Specifications-589A4-19-103-Vol 1 (486 pages).pdf
PDF 3 MB Posted
- Solicitation number
- 36C25521R0089
About this file
This document provides details for a federal construction contract opportunity to renovate behavioral health clinic space at a Veterans Affairs medical center. The project involves renovating approximately 9,706 square feet on the second floor and 5,089 square feet on the fourth floor to consolidate behavioral health services and improve patient flow. Scope of work includes demolition, new construction of electrical, HVAC, plumbing, fire protection and interior finish systems. Construction will occur in phases to minimize disruption to patient care services. The estimated price range is $2 million to $5 million. The North American Industry Classification Code is 236220 and the small business size standard is $39.5 million. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation package will be available on or around June 1, 2021 with proposals due on or around July 9, 2021. Award will be made using Best Value Lowest Price Technical Acceptable and the government plans to award without discussions. Interested parties should monitor the beta SAM website for amendments and register in SAM and VIP databases under the applicable NAICS code.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Romanyk Consulting Corp. Copyright © 2016
PRIVILEGED AND CONFIDENTIAL PROPRIETARY INFORMATION
Specifications Volume 1 Div 00 – Div 14
RENOVATE BEHAVIORAL
HEALTH CLINIC
COLUMBIA VA MEDICAL CENTER
Columbia, Missouri
Bid Documents May 13, 2021
Project Number: 589A4‐19‐103 Contract Number: VA255‐17‐D‐0084
Task Order: 36C25519N0285
05/13/2021 Bid Documents Renovate Behavioral Health Clinic Project Number 589A4‐19‐103
00 00 00 ‐ 1
SECTION 00 00 00
SEALS PAGE
ROMANYK CONSULTING
Michele Marie Kiehl, AIA
MISSOURI LICENSE NO. A ‐ 00785
IMEG
VA 02‐01‐21
00 01 10‐1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
Volume 1
DIVISION 00 – SPECIAL SECTIONS
00 00 00 Seals Page
00 01 15 List of Drawing Sheets 05‐20
DIVISION 01 ‐ GENERAL REQUIREMENTS
01 00 00 General Requirements 01‐21
01 00 10 Medical Center Requirements 10‐17
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 03‐20
01 33 23 Shop Drawings, Product Data, and Samples 05‐17
01 35 26 Safety Requirements 07‐20
01 42 19 Reference Standards 11‐20
01 45 00 Quality Control 02‐21
01 57 19 Temporary Environmental Controls 01‐21
01 74 19 Construction Waste Management 01‐21
01 81 13 Sustainable Construction Requirements 10‐17
DIVISION 02 – EXISTING CONDITIONS
02 41 19.33 Selective Demolition
DIVISION 03 – CONCRETE
Not Used
DIVISION 04 – MASONRY
04 20 00 Unit Masonry 08‐17
DIVISION 05 – METALS
05 55 00 Metal Fabrications 08‐18
05 51 00 Metal Stairs 01‐21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10‐17
00 01 10‐2
06 20 00 Finish Carpentry 01‐21
DIVISION 07 ‐ THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 01‐21
07 84 00 Firestopping 01‐21
07 92 00 Joint Sealants 01‐21
DIVISION 08 ‐ OPENINGS
08 11 13 Hollow Metal Doors and Frames 01‐21
08 14 00 Interior Wood Doors 01‐21
08 33 00 Coiling Doors and Grilles 01‐21
08 51 13 Aluminum Windows 01‐21
08 71 00 Door Hardware 01‐21
08 71 13 Automatic Door Operators 01‐21
08 80 00 Glazing 01‐21
DIVISION 09 – FINISHES
09 06 00 Schedule of Finishes 01‐21
09 22 16 Non‐Structural Metal Framing 06‐18
09 29 00 Gypsum Board 04‐20
09 30 13 Ceramic/Porcelain Tiling 01‐21
09 51 00 Acoustical Ceilings 12‐18
09 65 13 Resilient Base and Accessories 01‐21
09 65 16 Resilient Sheet Flooring 05‐18
09 91 00 Painting 01‐21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01‐21
10 21 13 Toilet Compartments & Urinal Screens 01‐21
10 21 23 Cubicle Curtain Tracks 01‐21
10 26 00 Wall and Door Protection 01‐21
10 28 00 Toilet, Bath, and Laundry Accessories 01‐21
10 44 13 Fire Extinguisher Cabinets 08‐18
DIVISION 11 – EQUIPMENT
11 73 00 Ceiling Mounted Patient Lift System 08‐20
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 08‐17
00 01 10‐3
DIVISION 13 ‐ SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non‐Structural Components 01‐14
13 49 00 Radiation Protection 01‐21
DIVISION 14– CONVEYING EQUIPEMENT
Volume 2
DIVISION 21‐ FIRE SUPPRESSION
21 13 13 Wet‐Pipe Sprinkler Systems 09‐15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09‐20
22 05 23 General‐Duty Valves for Plumbing Piping 09‐20
22 07 11 Plumbing Insulation 09‐19
22 11 00 Facility Water Distribution 11‐19
22 13 00 Facility Sanitary and Vent Piping 09‐20
22 40 00 Plumbing Fixtures 09‐15
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02‐20
23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 02‐20
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 02‐20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02‐20
23 07 11 HVAC and Boiler Plant Insulation 02‐20
23 09 23 Direct‐Digital Control System for HVAC 09‐11
23 21 13 Hydronic Piping 02‐20 23 31 00 HVAC Ducts and Casings 02‐20
23 34 00 HVAC Fans 02‐20
23 36 00 Air Terminal Units 02‐20
23 37 00 Air Outlets and Inlets 02‐20
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01‐16
26 05 19 Low‐Voltage Electrical Power Conductors and Cables 01‐17
26 05 26 Grounding and Bonding for Electrical Systems 09‐13
00 01 10‐4
26 05 33 Raceway and Boxes for Electrical Systems 01‐18
26 09 23 Lighting Controls 01‐18
26 24 16 Panelboards 01‐18
26 27 26 Wiring Devices 01‐18
26 29 21 Enclosed Switches and Circuit Breakers 01‐17
26 51 00 Interior Lighting 01‐18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09‐19
27 05 33 Raceways and Boxes for Communications Systems 10‐18
27 10 00 Control, Communication and Signal Wiring 06‐15
27 11 00 Communications Equipment Room Fittings 06‐15
27 15 00 Communications Structured Cabling 01‐16
27 52 23 Nurse Call and Code Blue Systems 12‐20
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04‐18
28 05 13 Conductors and Cables for Electronic Safety and Security 10‐18
28 05 26 Grounding and Bonding for Electronic Safety and Security 09‐11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 09‐11
28 13 00 Physical Access Control System 10‐11
28 23 00 Video Surveillance 09‐11
28 31 00 Fire Detection and Alarm 10‐11
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation
VA 05‐01‐20
00 01 15 ‐ 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
ARCHITECTURAL
1‐GI100 SHEET INDEX & GENERAL INFORMATION
1‐GI101 BUILDING CODE
1‐GI102 ABBREVIATIONS & SYMBOLS
1‐GI103 SECOND FLOOR LIFE SAFETY PLAN
1‐GI104 FOURTH FLOOR LIFE SAFETY PLAN
1‐GC101 SECOND & FOURTH FLOOR PHASING & INTERIM LIFE SAFETY PLAN
1‐GC102 THIRD FLOOR PHASING PLAN
1‐AD101 FIRST FLOOR RCP DEMOLITION PLAN & REFLECTED CEILING PLAN
1‐AD102 SECOND FLOOR RCP DEMOLITION PLAN
1‐AD103 SECOND FLOOR DEMOLITION PLAN
1‐AD104 THIRD FLOOR RCP DEMOLITION PLAN & REFLECTED CEILING PLAN
1‐AD105 FOURTH FLOOR RCP DEMOLITION PLAN
1‐AD106 FOURTH FLOOR DEMOLITION PLAN
1‐AE101 OVERALL SECOND FLOOR PLAN
1‐AE102 ENLARGED SECOND FLOOR PLAN
1‐AE103 OVERALL FOURTH FLOOR PLAN
1‐AE104 ENLARGED FOURTH FLOOR PLAN
1‐AE105 SECOND FLOOR DIMENSION PLAN
1‐AE106 FOURTH FLOOR DIMENSION PLAN
1‐AE107 SECOND FLOOR REFLECTED CEILING PLAN
1‐AE108 FOURTH FLOOR REFLECTED CEILING PLAN
1‐AE109A SECOND FLOOR EQUIPMENT PLAN
1‐AE109B ENLARGED SECOND FLOOR TMS ROOM EQUIPMENT PLAN &
ELEVATIONS
1‐AE110A FOURTH FLOOR EQUIPMENT PLAN
1‐AE110B FOURTH FLOOR EQUIPMENT PLAN INTERIOR ELEVATIONS
1‐AE110C FOURTH FLOOR EQUIPMENT PLAN INTERIOR ELEVATIONS
1‐AE110D FOURTH FLOOR EQUIPMENT PLAN INTERIOR ELEVATIONS
00 01 15 ‐ 2
1‐AE110E FOURTH FLOOR EQUIPMENT PLAN INTERIOR ELEVATIONS
1‐AE110F FOURTH FLOOR EQUIPMENT PLAN INTERIOR ELEVATIONS
1‐AE401 SECOND FLOOR ENLARGED TOILET PLANS AND ELEVATIONS
1‐AE402 SECOND FLOOR ENLARGED TOILET PLANS AND ELEVATIONS
1‐AE403 FOURTH FLOOR ENLARGED TOILET PLANS AND ELEVATIONS
1‐AE501 SECOND FLOOR MILLWORK PLAN & ELEVATIONS
1‐AE502 FOURTH FLOOR MILLWORK PLAN & ELEVATIONS
1‐AE503 SECOND FLOOR MILLWORK SECTIONS
1‐AE504 FOURTH FLOOR MILLWORK ELEVATIONS & SECTIONS
1‐AE702 MISCELLANEOUS DETAILS
1‐AE703 SECOND FLOOR CEILING DETAILS
1‐AE704 FOURTH FLOOR CEILING DETAILS
1‐AE705 METAL STUD DETAILS
1‐AE706 CEILING DETAILS SUSPENDED GYPSUM
1‐AE707 SECOND FLOOR WINDOW, DOOR & STAIR DETAILS
1‐AF101 SECOND FLOOR DOOR & WINDOW SCHEDULES
1‐AF102 FOURTH FLOOR DOOR SCHEDULE & DETAILS
1‐AF103 SECOND FLOOR FINISH PLAN & SCHEDULES
1‐AF104 FOURTH FLOOR FINISH PLAN & SCHEDULES
1‐AF105 SECOND FLOOR WALL TYPES
1‐AF106 FOURTH FLOOR WALL TYPES
1‐AW101 SECOND AND FOURTH FLOOR SIGNAGE PLAN
1‐AW102 SIGNAGE PLAN DETAILS
1‐AW103 SIGNAGE PLAN DETAILS
FIRE PROTECTION
1‐FX000 FIRE PROTECTION COVERSHEET
1‐FD101 LEVEL 02‐ FIRE PROTECTION DEMOLITION
1‐FD102 LEVEL 04 ‐ FIRE PROTECTION DEMOLITION
1‐FX101 LEVEL 02 – FIRE PROTECTION
1‐FX102 LEVEL 04 ‐ FIRE PROTECTION
PLUMBING
00 01 15 ‐ 3
1‐P‐000 PLUMBING COVER SHEET
1‐PD100 PIPE BASEMENT – PLUMBING DEMOLITION
1‐PD101 LEVEL 01 – PLUMBING DEMOLITION
1‐PD102 LEVEL 02 – PLUMBING DEMOLITION
1‐PD103 LEVEL 03 ‐ PLUMBING DEMOLITION
1‐PD104 LEVEL 04 ‐ PLUMBING DEMOLITION
1‐PL100 BASEMENT – PLUMBING
1‐PL101 LEVEL 01 – PLUMBING
1‐PL102 LEVEL 02 ‐ PLUMBING
1‐PL103 LEVEL 03 ‐ PLUMBING
1‐PL104 LEVEL 04 ‐ PLUMBING
1‐P‐300 PLUMBING DETAILS
1‐P‐400 PLUMBING RISERS
1‐ P‐401 PLUMBING RESTROOM RISER
MECHANICAL
1‐MP000 PIPING COVERSHEET
1‐MD101 LEVEL 02 – MECHANICAL PIPING DEMOLITION
1‐MD102 LEVEL 03 ‐ MECHANICAL PIPING DEMOLITION
1‐MD103 LEVEL 04 ‐ MECHANICAL PIPING DEMOLITION
1‐MP101 LEVEL 02 – MECHANICAL PIPING
1‐MP102 LEVEL 03 ‐ MECHANICAL PIPING
1‐MP103 LEVEL 04 ‐ MECHANICAL PIPING
1‐MP300 MECHANICAL PIPING DETAILS
1‐MP400 MECHANICAL PIPING DIAGRAMS
VENTILATION
1‐MH000 VENTILATION COVERSHEET
1‐MD201 LEVEL 02 – VENTILATION DEMOLITION
1‐MD202 LEVEL 03 ‐ VENTILATION DEMOLITION
1‐MD203 LEVEL 04 ‐ VENTILATION DEMOLITION
1‐MH101 LEVEL 02 ‐ VENTILATION
1‐MH102 LEVEL 03 ‐ VENTILATION
1‐MH103 LEVEL 04 ‐ VENTILATION
00 01 15 ‐ 4
1‐MH300 VENTILATION DETAILS
1‐MH400 VENTILATION DIAGRAMS
1‐MH500 VENTILATION SCHEDULES
1‐MH501 VENTILATION SCHEDULES
ELECTRICAL
1‐E‐000 ELECTRICAL COVER SHEET
1‐ED101 LEVEL 02 – ELECTRICAL DEMOLITION
1‐ED102 LEVEL 04 ‐ ELECTRICAL DEMOLITION
1‐E101 LEVEL 03 – ELECTRICAL
1‐EL101 LEVEL 02 ‐ ELECTRICAL LIGHTING
1‐EL103 LEVEL 04 ‐ ELECTRICAL LIGHTING
1‐EP101 LEVEL 02 – ELECTRICAL POWER
1‐EP102 LEVEL 04 ‐ ELECTRICAL POWER
1‐FA101 LEVEL 02 – FIRE ALARM
1‐FA102 LEVEL 04 ‐ FIRE ALARM
1‐E‐300 ELECTRICAL DETAILS
1‐E‐500 ELECTRICAL SCHEDULES
1‐E‐501 ELECTRICAL SCHEDULES
TELECOMMUNICATIONS
1‐ET‐000 TELECOMMUNICATIONS COVERSHEET
1‐TD101 LEVEL 02 – TELECOMMUNICATIONS DEMOLITION
1‐TD102 LEVEL 04 ‐TELECOMMUNICATIONS DEMOLITION
1‐ET101 LEVEL 01 –TELECOMMUNICATIONS
1‐ET102 LEVEL 02 ‐ TELECOMMUNICATIONS
1‐ET103 LEVEL 03 ‐ TELECOMMUNICATIONS
1‐ET104 LEVEL 04 ‐ TELECOMMUNICATIONS
1‐ET201 ENLARGED PLANS ‐ TELECOMMUNICATIONS
1‐T‐300 TELECOMMUNICATIONS DETAILS
1‐T‐400 TELECOMMUNICATIONS DIAGRAMS
1‐T‐500 TELECOMMUNICATIONS SCHEDULES
‐ ‐ ‐ E N D ‐ ‐ ‐
VA 01‐01‐21
01 00 00 ‐1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Renovate
Behavioral Health Clinic project as required by drawings and specifications.
B. Project Purpose/Use: PHASE 1: The project will renovate approximately 5,089 square foot on the fourth floor of VA Truman Memorial Veterans building in Columbia, Missouri. This will include
Procedure Rooms, Pain Exam Rooms, PM&R Exam Rooms, Nurse Work Rooms, MSA Check‐in, Swamp Rooms, EMG/SCI Room, Pain BH, and Pain Pharm Rooms. Phase 2‐4: The project will renovate approximately 9,706 square foot of state‐of‐the‐art Out‐ Patient Behavioral Health
Clinic located on the second floor of VA Truman Memorial Veterans building in Columbia, Missouri. This will include Group Rooms, Administrative Offices, Clinical Offices (which double as counseling rooms), Public Restrooms, a Central Check‐in/Waiting Room and a Staff Break Room.
C. Only one site visit will be offered to Bidders. The visit to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer.. It is highly encouraged to attend.
D. Offices of Romanyk Consulting Corporation, as Architect/Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
1.3 STATEMENT OF BID ITEM(S)
A. Bid Item 1: all work included in the project. Period of performance is 800 days.
B. Bid Items 2‐4 are ABATEMENT UNIT PRICING
1. Bid Item 2 Unit pricing: Provide abatement unit price per insulation fitting of 6” or less diameter. This will be used for possible modifications as required for any discovered, unforeseen, fittings.
01 00 00 ‐2
2. Bid Item 3: Provide abatement unit price per insulation fitting greater than 6”. This will be used for possible modifications as required for any discovered, unforeseen, fittings.
3. Bid Item 4: Provide abatement unit price per square foot of flooring and mastic. This will be used for possible modifications as required for any discovered, unforeseen, flooring.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub‐contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge.
They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting
Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting
Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General
Contractor’s employees off the premises in the event of a national emergency. The General
Contractor may return to the site only with the written approval of the Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the
Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation . See Section 08 71 00, DOOR HARDWARE and coordinate.
01 00 00 ‐3
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law
Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e‐ mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility
Manager.
01 00 00 ‐4
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236‐10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
C. Working space and space available for storing materials shall be only within the construction area. Coordinate with the COR for material deliveries.
D. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
E. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
01 00 00 ‐5
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor, as follows:
Phase I: 4th Floor areas. Period of performance 240 days.
Phase II: Includes the Second‐floor group rooms, restrooms, and waiting room. Period of performance 180 days.
Phase III: Includes the Second‐floor office area, TMS rooms, Care coordinator rooms, and Staff
Restroom. Period of performance 180 days.
Phase IV: Includes the Second‐floor corridors. Period of performance 30 days (nights and weekends).
F. Part of Bldg. 1 will be vacated by Government in accordance with above within 30 daysof receipt of Notice to Proceed and turned over to Contractor. Turnover is dependent on submittal status and approved project schedule.
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by
Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
01 00 00 ‐6
2. Immediate areas of alterations not mentioned in preceding Subparagraph 1 will be temporarily vacated while alterations are performed.
G. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre‐inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
H. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR . Electrical work shall be accomplished with all affected circuits or equipment de‐energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR
ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS
INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND
SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center .
01 00 00 ‐7
Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of
COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the
Contractor.
I. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
J. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
K. Coordinate the work for this contract with other construction operations as directed by COR.
This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the
Contracting Officer. This report shall list by rooms and spaces:
01 00 00 ‐8
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR , to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236‐2) and
"CHANGES" (FAR 52.243‐4).
C. Re‐Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re‐survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re‐survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be
01 00 00 ‐9 adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows: Items will be tagged by VA and COR will arrange for storage.
1. Reserved items which are to remain property of the Government are identified by attached tags as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to reinstallation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center .
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with
Contractor's operation.
1.9 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work.
Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR.
Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.)
disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
01 00 00 ‐10
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243‐4) and "DIFFERING SITE CONDITIONS" (FAR 52.236‐2).
1.10 AS‐BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as‐built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as‐built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as‐built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.11 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:
1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National
Electrical Code, (2014 Edition), Article 590, Temporary Installations. Voltage supplied to
01 00 00 ‐11 each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.
3. Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated.
4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze up damage.
5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.
6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.
B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.
C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.
D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.
1.12 TEMPORARY USE OF EXISTING ELEVATORS
A. Use of existing elevator for handling building materials and Contractor's personnel will be permitted subject to following provisions:
1. Contractor makes all arrangements with the COR for use of elevators. The COR will ascertain that elevators are in proper condition. Contractor may use elevators Nos 4 and 5 for daily use. Personnel for operating elevators will not be provided by the Department of Veterans
Affairs.
2. Contractor covers and provides maximum protection of following elevator components:
a) Entrance jambs, heads soffits and threshold plates.
b) Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.
c) Finish flooring.
01 00 00 ‐12
Government will accept hoisting ropes of elevator and rope of each speed governor if they are worn under normal operation. However, if these ropes are damaged by action of foreign matter such as sand, lime, grit, stones, etc., during temporary use, they shall be removed and replaced by new hoisting ropes at the contractor’s expense.
1.13 TEMPORARY TOILETS
1. *Contractor may have for use of Contractor's workers, such toilet accommodations as may be assigned to Contractor by Medical Center . Contractor shall keep such places clean and be responsible for any damage done thereto by Contractor's workers. Failure to maintain satisfactory condition in toilets will deprive Contractor of the privilege to use such toilets.
1.14 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the
Contractor from existing outlets and supplies, as specified in the contract. The Contractor shall carefully conserve any utilities furnished without charge.
1.15 TESTS
A. Testing to include pressure tests on new duct work, all lines prior to connection, and test and balance. No commissioning will be required. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.
B. Pre‐test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pretested.
C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building.
Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a system which involves several
01 00 00 ‐13 components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.
E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.
F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.
1.16 INSTRUCTIONS
A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.
B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and subassembly components. Manuals shall include an index covering all component parts clearly cross‐ referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished.
Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.
C. Instructions: Contractor shall provide qualified, factory trained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site.
These requirements are more specifically detailed in the various technical sections. Instructions
01 00 00 ‐14 for different items of equipment that are component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed. This is to assure proper instruction in the operation of inter‐related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outline with associated material to the COR for review and approval prior to scheduling training to ensure the subject matter covers the expectations of the
VA and the contractual requirements. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.
1.17 GOVERNMENT‐FURNISHED PROPERTY
A. The Government shall deliver to the Contractor, the Government furnished property shown on the drawings .
B. Equipment furnished by Government to be installed by Contractor will be furnished to
Contractor at the Medical Center .
1. Contractor will be provided Government Furnished Equipment at such time as needed. No requirement to store.
C. Notify Contracting Officer in writing, 60 days in advance, of date on which Contractor will be prepared to receive equipment furnished by Government. Arrangements will then be made by the Government for delivery of equipment.
1. Immediately upon delivery of equipment, Contractor shall arrange for a joint inspection thereof with a representative of the Government. At such time the Contractor shall acknowledge receipt of equipment described, make notations, and immediately furnish the
Government representative with a written statement as to its condition or shortages.
2. Contractor thereafter is responsible for such equipment until such time as acceptance of contract work is made by the Government.
D. Equipment furnished by the Government will be delivered in a partially assembled (knock down) condition in accordance with existing standard commercial practices, complete with all fittings, fastenings, and appliances necessary for connections to respective services installed under contract. All fittings and appliances (i.e., couplings, ells, tees, nipples, piping, conduits, cables, 01 00 00 ‐15 and the like) necessary to make the connection between the Government furnished equipment item and the utility stub up shall be furnished and installed by the contractor at no additional cost to the Government.
E. Completely assemble and install the Government furnished equipment in place ready for proper operation in accordance with specifications and drawings.
F. Furnish supervision of installation of equipment at construction site by qualified factory trained technicians regularly employed by the equipment manufacturer.
1.18 SAFETY SIGN
A. Construction area will be marked at all entry points, with standard signs “DANGER
CONSTRUCTION ARE AUTHORIZED PERSONNEL ONLY” and “HARD HAT REQUIRED”. COR will provide a shadow box for the contractor to hang near entry to display all permits, ICRA, etc, items.
01 00 00 ‐16
This page intentionally left blank
VA 10‐01‐17
01 00 10 ‐ 1
SECTION 01 00 10
MEDICAL CENTER REQUIREMENTS
PART 1 – GENERAL
1.1 GENERAL INTENTION
A This document pertains to station policy for construction projects performed at the Harry S. Truman
Memorial Veterans' Hospital (HSTMVH) in Columbia, MO. Safety and health concerns are taken seriously at this facility. Both our staff and yours are expected to strictly adhere to the regulations and requirements. This is exceedingly important, since we must be primarily concerned for the safety of our patients. In this regard, OSHA Standards may protect worker safety and health, but they have minimal benefit for protecting the safety and health of our patients, due primarily to their differing medical conditions. Review this information as orientation with your personnel performing work on site. Where the requirements as outlined in this and Section 01 00 00, GENERAL REQUIREMENTS are differing, the more stringent shall apply.
1.2 REQUIREMENTS:
A. Security:
1. Secure all construction areas, especially mechanical and electrical rooms against entry of unauthorized individuals including patients.
2. Notify the Contracting Officer’s Representative (COR) for permission to work after hours and weekends. Standard work hours for this project will be Monday through Friday from 7:30 am to
4:00 pm.
B. Key Security:
1. Only a limited number of keys will be issued to the contractor.
2. See section 01 00 00, GENERAL REQUIREMENTS for procedures in case the Contractor loses a key.
3. Ensure all doors leading to and from construction are either monitored or locked to prevent access to the area from unauthorized persons.
C. General Safety:
1. Follow all federal, state and local safety and health regulations.
2. Maintain safety in the construction site/area in accordance with the provisions of the contract that includes the Occupational Safety and Health Administration (OSHA) Regulations; National Fire
Protection Association (NFPA) 70, National Electric Code; and NFPA 101, Life Safety Code. Work in a
01 00 10 ‐ 2 safe manner and take all proper precautions while performing your work. Extra precautions shall be taken when working around persons occupying the building during construction.
3. Provide Personal Protective Equipment (PPE) for your employees.
4. Post appropriate signs in specific hazardous areas.
5. Keep tools, ladders, materials, etc., secure and away from patients to prevent injuries.
D. Safety Inspections:
The professional Occupational Safety and Health staff at this facility will perform safety inspections of all contract operations. Written reports of unsafe practices or conditions will be reported to the COR and
Contracting Officer for immediate attention and resolution.
E. Fire Alarms:
1. The fire alarm system connects all buildings at this facility, and is activated by various heat, duct, manual pull stations and smoke sensors. Manual pull stations are provided at each entrance. Please survey the area in which you are working to locate the manual pull stations.
2. In the event of a fire alarm sounding, you are to remain in your area, unless medical center personnel (Safety, Nursing or Engineering) instruct otherwise, or unless a fire situation is in your area, in which case you should immediately evacuate.
3. Any work involving the fire protection systems will require written permission to proceed from the
COR. Do not tamper with or otherwise disturb any fire alarm system components without prior written permission. To do so without written permission will result in an adverse action.
F. Hazardous Materials:
1. Many of the operations you are scheduled to perform may involve the use of hazardous materials.
Prior to locating hazardous materials on site, all Material Safety Data Sheets (MSDS) will be submitted through the COR for evaluation by the facility Safety Officer.
2. Storage of hazardous materials within buildings will be minimal with only enough on hand to perform daily work tasks. Flammable materials will either be removed from buildings at the end of the work shift or stored in approved flammable storage containers.
3. Care must be taken to ensure adequate ventilation to remove vapors of hazardous materials in use.
Many of the patients being cared for in the facility are susceptible to environmental contaminants, even when odors seem minimal. You will isolate those areas where vapors are produced, and ventilate to the most extent possible to reduce the number of complaints.
01 00 10 ‐ 3
G. Airborne Dust Control During Construction:
1. Generation of dust is of major concern within staff and especially in patient occupied buildings.
Where operations involve the generation of dust, all efforts will be directed at reducing airborne generated dust to the lowest level feasible. This may be accomplished by a number of methods.
These include misting the area with water, or use of tools attached to high efficiency particulate air
(HEPA) filtering vacuums. Where large amounts of materials may be disturbed, resulting in airborne dust, establishment of full ceiling‐to‐floor plastic barriers may be required.
2. Classification of Jobs: CLASS IV see ICRA (Attachment A)
H. Infection Control Procedures: see ICRA (Attachment A)
1. Implement the requirements of VAMC’s Infection Control Risk Assessment (ICRA) team. ICRA Group will monitor dust in the vicinity of the construction work and require the Contractor to take corrective action immediately if the safe levels are exceeded.
2. Establish and maintain a dust control program as part of the contractor’s infection preventive measures in accordance with the guidelines provided by ICRA Group. Prior to start of work, prepare a plan detailing project‐specific dust protection measures, including periodic status reports, and submit to COR for review for compliance with contract requirements in accordance with Section 01
33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. All personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center.
3. Medical center Infection Control personnel shall monitor for airborne disease (e.g. aspergillosis) as appropriate during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality. In addition:
a. The COR and VAMC Infection Control personnel shall review pressure differential monitoring documentation to verify that pressure differentials in the construction…