Technical Exhibit A - Performance Requirements Solid Waste (FY25-FY30).xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Fort Sill Post Wide Refuse Services Federal contract opportunity
- Solicitation number
- W9124L-24-B-0004
About this file
This Technical Exhibit outlines the performance requirements for solid waste management services at Fort Sill, detailing three key performance objectives with corresponding standards and thresholds. The first objective requires the contractor to dispose of all commercial, industrial, and community activity waste in accordance with applicable Federal, State, and local regulations. The second objective mandates that on-post Municipal Solid Waste (MSW) must not be co-mingled with off-post MSW and must be disposed of exclusively at Fort Sill's landfill. The third objective requires the creation and maintenance of a Quality Control Plan (QCP) that includes inspection systems and methods for identifying and preventing service defects.
The exhibit is part of solicitation W9124L-24-B-0004, which is a HUBZone set-aside for refuse services at Fort Sill, Oklahoma, with a period of performance from April 1, 2025, through March 31, 2026, plus four one-year options through March 31, 2030. The Contract Officer's Representative (COR) will conduct random sampling and gather customer feedback to measure compliance with these performance requirements. All performance objectives have zero deviation standards, indicating strict compliance requirements.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Technical Exhibit 1 (FY25) | ||||
| Performance Requirements | ||||
| Solid Waste Management Services | ||||
| Item # | Performance Objective | Standard | Performance Threshold | Incentive / Disincentive |
| 1 | The Contractor shall dispose of all commercial, industrial, and community activity waste IAW all applicable Federal, State, and local laws and regulations. (PWS par 5.1) | The contractor shall transport and dispose of MSW picked up on post IAW all Federal, State, and local laws and regulations | Zero deviation from standard | Random sampling by the COR of scheduled sites for the reporting period and customer feedback. |
| 2 | The contractor shall not co-mingle or transport on-post MSW with off-post generated MSW. (PWS par 5.1.2) | The Contractor shall only dispose of MSW picked up on post at the landfill located on Fort Sill. | Zero deviation from standard | Random sampling by the COR of scheduled sites for the reporting period and customer feedback. |
| 3 | The Contractor shall create and maintain a Quality Control Plan (QCP). (PWS par 1.7.8.5.3) | The contractor provided QCP shall include description of the inspection system to address services listed in the PWS and a description of methods to be used for identifying and preventing defects in the quality of services performed | Zero deviation from standard | Random sampling by the COR of scheduled sites for the reporting period and customer feedback. |
File details come from the government source that posted it. Updated .