Repair Tunnel Utilities_Contract Document_Drawing.pdf
PDF 5 MB Posted
- Solicitation number
- 36C24226B0036
About this file
This document is a drawing list and set of architectural and engineering plans for a federal construction project. The project is a VA New York Steam Distribution System Phase II renovation located in New York, New York, under Task Order to Contract No. VA243-P-0225 with VA Project No. 630-08-115. The Department of Veterans Affairs is the federal agency responsible for this work.
The 29-sheet drawing set includes comprehensive plans across multiple disciplines: general drawings with site plan and infection control requirements; mechanical plans showing existing hatches, tunnel-level conditions, dilution tank demolition, and control valve work on the 19th floor mechanical equipment room; electrical plans covering part plans, tunnel-level layouts, ground-level systems, and 19th floor mechanical room work; plumbing plans for tunnel-level demolition and new work on both northeast and southwest sections; architectural general notes, demolition plans, and construction details for ground-level southwest areas; and structural framing plans with sections and notes. The scope includes replacement of existing steam piping systems, pressure reducing stations, and associated components; demolition of obsolete equipment; installation of new mechanical, electrical, and plumbing systems; and various architectural modifications. Infection control requirements and phasing are documented for construction sequencing.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING LIST
DRAWING No. DESCRIPTION SHEET No.
GENERAL
T�001 COVER SHEET 1 OF 29
G�001 GENERAL DRAWINGS INFORMATION � SITE PLAN, PHASING AND INFECTION CONTROL REQUIREMENTS 2 OF 29
MECHANICAL
MH�001 EXISTING HATCHES LOCATION PLAN. GROUND LEVEL, NORTH�EAST NOT FOR CONSTRUCTION 3 OF 29
MH�002 EXISTING HATCHES LOCATION PLAN. GROUND LEVEL, SOUTH�WEST NOT FOR CONSTRUCTION 4 OF 29
MH�003 TUNNEL LEVEL NORTH�EAST. EXISTING CONDITION AND NEW WORK PLAN 5 OF 29
MH�004 TUNNEL LEVEL SOUTH�WEST. EXISTING CONDITION AND NEW WORK PLAN 6 OF 29
MH�005 PART PLANS (DILUTION TANK) DEMOLITION AND NEW WORK 7 OF 29
MH�006 GROUND LEVEL PART PLANS (DILUTION TANK AND PRV) DEMOLITION AND NEW WORK 8 OF 29
MH�007 GROUND LEVEL, SOUTH�WEST. DEMOLITION AND NEW WORK PART PLAN 9 OF 29
MH�008 19th FLOOR MER. CONTROL VALVES, DEMOLITION AND NEW WORK 10 OF 29
MH�009 MECHANICAL DETAILS, ABBREVIATIONS AND SYMBOLS 11 OF 29
MH�010 MECHANICAL DETAILS AND GENERAL NOTES 12 OF 29
MH�011 MECHANICAL DETAILS 13 OF 29
ELECTRICAL
ES�001 ELECTRICAL PART PLANS NEW WORK 14 OF 29
ES�002 NORTH�EAST TUNNEL LEVEL ELECTRICAL PLAN 15 OF 29
ES�003 TUNNEL LEVEL SOUTH�WEST EXISTING CONDITION AND NEW LIGHTING PLAN 16 OF 29
ES�004 GROUND LEVEL NORTH�EAST ELECTRICAL PLAN 17 OF 29
ES�005 GROUND LEVEL SOUTH�WEST ELECTRICAL PLAN 18 OF 29
ES�006 ELECTRICAL PART PLANS NEW WORK 19 OF 29
ES�007 19th FLOOR MECHANICAL ROOMS ELECTRICAL DEMOLITION AND NEW WORK PLANS 20 OF 29
ES�008 TUNNEL LEVEL SOUTH�WEST ELECTRICAL PART PLANS 21 OF 29
PLUMBING
PL�001 TUNNEL LEVEL NORTH�EAST DEMOLITION AND EXISTING CONDITION PLAN 22 OF 29
PL�002 TUNNEL LEVEL NORTH�EAST EXISTING CONDITION AND NEW WORK PLAN 23 OF 29
PL�003 TUNNEL LEVEL SOUTH�WEST DEMOLITION AND EXISTING CONDITION PLAN 24 OF 29
PL�004 TUNNEL LEVEL SOUTH�WEST EXISTING CONDITION AND NEW WORK PLAN 25 OF 29
ARCHITECTURAL
AS�001 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS 26 OF 29
AS�003 GROUND LEVEL SOUTH�WEST DEMOLITION PLAN 27 OF 29
AS�103 GROUND LEVEL SOUTH�WEST CONSTRUCTION PLAN AND DETAILS 28 OF 29
STRUCTURAL
SS�001 STRUCTURAL FRAMING PLANS, SECTIONS AND NOTES 29 OF 29
EXAUST FAN
Insulation above ceiling Grainder floor 364.67 Epoxy floor 364.67 sf Paint walls Repair wall Brick
0211E Repair Brick Wall
36SF
4SF
Reapir wall
Demo 25LF 5" Abandoned pipe above ceiling work.