Steam Piping Pennoni Drawing.pdf
PDF 3 MB Posted
- Solicitation number
- 36C24226B0036
About this file
This is a drawing list and set of architectural/engineering plans for a Department of Veterans Affairs (VA) steam distribution system renovation project located in New York, New York. The project is identified as Task Order to Contract No. VA243-P-0225 under VA Project No. 630-08-115, titled "VA New York Steam Distribution System – Phase II."
The document comprises 29 sheets of construction drawings organized by discipline: General (1 sheet), Mechanical (3 sheets covering existing hatches, tunnel level conditions, dilution tank, and control valves), Electrical (8 sheets detailing part plans, tunnel level work, ground level installations, and mechanical room demolition/new work), Plumbing (4 sheets addressing tunnel level demolition and new work plans), Architectural (3 sheets with general notes, demolition plans, and construction details), and Structural (1 sheet with framing plans and sections). The scope of work includes replacement of aging heating system pipes, condensate and return piping, isolation valves, dilution tanks, pressure reducing valves, expansion tanks, steam supply shut-off valves, and associated components across multiple levels (ground level, tunnel level, and 19th floor mechanical rooms). The work encompasses both demolition of existing infrastructure and installation of new mechanical, electrical, and plumbing systems with detailed specifications for infection control requirements and phasing plans to maintain building operations during construction.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING LIST
DRAWING No. DESCRIPTION SHEET No.
GENERAL
T�001 COVER SHEET 1 OF 29
G�001 GENERAL DRAWINGS INFORMATION � SITE PLAN, PHASING AND INFECTION CONTROL REQUIREMENTS 2 OF 29
MECHANICAL
MH�001 EXISTING HATCHES LOCATION PLAN. GROUND LEVEL, NORTH�EAST NOT FOR CONSTRUCTION 3 OF 29
MH�002 EXISTING HATCHES LOCATION PLAN. GROUND LEVEL, SOUTH�WEST NOT FOR CONSTRUCTION 4 OF 29
MH�003 TUNNEL LEVEL NORTH�EAST. EXISTING CONDITION AND NEW WORK PLAN 5 OF 29
MH�004 TUNNEL LEVEL SOUTH�WEST. EXISTING CONDITION AND NEW WORK PLAN 6 OF 29
MH�005 PART PLANS (DILUTION TANK) DEMOLITION AND NEW WORK 7 OF 29
MH�006 GROUND LEVEL PART PLANS (DILUTION TANK AND PRV) DEMOLITION AND NEW WORK 8 OF 29
MH�007 GROUND LEVEL, SOUTH�WEST. DEMOLITION AND NEW WORK PART PLAN 9 OF 29
MH�008 19th FLOOR MER. CONTROL VALVES, DEMOLITION AND NEW WORK 10 OF 29
MH�009 MECHANICAL DETAILS, ABBREVIATIONS AND SYMBOLS 11 OF 29
MH�010 MECHANICAL DETAILS AND GENERAL NOTES 12 OF 29
MH�011 MECHANICAL DETAILS 13 OF 29
ELECTRICAL
ES�001 ELECTRICAL PART PLANS NEW WORK 14 OF 29
ES�002 NORTH�EAST TUNNEL LEVEL ELECTRICAL PLAN 15 OF 29
ES�003 TUNNEL LEVEL SOUTH�WEST EXISTING CONDITION AND NEW LIGHTING PLAN 16 OF 29
ES�004 GROUND LEVEL NORTH�EAST ELECTRICAL PLAN 17 OF 29
ES�005 GROUND LEVEL SOUTH�WEST ELECTRICAL PLAN 18 OF 29
ES�006 ELECTRICAL PART PLANS NEW WORK 19 OF 29
ES�007 19th FLOOR MECHANICAL ROOMS ELECTRICAL DEMOLITION AND NEW WORK PLANS 20 OF 29
ES�008 TUNNEL LEVEL SOUTH�WEST ELECTRICAL PART PLANS 21 OF 29
PLUMBING
PL�001 TUNNEL LEVEL NORTH�EAST DEMOLITION AND EXISTING CONDITION PLAN 22 OF 29
PL�002 TUNNEL LEVEL NORTH�EAST EXISTING CONDITION AND NEW WORK PLAN 23 OF 29
PL�003 TUNNEL LEVEL SOUTH�WEST DEMOLITION AND EXISTING CONDITION PLAN 24 OF 29
PL�004 TUNNEL LEVEL SOUTH�WEST EXISTING CONDITION AND NEW WORK PLAN 25 OF 29
ARCHITECTURAL
AS�001 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS 26 OF 29
AS�003 GROUND LEVEL SOUTH�WEST DEMOLITION PLAN 27 OF 29
AS�103 GROUND LEVEL SOUTH�WEST CONSTRUCTION PLAN AND DETAILS 28 OF 29
STRUCTURAL
SS�001 STRUCTURAL FRAMING PLANS, SECTIONS AND NOTES 29 OF 29