 miles from Main Cantonment
Notional Task Order 4 Building 29
Notional Task Order 2 Area 2500
Distances are not to scale
Fort Future Scenario Map
Notional Task Order 5 Area B2
Fort Future Main Cantonment
Notional Task Order 5 Site W, 35 miles from
Main Cantonment
| Fort Future Scenario Map for Notional Task Order Requirements_1-28-2021 |
| Attachment 4a Notional Task Order Technical Drawings - Bliss JOC W911SG20R0042 |
| TO_1 - DWG_Wind Sensor Circuits |
| TO_2 - DWG_2500 Area |
| TO_3 - DWG_Pre-Fab Building |
| TO_4 - DWG_Convert Storage Room |
| TO_5 - DWG_Relocate Portable Buildings |
File details come from the government source that posted it. Updated .