Drawings-589A4-19-103- VOLUME III (42 Pages).pdf

PDF 12 MB Posted

Attached to
Z2DA-- Renovate Behavioral Health Clinic P/N:589A4-19-103
Solicitation number
36C25521R0089
Issued by

About this file

This document outlines a federal contract opportunity for renovation work. The Department of Veterans Affairs is seeking to renovate approximately 9,706 square feet of outpatient behavioral health clinic space and 5,089 square feet of outpatient clinic space on the second and fourth floors, respectively, of the VA Truman Memorial Veterans building in Columbia, Missouri. The scope of work includes demolition, construction, electrical, HVAC, plumbing, fire protection, data/voice, and interior finishes work. The project will be conducted in multiple phases to minimize disruption to ongoing patient care. The estimated price range for the project is $2,000,000 to $5,000,000. Pursuant to applicable law, this opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. Proposals are due around July 9, 2021. An organized site visit will be scheduled in June.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C3A2

A313

A312 A318A A318 A322 A323

A321A

A319

A317

C A

A353A354

D334A

D335D334

D333BD333A

A356

A358

D333

A318

A320

A314

C3A6

C3A4

A

A316 A321

B302

B316 B317 B318

B303 B301 B300

B323 B322

B321

B320

B338

B347

B345

A A

B344

B342

B341

C3B5

B304A B302A

B340

B315BB315A

B316A

B316B

B317A B318A

B301AB303A

C3B4

B339

B

A300

D332

STR #1

#2#3 #1

#7

D N

U P

U P

NaN M L

2.8

3.7

4.6

5.5

6.3

K J H G F E

REMOVE PIPING AS INDICATED FOR PLUMBING WORK.

PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO

MAINTAIN SYSTEM OPERATION DURING CONSTRUCTION.

REFER TO GENERAL SHEET NOTES.

VAV-E

VAV-E

3/4"HWR

3/4"HWS

VAV-E VAV-E

3/4"HWS

3/4"HWR

VAV-E

3/4"HWS

3/4"HWR

VAV-E

VAV-E

4"HWS

3"HWR

VAV-E

3/4"HWR

3/4"HWS

3/4"HWS

3/4"HWR

VAV-E

VAV-E

1"HWS

1"HWR

3" HCR UP

3"HWR

3"HWS

1 1/4"HWR

1 1/4"HWS

3"HWS

3"HWR

3/4"HWS

3/4"HWR

1"HWS

1"HWR

3/4"HWS

3/4"HWR

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

1"HWR

1"HWS

"H

W R

"H

W S

3/4"HWR

3/4"HWS

1"HWR

1"HWS

REMOVE PIPING AS INDICATED FOR PLUMBING WORK.

PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO

MAINTAIN SYSTEM OPERATION DURING CONSTRUCTION.

REFER TO GENERAL SHEET NOTES.

DEMO AS INDICATED ON

PLAN AND PREPARE FOR

NEW CONNECTION.

VAV-E

VAV-EVAV-E

COORDINATE SYSTEM REMOVAL AND

REPLACEMENT IN THIS AREA WITH

PIPING FOR NEW DUCTWORK REQUIRED

FOR 2ND FLOOR RENOVATION.

EXISTING RADIANT CEILING

PANELS(TYP. ALL)

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

NOT FOR

PERMITTING OR

CONSTRUCTION

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/7

/2

:0

:5

P M

LEVEL 03 - MECHANICAL PIPING DEMOLITION

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MD102

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

N

O R HT

1/8" = 1'-0"1

LEVEL 03 - MECHANICAL PIPING DEMOLITION

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

GENERAL SHEET NOTES:

1. CONTRACTORS MUST VISIT THE SITE PRIOR TO

BID TO DETERMINE THE AMOUNT OF WORK

REQUIRED. SITE WORK DURING DESIGN WAS

LIMITED DUE TO COVID-19 AND CONDITIONS

SHOWN ARE BASED UPON EXISTING

DRAWINGS.

2. COORDINATE SYSTEM SHUT DOWN A MINIMUM

OF ONE WEEK IN ADVANCE WITH OWNER.

COORDINATE ALL WORK, INCLUDING SHUT

DOWNS, WITH THE ARCHITECTURAL PHASING

PLAN.

3. ALL PENETRATIONS BOTH NEW AND EXISTING

NEED TO BE PROPERLY FILLED AND SEALED.

4. REFER TO COVERSHEET FOR ADDITIONAL

INFORMATION.

5. TEMPORARY CONNECTIONS CAN BE MADE

WITH FLEXIBLE PIPING OR OTHER METHODS

TO ALLOW PLUMBING WORK TO BE

ACCOMPLISHED. METHOD FOR CUTTING INTO

PIPING SHOULD PROVIDE MINIMAL DOWNTIME

OF THE SYSTEM AND BE REVIEWED AND

DISCUSSED WITH THE OWNER. COORDINATE

TEMPORARY CONNECTION METHOD USED

WITH OWNER.

NOT FOR

PERMITTING OR

CONSTRUCTION

NOT FOR

PERMITTING OR

CONSTRUCTION

T

TT

T

T T

T T T

T

Na N M L

2.8

3.7

4.6

5.5

6.3

K J H G F

7.2

8.3

9.1

122222

3"HCR

1 1/2"HWS

1 1/2"HWR

1 1/2"HWS

1 1/2"HWR

3/4"HWS

3/4"HWR

3/4"HWS

3/4"HWR

REMOVE EXISTING

ABANDONED

PIPING BACK TO

WALL AND CAP.

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E VAV-E VAV-E

VAV-E

3"HCR DN

VAV-E

3"HCR

REMOVE AND STORE THE

EXISTING THERMOSTAT

AND WIRING, BRACKETS,

AND ACCESSORIES FOR

RELOCATION.

VAV-E

VAV-E

3/4"HWR

3/4"HWS

DEMO AS SHOWN

ON PLAN AND

PREARE FOR NEW

CONNECTION.

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

NOT FOR

PERMITTING OR

CONSTRUCTION

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/7

/2

:0

:5

P M

LEVEL 04 - MECHANICAL PIPING DEMOLITION

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MD103

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

N

O R HT

1/8" = 1'-0"1

LEVEL 04 - MECHANICAL PIPING DEMOLITION

GENERAL SHEET NOTES:

1. COORDINATE SYSTEM SHUT DOWN A MINIMUM

OF ONE WEEK IN ADVANCE WITH OWNER.

COORDINATE ALL WORK, INCLUDING SHUT

DOWNS, WITH THE ARCHITECTURAL PHASING

PLAN.

2. REMOVE ALL ABANDONED PIPING, HANGERS,

AND CONTROLS. VERIFY ITEMS ARE NO

LONGER IN USE PRIOR TO REMOVAL.

3. ALL PENETRATIONS BOTH NEW AND EXISTING

NEED TO BE PROPERLY FILLED AND SEALED.

4. REFER TO COVERSHEET FOR ADDITIONAL

INFORMATION.

5. REMOVE ANY ABANDONED LINES FOUND

AFTER CEILING HAS BEEN REMOVED.

6. POSSIBILITY OF ASBESTOS CONTAINING

MATERIALS(ACM) ON FITTINGS OR VAV

VALUES. COORDINATE WITH CONTRACTING

OFFICER REPRESENTATIVE(COR) IF ACM IS

FOUND.

7. PIPING TO INDIVIDUAL VAV BOXES IS 3/4" IN

SIZE UNLESS NOTED OTHERWISE.

8. REMOVE ALL THE EXISTING THERMOSTATS

AND ASSOCIATED WIRING LOCATED WITHIN

AREA OF WORK.

KEYNOTES:

1. REMOVE PIPING BACK TO MAIN AND CAP.

2. REMOVE PIPING BACK TO MAIN AND PREPARE

FOR NEW CONNECTION.

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

NOT FOR

PERMITTING OR

CONSTRUCTION

NOT FOR

T T

T T T

T

T T

T T

T

T

T

T

T

T

T

T

T

T

T

NaN M L

2.8

3.7

4.6

5.5

6.3

K J H G F E

CLINIC OFFICE

A200

CLINIC OFFICE

A203

CLINIC OFFICE

A204

CLINIC OFFICE

A202

OBSERVATION

A201B CORRIDOR 2

C2A02

PSYCH. RES

A201

PSYCH. RES

A206

EXIST. STRG

A206A

CORRIDOR 1

C2A01 PSYCH. RES

A205

EXIST. ELEC

A207

CORRIDOR 3

C2A04

CORRIDOR 4

C2A03

TMS ROOM

A208

TMS ROOM

A210

EXIST. SOC WRK

A212

EXIST. SOC WRK

A213

CORRIDOR 5

C2A05

CARE COORDINATOR

A209

CARE COORDINATOR

A211

STAFF RESTROOM

A214

HAC

A215

EXIST. IT

A217

WOMEN'S

A221

MEN'S

A222

EXIST. ELEC. CLO.

A216

CORRIDOR 6

C2A07

CORRIDOR 8

C2A08

GROUP ROOM WAITING AREA

A226

WAITING 2

A224

WAITING 1

A223

WORK AREA

A223B

COPIER/PAPER STORAGE AREA

A223C

MAIL AREA

A223D

CHECKOUT/CHECK IN

A223A

GROUP ROOM

A219

GROUP ROOM

A218

GROUP ROOM

A220

VESTIBULE

A200A

1 1/4"HWR

4"HWS

02-03-VAV-06

02-05-VAV-02

02-05-VAV-04

02-05-VAV-03

02-05-VAV-01

02-03-VAV-03

02-03-VAV-01

02-03-VAV-02

VAV-E VAV-E VAV-E

VAV-E

02-03-VAV-01 02-05-VAV-01

02-03-VAV-03

02-05-VAV-03

02-05-VAV-02

02-05-VAV-04 02-05-VAV-05

02-03-VAV-06

02-03-VAV-12

02-03-VAV-09

02-03-VAV-10

VAV-E

VAV-E VAV-E

02-05-VAV-05

02-05-VAV-06

02-03-VAV-09

02-03-VAV-10

02-03-VAV-11

2 1/2"HWR

2 1/2"HWR

3"HWS

1 1/4"HWS

1 1/4"HWR

1 1/4"HWR

4"HWS

1 1/4"HWS

1 1/4"HWR

3"HWS

3"HWS

02-03-VAV-08

02-03-VAV-12

02-03-VAV-02

3/4"HWS

3/4"HWR

02-03-VAV-05

LIQ UP

SUC UP

SSU-1

02-03-VAV-07

3"HWR

2 1/2"HWS

SUC

LIQ

02-03-VAV-05

SSU-1

3"HWR

1"HWR

1"HWS

02-03-VAV-08

02-03-VAV-04

3/4"HWR

3/4"HWS

02-03-VAV-07

MOUNT UNIT AS HIGH AS

POSSIBLE. COORDINATE EXACT

LOCATION AND ELEVATION WITH

IT EQUIPMENT, CABLE TRAY, AND

FIRE PROTECTION PIPING.

02-03-VAV-06

1 1/4"HWR

1 1/4"HWS

"H

W S

1"HWS

1"HWR

1"HWS

1"HWR

1"HWR

1"HWS

TERMINATE CONDENSATE

DRAIN PIPING TO UTILITY

BOX (P-808).

02-03-VAV-11

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

NOT FOR

PERMITTING OR

CONSTRUCTION

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/7

/2

:0

:5

P M

LEVEL 02 - MECHANICAL PIPING

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MP101

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

N

O R HT

1/8" = 1'-0"1

LEVEL 02 - MECHANICAL PIPING

GENERAL SHEET NOTES:

1. COORDINATE SYSTEM SHUT DOWN A MINIMUM

OF ONE WEEK IN ADVANCE WITH OWNER.

COORDINATE ALL WORK, INCLUDING SHUT

DOWNS, WITH THE ARCHITECTURAL PHASING

PLAN.

2. MAIN CORRIDOR FROM NORTH WING EXIT TO

PAST ELEVATOR LOBBY AND INTO WEST WING

INCLUDING CORRIDOR TO STAIRWELL MUST

REMAIN USABLE DURING NORMAL HOURS

(07:00 - 17:00). REFER TO ARCHITECTURAL

PHASING PLAN FOR MORE INFORMATION.

COORDINATE WORK WITH OWNER.

3. ALL PENETRATIONS BOTH NEW AND EXISTING

NEED TO BE PROPERLY FILLED AND SEALED.

4. REFER TO COVERSHEET FOR ADDITIONAL

INFORMATION.

5. PIPING TO INDIVIDUAL VAV BOXES IS 3/4" IN

SIZE UNLESS NOTED OTHERWISE.

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

NOT FOR

PERMITTING OR

CONSTRUCTION

NOT FOR

A312 A318A A318 A322 A323

A321A

A319

A317

C A

A353A354

D334A

D335D334

D333BD333A

A356

A358

D333

A318

A320

A314

C3A6

C3A4

A

A316 A321

B302

B315 B316 B317 B318

B303 B301 B300

B323 B322

B321

B320

B338

B347

B345

A A

B344

B342

B341

C3B5

B304A B302A

B340

B315BB315A

B316A

B316B

B317A B318A

B301AB303A

C3B4

B339

B

A300

D332

STR #1

#2#3 #1

#7

D N

U P

U P

NaN M L

2.8

3.7

4.6

5.5

6.3

K J H G F E

COORDINATE WITH OTHER

SYSTEMS IN THE PLENUM.

VAV-E

VAV-E

VAV-E VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

3/4"HWS

3/4"HWR

3/4"HWS

3/4"HWR

3/4"HWR

3/4"HWS3/4"HWS

3/4"HWR

4"HWS

3"HWR

3/4"HWR

3/4"HWS

3/4"HWS

3/4"HWR

1"HWS

1"HWR

3"HWR

3"HWS

1 1/4"HWR

1 1/4"HWS

3"HWS

3"HWR

3/4"HWS

3/4"HWR

1"HWS

1"HWR

3/4"HWS

3/4"HWR

1"HWR

1"HWS

"H

W R

"H

W S

3/4"HWR

3/4"HWS

1"HWR

1"HWS

LIQ DN

SUC DN

LIQ UP TO CU-1

SUC UP TO CU-1

REMOVE TEMPORARY CONNECTIONS

AND INSTALL NEW PIPING AS

REQUIRED FOR PLUMBING WORK.

COORDINATE WORK WITH PLUMBING

WORK AND OWNER.

NC

3" HCR UP

3"HCR

VAV-E

COORDINATE SYSTEM REMOVAL AND

REPLACEMENT IN THIS AREA WITH

PIPING FOR NEW DUCTWORK REQUIRED

FOR 2ND FLOOR RENOVATION.

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

NOT FOR

PERMITTING OR

CONSTRUCTION

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/7

/2

:0

:0

P M

LEVEL 03 - MECHANICAL PIPING

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MP102

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

N

O R HT

1/8" = 1'-0"1

LEVEL 03 - MECHANICAL PIPING

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

GENERAL SHEET NOTES:

1. CONTRACTORS MUST VISIT THE SITE PRIOR TO

BID TO DETERMINE THE AMOUNT OF WORK

REQUIRED. SITE WORK DURING DESIGN WAS

LIMITED DUE TO COVID-19 AND CONDITIONS

SHOWN ARE BASED UPON EXISTING

DRAWINGS.

2. COORDINATE SYSTEM SHUT DOWN A MINIMUM

OF ONE WEEK IN ADVANCE WITH OWNER.

COORDINATE ALL WORK, INCLUDING SHUT

DOWNS, WITH THE ARCHITECTURAL PHASING

PLAN.

3. ALL PENETRATIONS BOTH NEW AND EXISTING

NEED TO BE PROPERLY FILLED AND SEALED.

4. REFER TO COVERSHEET FOR ADDITIONAL

INFORMATION.

NOT FOR

PERMITTING OR

CONSTRUCTION

NOT FOR

T

T T

T

T

T

T

T

T

T

T

T

T

T

T

Na N M L

2.8

3.7

4.6

5.5

6.3

K J H G F E

7.2

8.3

9.1

EMG/SCI

NURSE NAVIGATOR

PAIN & PMR VVC/TM

PAIN BH

PAIN PHARM

PAIN EXAM ROOM 2

PAIN EXAM ROOM 3

PAIN EXAM ROOM 4

WORKSTATION

TOILET

PAIN SWAMP

EXISTING ELEC.

492A

SOILED HOLDING

TOILET

PAIN EXAM

PM&R SWAMP

PM&R EXAM ROOM 4

PM&R EXAM ROOM 3

PM&R EXAM ROOM 1

PM&R EXAM ROOM 2

MSA CHECKIN/OUT

PROCEDURE ROOM

CLEAN SUPPLY

PROCEDURE ROOM

OIT

CORRIDOR

C498

Room

A200BBBRoom

A200CCC

NURSES

CORRIDOR

C498

CORRIDOR

C496

CORRIDOR

C499

C O

R R

ID

O

R

C

04-04-VAV-03

04-04-VAV-01

04-04-VAV-02

04-04-VAV-11

04-04-VAV-1204-04-VAV-13

04-04-VAV-14

04-04-VAV-15

04-04-VAV-06

3" HCR DN

3"HCR

04-04-VAV-05

04-04-VAV-1304-04-VAV-14

04-04-VAV-12

04-04-VAV-11

04-04-VAV-07

04-04-VAV-06

04-04-VAV-04

04-04-VAV-02

1 1/4"HWR

1 1/4"HWS

04-04-VAV-09

1 1/2"HWS

1 1/2"HWR

1 1/2"HWS

1 1/2"HWR

04-04-VAV-15

04-04-VAV-03

EF-61EF-61

CU-1

LIQ DN

SUC DN

CU-204-04-VAV-07

04-04-VAV-08

SSU-2

LIQ

SUC1 1/2"HWS

1 1/2"HWR

04-04-VAV-10

04-04-VAV-10

SSU-2

04-04-VAV-01

04-04-VAV-04

3"HCR

3"HCR

04-04-VAV-08

3/4"HWS

3/4"HWR

3/4"HWR

3/4"HWS

MOUNT UNIT AS HIGH AS

POSSIBLE. COORDINATE

EXACT LOCATION AND

ELEVATION WITH IT

EQUIPMENT, CABLE TRAY,

AND FIRE PROTECTION

PIPING.

3/4"HWR

3/4"HWS

1 1/4"HWR

1 1/4"HWS

1 1/4"HWR

1 1/4"HWS

ROUTE PIPING UP EXTERIOR WALL

TO ELEVATION ABOVE FOURTH

FLOOR CEILING PRIOR TO

PENETRATING EXTERIOR WALL.

RELOCATED

THERMOSTAT

NEW PIPING AND

INSULATION TO

MATCH THE EXISTING.

TERMINATE CONDENSATE

DRAIN PIPING TO UTILITY

BOX (P-808).

3/4"DPP

04-04-VAV-05

04-04-VAV-0904-04-VAV-09

VAV-E

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

NOT FOR

PERMITTING OR

CONSTRUCTION

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/7

/2

:0

:0

P M

LEVEL 04 - MECHANICAL PIPING

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MP103

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

N

O R HT

1/8" = 1'-0"1

LEVEL 04 - MECHANICAL PIPING

GENERAL SHEET NOTES:

1. COORDINATE SYSTEM SHUT DOWN A MINIMUM

OF ONE WEEK IN ADVANCE WITH OWNER.

COORDINATE ALL WORK, INCLUDING SHUT

DOWNS, WITH THE ARCHITECTURAL PHASING

PLAN.

2. ALL PENETRATIONS BOTH NEW AND EXISTING

NEED TO BE PROPERLY FILLED AND SEALED.

3. REFER TO COVERSHEET FOR ADDITIONAL

INFORMATION.

4. PIPING TO INDIVIDUAL VAV BOXES IS 3/4" IN

SIZE UNLESS NOTED OTHERWISE.

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

NOT FOR

PERMITTING OR

CONSTRUCTION

NOT FOR

INSULATION

STEEL PIPE SADDLE, AND

INSULATION SHIELD TACK

WELDED TO PIPE, FILL

SADDLE WITH

INSULATION.

LUG, COUPLING,

OR HUB

RISER CLAMP

INSULATION AND NEOPRENE

MOUNTS PER

SPECIFICATIONS.

INSULATION

SEAL OPENING,

FIRESTOP IF REQUIRED.

THREADED ROD.(TYP.)

OVERSIZE HANGER TO ALLOW

LONGITUDINAL PIPE EXPANSION

AND PIPE INSULATION TO PASS

THROUGH UNBROKEN. (TYP.)

UNI-STRUT OR EQUIVALENT

HIGH DENSITY INSULATION INSERT

AS REQUIRED IN SPECIFICATIONS.

THREADED ROD.(TYP.)

FLOOR

PIPE INSULATION(TYP.)

INSULATION SHIELD (TYP.)

INSULATION SHIELD

INSTALL CLAMP ON ALL

PIPES LESS THAN 4"Ø

THREADED ROD

INSULATION

CLEVIS HANGER

HIGH DENSITY INSULATION INSERT

AS REQUIRED IN SPECIFICATIONS.

NOTES:

1. REFER TO SPECIFICATION SECTIONS 23 05 11 AND 23 07 11 FOR ADDITIONAL

INFORMATION.

INSULATION SHIELD (TYP.)

INSTALL AN ESCUTCHEON AROUND PIPES

EXPOSED IN FINISHED ROOMS. FOR ALL

INSULATED PIPING INSTALL A PLASTIC JACKET

EXTENDING 6" BEYOND THE WALL TO PROTECT

INSULATION FROM DAMAGE.

MAKE A SMOOTH ROUND OPENING IN

WALL SLIGHTLY LARGER THAN OUTSIDE

DIAMETER OF THE PIPE AND INSULATION.

ADD A BEAD OF NON-HARDENING

CAULK IN THE ANNULAR SPACE.

NOTES:

1. THIS DETAIL APPLIES TO ALL PIPES. THE INTENTION IS TO

CONTINUE THE INSULATION AND VAPOR BARRIER THROUGH

ALL PENETRATIONS. PERMIT THERMAL EXPANSION WITHOUT

DAMAGING INSULATION, AND TO SEAL AIRTIGHT AROUND

INSULATED AND UNINSULATED PIPES FOR NOISE

TRANSMISSION CONTROL.

2. FLOOR OPENINGS ARE SIMILAR SEE SPECIFICATION SECTION

23 05 11 FOR DIFFERENCES BETWEEN FLOOR AND WALL

PENETRATIONS.

3. SEE SPECIFICATION SECTION 23 05 11 AND 23 07 11 FOR

ADDITIONAL INFORMATION.

FIRE SEALANT

FIRE SEALANT

NOTE 2

NOTE 3

PENETRATING ITEM

NOTE 4

NOTE 3

NOTE 4

PENETRATING ITEM

NOTE 2

NOTE 3

RATED WALL

(CONSTRUCTION

VARIES)

RATED FLOOR

(CONSTRUCTION

VARIES)

NOTES:

1. THIS GENERAL DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS

OR FLOORS. THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW

LONGITUDINAL MOVEMENT. REFER TO SPECIFICATION SECTION 07 84 00 FOR

SELECTION OF THROUGH PENETRATION FIRE STOPPING.

2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE

DRILL. EACH CONTRACTOR FURNISHES SLEEVE TO G.C., COORDINATES SLEEVE

LOCATIONS AND DEBURS SLEEVE. G.C. BUILDS SLEEVE INTO WALL OR FLOOR

ALLOWING NO GAP AROUND SLEEVE. IF SLEEVE IS NOT PROVIDED WHEN WALL

OR FLOOR IS BUILT, CONTRACTOR SHALL INSTALL SLEEVE. SLEEVE SIZE SHALL

ALLOW ANNULAR SPACE REQUIRED BY THE SELECTED FIRE STOP SYSTEM.

3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED

FOR FIRE STOP SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM

APPLICATION LISTING. SECURE TO WALL OR FLOOR TO ALLOW LONGITUDINAL

MOVEMENT OF PENETRATING ITEM WITHOUT MOVEMENT OF FIRE BARRIER.

4. WATERTIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL

ANGLE FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP.

PLACE A BEAD OF WATERPROOF SEALANT BETWEEN FLOOR AND BOTTOM OF

ANGLE FRAME. SECURE TO FLOOR WITH MASONRY ANCHORS IN CORNERS AND

ON 12" MAXIMUM CENTERS. MULTIPLE PENETRATING ITEMS MAY BE ENCLOSED

IN ONE FRAME.

9-24 MBH AIR COOLED

CONDENSING UNIT

5/16" ZINC-PLATED LAG

SCREWS. (TYP. 4)

MOUNTING FEET (TYP.)

INSULATION AND

ROOFING

ROOF STRUCTURE

PREFABRICATED EQUIPMENT

SUPPORT CURB (TYP). VERIFY

ROOFING MATERIAL AND PROVIDE

WITH OR WITHOUT CANT AS

REQUIRED.

TOP OF CURB

NOTES:

1. VERIFY DIAMETER OF ANCHOR BOLT REQUIRED TO FIT WITHIN

MOUNTING FEET ANCHOR HOLES.

CURB HEIGHT 24"

ABOVE ROOF

DECK

VIBRATION PAD (TYP.)

PIPING

BATT INSULATION. PROVIDE

THICKNESS TO MATCH ROOF

INSULATION. MINIMUM OF 6" THICK

18 GAUGE GALVANIZED

SHEETMETAL

BOX WITH SOLDERED JOINTS.

FASTEN TO CURB WITH

CADMIUM PLATED SCREWS 12" O.C..

PREFABRICATED CURB

WITH WOOD NAILER.

CARRY ROOFING UP UNDER

COUNTER FLASHING.

RAISED CANT TO MATCH THICKNESS

OF ROOF DECK INSULATION.

(BUILT-UP ROOF ONLY)

COVER BOTTOM OF CURB

OPENING WITH MINIMUM

18 GAUGE SHEETMETAL.

GALVANIZED SHEETMETAL CAP.

CROSS BREAK TO PROVIDE

DRAINAGE/ FASTEN CAP TO

BOX WITH SHEETMETAL

SCREWS. SEAL JOINT WITH

SILICONE CAULKING.

PIPE SLEEVE SOLDERED

TO SHEET METAL BOX.

SEAL PIPING WATERTIGHT

BY CAULKING BETWEEN

PIPE & SHEETMETAL

SLEEVE WITH SILICONE

CAULK.

CURB HEIGHT 24"

ABOVE ROOF DECK

FRAMING, ROOF, &

ROOFING BY G.C.

10"MIN

MIN.

6"

CONCRETE

WALL

HYDROSTATIC SEAL ASSEMBLY

(LINK-SEAL) SEE SPECS.

SECTION 23 05 11 AND 23 07 11

FOR ADDITIONAL INFORMATION.

PIPE THRU WALL

INSTALL ASSEMBLY SO BOLT

HEADS ARE ACCESSIBLE FROM

INSIDE FOR DISASSEMBLY.

WALL SLEEVE. SEE SPECS.

SECTION 23 05 11 AND 23 21 13

APPLY CAULK FLUSH WITH

OUTSIDE SURFACE FOR

FINISHED APPEARANCE IN

WALLS ABOVE GRADE.

NOTES:

1. CONTRACTOR MAY FABRICATE PIPE SLEEVE.

2. SEAL SELECTION BASED ON OUTSIDE DIAMETER OF PIPE THRU

WALL AND INSIDE DIAMETER OF SLEEVE.

3. SLEEVE NOT REQUIRED FOR CORE DRILLED PENETRATIONS.

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

NOT FOR

PERMITTING OR

CONSTRUCTION

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/7

/2

:0

:0

P M

MECHANICAL PIPING DETAILS

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MP300

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

NO SCALE1

PIPE SUPPORT DETAIL

NO SCALE2

PIPE THROUGH NON-FIRE RATED WALL

NO SCALE3

RATED FIRE BARRIER PENETRATION

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

NO SCALE4

CONDENSING UNIT ROOF SUPPORT

NO SCALE5

REFRIGERANT PIPING WEATHERPROOFING (BUILT-UP ROOF)

NO SCALE6

EXTERIOR WALL PENETRATION

NOT FOR

PERMITTING OR

CONSTRUCTION

NOT FOR

HWR

HWS

HEATING WATER FLOW DIAGRAM SYMBOL LIST

SYMBOL: DESCRIPTION:

HEATING WATER RETURNHWR

HEATING WATER SUPPLYHWS

COLD WATER - POTABLECW

PITCH PIPE IN DIRECTION

DIRECTION OF FLOW IN PIPE

FLEXIBLE CONNECTION

PRESSURE/TEMPERATURE TEST PLUG

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

METERM

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

SUCTION DIFFUSER WITH SUPPORT FOOT

AUTOMATIC AIR VENT

MANUAL AIR VENT W/ BALL VALVE

DRAIN WITH HOSE CONNECTION, CAP

& BALL VALVE

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (FILLED TYPE)

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

THROTTLING VALVE

BALANCING VALVE

CONTROL VALVE (TWO-WAY)

"WYE" - STRAINER

"WYE" - STRAINER W/SHUTOFF VALVE

AND HOSE CONNECTION WITH CAP

CHECK VALVE

SAFETY/RELIEF VALVE

PRESSURE REDUCING VALVE (LIQUID/GAS)

UNION/FLANGE

CONTROL VALVE (THREE-WAY)

H W

R

H W

S

3/4" SHUTOFF VALVE WITH

3/4" MALE HOSE THREAD

ADAPTER AND CAP AT

LOWEST POINT (TYP.)

MANUAL AIR VENT AT

HIGH POINT OF PIPING

NEXT TO COIL (TYP.)

(NOT ALL MAY APPLY)

VAV REHEAT

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

NOT FOR

PERMITTING OR

CONSTRUCTION

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/7

/2

:0

:1

P M

MECHANICAL PIPING DIAGRAMS

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MP400

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

NO SCALE1

HEATING WATER FLOW DIAGRAM

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

NOT FOR

PERMITTING OR

CONSTRUCTION

NOT FOR

DIRECTION OF AIR FLOW

FLEXIBLE DUCT

MANUAL VOLUME DAMPER

RISE IN DIRECTION OF AIR FLOWR

DUCT CAP

DROP IN DIRECTION OF AIR FLOWD

DUCT DOWN

DUCT UP

SUPPLY/OUTSIDE AIR DUCT SECTION

RETURN AIR DUCT SECTION

EXHAUST/RELIEF AIR DUCT SECTION

4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION

CD-1

6/115

AIR TERMINAL PROPERTIES SYMBOL

NECK SIZE/CFM

TERMINAL AIR BOX (REFER TO SCHEDULE)###

### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)

HUMIDIFIERH

OPPOSED BLADE DAMPER (REFER TO SCHEDULE)

PARALLEL BLADE DAMPER (REFER TO SCHEDULE)

DIFFERENTIAL PRESSURE SENSOR

CARBON MONOXIDE SENSORC

CARBON DIOXIDE SENSORC2

HUMIDISTAT SENSORH

HUMIDISTAT/SENSOR (DUCT MOUNTED)H

OCCUPANCY SENSORO

PRESSURE SENSOR/MONITORP

PRESSURE SENSOR (DUCT MOUNTED)P

THERMOSTAT/SENSORT

TEMPERATURE SENSOR (DUCT MOUNTED)T

THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET

VENTILATION SYMBOL LIST

SYMBOL: DESCRIPTION:

AIRFLOW MEASUREMENT SYMBOL

XX - AHU SYMBOL

Y - SEQUENTIAL NUMBER

XX-Y

NOT ALL SYMBOLS MAY APPLY.

SERIES FAN POWERED TERMINAL AIR BOX w/REHEAT COIL

(REFER TO SCHEDULE)

PARALLEL FAN POWERED TERMINAL AIR BOX w/REHEAT

COIL (REFER TO SCHEDULE)

AREA NOT IN SCOPE

VENTILATION ABBREVIATION KEY

ABBR: DESCRIPTION:

DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")

DIFFERENTIAL PRESSURE SWITCHDPS

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

NC NEW CONNECTION

CFSD CONTROL/FIRE/SMOKE DAMPER

EA EXHAUST/RELIEF AIR

FD FIRE DAMPER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FSD FIRE/SMOKE DAMPER

MA MIXED AIR

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

SD SMOKE DAMPER

TRANSFER DUCTTD

UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)

CFSD-E EXISTING CONTROL FIRE SMOKE DAMPER

FD-E EXISTING FIRE DAMPER

FSD-E EXISTING FIRE SMOKE DAMPER

SD-E EXISTING SMOKE DAMPER

TERMINAL AIR BOXTAB

TYPICALTYP

CEILING DIFFUSER - EXISTINGCD-E

N.C. NORMALLY CLOSED

NOT IN CONTRACTNIC

NORMALLY OPENN.O.

NOT ALL MAY APPLY

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

T101

SIM

DETAIL REFERRED TO BY ELEVATION

SHEET DETAIL IS LOCATED ON

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

SIM

INDICATES SIMILAR DETAIL

REFERENCED IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

NEW WORK BY THIS CONTRACTOR

(DARK SOLID LINE)

NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR

(DARK LONG DASHED LINE)

NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN

(LIGHT SOLID LINE)

EXISTING TO BE REMOVED BY THIS CONTRACTOR

(DARK SHORT DASHED LINE)

LINE TYPE KEY:

TEMPERATURE CONTROLS CONTRACTORT.C.C.

SECURITY CONTRACTORS.C.

AUDIO/VISUAL CONTRACTORA.V.C.

FIRE PROTECTION CONTRACTORF.P.C.

AUTOMATIC TEMPERATURE CONTROL CONTRACTORA.T.C.

HEATING CONTRACTORH.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

VENTILATION CONTRACTORV.C.

ELECTRICAL CONTRACTORE.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONSTRUCTION MANAGERC.M.

NOT ALL MAY APPLY

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, AND PIPING.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

G.C. FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE G.C. OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

16. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, VENTILATION, AND PIPING.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK

AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF

WORK.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE G.C. OF AFFECTED AREAS PRIOR TO BIDDING.

6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER AT LEAST ONE WEEK IN ADVANCED BEFORE SHUTTING

DOWN ANY SYSTEM FOR ANY REASON. DEPENDING ON TIME OF YEAR, WORK MAY BE

AFTER HOURS OR WEEKEND. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO

REMAIN UNTIL NEW SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

12. CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL DRAWINGS, NOT JUST THEIR TRADES.

1. THE SIZE OF EACH BRANCH DUCT TO A TERMINAL AIR BOX (TAB) SHALL MATCH THE TAB’S

INLET SIZE UNLESS THE BRANCH IS GREATER THAN 6 FEET IN LENGTH, IN WHICH CASE THE

BRANCH SHOULD BE INCREASED ONE DUCT SIZE, OR AS NOTED OTHERWISE.

2. ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES AND WHEN IN CLOSE PROXIMITY TO

EACH OTHER.

3. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.

4. EXISTING AIR INLET AND OUTLET CFM SHOWN ON DRAWINGS ARE FROM EXISTING

DRAWINGS, AND ARE FOR REFERENCE ONLY. CONTRACTOR SHALL USE PRE-BALANCE

VALUES, AND NOT EXISTING CFM SHOWN ON DRAWINGS.

5. CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSURE

CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND ALL

TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEALED

AS SPECIFIED FOR NEW DUCTWORK.

VENTILATION GENERAL NOTES:

1. BEFORE ANY DEMOLITION WORK IS BEGUN A COMPLETE AIR BALANCE TEST SHALL BE

PERFORMED BY THE TESTING, ADJUSTING AND BALANCING (TAB) CONTRACTOR ON

EXISTING AIR HANDLERS AND EXHAUST FANS SERVING THE AREAS AFFECTED BY

CONSTRUCTION. EQUIPMENT TO BE DEMOLISHED DOES NOT REQUIRE TESTING. PROVIDE

AIR BALANCE TESTING ONLY ON EQUIPMENT THAT WILL CONTINUE TO BE USED TO SERVE

RENOVATED AREAS AFTER THE CONSTRUCTION PHASE IS COMPLETED.

2. PROVIDE DUCT TRAVERSE READINGS AT LOCATIONS DESIGNATED ON THE DRAWINGS BY

THE "AIRFLOW MEASUREMENT SYMBOL". THOSE MEASUREMENTS SHALL BE INCLUDED IN

THE PRE DEMOLITION REPORT AND SHALL BE DESIGNATED WITH THE IDENTIFIER AS

MARKED ON THE DRAWINGS. READINGS SHALL BE DESIGNATED WITH THE ROOM NAME AND

NUMBER AS MARKED ON THE DRAWINGS. IF FLOOR PLANS DO NOT HAVE UNIQUE ROOM

NAMES AND NUMBERS, TAB CONTRACTOR SHALL INCLUDE FLOOR PLAN WITH UNIQUE

NUMBER DESIGNATIONS ASSIGNED TO READINGS THAT MATCH THOSE USED IN THE FINAL

PRE-DEMOLITION REPORT. DRAWINGS THAT ARE HAND-MARKED WITH RED INK ARE

ACCEPTABLE, PROVIDED THEY ARE LEGIBLE.

3. IN THE EVENT A DUCT TRAVERSE LOCATION AS MARKED ON THIS PLAN IS INACCESSIBLE

FOR MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN

ALTERNATE LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES AND/OR READINGS AS

REQUIRED TO DETERMINE THE AIRFLOW READING WHERE THE DUCT TRAVERSE SYMBOL IS

SHOWN. IN THE EVENT TRAVERSES ARE TAKEN AT ALTERNATE LOCATION(S), TAB

CONTRACTOR SHALL INCLUDE A DRAWING THAT SHOWS THE LOCATIONS WHERE THE

ACTUAL MEASUREMENTS WERE TAKEN.

4. TAKE A DUCT STATIC PRESSURE READING AT EACH LOCATION WHERE A DUCT TRAVERSE

READING IS TAKEN AND INCLUDE IN THE FINAL PRE-DEMOLITION TAB REPORT.

5. TAB CONTRACTOR SHALL COMPILE AND SUBMIT FOUR COPIES OF THE FINAL PRE-

DEMOLITION REPORT WITHIN 10 WORKING DAYS AFTER THE FIELD MEASUREMENTS ARE

COMPLETED. FINAL TAB REPORT SHALL BE SUBMITTED FOR REVIEW TO THE

ARCHITECT/ENGINEER. TESTING SHALL INCLUDE ALL ITEMS REQUIRED IN THE

SPECIFICATIONS.

6. TAB CONTRACTOR SHALL PROVIDE DUCT TRAVERSE READINGS AT LOCATIONS

DESIGNATED ON THE DRAWINGS BY THE "AIRFLOW MEASUREMENT SYMBOL". THOSE

MEASUREMENTS SHALL BE INCLUDED IN THE POST-CONSTRUCTION REPORT AND SHALL BE

DESIGNATED WITH THE IDENTIFIER AS MARKED ON THE CONSTRUCTION DRAWINGS. GRILLE

AND DIFFUSER READINGS SHALL BE DESIGNATED WITH THE ROOM NAME AND NUMBER AS

MARKED ON THE DRAWINGS. IF THE DRAWINGS DO NOT HAVE UNIQUE ROOM NAMES AND

NUMBERS, TAB CONTRACTOR SHALL INCLUDE FLOOR PLANS WITH UNIQUE NUMBER

DESIGNATIONS ASSIGNED TO TRAVERSES, GRILLES, AND DIFFUSERS THAT MATCH THOSE

USED IN THE FINAL PRE-DEMOLITION REPORT. SIMILAR ROOM NAMES, NUMBERS, OR

DESIGNATIONS SHALL BE USED TO SIMPLIFY THE CROSS- REFERENCING OF READINGS

TAKEN BETWEEN PRE-DEMOLITION AND POST-CONSTRUCTION REPORTS.

7. BALANCING CONTRACTOR SHALL PRE-BALANCE ALL EXISTING SYSTEMS TO REMAIN PER

SPECIFICATION SECTION 23 05 93. BALANCE READINGS WILL BE REQUIRED AT AIR OUTLETS

AND DUCT TRAVERSES TO VERIFY EXISTING AIRFLOW TO UNAFFECTED SPACES.

TAB PRE-DEMOLITION NOTES:

1. AFTER CONSTRUCTION ACTIVITIES ARE COMPLETE, TESTING, ADJUSTING (TAB) AND

BALANCING CONTRACTOR SHALL REBALANCE AIR HANDLING UNITS AND EXHAUST FANS AS

REQUIRED TO ACHIEVE THE NEW AIRFLOW VALUES SHOWN ON THE CONSTRUCTION

DRAWINGS.

2. AREAS SERVED BY THIS EQUIPMENT WHICH WERE NOT RENOVATED SHALL BE RE-

BALANCED TO THE AIRFLOW RATES MEASURED BEFORE THE RENOVATION OCCURRED

(REFER TO THE FINAL PRE- DEMOLITION REPORT).

3. IF DUCT TRAVERSE LOCATION AS MARKED ON THE DRAWINGS IS INACCESSIBLE FOR

MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN ALTERNATE

LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES AND/OR GRILLE READINGS AS

REQUIRED TO DETERMINE THE FLOW RATE. IN THE EVENT TRAVERSES ARE TAKEN AT AN

ALTERNATE LOCATION(S), TAB CONTRACTOR SHALL INCLUDE A DRAWING THAT SHOWS THE

LOCATIONS WHERE THE ACTUAL MEASUREMENTS WERE TAKEN.

4. A DUCT STATIC PRESSURE READING SHALL BE TAKEN AT EACH LOCATION WHERE A DUCT

TRAVERSE READING IS TAKEN AND SHALL BE INCLUDED IN THE FINAL POST-CONSTRUCTION

TAB REPORT.

5. TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST-

CONSTRUCTION TAB REPORT AS REQUIRED BY SECTION 23 05 93.

6. THE FINAL POST CONSTRUCTION REPORT SHALL INCLUDE ALL ITEMS REQUIRED IN THE

SPECIFICATIONS.

TAB POST-CONSTRUCTION NOTES:

THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR

SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL

MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.

ALL FLOOR, ASSEMBLIES SHALL BE DESIGNATED AS 2 HOUR FIRE, BARRIERS, UNLESS NOTED

OTHERWISE ON THE PLANS. RATINGS WERE ACQUIRED FROM THE ARCHITECTURAL PLANS

DATED 03/05/2021.

FIRE / SMOKE BARRIER DESIGNATIONS

2 HOUR OCCUPANCY/AREA SEPARATION FIRE

BARRIER

2 HOUR BUILDING SEPARATION FIRE BARRIER

1 HOUR VERT. OPG. (SHAFT) FIRE BARRIER

2 HOUR HORIZONTAL EXIT (& REFUGE AREA)

FIRE BARRIER

1 HOUR HAZ./INCIDENTAL USE FIRE BARRIER

NR-RESIST SMK HAZ./INCIDENTAL USE SMOKE

PARTITIONS (SPRINKLERED)

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

NOT FOR

PERMITTING OR

CONSTRUCTION

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/7

/2

:0

:1

P M

VENTILATION COVERSHEET

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MH000

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

NOT FOR

T T

T T

T T

T

T

T

T

NaN M L

2.8

3.7

4.6

5.5

6.3

K J H G F E

40x14

28x14

20x12 RA

12x14

26x15 x2

30x8 x1

24x13

26x13

30x8

18x818x717x7

14x4 x4

18ø 18ø

8x4

8x4

VAV-E

VAV-E

VAV-E

18ø ø x8

20x818x8 x4 x4 x4

19x7ø x ø

40x14 17x8ø BELOW

13x6

14x10ø ø ø

16x7ø13x6ø x x 6 14x6

12x10

12x10 x ø x5

14x8

26x13

2 2

40x14

16ø

40x14

17ø 16ø

18x8

36x10

26x10

18x8

21x5

21x5

VAV-E

VAV-E

VAV-E

VAV-E VAV-E

VAV-E VAV-E

VAV-E

x1

20x10

22x10

28x14 ø

17x8ø

12x5 x

30x6

VAV-EVAV-EVAV-E

x1 x1 ø x1

40x10

40x22 x1 ø

27x10 x1 ø

25x8

42x14

17x72 x1

37x10

21x8

30x8 x1

18ø ø

29x7 x x

29x7

27x10

FSD-E

FSD-E

FSD-E

FSD-E

27ø

FSD-E

40x20

14x10ø

13x6

12x8

16x7ø x ø

30x6

20x10

16x6

10ø

13x5

12x5

8x8

18x7 18x6

16ø

6x6

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E

12x8

30x14

16x516x5

10x4

9x4

12x10

8x8

10x10

20x5 x

10x8

SD-E

SD-E

SD-E

RG-E

RG-E

RG-E

RG-E

RG-E

SD-E

SD-E

RG-E

RG-E

LD-E

LD-E

LD-E

LD-E

LD-E

LD-E

LD-E LD-E

LD-E

LD-E

LD-E

LD-E

LD-E

LD-E

RG-E

RG-E

RG-E

RG-E

LD-E

LD-E

LD-E

EG-1LD-E

LD-E

RG-E

RG-E

RG-E

RG-E

RG-E

RG-E

RG-E

RG-E

RG-E

RG-E

RG-E

RG-E

SD-E

SD-E

SD-E

SD-E

SD-E

RG-E

SD-E

LD-E

SD-E

LD-E

RG-E

RG-E

SD-E

RG-E

LD-E

SD-E

SD-E

LD-E LD-E LD-E LD-E

LD-E

LD-E

LD-E LD-E

LD-E LD-E

RG-E

EG-E EG-E

SD-E

SD-E

SD-E

SD-E

SD-E SD-E

SD-E

RG-E

SD-E

SD-E

SD-E

RG-E

RG-E

RG-E

RG-E

RG-E

LD-E

RG-E

RG-E

RG-E

RG-E

LD-E

LD-E

RG-E

LD-E

LD-E

SG-E

LD-E

x

18x6

18ø

24x10

8x4 UP

8x4 UP

9x6. TYP ALL

13x4 UP TYP. ALL

28x14 UP

8x4

8x4 UP

8x4 UP

RG-E

18x8

RG-E

x

SD-E SD-E

SD-E

SD-E

10x4 10x4

RG-E

SD-E

SD-E

RG-E

12x10

34x9

RG-E

10x4

VAV-E

10x4

EG-E

8x6/0

12x8

VAV-E

SD-E

SD-E

14x6ø

8ø

VAV-E

14x8

19Ø UP TO

AC-S4

19Ø UP TO

AC-S5

40x22 UP

TO ER-5

27Ø UP

TO AC-S3

42x14 TO ER-3

40x20 UP

EXISTING 8X4 DUCT STUB

PROVIDING 170CFM EACH.

(TYPICAL 12)

EXISTING 8x4

DUCT STUB DN

28x11ø 32x12ø BELOW

9ø

13x6

2 2

2 32X10 RA UP

32x10

EXISTING

CAPPED

DUCT

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

NOT FOR

PERMITTING OR

CONSTRUCTION

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/7

/2

:0

:0

P M

LEVEL 02 - VENTILATION DEMOLITION

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MD201

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

N

O R HT

1/8" = 1'-0"1

LEVEL 02 - VENTILATION DEMOLITION

GENERAL SHEET NOTES:

1. COORDINATE SYSTEM SHUT DOWN A MINIMUM

OF ONE WEEK IN ADVANCE WITH OWNER.

COORDINATE ALL WORK, INCLUDING SHUT

DOWNS, WITH THE ARCHITECTURAL PHASING

PLAN.

2. MAIN CORRIDOR FROM NORTH WING EXIT TO

PAST ELEVATOR LOBBY AND INTO WEST WING

INCLUDING CORRIDOR TO STAIRWELL MUST

REMAIN USABLE DURING NORMAL HOURS

(07:00 - 17:00). REFER TO ARCHITECTURAL

PHASING PLAN FOR MORE INFORMATION.

COORDINATE WORK WITH OWNER.

3. REFER TO COVER SHEET FOR ADDITIONAL

INFORMATION.

4. REFER TO DETAIL, SCHEDULE AND

CONTROLS DIAGRAMS FOR ADDITIONAL

INFORMATION.

5. REMOVE ALL ABANDONED DUCTWORK,

HANGERS, AND CONTROLS. VERIFY ITEMS ARE

NO LONGER IN USE PRIOR TO REMOVAL.

6. ALL PENETRATIONS BOTH NEW AND EXISTING

NEED TO BE PROPERLY FILLED AND SEALED.

7. REMOVE ALL VAV BOXES AND ASSOCIATED

DOWNSTREAM DUCTWORK, DIFFUSERS,

CONTROLS, HANGERS, AND SUPPORTS WITHIN

THE AREA OF SCOPE. REMOVE UPSTREAM

DUCTORK TO VAV SYSTEM UP TO MAINS AS

SHOWN ON FLOOR PLAN.

8. REMOVE ANY ABANDONED DUCT FOUND

AFTER CEILING IS BEING REMOVED.

9. POSSIBILITY OF ASBESTOS CONTAINING

MATERIALS(ACM) ON FITTINGS OR VAV

VALUES. COORDINATE WITH CONTRACTING

OFFICER REPRESENTATIVE(COR) IF ACM IS

FOUND.

KEYNOTES:

1. REMOVE DUCTWORK, VAV BOX, DIFFUSERS,

AND ASSOCIATED ACCESSORIES UP TO THIS

POINT AND PREPARE FOR NEW CONNECTION.

2. REMOVE DUCTWORK, DIFFUSERS, AND

ASSOCIATED ACCESSORIES UP TO THIS POINT

AND CAP.

3. REMOVE DUCTWORK, DIFFUSERS, AND

ASSOCIATED ACCESSORIES UP TO THIS POINT

AND PREPARE FOR NEW CONNECTION.

4. MEASURE EXISTING CFM AND RECORD.

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

DEMO EXISTING DUCTWORK COMING THROUGH

THE FLOOR FROM THE 1ST FLOOR CEILING AND

CAP THE DUCTS ON 1ST FLOOR. PATCH AND

REPAIR THE FLOOR AS REQUIRED TO MATCH THE

FINISH WITH THE REST OF THE FLOOR.

REMOVE EXISTING DUCT

STUB FOR 3RD FLOOR AND

SEAL OPENINGS AS

REQUIRED TO MAINTAIN

RATING. (TYP. ALL)

REMOVE BOXES, BRACKETS, CONTROLS,

ACCESSORIES, ETC. (TYP.)

Marc.T.Harris Snapshot

A312 A318A A318 A322 A323

A321A

A319

A317

C A

A353A354

D334A

D335D334

D333BD333A

A356

A358

D333

A318

A320

A314

C3A6

C3A4

A

A316 A321

B302

B316 B317 B318

B303 B301 B300

B323

B320

B347

B345

A A

B344

B342

B341

C3B5

B304A

B340

B315B

B316A

B316B

B317A B318A

B301AB303A

D332

STR #1

#2#3 #1

#7

D N

U P

U P

NaN M L

2.8

3.7

4.6

5.5

6.3

K J H G F E

COORDINATE SYSTEM REMOVAL AND

REPLACEMENT IN THIS AREA WITH

VENTILATION FOR NEW DUCTWORK AND

REFRIGERANT PIPING AS REQUIRED FOR

SECOND FLOOR RENOVATION.

8x8

12x12

CD-E

EG-E

20x12

26x9ø

16x6

10x12

VAV-E

x9 ø R

A

14x8 EA

30x16ø VAV-E

18x11 x1

22x9 26x9ø x9 ø x8 x1

22x14

22x14

26x12

26x16ø

20x9ø

20x9ø

16x12

13x610x8

10x10

12x12

8x8

8x8

10x6

14ø14x12

16x6

12x6

16x10 11ø

10x10

14x10 8x6

15ø5 x1

36x12

14x12

24x10

10x12

11ø

8ø

11ø

15ø

VAV-E

10x8

12x6

16x6

16x6

32x12ø

10x8

EG-E

CD-E

CD-ESD-E

SD-E

CD-E

CD-E

RG-E

RG-E

RG-E

CD-E

CD-E

RG-E

RG-E

RG-E

RG-E

RG-E

SG-E

EG-E

EG-E

CD-E

CD-E

CD-E

EG-E EG-E

RG-E RG-E

RG-E

RG-E

EG-E

EG-E

CD-E

CD-E

CD-E

CD-E

CD-E

CD-E

EG-E

EG-E

EG-E

EG-E

26ø ø

20ø

8x8

12ø

10ø

VAV-E VAV-E

16x10

30x8

16x14

16x10

VAV-E

12x10

10x10

VAV-E

x1

12x10

14x12

14x10 14x12

12x12 x8

VAV-E

VAV-E

VAV-E

VAV-E

VAV-EVAV-E

VAV-E

VAV-E

VAV-E

8x8

12ø

26x14ø

14x8

19ø

LD-E

8ø

SD-E

50x14

RG-E

40x6

28x14

22x824x10

SG-E

18x6

19Ø DN

19Ø DN

40x22 DN

27Ø DN

42x14 DN

40x20 DN

VAV-E

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

NOT FOR

PERMITTING OR

CONSTRUCTION

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/7

/2

:0

:1

P M

LEVEL 03 - VENTILATION DEMOLITION

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MD202

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

N

O R HT

1/8" = 1'-0"1

LEVEL 03 - VENTILATION DEMOLITION

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

GENERAL SHEET NOTES:

1. CONTRACTORS MUST VISIT THE SITE PRIOR TO

BID TO DETERMINE THE AMOUNT OF WORK

REQUIRED. SITE WORK DURING DESIGN WAS

LIMITED DUE TO COVID-19 AND CONDITIONS

SHOWN ARE BASED UPON EXISTING

DRAWINGS.

2. COORDINATE SYSTEM SHUT DOWN A MINIMUM

OF ONE WEEK IN ADVANCE WITH OWNER.

COORDINATE ALL WORK, INCLUDING SHUT

DOWNS, WITH THE ARCHITECTURAL PHASING

PLAN.

3. ALL PENETRATIONS BOTH NEW AND EXISTING

NEED TO BE PROPERLY FILLED AND SEALED.

4. REFER TO COVERSHEET FOR ADDITIONAL

INFORMATION.

5. TEMPORARY CONNECTIONS CAN BE MADE

WITH FLEXIBLE DUCTWORK OR OTHER

METHODS TO ALLOW PLUMBING WORK TO BE

ACCOMPLISHED. METHOD FOR CUTTING INTO

DUCTWORK SHOULD PROVIDE MINIMAL

DOWNTIME OF THE SYSTEM AND BE

REVIEWED AND DISCUSSED WITH THE OWNER.

COORDINATE TEMPORARY CONNECTION

MEHOD USED WITH OWNER.

KEYNOTE:

1. REMOVE DUCTWORK AS INDICATED FOR

PLUMBING WORK. PROVIDE TEMPORARY

CONNECTIONS AS REQUIRED TO MAINTAIN

SYSTEM OPERATION DURING CONSTRUCTION.

COORDINATE WORK WITH PLUMBING WORK

AND OWNER. REFER TO GENERAL NOTES.

2. MEASURE EXISTING CFM AND RECORD.

TT

T

T T

T T T

T

Na N M L

2.8

3.7

4.6

5.5

6.3

K J H G F DE

7.2

8.3

9.1

12x8 x

26x12 x x 2 1 x x

16x10 x x x

24x1822x12

8x6

26x12 x

8x6 ø

RG-E

22x6

RG-E

x

RG-E

CD-E

CD-E

CD-E

CD-E

CD-E

CD-E

EG-E

CD-E

EG-E

CD-E EG-E

RG-E

CD-E

14x12

CD-E

CD-E

CD-E

CD-E

28x16

EXISTING 24"Ø SA UP (AC-S4)

EXISTING 24x18 RA

VAV-E

14x12

12x10

12x10

12x10

12x10

14x12 14x1210x10

10x6

10x6

14x12

10x6 12x8

FSD-E

FSD-E

FSD-E

14x12

12x10

17x13

18x12

8x8

REMOVE DUCTWORK, VAV BOX, DIFFUSERS,

AND ASSOCIATED ACCESSORIES UP TO THIS

POINT AND PREPARE FOR NEW CONNECTION.

REMOVE DUCTWORK, DIFFUSERS,

AND ASSOCIATED ACCESSORIES UP TO THIS

POINT AND PREPARE FOR NEW CONNECTION.

REMOVE THE EXHAUST

DUCTWORK, DIFFUSERS, AND

ASSOCIATED ACCESSORIES BACK

TO THE SHAFT AND CAP.

EXISTING 12x10 EA UP

EXISTING 12x10 EA UP

EXISTING 12x10 EA UP

EXISTING 12x10 EA UP

EXISTING 12x10 EA UP

EG-E

CD-E

CD-E

SD-E-E

10ø

8ø

VAV-E

36x30 RA TO ER-4

30x30 RA

16ø

Ø19 SA UP & DN (AC-S2)

DEMO AS SHOWN ON PLAN AND CAP.

REMOVE AND STORE THE EXISTING

THERMOSTAT AND WIRING, BRACKETS, AND

ACCESSORIES FOR RELOCATION.

RECORD EXISTING CFM.

REMOVE DUCTWORK, DIFFUSERS, TRANSITIONS,

AND ASSOCIATED ACCESSORIES UP TO THE

MAIN DUCT IN SHAFT AND PREPARE FOR NEW

CONNECTION.

MEASURE EXISTING

CFM AND RECORD

12x10 12x12 12x10 12x10 12x10

FSD-E

FSD-E

VAV-E

VAV-E

VAV-E

VAV-E

VAV-E VAV-E VAV-E

VAV-E

VAV-E

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

A/E:Consultant:

NOT FOR

PERMITTING OR

CONSTRUCTION

Sprinklered

Fully Sprinklered

C R e v it L o c a l F ile s \M

E P

T

.0

B H

C lin ic R e n o v a ti o n

C

A n u j.

S

.S h a rm a .r v t

/7

/2

:0

:1

P M

LEVEL 04 - VENTILATION DEMOLITION

SCOPRZ ANUSHA

BID DOCUMENTS 589A4-19-103

1-MD203

Columbia Harry S. Truman Memorial

Veterans Hospital

Columbia, Missouri

05/13/2021

N

O R HT

1/8" = 1'-0"1

LEVEL 04 - VENTILATION DEMOLITION

GENERAL SHEET NOTES:

1. COORDINATE SYSTEM SHUT DOWN A MINIMUM

OF ONE WEEK IN ADVANCE WITH OWNER.

COORDINATE ALL WORK, INCLUDING SHUT

DOWNS, WITH THE ARCHITECTURAL PHASING

PLAN.

2. REFER TO COVER SHEET FOR ADDITIONAL

INFORMATION.

3. REFER TO DETAIL, SCHEDULE AND

CONTROLS DIAGRAMS FOR ADDITIONAL

INFORMATION.

4. REMOVE ALL ABANDONED DUCTWORK,

HANGERS, AND CONTROLS. VERIFY ITEMS ARE

NO LONGER IN USE PRIOR TO REMOVAL.

5. ALL PENETRATIONS BOTH NEW AND EXISTING

NEED TO BE PROPERLY FILLED AND SEALED.

6. REMOVE ANY ABANDONED LINES FOUND

AFTER CEILING IS BEING REMOVED.

7. POSSIBILITY OF ASBESTOS CONTAINING

MATERIALS(ACM) ON FITTINGS OR VAV

VALUES. COORDINATE WITH CONTRACTING

OFFICER REPRESENTATIVE(COR) IF ACM IS

FOUND.

15 SUNNEN DR SUITE 104

SAINT LOUIS, MO 63143

314.645.1132 FAX: 314.645.1173

www.imegcorp.com # 17002665.01Revisions: Date:

T T

T T T

T

T T

T T

T

T

T

T

T

T

T

T

T

T

T

NaN M L

2.8

3.7

4.6

5.5

6.3

K J H G F E

CLINIC OFFICE

A200

CLINIC OFFICE

A203

CLINIC OFFICE

A204

CLINIC OFFICE

A202

OBSERVATION

A201B CORRIDOR 2

C2A02

PSYCH. RES

A201

PSYCH. RES

A206

EXIST. STRG

A206A

CORRIDOR 1

C2A01 PSYCH. RES

A205

EXIST. ELEC

A207

CORRIDOR 3

C2A04

CORRIDOR 4

C2A03

TMS ROOM

A208

TMS ROOM

A210

EXIST. SOC WRK

A212

EXIST. SOC WRK

A213

CORRIDOR 5

C2A05

CARE COORDINATOR

A209

CARE COORDINATOR

A211

STAFF RESTROOM

A214

HAC

A215

EXIST. IT

A217

WOMEN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .