TE C 5-5-006 Storm Drain System washracks.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Sources Sought: Total Maintenance Contract (TMC) – Rheinland-Pfalz, Germany (409th CSB TCC)
- Solicitation number
- W564KV26RA000
About this file
This is a technical specification document detailing storm drain system and washrack infrastructure requirements across multiple military facilities in the Rheinland-Pfalz region of Germany. The document provides an inventory listing of facilities requiring maintenance and technical inspection, organized by installation location and equipment type.
The specification includes storm retaining basins at ten installations (MIAD, ROB, KAD, Pulaski, Daenner, Landstul, and others) with varying capacities ranging from 1.4 to 185 units and inspection frequencies designated as either "A" (annual) or "M" (monthly). The document also catalogs six washrack installations requiring semi-annual (SA) inspections, one automatic car wash facility at Pulaski requiring monthly maintenance, multiple drop inlet locations across various kasernes with semi-annual inspection schedules, and extensive storm drain and drainage ditch networks totaling over 1,100 linear meters and 3,711 square meters across ROB and SATCOM areas. This inventory serves as the technical foundation for the 409th CSB TCC's Total Maintenance Contract (TMC) RFI for consolidated facilities maintenance services in Germany, supporting the government's market research and industry feedback solicitation on the draft Performance Work Statement prior to formal competitive procurement.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| DESCRIPTION | INSTALLATION | FACILITY # | MODEL | QTY | CAPACITY | Technical insepction frequency | |
| STORM RET BASIN | MIAD | 1401 | 1 | A | |||
| STORM RETAINING BASIN | ROB | 301 | 1 | 2.4 | A | ||
| STORM RETAINING BASIN | ROB | 397 | 1 | 185 | A | ||
| STORM RETAINING BASIN | ROB | 645 | 1 | 55 | A | ||
| STORM RETAINING BASIN | ROB | 645 | IGR | 1 | 55 | M | |
| STORM RETAINING BASIN | KAD | 2360 | 1 | A | |||
| STORM RETAINING BASIN | PULASKI | 2950 | 1 | A | |||
| STORM RETAINING BASIN | DAENNER | 3150 | 1 | 1.4 | A | ||
| STORM RETAINING BASIN | LANDSTUL | STOSP | 1 | A | |||
| STORM RETAINING BASIN | KAD | WTRBB | (BY BLDG 2313) | 1 | 38 | A | |
| STORM RETAINING BASIN, LUITPOL | LANDSTUL | STOSP | 1 | 2.2 | M | ||
| WASHRACK | ROB | 167 | 1 | SA | |||
| WASHRACK | ROB | 301 | 1 | SA | |||
| WASHRACK | KAD | 2236 | 1 | SA | |||
| WASHRACK | KAD | 2288 | 1 | SA | |||
| WASHRACK | KLEBER | 3260 | 1 | SA | |||
| WASHRACK | KAD | 92233 | 1 | SA | |||
| Automatic Car Wash Facility | PULASKI | 2934 | 1 | M | |||
| DROP INLET | DRMO | 103 | SA | ||||
| DROP INLET | DAENNER KASERNE | 123 | SA | ||||
| DROP INLET | HUSTERHOE KASERNE | 207 | SA | ||||
| DROP INLET | KAD | 285 | SA | ||||
| DROP INLET | KLEBER KASERNE | 342 | SA | ||||
| DROP INLET | HELIPORT | 22 | SA | ||||
| DROP INLET | LANDSTUHL HOSPITAL | 302 | SA | ||||
| DROP INLET | PANZER KASERNE | 210 | SA | ||||
| DROP INLET | PULASKI BARRACKS | 85 | SA | ||||
| DROP INLET | ROB | 217 | SA | ||||
| STORM DRAINS, DRAINAGE, DITCHES | ROB | 260 | 100 | METER | SA | ǀ | |
| STORM DRAINS, DROP INLETS, DRAINAGE GUTTERS | ROB | 260 | 250 | METER | SA | ǀ | |
| Storm drains, Drainange, Ditches | SATCOM | Area | 912m | A | |||
| Storm Retaining Basin | SATCOM | Area | 3711m2 | A |
&"-,Bold"&12TE C 5.5‐006 Storm Drain Systems and Washracks
Page &Pof &N &"-,Regular"Updated by VECTRUS 2015-10-01
File details come from the government source that posted it. Updated .