This is a specification section for maintenance of masonry work, specifically addressing the repointing of damaged masonry joints and replacement of damaged masonry units. The work includes cutting out existing mortar joints to a uniform depth of 19 mm (3/4 inches) or to sound mortar, removing dust and debris, dampening joints, and tightly packing tuck pointing mortar in thin 6 mm (1/4 inch) layers. The specification requires installers to have documented experience in similar masonry work and mandates preconstruction testing of existing brick per ASTM C67 and existing mortar per ASTM C295/C295M to determine compatible mortar composition matching existing color and texture. A mockup demonstrating quality and aesthetics must be prepared before proceeding with full-scale work.
Mortar components must comply with ASTM standards: Hydrated Lime (ASTM C207, Type S), Aggregate (ASTM C144), Portland Cement (ASTM C150/C150M, Type I), and potable water free of deleterious substances. Replacement face brick must be ASTM C216, Grade SW, Type FBS matching existing units and rated as slightly efflorescent per ASTM C67. Tuck pointing mortar shall conform to ASTM C270 standards, with options for Type N, Type O, or Type K mortar, with Type K requiring 1 part Portland cement, 4 parts hydrated lime, and 11-1/4 to 15 parts fine sand. All masonry unit replacements require dampening surrounding surfaces, buttering contact surfaces with mortar, centering units, and tuck pointing to ensure full head and bed joints. Upon completion, joints must be tooled to produce smooth, compacted, concave joints matching existing conditions, and exposed surfaces must be cleaned using a soapless, non-acidic detergent followed by rinsing with clean water.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01-01-21
04 01 00 - 1
SECTION 04 01 00
MAINTENANCE OF MASONRY
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Repointing existing wall damaged masonry joints.
2. Replacing existing wall damaged masonry units.
1.2 RELATED WORK
A. Section 04 05 13, MASONRY MORTARING: Mortars for new masonry.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. ASTM International (ASTM):
C67/C67M-20.............Sampling and Testing Brick and Structural Clay
Tile.
C144-18.................Aggregate for Masonry Mortar.
C150/C150M-20...........Specification for Portland Cement.
C207-18 - ..............Hydrated Lime for Masonry Purposes
C216-19 - ..............Facing Brick (Solid Masonry Units Made from
Clay or Shale)
C270-19ae1..............Mortar for Unit Masonry
C295/C295M-19...........Petrographic Examination of Aggregates for
Concrete
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Description of each product.
2. Replacement units indicating manufacturer recommendation for each application.
C. Samples:
1. Pointing Mortar: Molded, 150 mm (6 inches) long for each type, texture, and color.
D. Test reports:
1. Preconstruction test results of existing masonry mortar and units.
2. Recommended mortar mix and mortar materials sources.
1.5 QUALITY ASSURANCE
A. Installer Qualifications:
04 01 00 - 2
1. Documented experience in completion of work, similar in design, material, and extent specified.
B. Preconstruction Testing:
1. Existing Brick: according to ASTM C67.
2. Existing Mortar: according to ASTM C295/C295M.
a. Recommend mortar mix compatible with existing mortar material sources required to match existing color and texture.
C. Mockups: Prepare mockup in size indicated on Drawings, demonstrating quality and aesthetics of tuck pointing, masonry unit replacement and cleaning.
1.6 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.7 STORAGE AND HANDLING
A. Store materials covered, protected from weather, and elevated above grade.
1. Prevent contamination of aggregates.
B. Protect products from damage during handling and construction operations.
1.8 FIELD CONDITIONS
A. Environment:
1. Cold Weather Requirements: Maintain mortar ingredients and substrate within temperature range between 4 degrees C (40 degrees F) and
49 degrees C (120 degrees F) when outside temperature is less than
4 degrees C (40 degrees F).
2. Hot Weather Requirements: Protect mortar-joint from evaporation of moisture from mortar material. When required, provide adequately shaded work area.
1.9 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 MATERIALS
A. Mortar Components:
1. Hydrated Lime: ASTM C207, Type S.
04 01 00 - 3
2. Aggregate: ASTM C144.
3. Portland Cement: ASTM C150/C150M, Type I.
4. Water: Potable, free of substances that are detrimental to grout, masonry, and metal.
2.2 PRODUCTS - GENERAL
A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES.
B. Provide each product from one manufacturer and from one production run.
2.3 REPLACEMENT MASONRY UNITS
A. Face Brick:
1. ASTM C216, Grade SW, Type FBS matching existing .
2. Efflorescence: Rated slight efflorescent when tested according to
ASTM C67.
B. Other Masonry Units: Match existing.
2.4 MIXES
A. Tuck Pointing Mortar: ASTM C270; Appendix X3.
Mortar type. ASTM C270 defines Type N and Type O mortar. ASTM C270
Appendix X3 defines Type K mortar. Only Portland cement is permitted for
Type K mortar.
1. Type N, Type O, Type K
2. Brick Industry Association Tech Note 46 defines Type K mortar as follows.
3. Type K: 1 part Portland cement, 4 parts hydrated lime and 11-1/4 to
15 parts fine sand.
2.5 ACCESSORIES
A. Cleaning Agent: Soapless, non-acidic, detergent, specially prepared for cleaning brick stone concrete masonry.
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
1. Protect from mortar droppings and cleaning operations.
C. Remove existing fixtures and fittings concealing masonry joints to permit repointing and repair.
3.2 EXISTING MORTAR JOINTS
A. Cut out existing bed and head mortar joints, to uniform depth of 19 mm
(3/4 inches), or to sound mortar without damaging edges and faces of existing masonry units to remain.
04 01 00 - 4
B. Remove dust and debris from joints.
1. Do not rinse when temperature is below freezing.
3.3 TUCK POINTING
A. Dampen joints immediately before tuck pointing. Allow masonry units to absorb surface water.
B. Tightly pack tuck pointing mortar into joints in thin layers, 6 mm
(1/4 inch) thick, maximum.
C. Allow layer to become slightly hardened before applying next layer.
D. Pack final layer flush with surfaces of masonry units.
3.4 MASONRY UNIT REPLACEMENT
A. Cut out mortar joints surrounding masonry units requiring replacement.
1. Remove existing masonry units creating opening for replacement masonry unit installation.
2. Remove mortar, dust, and debris from opening perimeter surfaces.
3. Prevent debris from falling into cavity.
B. Dampen surfaces of surrounding existing masonry before installing replacement masonry units.
1. Allow existing masonry to absorb surface moisture before installing replacement units.
2. Butter contact surfaces of existing masonry and replacement masonry units with mortar.
3. Center replacement masonry units in opening and press into position.
4. Remove excess mortar.
5. Tuck point replacement masonry units to ensure full head and bed joints.
3.5 JOINT TOOLING
A. Tool repointed and replaced masonry joints when mortar becomes slightly hardened.
B. Produce smooth, compacted, concave joint joint matching existing.
3.6 CLEANING
A. Remove mortar splatter from exposed surfaces immediately.
B. Clean exposed masonry surfaces on completion.
C. Remove mortar droppings and other foreign substances from wall surfaces.
D. Wet surfaces with clean water.
E. Wash with cleaning agent.
F. Brush masonry surfaces with stiff fiber brushes while washing.
G. Immediately after washing, rinse with clean water.
04 01 00 - 5
1. Remove traces of detergent, foreign streaks or stains.
- - E N D - -