About this file

This requirements description outlines the design, qualification, and production of low band high voltage power supplies for AN/ALQ-184 electronic attack pods. The Air Force Life Cycle Management Center seeks to redesign and qualify new prototypes of the NSN 6130-01-664-5626 power supply, evaluate against specifications 578R729 Rev F and PDS21777 Rev E, and establish a qualified manufacturer for production units. Offerors must deliver prototypes for testing and acceptance, produce units per schedules, and submit various plans and reports including IUID, counterfeit prevention, acceptance test procedures and reports, and qualification test procedures and reports. Delivery of first articles is required within 18 months of award with production units delivered within 9 months thereafter.

View the file

Other files for this federal contract opportunity

Other files attached to Power Supply Solutions Virtual Industry Day, newest first.
File Type Posted
Virtual_Industry_Day_Questions_and_Answers.docx DOCX document
Transportation5626.pdf PDF
EDL5626.pdf PDF
VIRTUAL_INDUSTRY_DAY_INSTRUCTIONS.pdf PDF
EDL3927.pdf PDF
FirstArticleRequirement3927.pdf PDF
FirstArticleRequirement3624.pdf PDF
Attachment3ClientAuthorizationLetter.docx DOCX document
Attachment4PricingMatrix.xlsx XLSX spreadsheet
PackagingRequirements3927v2.pdf PDF
IUIDChecklist3927.pdf PDF
Attachment1FACTSSHEET.docx DOCX document
CDRLpackage.pdf PDF
SPRWA119R0007DRAFT.pdf PDF
PackagingRequirements5626v3.pdf PDF
PackagingRequirements3624v3.pdf PDF
Attachment2PastPerformanceQuestionnaireDLA.docx DOCX document
ReqDescriptionALQ1613624v2.pdf PDF
Transportation3927.pdf PDF
ReqDescriptionALQ1843927v2.pdf PDF
IUIDChecklist5626.pdf PDF
FirstArticleRequirement5626.pdf PDF
StatementofWorkPS215Feb19.pdf PDF
Transportation3624.pdf PDF
EDL3624.pdf PDF
IUIDChecklist3624.pdf PDF
FirstArticleRequirement5626.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AN/ALQ-184 LOW BAND HIGH VOLTAGE POWER SUPPLY REDESIGN

AND PRODUCTION

Requiring Office and Address:

Directorate: 408th Supply Chain Management Office Symbol: 408th SCMS/GUEA Attention line: Matt Moorman, 478-222-4360 Address: 235 Byron Street, Ste. 19-A, Robins AFB, GA 31098-1670

REQUIREMENTS DESCRIPTION

OBJECTIVE

This Requirements Description is for the design and qualification of the AN/ALQ-184(V) Electronic Attack (EA) Pod’s Low Band High Voltage Power Supply (LB HVPS), NSN 6130- 01-664-5626EW, P/N: VPW3552. The effort will be to evaluate current specifications, build functional, flight-worthy prototypes, test, and certify a qualified manufacturer of the ALQ-184 LB HVPS. The detailed Scope of Work is contained in Attachment 1 and is entitled “Statement of Work for PS2 Multi Award Contract”.

APPLICABLE DOCUMENTS

578R729 Rev F Output Power Supply (Dual-Lo) PDS21777 Rev E Output Power Supply (Dual-Lo)

SPECIFIC TASKS

-Review specifications.

-Development of first articles (Quantity 2).

-Validate first articles via acceptance/qualification testing.

-Validate first articles at system level via integration testing.

-Produce production units in accordance with production schedule levied by contract.

DELIVERABLES/REPORTING REQUIREMENTS

CDRL

TAB Block 16 Continuation

A002 Item Unique Identification (IUID) Marking Plan

BLK 4: Contractor format is acceptable. IUID Marking Plan shall be type written in Microsoft Word with support files in Microsoft Excel and Microsoft Project. IUID Marking Plan shall be formatted for printing on standard 8.5" x 11" paper. Submission shall be delivered electronically via email to the following people: Marking Plan shall be delivered electronically via E-mail to the following addresses:

Matt Moorman, 408 SCMS/GUEA Pods Engineer, Matthew.Moorman.3@us.af.mil

Lisa Morris, AFLCMC/WNYEAA, Lead Engineer, Lisa.Morris@us.af.mil

BLK 7: Submit invoice in WAWF after submittal of final report to account for all previously submitted.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only due to operational use as of January 1st, 2019. Other requests shall be referred to 408 SCMS/GUEA or higher DoD authority.

BLK 8 & 10-13: Submit NLT 45 Days after contract award. Government comments/approval will be provided within 30 days after receipt. The contractor shall resubmit within 15 days after receipt of Government comments.

A003 Item Unique Identification (IUID) Marking Activity and Verification Report

BLK 4: Contractor format is acceptable. 100% of the units shall be inspected, evaluated and added to the Activity and Verification Report.

Initial report during each production cycle with be delivered electronically via E-mail to the following addresses:

Matt Moorman, 408 SCMS/GUEA Pods Engineer, Matthew.Moorman.3@us.af.mil

Lisa Morris, AFLCMC/WNYEAA, Lead Engineer, Lisa.Morris@us.af.mil

BLK 7: Submit invoice in WAWF after submittal of final report to account for all previously submitted.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only due to operational use as of January 1st, 2019.

Other requests shall be referred to 408 SCMS/GUEA or higher DoD authority.

BLK 8 & 10-13: Submit quarterly on 15th date of the month.

A004 Counterfeit Prevention Plan

BLK 4: Contractor format is acceptable. Counterfeit Prevention Plan shall be type written in Microsoft Word with support files in Microsoft Excel and Microsoft Project. Counterfeit Prevention Plan shall be formatted for printing on standard 8.5" x 11" paper. Submission shall be delivered electronically via email mailto:Matthew.Moorman.3@us.af.mil mailto:Lisa.Morris@us.af.mil mailto:Matthew.Moorman.3@us.af.mil mailto:Lisa.Morris@us.af.mil to the following people:

Matt Moorman, 408 SCMS/GUEA Pods Engineer, Matthew.Moorman.3@us.af.mil

Lisa Morris, AFLCMC/WNYEAA, Lead Engineer, Lisa.Morris@us.af.mil

BLK 7: Submit invoice in WAWF after submittal of final report to account for all previously submitted.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only due to operational use as of January 1st, 2019.

Other requests shall be referred to 408 SCMS/GUEA or higher DoD authority.

A017 Acceptance Test Procedure (ATP)

BLK 4: Contractor format is acceptable. Acceptance Test Procedure shall be type written in Microsoft Word with support files in Microsoft Excel and Microsoft Project. Acceptance Test Procedure shall be formatted for printing on standard 8.5" x 11" paper. Acceptance Test Procedures shall have developed in accordance with 578R729 Rev F drawing specifications and PDS21777 Rev E test specifications.

Submissions shall be electronically submitted to the following e-mail addresses:

Matt Moorman, 408 SCMS/GUEA Pods Engineer, Matthew.Moorman.3@us.af.mil

Lisa Morris, AFLCMC/WNYEAA, Lead Engineer, Lisa.Morris@us.af.mil

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only due to operational use as of January 1st, 2019.

Other requests shall be referred to 408 SCMS/GUEA or higher DoD authority.

BLKS 11 & 12: First submission shall be no later than 90 days after contract award.

Approval/Disapproval of subsequent submissions will be furnished within 30 days of receipt.

BLK 13: Revisions shall be furnished to personnel mentioned above within 30 days after receipt of AFLCMC/WNYEAA comments.

A018 Acceptance Test Report (ATR)

BLK 4: Contractor format is acceptable. Acceptance Test Report shall be type written in Microsoft Word with support files in Microsoft Excel and Microsoft Project. Acceptance Test Report shall be formatted for printing on standard 8.5" x 11" paper. Acceptance Test Report shall document testing of units in accordance with Government approved ATP.

First submission shall be delivered electronically via e-mail to the following addresses:

Matt Moorman, 408 SCMS/GUEA Pods Engineer, Matthew.Moorman.3@us.af.mil mailto:Matthew.Moorman.3@us.af.mil mailto:Lisa.Morris@us.af.mil mailto:Matthew.Moorman.3@us.af.mil

Lisa Morris, AFLCMC/WNYEAA, Lead Engineer, Lisa.Morris@us.af.mil

Subsequent reports shall be stored at contractor's facility for 3 years or until deemed as no longer required by AFLCMC/WNYEAA.

BLK 8: Approval/Disapproval of first submission will be furnished within 45 days after receipt by AFLCMC/WNYEAA. Approval/Disapproval of subsequent submissions will be furnished within 30 days of receipt.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only due to operational use as of January 1st, 2019.

Other requests shall be referred to 408 SCMS/GUEA or higher DoD authority.

BLKS 11, 12, & 13: Submissions shall be no later than 30 days after acceptance testing has completed.

A019 Qualification Test Procedure (QTP)

BLK 4: Contractor format is acceptable. Qualification Test Procedures shall be type written in Microsoft Word with support files in Microsoft Excel and Microsoft Project.

Qualification Test Procedures shall be formatted for printing on standard 8.5" x 11" paper. Qualification Test Procedures shall have developed in accordance with 578R729 Rev F drawing specifications and PDS21777 Rev E test specifications. Submissions shall be electronically submitted to the following e-mail addresses:

Matt Moorman, 408 SCMS/GUEA Pods Engineer, Matthew.Moorman.3@us.af.mil

Lisa Morris, AFLCMC/WNYEAA, Lead Engineer, Lisa.Morris@us.af.mil

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only due to operational use as of January 1st, 2019.

Other requests shall be referred to 408 SCMS/GUEA or higher DoD authority.

BLKS 11 & 12: First submission shall be no later than 90 days after contract award.

Approval/Disapproval of subsequent submissions will be furnished within 30 days of receipt.

BLK 13: Revisions shall be furnished to personnel mentioned above within 30 days after receipt of AFLCMC/WNYEAA comments.

A020 Qualification Test Report (QTR)

BLK 4: Contractor format is acceptable. Qualification Test Report shall be type written in Microsoft Word with support files in Microsoft Excel and Microsoft Project.

Qualification Test Report shall be formatted for printing on standard 8.5" x 11" paper.

mailto:Lisa.Morris@us.af.mil

Qualification Test Report shall document testing of units in accordance with Government approved QTP. First submission shall be delivered electronically via e-mail to the following addresses:

Matt Moorman, 408 SCMS/GUEA Pods Engineer, Matthew.Moorman.3@us.af.mil

Lisa Morris, AFLCMC/WNYEAA, Lead Engineer, Lisa.Morris@us.af.mil

Subsequent reports shall be stored at contractor's facility for 3 years or until deemed as no longer required by AFLCMC/WNYEAA.

BLK 8: Approval/Disapproval of first submission will be furnished within 45 days after receipt by AFLCMC/WNYEAA. Approval/Disapproval of subsequent submissions will be furnished within 30 days of receipt.

BLK 9: DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only due to operational use as of January 1st, 2019.

Other requests shall be referred to 408 SCMS/GUEA or higher DoD authority.

BLKS 11, 12, & 13: Submissions shall be no later than 30 days after qualification testing has completed.

First article Hardware shall be sent to the following address:

FD2060 – DLA Central Rcvg, DDWG ER Special Handling, First Art. Unit 455 Byron Street WR-ALC Robins AFB, GA 31098-1887

All forms of media shall be sent to the following address:

408th SCMS/GUEA (POC: Matt Moorman) 460 Richard Ray Blvd, STE 200 Robins AFB, GA 31098-1813