Amendment 2-07 20210716_PIPING_ADD001.pdf

PDF 3 MB Posted

Attached to
Z2DA-- Renovate Behavioral Health Clinic P/N:589A4-19-103
Solicitation number
36C25521R0089
Issued by

About this file

This is a presolicitation notice for a construction project to renovate approximately 14,795 square feet of behavioral health clinic space on the second and fourth floors of a Veterans Affairs medical center in Columbia, Missouri. The project scope includes demolition and construction of new electrical, HVAC, plumbing, fire protection, and data/voice systems as well as interior finishes. Work will be completed through a design-bid-build project delivery method in multiple phases to minimize disruption to ongoing patient care in the active facility. The estimated price range for the project is $2,000,000 to $5,000,000. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and use a best value low price technically acceptable source selection process. The North American Industry Classification Code is 236220 and the small business size standard is $39.5 million. Interested offerors should monitor the beta SAM website for amendments and the solicitation package is expected to be available for download on or about June 1, 2021 with proposals due on or about July 9, 2021.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T T

T T T

T

T T

T T

T

T

T

T

T

T

T

T

T

T

T

NaN M L

2.8

3.7

4.6

5.5

6.3

K J H G F E

CLINIC OFFICE

A200

CLINIC OFFICE

A203

CLINIC OFFICE

A204

CLINIC OFFICE

A202

OBSERVATION

A201B CORRIDOR 2

C2A02

PSYCH. RES

A201

PSYCH. RES

A206

EXIST. STRG

A206A

CORRIDOR 1

C2A01 PSYCH. RES

A205

EXIST. ELEC

A207

CORRIDOR 3

C2A04

CORRIDOR 4

C2A03

TMS ROOM

A208

TMS ROOM

A210

EXIST. SOC WRK

A212

EXIST. SOC WRK

A213

CORRIDOR 5

C2A05

CARE COORDINATOR

A209

CARE COORDINATOR

A211

STAFF RESTROOM

A214

HAC

A215

EXIST. IT

A217

WOMEN'S

A221

MEN'S

A222

EXIST. ELEC. CLO.

A216

CORRIDOR 6

C2A07

CORRIDOR 8

C2A08

GROUP ROOM WAITING AREA

A226

WAITING 2

A224

WAITING 1

A223

WORK AREA

A223B

COPIER/PAPER STORAGE AREA

A223C

MAIL AREA

A223D

CHECKOUT/CHECK IN

A223A

GROUP ROOM

A219

GROUP ROOM

A218

GROUP ROOM

A220

VESTIBULE

A200A

1 1/4"HWR

4"HWS

02-03-VAV-06

02-05-VAV-02

02-05-VAV-04

02-05-VAV-03

02-05-VAV-01

02-03-VAV-03

02-03-VAV-01

02-03-VAV-02

VAV-E VAV-E VAV-E

VAV-E

02-03-VAV-01 02-05-VAV-01

02-03-VAV-03

02-05-VAV-03

02-05-VAV-02

02-05-VAV-04 02-05-VAV-05

02-03-VAV-06

02-03-VAV-12

02-03-VAV-09

02-03-VAV-10

VAV-E

VAV-E VAV-E

02-05-VAV-05

02-05-VAV-06

02-03-VAV-09

02-03-VAV-10

02-03-VAV-11

2 1/2"HWR

2 1/2"HWR

3"HWS

1 1/4"HWS

1 1/4"HWR

1 1/4"HWR

4"HWS

1 1/4"HWS

1 1/4"HWR

3"HWS

3"HWS

02-03-VAV-08

02-03-VAV-12

02-03-VAV-02

3/4"HWS

3/4"HWR

02-03-VAV-05

SSU-1

02-03-VAV-07

3"HWR

2 1/2"HWS

02-03-VAV-05

SSU-1

3"HWR

1"HWR

1"HWS

02-03-VAV-08

02-03-VAV-04

3/4"HWR

3/4"HWS

02-03-VAV-07

MOUNT UNIT AS HIGH AS

POSSIBLE. COORDINATE EXACT

LOCATION AND ELEVATION WITH

IT EQUIPMENT, CABLE TRAY, AND

FIRE PROTECTION PIPING.

02-03-VAV-06

1 1/4"HWR

1 1/4"HWS

"H

W S

1"HWS

1"HWR

1"HWS

1"HWR

1"HWR

1"HWS

TERMINATE CONDENSATE

DRAIN PIPING TO UTILITY

BOX (P-808).

02-03-VAV-11

CU-1

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

S c o tt .R

.P rz y b y s z im e g c o rp .c o m

.r v t

/1

/2

:5

:0

A

M

LEVEL 02 - MECHANICAL PIPING

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MP101

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

N

O R HT

1/8" = 1'-0"1

LEVEL 02 - MECHANICAL PIPING

GENERAL SHEET NOTES:

1. COORDINATE SYSTEM SHUT DOWN A MINIMUM

OF ONE WEEK IN ADVANCE WITH OWNER.

COORDINATE ALL WORK, INCLUDING SHUT

DOWNS, WITH THE ARCHITECTURAL PHASING

PLAN.

2. MAIN CORRIDOR FROM NORTH WING EXIT TO

PAST ELEVATOR LOBBY AND INTO WEST WING

INCLUDING CORRIDOR TO STAIRWELL MUST

REMAIN USABLE DURING NORMAL HOURS

(07:00 - 17:00). REFER TO ARCHITECTURAL

PHASING PLAN FOR MORE INFORMATION.

COORDINATE WORK WITH OWNER.

3. ALL PENETRATIONS BOTH NEW AND EXISTING

NEED TO BE PROPERLY FILLED AND SEALED.

4. REFER TO COVERSHEET FOR ADDITIONAL

INFORMATION.

5. PIPING TO INDIVIDUAL VAV BOXES IS 3/4" IN

SIZE UNLESS NOTED OTHERWISE.

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

ADDENDUM#1 07/16/2021

C3A2

A313

A312 A318A A318 A322 A323

A321A

A319

A317

C A

A353A354

D334A

D335D334

D333BD333A

A356

A358

D333

A318

A320

A314

C3A6

C3A4

A

A316 A321

B302

B315 B316 B317 B318

B303 B301 B300

B323 B322

B321

B320

B338

B347

B345

A A

B344

B342

B341

C3B5

B304A B302A

B340

B315BB315A

B316A

B316B

B317A B318A

B301AB303A

C3B4

B339

B

A300

D332

STR #1

#2#3 #1

#7

D N

U P

U P

NaN M L

2.8

3.7

4.6

5.5

6.3

K J H G F E

COORDINATE WITH OTHER

SYSTEMS IN THE PLENUM.

VAV-E

VAV-E

VAV-E VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

3/4"HWS

3/4"HWR

3/4"HWS

3/4"HWR

3/4"HWR

3/4"HWS3/4"HWS

3/4"HWR

4"HWS

3"HWR

3/4"HWR

3/4"HWS

3/4"HWS

3/4"HWR

1"HWS

1"HWR

3"HWR

3"HWS

1 1/4"HWR

1 1/4"HWS

3"HWS

3"HWR

3/4"HWS

3/4"HWR

1"HWS

1"HWR

3/4"HWS

3/4"HWR

1"HWR

1"HWS

"H

W R

"H

W S

3/4"HWR

3/4"HWS

1"HWR

1"HWS

REMOVE TEMPORARY CONNECTIONS

AND INSTALL NEW PIPING AS

REQUIRED FOR PLUMBING WORK.

COORDINATE WORK WITH PLUMBING

WORK AND OWNER.

NC

3" HCR UP

3"HCR

VAV-E

COORDINATE SYSTEM REMOVAL AND

REPLACEMENT IN THIS AREA WITH

PIPING FOR NEW DUCTWORK REQUIRED

FOR 2ND FLOOR RENOVATION.

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/1

/2

:4

:3

P

M

LEVEL 03 - MECHANICAL PIPING

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MP102

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

N

O R HT

1/8" = 1'-0"1

LEVEL 03 - MECHANICAL PIPING

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01

GENERAL SHEET NOTES:

1. CONTRACTORS MUST VISIT THE SITE PRIOR TO

BID TO DETERMINE THE AMOUNT OF WORK

REQUIRED. SITE WORK DURING DESIGN WAS

LIMITED DUE TO COVID-19 AND CONDITIONS

SHOWN ARE BASED UPON EXISTING

DRAWINGS.

2. COORDINATE SYSTEM SHUT DOWN A MINIMUM

OF ONE WEEK IN ADVANCE WITH OWNER.

COORDINATE ALL WORK, INCLUDING SHUT

DOWNS, WITH THE ARCHITECTURAL PHASING

PLAN.

3. ALL PENETRATIONS BOTH NEW AND EXISTING

NEED TO BE PROPERLY FILLED AND SEALED.

4. REFER TO COVERSHEET FOR ADDITIONAL

INFORMATION.

Revisions: Date:

T

T

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

Na N M L

2.8

3.7

4.6

5.5

6.3

K J H G F E

7.2

8.3

9.1

EMG/SCI

NURSE NAVIGATOR

PAIN & PMR VVC/TM

PAIN BH

PAIN PHARM

PAIN EXAM ROOM 2

PAIN EXAM ROOM 3

PAIN EXAM ROOM 4

WORKSTATION

TOILET

PAIN SWAMP

EXISTING ELEC.

492A

SOILED HOLDING

TOILET

PAIN EXAM

PM&R SWAMP

PM&R EXAM ROOM 4

PM&R EXAM ROOM 3

PM&R EXAM ROOM 1

PM&R EXAM ROOM 2

MSA CHECKIN/OUT

PROCEDURE ROOM

CLEAN SUPPLY

PROCEDURE ROOM

OIT

CORRIDOR

C498

Room

A200BBBRoom

A200CCC

NURSES

CORRIDOR

C498

CORRIDOR

C496

CORRIDOR

C499

C O

R R

ID

O

R

C

04-04-VAV-03

04-04-VAV-01

04-04-VAV-02

04-04-VAV-11

04-04-VAV-1204-04-VAV-13

04-04-VAV-14

04-04-VAV-15

04-04-VAV-06

3" HCR DN

3"HCR

04-04-VAV-05

04-04-VAV-1304-04-VAV-14

04-04-VAV-12

04-04-VAV-11

04-04-VAV-07

04-04-VAV-06

04-04-VAV-04

04-04-VAV-02

1 1/4"HWR

1 1/4"HWS

04-04-VAV-09

1 1/2"HWS

1 1/2"HWR

1 1/2"HWS

1 1/2"HWR

04-04-VAV-15

04-04-VAV-03

EF-61EF-61

CU-204-04-VAV-07

04-04-VAV-08

SSU-2

LIQ

SUC1 1/2"HWS

1 1/2"HWR

04-04-VAV-10

04-04-VAV-10

SSU-2

04-04-VAV-01

04-04-VAV-04

3"HCR

3"HCR

04-04-VAV-08

3/4"HWS

3/4"HWR

3/4"HWR

3/4"HWS

MOUNT UNIT AS HIGH AS

POSSIBLE. COORDINATE

EXACT LOCATION AND

ELEVATION WITH IT

EQUIPMENT, CABLE TRAY,

AND FIRE PROTECTION

PIPING.

3/4"HWR

3/4"HWS

1 1/4"HWR

1 1/4"HWS

1 1/4"HWR

1 1/4"HWS

ROUTE PIPING UP EXTERIOR WALL

TO ELEVATION ABOVE FOURTH

FLOOR CEILING PRIOR TO

PENETRATING EXTERIOR WALL.

RELOCATED

THERMOSTAT

NEW PIPING AND

INSULATION TO

MATCH THE EXISTING.

TERMINATE CONDENSATE

DRAIN PIPING TO UTILITY

BOX (P-808).

3/4"DPP

04-04-VAV-05

04-04-VAV-0904-04-VAV-09

VAV-E

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/1

/2

:4

:3

P

M

LEVEL 04 - MECHANICAL PIPING

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MP103

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

N

O R HT

1/8" = 1'-0"1

LEVEL 04 - MECHANICAL PIPING

GENERAL SHEET NOTES:

1. COORDINATE SYSTEM SHUT DOWN A MINIMUM

OF ONE WEEK IN ADVANCE WITH OWNER.

COORDINATE ALL WORK, INCLUDING SHUT

DOWNS, WITH THE ARCHITECTURAL PHASING

PLAN.

2. ALL PENETRATIONS BOTH NEW AND EXISTING

NEED TO BE PROPERLY FILLED AND SEALED.

3. REFER TO COVERSHEET FOR ADDITIONAL

INFORMATION.

4. PIPING TO INDIVIDUAL VAV BOXES IS 3/4" IN

SIZE UNLESS NOTED OTHERWISE.

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

INSULATION

STEEL PIPE SADDLE, AND

INSULATION SHIELD TACK

WELDED TO PIPE, FILL

SADDLE WITH

INSULATION.

LUG, COUPLING,

OR HUB

RISER CLAMP

INSULATION AND NEOPRENE

MOUNTS PER

SPECIFICATIONS.

INSULATION

SEAL OPENING,

FIRESTOP IF REQUIRED.

THREADED ROD.(TYP.)

OVERSIZE HANGER TO ALLOW

LONGITUDINAL PIPE EXPANSION

AND PIPE INSULATION TO PASS

THROUGH UNBROKEN. (TYP.)

UNI-STRUT OR EQUIVALENT

HIGH DENSITY INSULATION INSERT

AS REQUIRED IN SPECIFICATIONS.

THREADED ROD.(TYP.)

FLOOR

PIPE INSULATION(TYP.)

INSULATION SHIELD (TYP.)

INSULATION SHIELD

INSTALL CLAMP ON ALL

PIPES LESS THAN 4"Ø

THREADED ROD

INSULATION

CLEVIS HANGER

HIGH DENSITY INSULATION INSERT

AS REQUIRED IN SPECIFICATIONS.

NOTES:

1. REFER TO SPECIFICATION SECTIONS 23 05 11 AND 23 07 11 FOR ADDITIONAL

INFORMATION.

INSULATION SHIELD (TYP.)

INSTALL AN ESCUTCHEON AROUND PIPES

EXPOSED IN FINISHED ROOMS. FOR ALL

INSULATED PIPING INSTALL A PLASTIC JACKET

EXTENDING 6" BEYOND THE WALL TO PROTECT

INSULATION FROM DAMAGE.

MAKE A SMOOTH ROUND OPENING IN

WALL SLIGHTLY LARGER THAN OUTSIDE

DIAMETER OF THE PIPE AND INSULATION.

ADD A BEAD OF NON-HARDENING

CAULK IN THE ANNULAR SPACE.

NOTES:

1. THIS DETAIL APPLIES TO ALL PIPES. THE INTENTION IS TO

CONTINUE THE INSULATION AND VAPOR BARRIER THROUGH

ALL PENETRATIONS. PERMIT THERMAL EXPANSION WITHOUT

DAMAGING INSULATION, AND TO SEAL AIRTIGHT AROUND

INSULATED AND UNINSULATED PIPES FOR NOISE

TRANSMISSION CONTROL.

2. FLOOR OPENINGS ARE SIMILAR SEE SPECIFICATION SECTION

23 05 11 FOR DIFFERENCES BETWEEN FLOOR AND WALL

PENETRATIONS.

3. SEE SPECIFICATION SECTION 23 05 11 AND 23 07 11 FOR

ADDITIONAL INFORMATION.

FIRE SEALANT

FIRE SEALANT

NOTE 2

NOTE 3

PENETRATING ITEM

NOTE 4

NOTE 3

NOTE 4

PENETRATING ITEM

NOTE 2

NOTE 3

RATED WALL

(CONSTRUCTION

VARIES)

RATED FLOOR

(CONSTRUCTION

VARIES)

NOTES:

1. THIS GENERAL DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS

OR FLOORS. THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW

LONGITUDINAL MOVEMENT. REFER TO SPECIFICATION SECTION 07 84 00 FOR

SELECTION OF THROUGH PENETRATION FIRE STOPPING.

2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE

DRILL. EACH CONTRACTOR FURNISHES SLEEVE TO G.C., COORDINATES SLEEVE

LOCATIONS AND DEBURS SLEEVE. G.C. BUILDS SLEEVE INTO WALL OR FLOOR

ALLOWING NO GAP AROUND SLEEVE. IF SLEEVE IS NOT PROVIDED WHEN WALL

OR FLOOR IS BUILT, CONTRACTOR SHALL INSTALL SLEEVE. SLEEVE SIZE SHALL

ALLOW ANNULAR SPACE REQUIRED BY THE SELECTED FIRE STOP SYSTEM.

3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED

FOR FIRE STOP SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM

APPLICATION LISTING. SECURE TO WALL OR FLOOR TO ALLOW LONGITUDINAL

MOVEMENT OF PENETRATING ITEM WITHOUT MOVEMENT OF FIRE BARRIER.

4. WATERTIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL

ANGLE FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP.

PLACE A BEAD OF WATERPROOF SEALANT BETWEEN FLOOR AND BOTTOM OF

ANGLE FRAME. SECURE TO FLOOR WITH MASONRY ANCHORS IN CORNERS AND

ON 12" MAXIMUM CENTERS. MULTIPLE PENETRATING ITEMS MAY BE ENCLOSED

IN ONE FRAME.

9-24 MBH AIR COOLED

CONDENSING UNIT

5/16" ZINC-PLATED LAG

SCREWS. (TYP. 4)

MOUNTING FEET (TYP.)

INSULATION AND

ROOFING

ROOF STRUCTURE

PREFABRICATED EQUIPMENT

SUPPORT CURB (TYP). VERIFY

ROOFING MATERIAL AND PROVIDE

WITH OR WITHOUT CANT AS

REQUIRED.

TOP OF CURB

NOTES:

1. VERIFY DIAMETER OF ANCHOR BOLT REQUIRED TO FIT WITHIN

MOUNTING FEET ANCHOR HOLES.

CURB HEIGHT 24"

ABOVE ROOF

DECK

VIBRATION PAD (TYP.)

CONCRETE

WALL

HYDROSTATIC SEAL ASSEMBLY

(LINK-SEAL) SEE SPECS.

SECTION 23 05 11 AND 23 07 11

FOR ADDITIONAL INFORMATION.

PIPE THRU WALL

INSTALL ASSEMBLY SO BOLT

HEADS ARE ACCESSIBLE FROM

INSIDE FOR DISASSEMBLY.

WALL SLEEVE. SEE SPECS.

SECTION 23 05 11 AND 23 21 13

APPLY CAULK FLUSH WITH

OUTSIDE SURFACE FOR

FINISHED APPEARANCE IN

WALLS ABOVE GRADE.

NOTES:

1. CONTRACTOR MAY FABRICATE PIPE SLEEVE.

2. SEAL SELECTION BASED ON OUTSIDE DIAMETER OF PIPE THRU

WALL AND INSIDE DIAMETER OF SLEEVE.

3. SLEEVE NOT REQUIRED FOR CORE DRILLED PENETRATIONS.

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

S c o tt .R

.P rz y b y s z im e g c o rp .c o m

.r v t

/1

/2

:5

:0

A

M

MECHANICAL PIPING DETAILS

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MP300

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

NO SCALE1

PIPE SUPPORT DETAIL

NO SCALE2

PIPE THROUGH NON-FIRE RATED WALL

NO SCALE3

RATED FIRE BARRIER PENETRATION

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01

NO SCALE4

CONDENSING UNIT ROOF SUPPORT

NO SCALE5

EXTERIOR WALL PENETRATION

Revisions: Date:

ADDENDUM#1 07/16/2021

Sheets
1-MP101 - LEVEL 02 - MECHANICAL PIPING
1-MP300 - MECHANICAL PIPING DETAILS

File details come from the government source that posted it. Updated .