FirstArticleRequirement3927.pdf

PDF 89 KB Posted

Attached to
Power Supply Solutions Virtual Industry Day Federal contract opportunity
Solicitation number
SPRWA1-19-R-0007
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This document outlines first article testing requirements for a federal contract to procure power supplies with national stock numbers 6130011833927EW, 6130016645626, and 6130012693624. Key details include:

  • The contractor must submit two units of the first article within 540 calendar days of award for government testing to verify all qualification requirements are met. The contractor must notify the government 30 days prior to shipping and the government will provide approval or disapproval within 45 days of receipt.

  • Production quantities for the first national stock number are 150 units with a nine month delivery period after first article acceptance. The second national stock number requires 150 units for the first two pricing periods and the third national stock number requires quantities of 25, 10, and 10 units over three pricing periods with a 12 month delivery period.

  • The contractor must perform testing or the government will test. The contractor must submit a test plan and report. The cognizant engineering organization at Robins Air Force Base is responsible for approving and conducting testing.

View the file

Other files for this federal contract opportunity

Other files attached to Power Supply Solutions Virtual Industry Day, newest first.
File Type Posted
Virtual_Industry_Day_Questions_and_Answers.docx DOCX document
EDL5626.pdf PDF
Transportation5626.pdf PDF
VIRTUAL_INDUSTRY_DAY_INSTRUCTIONS.pdf PDF
ReqDescriptionALQ1613624v2.pdf PDF
Transportation3927.pdf PDF
ReqDescriptionALQ1843927v2.pdf PDF
IUIDChecklist5626.pdf PDF
FirstArticleRequirement5626.pdf PDF
StatementofWorkPS215Feb19.pdf PDF
Transportation3624.pdf PDF
EDL3624.pdf PDF
IUIDChecklist3624.pdf PDF
FirstArticleRequirement5626.pdf PDF
PackagingRequirements3927v2.pdf PDF
IUIDChecklist3927.pdf PDF
Attachment1FACTSSHEET.docx DOCX document
CDRLpackage.pdf PDF
SPRWA119R0007DRAFT.pdf PDF
PackagingRequirements5626v3.pdf PDF
PackagingRequirements3624v3.pdf PDF
Attachment2PastPerformanceQuestionnaireDLA.docx DOCX document
EDL3927.pdf PDF
FirstArticleRequirement3624.pdf PDF
Attachment3ClientAuthorizationLetter.docx DOCX document
Attachment4PricingMatrix.xlsx XLSX spreadsheet
ReqDescriptionALQ1845626v2.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

20 DEC 2018(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

49956 / G254084-1

4. NSN

6130011833927EW

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 2 UNIT(S) OF LOT / ITEM 0

AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

REQUIRED X NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X

X

CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

All applicable testing for qualification requirements as defined by G254084

B. The detailed technical requirements for First Article approval tests are contained in

G254084 and Contract requirements

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

Number of days for government approval / disapproval 30 days.

D. Contractor's notification to ACO and

Lisa Morris, LCMC/WNYEAA

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

Lisa Morris LCMC/WNYEAA

478-222-4362

280 Byron Street BLDG 229

Robins AFB, GA 31098

(2) Government written notice of approval / disapproval due 30 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within 540 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at

FD2060 - DLA Central Rcvg, DDWG ER

Special Handling, First Art. Unit

455 Byron Street WR-ALC

Robins AFB, GA 31098-1887

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 45 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$10,000.0000

Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 29 Jan 2019

FIRST ARTICLE REQUIREMENTS 1. DATE

20 DEC 2018(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

Approved First Articles will be forwarded to

X 2 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor

X will be retained by LCMC/WNYEAA pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

Disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. Provided not more than months have elapsed since completion of the contract.

e. X First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

Morris, Lisa

LCMC/WNYEAA

478-222-4362

472-4362

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Morris, Lisa

LCMC/WNYEAA

478-222-4362

472-4362

Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 29 Jan 2019

File details come from the government source that posted it. Updated .