TE C 5-7-002 Checklist Substations Jan 2023.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Sources Sought: Total Maintenance Contract (TMC) – Rheinland-Pfalz, Germany (409th CSB TCC)
- Solicitation number
- W564KV26RA000
About this file
This is an inspection and maintenance checklist for heating plant substations that supports a Total Maintenance Contract (TMC) requirement for the Rheinland-Pfalz Area of Responsibility in Germany under the 409th CSB TCC. The checklist, designated as TE-C-5.7-002 under SOO-NUMBER DEH00133, outlines thirteen quarterly inspection and maintenance tasks that must be performed on substations. Key tasks include: verifying heating system function; inspecting control panels for disturbances or alarms; checking and adjusting heating controls; verifying temperatures and pressures on primary and secondary sides of district heating lines; inspecting heat exchangers for leaks and insulation integrity; checking circulation pumps, mixing valves, manometers, thermometers, expansion vessels, refill stations, and water treatment systems; inspecting pipes and valves for leakage; cleaning stairways and drainage systems; checking waste water pump function; inspecting structural integrity of heating rooms for safety and accident prevention; verifying electrical installations, lighting, sockets, and wiring; cleaning heating rooms; and documenting all maintenance work, measurements, and repair orders issued. The document is presented in both German and English to accommodate operations at the German military installation.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Substations
| SOO-NUMBER | DEH00133: HEATING PLANTS |
| DESCRIPTION | PERFORM INSPECTION/MAINTENANCE ON SUBSTATIONS |
| TE-C-5.7-002 | |
| FREQUENZ: | VIERTELJÄHRLICH |
| FREQUENCY: | QUARTERLY |
| TASK | INSPECT/MAINTAIN SUBSTATIONS PER FOLLOWING CHECKLIST |
| CHECKPOINT | TASK |
| 1 | ÜBERPRÜFUNG DER HEIZUNGSANLAGE AUF FUNKTION |
| CHECK HEATING SYSTEM FOR PROPER FUNKTION | |
| 2 | ÜBERPRÜFUNG DES KONTROLLSCHRANKS AUF STÖRUNGS/ALARM-MELDUNGEN |
| CHECK CONTROL PANEL FOR DISTURBANCE / ALARMS | |
| 3 | ÜBERPRÜFUNG DER HEIZUNGSREGELUNG; NACHREGELUNG, REPARATUR ODER AUSTAUSCH FALLS ERFORDERLICH ÜBERPRÜFUNG DER EVENTUELL VORHANDENEN ELEKTROVERTEILUNG AUF VORHANDENE SCHÄDEN |
| CHECK THE HEATING CONTROL; ADJUST, REPAIR OR REPLACE AS REQUIRED CHECKING THE ELECTRICAL DISTRIBUTION SYSTEM, IF ANY, FOR EXISTING DAMAGE | |
| 4 | ÜBERPRÜFUNG DER TEMPERATUR UND DES DRUCKS DER FERNLEITUNG AUF DER PRIMÄRSEITE UND AUF DER SEKUNDÄRSEITE ÜBERPRÜFUNG DES WÄRMETAUSCHERS AUF DICHTIGKEIT UND ISOLATION (EVENTUELL SWK ODER DPW BEI VORHANDENEN SCHÄDEN BENACHRICHTIGEN |
| CHECK TEMPERATURE AND PRESSURE ON LONG DISTANCE LINE ON PRIMARY SIDE AND ON SECONDARY SIDE CHECK HEAT EXCHANGER FOR TIGHTNESS AND INSULATION (POSSIBLY NOTIFY SWK OR DPW IN CASE OF EXISTING DAMAGE) | |
| 5 | ÜBERPRÜFUNG DER TEMPERATUR UND DES DRUCKS DER HEIZKREISE UND BRAUCHWASSER WARMWASSERVERSORGUNG |
| CHECK TEMPERATURE AND PRESSURE ON HEAT CIRCULATION AND FEEDWATER WARM WATER SUPPLY | |
| 6 | ÜBERPRÜFUNG DER UMWÄLZPUMPEN UND MISCHER,MANOMENTER; THERMOMETER; AUSDEHNUNGSGEFÄßE UND NACHFÜLLSTATIONEN UND WASSERAUFBEREITUNGSANLAGEN (EVENTUELL SALZ NACHFÜLLEN) REPARATUR ODER AUSTAUSCH FALLS ERFORDERLICH |
| CHECK PUMPS AND MIXING VALVES, MANOMENTER; THERMOMETER; EXTENSION VESSELS AND REFILL STATIONS AND WATER PREPARATION SYSTEMS (EVENTUALLY REFILLING SALT) REPAIR OR REPLACE AS REQUIRED | |
| 7 | ÜBERPRÜFUNG DER ROHRLEITUNGEN UND VENTILE AUF DICHTIGKEIT, REPARATUR ODER AUSTAUSCH FALLS ERFORDERLICH ÜBERPRÜFUNGEN ALLER ISOLIERUNGEN UND BESCHRIFTUNGEN |
| CHECK PIPES AND VALVES FOR LEAKAGE, CHECKS ALL INSULATION AND LABELING REPAIR OR REPLACE AS REQUIRED | |
| 8 | REININGUNG DER TREPPENABGÄNGE ZU DEN HEIZRÄUMEN: VORHANDENE BODENABLÄUFE ÜBERPRÜFEN & EVENTUELL REINIGEN, BELEUCHTUNG IM AUßENBEREICH ÜBERPRÜFEN, DEFEKTE AN TREPPENSTUFEN PRÜFEN |
| CLEANING THE STAIRWAYS LEADING TO THE HEATING ROOMS: CHECK THE EXISTING FLOOR DRAINS & CLEAN THEM IF NECESSARY, CHECK THE LIGHTING IN THE OUTSIDE AREA, CHECK FOR DEFECTS ON THE STAIR TREADS | |
| 9 | ÜBERPRÜFUNG DER VORHANDENEN SCHMUTZWASSERPUMPE AUF FUNKTION: REINIGUNG DER ENTWÄSSERUNGSSCHÄCHTE UND ÜBERPRÜFUNG DER SCHACHTABDECKUNG |
| CHECK OF THE EXISTING WASTE WATER PUMP FOR FUNCTION: CLEANING OF THE DRAINAGE MANHOLES AND CHECK THE MANHOLE COVER | |
| 10 | ÜBERPRÜFUNG DES HEIZUNGSRAUMES AUF STRUKTURELLE BESCHÄDIGUNGEN AUCH IN HINSICHT AUF BETRIEBSSICHERHEIT UND UNFALLVERHÜTUNG |
| INSPECTION OF THE BOILER ROOM FOR STRUCTURAL DAMAGE ALSO WITH REGARD TO OPERATIONAL SAFETY AND ACCIDENT PREVENTION | |
| 11 | ÜBERPRÜFUNG DER ELEKTRISCHEN ANLAGEN; BELEUCHTUNG; STECKDOSEN; ELEKTROLEITUNGEN U.S.W. |
| INSPECTION OF ELECTRICAL INSTALLATIONS; LIGHTING; SOCKETS; ELECTRICAL WIRING, ETC. | |
| 12 | HEIZRAUM REINIGEN UND EVENT. VORHANDENEN UNRAT ENTFERNEN |
| CLEAN THE HEATING ROOM AND REMOVE ANY POTENTIAL EXISTING DEBRIS | |
| 13 | DOKUMENTATION DER AUSGEFÜHRTEN WARTUNG UND DER MESSERGEBNISSE UND DER ERTEILTEN ERFORDERLICHEN REPERATURAUFTRÄGE |
| DOCUMENTATION OF THE MAINTENANCE WORK AND MEASUREMENTS AND THE NECESSARY REPAIR ORDERS PLACED |
&12INSPECTION AND MAINTENANCE CHECKLIST
Feb 2023 Page 1 of 1