GSA_Form_1364.pdf
GSA Form PDF 55 KB Posted
- Attached to
- Commercial office space Lease for the Stanton USDA Service Center, Stanton, TX, (Martin County)
- Solicitation number
- Stanton1
About this file
1364
View the file
Other versions and copies of GSA Form 1364
Show all 20
Who attaches GSA Form 1364
Other files
| File | Type | Posted |
|---|---|---|
| 2_FBO_14_ITS_Electrical_Requirements_of_Project.pdf | ||
| STANTON FLOOD PLAIN MAP DOC.PDF | ||
| GSA FORM 1217 DOC.PDF | ||
| PreLeaseBldgSecurityPlan.doc | DOC document | |
| GSA_Form_12000.pdf | ||
| GSA_Form_12001.pdf | ||
| 2_FBO_13_ITS_Departmental_Regulaton_DR3902-001.pdf | ||
| GSA_Form_3518A.DOC | DOC document | |
| SFO STANTON 2010.DOCM | DOCM document | |
| GSA_Form_3516A.doc | DOC document | |
| 2_FBO_12_ITS_Departmental_Regualtion_DR3901-001.pdf | ||
| _GSA_Form_3517B.DOC | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 of 2 GSA FORM 1364 (Rev 08/08)
PROPOSAL TO LEASE SPACE
(For use with TI SFO and/or National Broker Contract)
IN RESPONSE TO
SOLICITATION
NUMBER
DATED
SECTION I - DESCRIPTION OF PREMISES
1a. BUILDING NAME 1b. BUILDING ADDRESS
1c. CITY 1d. STATE 1e. 9-DIGIT ZIP CODE 1f. CONGRESSIONAL DISTRICT
3. TOTAL RENTABLE SPACE IN OFFERED BUILDING 2a. FLOORS OFFERED 2b. TOTAL NUMBER
OF FLOORS IN BUILDING
a. GENERAL PURPOSE (Office)
b. WAREHOUSE c. OTHER
sq. ft. sq. ft. sq. ft.
4. LIVE FLOOR LOAD 5. MEASUREMENT
METHOD
6. YEAR OF LAST
MAJOR RENOVATION
(if applicable)
7. BUILDING AGE 8. SITE SIZE
lbs. / sq. ft. ANSI/BOMA [ ]
OTHER [ ]
sq. ft.
acres
SECTION II - SPACE OFFERED AND RATES
9. ANSI/BOMA OFFICE AREA
SQUARE FEET (ABOA)
10. RENTABLE SQUARE FEET (RSF) 11. COMMON AREA FACTOR (CAF)
“Tenant Improvements” are all alterations for the Government-demised area above the building shell buildout, excluding costs identified as tenant improvements in the Security Unit Price List. Building-Specific Security is the sum of costs identified as such in the Security Unit Price List. Neither the Tenant Improvements as stated in Block 12, nor the Building-Specific Security as stated in Block 13, are to be included in the shell rent. It is expected that the tenant buildout will be fully amortized at the end of the firm term, and the rent will be reduced accordingly. Any desired rent increases or decreases beyond the firm term of the lease should be reflected in the shell rate and fully explained as part of this written proposal. If Tenant Improvements or Building-Specific Security improvements are to be amortized beyond the firm term, those calculations must be itemized as part of this written proposal. The Offeror may attach additional pages as necessary.
Offerors may copy this section through lines 18 as needed. Insert them above Box 20 or in Box 29.
Number of years each cost per RSF is in effect. State any changes for any rent component.
a.
BUILD-OUT COSTS
PER CATEGORY
b.
AMORTIZATION
TERM
c.
AMORTIZATION
d.
AMORTIZED COST
PER RSF
e.
AMORTIZED COST
PER ABOA SF
f.
NO. YEARS RATE
IS EFFECTIVE
12. TENANT IMPROVEMENTS
(per SFO requirements)
13. BUILDING-SPECIFIC SECURITY
(per SFO requirements detailed on Security Unit Price List)
14. SHELL BUILD-OUT
(per SFO requirements)
15. TOTAL BUILD-OUT COSTS
16. SHELL RENT (Including current real estate taxes. Refer to Line 28 on GSA Form 1217)
17. OPERATING COSTS (Refer to Line 27 on GSA Form 1217
18. TOTAL ANNUAL RATE
19. TOTAL ANNUAL RENT
PER ANNUM RENT FOR YEARS PER ANNUM RENT FOR YEARS PER ANNUM RENT FOR YEARS
TOTAL ANNUAL STEP RENTS $__________RSF
$__________ABOA
_____ Thru _____
$__________RSF
$__________ABOA
_____ Thru ____ $__________RSF
$__________ABOA
_____ Thru _____
20.
a. Number of parking spaces for the entire building/ facility, which are under the control of the Offeror: surface structured
b. Number of parking spaces required by local code: surface structured
c. Number of parking spaces for Employee/Visitor Use (per SFO): surface structured
d. Number of parking spaces for Official Government Vehicles (per SFO): surface structured
e. Does the rental rate offered above include SFO-required parking costs?
YES NO If NO, complete the following: Annual cost per space: $ surface structured
PAGE 2 of 2 GSA FORM 1364 (Rev 08/08)
SECTION III - LEASE TERMS AND CONDITIONS
21. INITIAL LEASE TERM
(Full Term)
22. RENEWAL OPTIONS
a. Number of years b. Years firm c. Number of days notice for Government to terminate lease:
a. Shell rate / RSF / Yr
b. Years each c. Number of options
d. Number of days NOTICE to exercise renewal option:
23. OFFER GOOD UNTIL AWARD
(In accordance with Federal Acquisition Regulations 15.208)
24. Space will be altered and delivered in accordance with the Government's specifications and requirements in accordance with the Solicitation for Offers and any additional attachments.
25. COMMISSIONS--IF APPLICABLE, ATTACH COMMISSION AGREEMENT
a. Tenant Representative Commission: b. Owner’s Representative Commission: c. Schedule of Commission payments:
% % % at lease award and % at lease occupancy
27. ADDITIONAL FINANCIAL ASPECTS OF THE OFFER
Adjustment for Vacant Premises: $ per ABOA sf HVAC Overtime Rate: $ per Areas requiring 24 hour HVAC (LAN, etc.) $ per sf
NOTE: THE COST TO PROVIDE 24 HOUR HVAC SERVICE IS REIMBURSED
SEPARATELY FROM RENT. THE COST FOR THESE OVERTIME UTILITIES
MUST NOT BE INCLUDED IN THE OFFERED RENTAL RATE OR BASE
OPERATING COSTS.
Building’s Normal Hours of HVAC Operation:
Mon-– Fri AM to PM;
Saturday AM to PM;
Sunday AM to PM Percent of Government Occupancy: % Current Year Taxes: $ Based on fully assessed value? YES NO Is the offered space part of multiple tax bills? YES NO If so, provide tax ID numbers and square footage for each. Attach the legal description of the offered property.
If a site is offered, state the total land costs: $
26. OFFEROR’S TENANT IMPROVEMENT FEE SCHEDULE
a. General Conditions will be percent of (choose one):
1. Total Subcontractors Costs estimated to be $
2. Other (state basis) $
b. General Contractor’s fee will be percent of (choose one):
1. Total Subcontractors Costs estimated to be $
2. Other (state basis) $
c. Architectural/Engineering fees will be (choose one):
1. $ per usable square foot
2. % of (state basis) $
3. $ flat fee
d. Lessor’s Project Management fees will be percent of (choose one):
1. Total Subcontractors Costs estimated to be $
2. Total Subcontractors Costs plus (add basis): $
e. If other fees are applicable, state what they are in terms of a per usable square foot amount, or if using a percentage, what is the basis for determining the fee.
The Government will add the cost of the proposed fees to the net present value of the offered rental rate as described in the SFO’s Price Evaluation paragraph. This schedule will be applicable for Tenant Improvements, Building-Specific Security, and change orders during initial construction arising under any resulting lease contract.
28. LIST OF ATTACHMENTS SUBMITTED WITH THIS OFFER
(See Solicitation requirements)
29. ADDITIONAL REMARKS OR CONDITIONS WITH RESPECT TO THIS OFFER
SECTION IV - OWNER IDENTIFICATION AND CERTIFICATION
30. RECORDED OWNER (Name and address including ZIP code)
31. BY SUBMITTING THIS OFFER, THE OFFEROR AGREES UPON ACCEPTANCE OF THIS PROPOSAL BY THE HEREIN SPECIFIED DATE, TO LEASE TO THE UNITED STATES OF AMERICA, THE PREMISES DESCRIBED, UPON THE TERMS AND CONDITIONS AS SPECIFIED HEREIN, IN FULL COMPLIANCE WITH AND ACCEPTANCE
OF THE AFOREMENTIONED SOLICITATION FOR OFFERS, WITH ATTACHMENTS.
32. OFFEROR’S INTEREST IN PROPERTY OWNER AGENT OTHER
(Specify):
33. OFFEROR
b. E-MAIL ADDRESS:
a.
c. TELEPHONE NUMBER (Including area code) extension
d. SIGNATURE e. DATE SIGNED
| SECTION I - DESCRIPTION OF PREMISES: |
| DATED: |
| 1a. BUILDING NAME: |
| 1b. BUILDING ADDRESS: |
| 1c. CITY: |
| 1d. STATE: |
| 1e. 9-DIGIT ZIP CODE: |
| 1f. CONGRESSIONAL DISTRICT: |
| 4: |
| 5: |
| b. WAREHOUSE sq. ft.: |
| c. OTHER sq. ft.: |
| SECTION II - SPACE OFFERED AND RATES: |
| 7. BUILDING AGE: |
| 8. SITE SIZE sq. ft. acres: |
| 9. ANSI/BOMA OFFICE AREA SQUARE FEET (ABOA): |
| 11. COMMON AREA FACTOR (CAF): |
| Offerors may copy this section through lines 18 as needed. Insert them above Box 20 or in Box 29.: |
| (Offerors may copy this section through lines 18 as needed. Insert them above Box 20 or in Box 29., <Row 1>): |
| (a. BUILD-OUT COSTS PER CATEGORY, 12. TENANT IMPROVEMENTS (per SFO requirements)): |
| (b. AMORTIZATION TERM, 12. TENANT IMPROVEMENTS (per SFO requirements)): |
| (c. AMORTIZATION (%), 12. TENANT IMPROVEMENTS (per SFO requirements)): |
| (d. AMORTIZED COST PER RSF, 12. TENANT IMPROVEMENTS (per SFO requirements)): |
| (e. AMORTIZED COST PER ABOA SF, 12. TENANT IMPROVEMENTS (per SFO requirements)): |
| (f. NO. YEARS RATE IS EFFECTIVE, 12. TENANT IMPROVEMENTS (per SFO requirements)): |
| (a. BUILD-OUT COSTS PER CATEGORY, 13. BUILDING-SPECIFIC SECURITY (per SFO requirements detailed on Security Unit Price List)): |
| (b. AMORTIZATION TERM, 13. BUILDING-SPECIFIC SECURITY (per SFO requirements detailed on Security Unit Price List)): |
| (c. AMORTIZATION (%), 13. BUILDING-SPECIFIC SECURITY (per SFO requirements detailed on Security Unit Price List)): |
| (d. AMORTIZED COST PER RSF, 13. BUILDING-SPECIFIC SECURITY (per SFO requirements detailed on Security Unit Price List)): |
| (e. AMORTIZED COST PER ABOA SF, 13. BUILDING-SPECIFIC SECURITY (per SFO requirements detailed on Security Unit Price List)): |
| (f. NO. YEARS RATE IS EFFECTIVE, 13. BUILDING-SPECIFIC SECURITY (per SFO requirements detailed on Security Unit Price List)): |
| (a. BUILD-OUT COSTS PER CATEGORY, 14. SHELL BUILD-OUT (per SFO requirements)): |
| (a. BUILD-OUT COSTS PER CATEGORY, 15. TOTAL BUILD-OUT COSTS): |
| undefined: |
| undefined: |
| undefined: |
| undefined: |
| undefined: |
| undefined: |
| undefined: |
| undefined: |
| undefined: |
| FOR YEARS: |
| TOTAL ANNUAL STEP RENTS: |
| undefined: |
| undefined: |
| undefined: |
| Thru: |
| undefined: |
| undefined: |
| undefined: |
| undefined: |
| undefined: |
| Thru: |
| e. Does the rental rate offered above include SFO-required parking costs: |
| a. Number of years: |
| b. Years firm: |
| c. Number of days notice for Government to terminate lease:: |
| a. Shell rate / RSF / Yr: |
| b. Years each: |
| c. Number of options: |
| d. Number of days NOTICE to exercise renewal option:: |
| 23. OFFER GOOD UNTIL AWARD (In accordance with Federal Acquisition Regulations 15.208): |
| 1. Total Subcontractors Costs estimated to be: Off |
| 2. Other (state basis: Off |
| 1. Total Subcontractors Costs estimated to be: Off |
| 2. Other (state basis: Off |
| 1: Off |
| 2: Off |
| 3: Off |
| 1. Total Subcontractors Costs estimated to be: Off |
| 2. Total Subcontractors Costs plus (add basis: Off |
| 28. LIST OF ATTACHMENTS SUBMITTED WITH THIS OFFER (See Solicitation requirements): |
| 29. ADDITIONAL REMARKS OR CONDITIONS WITH RESPECT TO THIS OFFER: |
| 30. RECORDED OWNER (Name and address including ZIP code): |
| 32. OFFEROR’S INTEREST IN PROPERTY: |
| OTHER (Specify):: |
| a.: |
| b. E-MAIL ADDRESS:: |
| d. SIGNATURE: |
| e. DATE SIGNED: |
File details come from the government source that posted it. Updated .