Amendment 2-07 20210716_PIPING_ADD001.pdf
PDF 3 MB Posted
- Solicitation number
- 36C25521R0089
About this file
This is a presolicitation notice for a construction project to renovate approximately 14,795 square feet of behavioral health clinic space on the second and fourth floors of a Veterans Affairs medical center in Columbia, Missouri. The project scope includes demolition and construction of new electrical, HVAC, plumbing, fire protection, and data/voice systems as well as interior finishes. Work will be completed through a design-bid-build project delivery method in multiple phases to minimize disruption to ongoing patient care in the active facility. The estimated price range for the project is $2,000,000 to $5,000,000. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and use a best value low price technically acceptable source selection process. The North American Industry Classification Code is 236220 and the small business size standard is $39.5 million. Interested offerors should monitor the beta SAM website for amendments and the solicitation package is expected to be available for download on or about June 1, 2021 with proposals due on or about July 9, 2021.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T T
T T T
T
T T
T T
T
T
T
T
T
T
T
T
T
T
T
NaN M L
2.8
3.7
4.6
5.5
6.3
K J H G F E
CLINIC OFFICE
A200
CLINIC OFFICE
A203
CLINIC OFFICE
A204
CLINIC OFFICE
A202
OBSERVATION
A201B CORRIDOR 2
C2A02
PSYCH. RES
A201
PSYCH. RES
A206
EXIST. STRG
A206A
CORRIDOR 1
C2A01 PSYCH. RES
A205
EXIST. ELEC
A207
CORRIDOR 3
C2A04
CORRIDOR 4
C2A03
TMS ROOM
A208
TMS ROOM
A210
EXIST. SOC WRK
A212
EXIST. SOC WRK
A213
CORRIDOR 5
C2A05
CARE COORDINATOR
A209
CARE COORDINATOR
A211
STAFF RESTROOM
A214
HAC
A215
EXIST. IT
A217
WOMEN'S
A221
MEN'S
A222
EXIST. ELEC. CLO.
A216
CORRIDOR 6
C2A07
CORRIDOR 8
C2A08
GROUP ROOM WAITING AREA
A226
WAITING 2
A224
WAITING 1
A223
WORK AREA
A223B
COPIER/PAPER STORAGE AREA
A223C
MAIL AREA
A223D
CHECKOUT/CHECK IN
A223A
GROUP ROOM
A219
GROUP ROOM
A218
GROUP ROOM
A220
VESTIBULE
A200A
1 1/4"HWR
4"HWS
02-03-VAV-06
02-05-VAV-02
02-05-VAV-04
02-05-VAV-03
02-05-VAV-01
02-03-VAV-03
02-03-VAV-01
02-03-VAV-02
VAV-E VAV-E VAV-E
VAV-E
02-03-VAV-01 02-05-VAV-01
02-03-VAV-03
02-05-VAV-03
02-05-VAV-02
02-05-VAV-04 02-05-VAV-05
02-03-VAV-06
02-03-VAV-12
02-03-VAV-09
02-03-VAV-10
VAV-E
VAV-E VAV-E
02-05-VAV-05
02-05-VAV-06
02-03-VAV-09
02-03-VAV-10
02-03-VAV-11
2 1/2"HWR
2 1/2"HWR
3"HWS
1 1/4"HWS
1 1/4"HWR
1 1/4"HWR
4"HWS
1 1/4"HWS
1 1/4"HWR
3"HWS
3"HWS
02-03-VAV-08
02-03-VAV-12
02-03-VAV-02
3/4"HWS
3/4"HWR
02-03-VAV-05
SSU-1
02-03-VAV-07
3"HWR
2 1/2"HWS
02-03-VAV-05
SSU-1
3"HWR
1"HWR
1"HWS
02-03-VAV-08
02-03-VAV-04
3/4"HWR
3/4"HWS
02-03-VAV-07
MOUNT UNIT AS HIGH AS
POSSIBLE. COORDINATE EXACT
LOCATION AND ELEVATION WITH
IT EQUIPMENT, CABLE TRAY, AND
FIRE PROTECTION PIPING.
02-03-VAV-06
1 1/4"HWR
1 1/4"HWS
"H
W S
1"HWS
1"HWR
1"HWS
1"HWR
1"HWR
1"HWS
TERMINATE CONDENSATE
DRAIN PIPING TO UTILITY
BOX (P-808).
02-03-VAV-11
CU-1
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
S c o tt .R
.P rz y b y s z im e g c o rp .c o m
.r v t
/1
/2
:5
:0
A
M
LEVEL 02 - MECHANICAL PIPING
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MP101
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
N
O R HT
1/8" = 1'-0"1
LEVEL 02 - MECHANICAL PIPING
GENERAL SHEET NOTES:
1. COORDINATE SYSTEM SHUT DOWN A MINIMUM
OF ONE WEEK IN ADVANCE WITH OWNER.
COORDINATE ALL WORK, INCLUDING SHUT
DOWNS, WITH THE ARCHITECTURAL PHASING
PLAN.
2. MAIN CORRIDOR FROM NORTH WING EXIT TO
PAST ELEVATOR LOBBY AND INTO WEST WING
INCLUDING CORRIDOR TO STAIRWELL MUST
REMAIN USABLE DURING NORMAL HOURS
(07:00 - 17:00). REFER TO ARCHITECTURAL
PHASING PLAN FOR MORE INFORMATION.
COORDINATE WORK WITH OWNER.
3. ALL PENETRATIONS BOTH NEW AND EXISTING
NEED TO BE PROPERLY FILLED AND SEALED.
4. REFER TO COVERSHEET FOR ADDITIONAL
INFORMATION.
5. PIPING TO INDIVIDUAL VAV BOXES IS 3/4" IN
SIZE UNLESS NOTED OTHERWISE.
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
ADDENDUM#1 07/16/2021
C3A2
A313
A312 A318A A318 A322 A323
A321A
A319
A317
C A
A353A354
D334A
D335D334
D333BD333A
A356
A358
D333
A318
A320
A314
C3A6
C3A4
A
A316 A321
B302
B315 B316 B317 B318
B303 B301 B300
B323 B322
B321
B320
B338
B347
B345
A A
B344
B342
B341
C3B5
B304A B302A
B340
B315BB315A
B316A
B316B
B317A B318A
B301AB303A
C3B4
B339
B
A300
D332
STR #1
#2#3 #1
#7
D N
U P
U P
NaN M L
2.8
3.7
4.6
5.5
6.3
K J H G F E
COORDINATE WITH OTHER
SYSTEMS IN THE PLENUM.
VAV-E
VAV-E
VAV-E VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
3/4"HWS
3/4"HWR
3/4"HWS
3/4"HWR
3/4"HWR
3/4"HWS3/4"HWS
3/4"HWR
4"HWS
3"HWR
3/4"HWR
3/4"HWS
3/4"HWS
3/4"HWR
1"HWS
1"HWR
3"HWR
3"HWS
1 1/4"HWR
1 1/4"HWS
3"HWS
3"HWR
3/4"HWS
3/4"HWR
1"HWS
1"HWR
3/4"HWS
3/4"HWR
1"HWR
1"HWS
"H
W R
"H
W S
3/4"HWR
3/4"HWS
1"HWR
1"HWS
REMOVE TEMPORARY CONNECTIONS
AND INSTALL NEW PIPING AS
REQUIRED FOR PLUMBING WORK.
COORDINATE WORK WITH PLUMBING
WORK AND OWNER.
NC
3" HCR UP
3"HCR
VAV-E
COORDINATE SYSTEM REMOVAL AND
REPLACEMENT IN THIS AREA WITH
PIPING FOR NEW DUCTWORK REQUIRED
FOR 2ND FLOOR RENOVATION.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/1
/2
:4
:3
P
M
LEVEL 03 - MECHANICAL PIPING
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MP102
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
N
O R HT
1/8" = 1'-0"1
LEVEL 03 - MECHANICAL PIPING
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01
GENERAL SHEET NOTES:
1. CONTRACTORS MUST VISIT THE SITE PRIOR TO
BID TO DETERMINE THE AMOUNT OF WORK
REQUIRED. SITE WORK DURING DESIGN WAS
LIMITED DUE TO COVID-19 AND CONDITIONS
SHOWN ARE BASED UPON EXISTING
DRAWINGS.
2. COORDINATE SYSTEM SHUT DOWN A MINIMUM
OF ONE WEEK IN ADVANCE WITH OWNER.
COORDINATE ALL WORK, INCLUDING SHUT
DOWNS, WITH THE ARCHITECTURAL PHASING
PLAN.
3. ALL PENETRATIONS BOTH NEW AND EXISTING
NEED TO BE PROPERLY FILLED AND SEALED.
4. REFER TO COVERSHEET FOR ADDITIONAL
INFORMATION.
Revisions: Date:
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
Na N M L
2.8
3.7
4.6
5.5
6.3
K J H G F E
7.2
8.3
9.1
EMG/SCI
NURSE NAVIGATOR
PAIN & PMR VVC/TM
PAIN BH
PAIN PHARM
PAIN EXAM ROOM 2
PAIN EXAM ROOM 3
PAIN EXAM ROOM 4
WORKSTATION
TOILET
PAIN SWAMP
EXISTING ELEC.
492A
SOILED HOLDING
TOILET
PAIN EXAM
PM&R SWAMP
PM&R EXAM ROOM 4
PM&R EXAM ROOM 3
PM&R EXAM ROOM 1
PM&R EXAM ROOM 2
MSA CHECKIN/OUT
PROCEDURE ROOM
CLEAN SUPPLY
PROCEDURE ROOM
OIT
CORRIDOR
C498
Room
A200BBBRoom
A200CCC
NURSES
CORRIDOR
C498
CORRIDOR
C496
CORRIDOR
C499
C O
R R
ID
O
R
C
04-04-VAV-03
04-04-VAV-01
04-04-VAV-02
04-04-VAV-11
04-04-VAV-1204-04-VAV-13
04-04-VAV-14
04-04-VAV-15
04-04-VAV-06
3" HCR DN
3"HCR
04-04-VAV-05
04-04-VAV-1304-04-VAV-14
04-04-VAV-12
04-04-VAV-11
04-04-VAV-07
04-04-VAV-06
04-04-VAV-04
04-04-VAV-02
1 1/4"HWR
1 1/4"HWS
04-04-VAV-09
1 1/2"HWS
1 1/2"HWR
1 1/2"HWS
1 1/2"HWR
04-04-VAV-15
04-04-VAV-03
EF-61EF-61
CU-204-04-VAV-07
04-04-VAV-08
SSU-2
LIQ
SUC1 1/2"HWS
1 1/2"HWR
04-04-VAV-10
04-04-VAV-10
SSU-2
04-04-VAV-01
04-04-VAV-04
3"HCR
3"HCR
04-04-VAV-08
3/4"HWS
3/4"HWR
3/4"HWR
3/4"HWS
MOUNT UNIT AS HIGH AS
POSSIBLE. COORDINATE
EXACT LOCATION AND
ELEVATION WITH IT
EQUIPMENT, CABLE TRAY,
AND FIRE PROTECTION
PIPING.
3/4"HWR
3/4"HWS
1 1/4"HWR
1 1/4"HWS
1 1/4"HWR
1 1/4"HWS
ROUTE PIPING UP EXTERIOR WALL
TO ELEVATION ABOVE FOURTH
FLOOR CEILING PRIOR TO
PENETRATING EXTERIOR WALL.
RELOCATED
THERMOSTAT
NEW PIPING AND
INSULATION TO
MATCH THE EXISTING.
TERMINATE CONDENSATE
DRAIN PIPING TO UTILITY
BOX (P-808).
3/4"DPP
04-04-VAV-05
04-04-VAV-0904-04-VAV-09
VAV-E
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/1
/2
:4
:3
P
M
LEVEL 04 - MECHANICAL PIPING
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MP103
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
N
O R HT
1/8" = 1'-0"1
LEVEL 04 - MECHANICAL PIPING
GENERAL SHEET NOTES:
1. COORDINATE SYSTEM SHUT DOWN A MINIMUM
OF ONE WEEK IN ADVANCE WITH OWNER.
COORDINATE ALL WORK, INCLUDING SHUT
DOWNS, WITH THE ARCHITECTURAL PHASING
PLAN.
2. ALL PENETRATIONS BOTH NEW AND EXISTING
NEED TO BE PROPERLY FILLED AND SEALED.
3. REFER TO COVERSHEET FOR ADDITIONAL
INFORMATION.
4. PIPING TO INDIVIDUAL VAV BOXES IS 3/4" IN
SIZE UNLESS NOTED OTHERWISE.
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
INSULATION
STEEL PIPE SADDLE, AND
INSULATION SHIELD TACK
WELDED TO PIPE, FILL
SADDLE WITH
INSULATION.
LUG, COUPLING,
OR HUB
RISER CLAMP
INSULATION AND NEOPRENE
MOUNTS PER
SPECIFICATIONS.
INSULATION
SEAL OPENING,
FIRESTOP IF REQUIRED.
THREADED ROD.(TYP.)
OVERSIZE HANGER TO ALLOW
LONGITUDINAL PIPE EXPANSION
AND PIPE INSULATION TO PASS
THROUGH UNBROKEN. (TYP.)
UNI-STRUT OR EQUIVALENT
HIGH DENSITY INSULATION INSERT
AS REQUIRED IN SPECIFICATIONS.
THREADED ROD.(TYP.)
FLOOR
PIPE INSULATION(TYP.)
INSULATION SHIELD (TYP.)
INSULATION SHIELD
INSTALL CLAMP ON ALL
PIPES LESS THAN 4"Ø
THREADED ROD
INSULATION
CLEVIS HANGER
HIGH DENSITY INSULATION INSERT
AS REQUIRED IN SPECIFICATIONS.
NOTES:
1. REFER TO SPECIFICATION SECTIONS 23 05 11 AND 23 07 11 FOR ADDITIONAL
INFORMATION.
INSULATION SHIELD (TYP.)
INSTALL AN ESCUTCHEON AROUND PIPES
EXPOSED IN FINISHED ROOMS. FOR ALL
INSULATED PIPING INSTALL A PLASTIC JACKET
EXTENDING 6" BEYOND THE WALL TO PROTECT
INSULATION FROM DAMAGE.
MAKE A SMOOTH ROUND OPENING IN
WALL SLIGHTLY LARGER THAN OUTSIDE
DIAMETER OF THE PIPE AND INSULATION.
ADD A BEAD OF NON-HARDENING
CAULK IN THE ANNULAR SPACE.
NOTES:
1. THIS DETAIL APPLIES TO ALL PIPES. THE INTENTION IS TO
CONTINUE THE INSULATION AND VAPOR BARRIER THROUGH
ALL PENETRATIONS. PERMIT THERMAL EXPANSION WITHOUT
DAMAGING INSULATION, AND TO SEAL AIRTIGHT AROUND
INSULATED AND UNINSULATED PIPES FOR NOISE
TRANSMISSION CONTROL.
2. FLOOR OPENINGS ARE SIMILAR SEE SPECIFICATION SECTION
23 05 11 FOR DIFFERENCES BETWEEN FLOOR AND WALL
PENETRATIONS.
3. SEE SPECIFICATION SECTION 23 05 11 AND 23 07 11 FOR
ADDITIONAL INFORMATION.
FIRE SEALANT
FIRE SEALANT
NOTE 2
NOTE 3
PENETRATING ITEM
NOTE 4
NOTE 3
NOTE 4
PENETRATING ITEM
NOTE 2
NOTE 3
RATED WALL
(CONSTRUCTION
VARIES)
RATED FLOOR
(CONSTRUCTION
VARIES)
NOTES:
1. THIS GENERAL DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS
OR FLOORS. THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW
LONGITUDINAL MOVEMENT. REFER TO SPECIFICATION SECTION 07 84 00 FOR
SELECTION OF THROUGH PENETRATION FIRE STOPPING.
2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE
DRILL. EACH CONTRACTOR FURNISHES SLEEVE TO G.C., COORDINATES SLEEVE
LOCATIONS AND DEBURS SLEEVE. G.C. BUILDS SLEEVE INTO WALL OR FLOOR
ALLOWING NO GAP AROUND SLEEVE. IF SLEEVE IS NOT PROVIDED WHEN WALL
OR FLOOR IS BUILT, CONTRACTOR SHALL INSTALL SLEEVE. SLEEVE SIZE SHALL
ALLOW ANNULAR SPACE REQUIRED BY THE SELECTED FIRE STOP SYSTEM.
3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED
FOR FIRE STOP SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM
APPLICATION LISTING. SECURE TO WALL OR FLOOR TO ALLOW LONGITUDINAL
MOVEMENT OF PENETRATING ITEM WITHOUT MOVEMENT OF FIRE BARRIER.
4. WATERTIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL
ANGLE FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP.
PLACE A BEAD OF WATERPROOF SEALANT BETWEEN FLOOR AND BOTTOM OF
ANGLE FRAME. SECURE TO FLOOR WITH MASONRY ANCHORS IN CORNERS AND
ON 12" MAXIMUM CENTERS. MULTIPLE PENETRATING ITEMS MAY BE ENCLOSED
IN ONE FRAME.
9-24 MBH AIR COOLED
CONDENSING UNIT
5/16" ZINC-PLATED LAG
SCREWS. (TYP. 4)
MOUNTING FEET (TYP.)
INSULATION AND
ROOFING
ROOF STRUCTURE
PREFABRICATED EQUIPMENT
SUPPORT CURB (TYP). VERIFY
ROOFING MATERIAL AND PROVIDE
WITH OR WITHOUT CANT AS
REQUIRED.
TOP OF CURB
NOTES:
1. VERIFY DIAMETER OF ANCHOR BOLT REQUIRED TO FIT WITHIN
MOUNTING FEET ANCHOR HOLES.
CURB HEIGHT 24"
ABOVE ROOF
DECK
VIBRATION PAD (TYP.)
CONCRETE
WALL
HYDROSTATIC SEAL ASSEMBLY
(LINK-SEAL) SEE SPECS.
SECTION 23 05 11 AND 23 07 11
FOR ADDITIONAL INFORMATION.
PIPE THRU WALL
INSTALL ASSEMBLY SO BOLT
HEADS ARE ACCESSIBLE FROM
INSIDE FOR DISASSEMBLY.
WALL SLEEVE. SEE SPECS.
SECTION 23 05 11 AND 23 21 13
APPLY CAULK FLUSH WITH
OUTSIDE SURFACE FOR
FINISHED APPEARANCE IN
WALLS ABOVE GRADE.
NOTES:
1. CONTRACTOR MAY FABRICATE PIPE SLEEVE.
2. SEAL SELECTION BASED ON OUTSIDE DIAMETER OF PIPE THRU
WALL AND INSIDE DIAMETER OF SLEEVE.
3. SLEEVE NOT REQUIRED FOR CORE DRILLED PENETRATIONS.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
S c o tt .R
.P rz y b y s z im e g c o rp .c o m
.r v t
/1
/2
:5
:0
A
M
MECHANICAL PIPING DETAILS
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MP300
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
NO SCALE1
PIPE SUPPORT DETAIL
NO SCALE2
PIPE THROUGH NON-FIRE RATED WALL
NO SCALE3
RATED FIRE BARRIER PENETRATION
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01
NO SCALE4
CONDENSING UNIT ROOF SUPPORT
NO SCALE5
EXTERIOR WALL PENETRATION
Revisions: Date:
ADDENDUM#1 07/16/2021
| Sheets |
| 1-MP101 - LEVEL 02 - MECHANICAL PIPING |
| 1-MP300 - MECHANICAL PIPING DETAILS |
File details come from the government source that posted it. Updated .