Drawings-589A4-19-103- VOLUME III (42 Pages).pdf
PDF 12 MB Posted
- Solicitation number
- 36C25521R0089
About this file
This document outlines a federal contract opportunity for renovation work. The Department of Veterans Affairs is seeking to renovate approximately 9,706 square feet of outpatient behavioral health clinic space and 5,089 square feet of outpatient clinic space on the second and fourth floors, respectively, of the VA Truman Memorial Veterans building in Columbia, Missouri. The scope of work includes demolition, construction, electrical, HVAC, plumbing, fire protection, data/voice, and interior finishes work. The project will be conducted in multiple phases to minimize disruption to ongoing patient care. The estimated price range for the project is $2,000,000 to $5,000,000. Pursuant to applicable law, this opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. Proposals are due around July 9, 2021. An organized site visit will be scheduled in June.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C3A2
A313
A312 A318A A318 A322 A323
A321A
A319
A317
C A
A353A354
D334A
D335D334
D333BD333A
A356
A358
D333
A318
A320
A314
C3A6
C3A4
A
A316 A321
B302
B316 B317 B318
B303 B301 B300
B323 B322
B321
B320
B338
B347
B345
A A
B344
B342
B341
C3B5
B304A B302A
B340
B315BB315A
B316A
B316B
B317A B318A
B301AB303A
C3B4
B339
B
A300
D332
STR #1
#2#3 #1
#7
D N
U P
U P
NaN M L
2.8
3.7
4.6
5.5
6.3
K J H G F E
REMOVE PIPING AS INDICATED FOR PLUMBING WORK.
PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO
MAINTAIN SYSTEM OPERATION DURING CONSTRUCTION.
REFER TO GENERAL SHEET NOTES.
VAV-E
VAV-E
3/4"HWR
3/4"HWS
VAV-E VAV-E
3/4"HWS
3/4"HWR
VAV-E
3/4"HWS
3/4"HWR
VAV-E
VAV-E
4"HWS
3"HWR
VAV-E
3/4"HWR
3/4"HWS
3/4"HWS
3/4"HWR
VAV-E
VAV-E
1"HWS
1"HWR
3" HCR UP
3"HWR
3"HWS
1 1/4"HWR
1 1/4"HWS
3"HWS
3"HWR
3/4"HWS
3/4"HWR
1"HWS
1"HWR
3/4"HWS
3/4"HWR
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
1"HWR
1"HWS
"H
W R
"H
W S
3/4"HWR
3/4"HWS
1"HWR
1"HWS
REMOVE PIPING AS INDICATED FOR PLUMBING WORK.
PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO
MAINTAIN SYSTEM OPERATION DURING CONSTRUCTION.
REFER TO GENERAL SHEET NOTES.
DEMO AS INDICATED ON
PLAN AND PREPARE FOR
NEW CONNECTION.
VAV-E
VAV-EVAV-E
COORDINATE SYSTEM REMOVAL AND
REPLACEMENT IN THIS AREA WITH
PIPING FOR NEW DUCTWORK REQUIRED
FOR 2ND FLOOR RENOVATION.
EXISTING RADIANT CEILING
PANELS(TYP. ALL)
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/7
/2
:0
:5
P M
LEVEL 03 - MECHANICAL PIPING DEMOLITION
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MD102
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
N
O R HT
1/8" = 1'-0"1
LEVEL 03 - MECHANICAL PIPING DEMOLITION
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
GENERAL SHEET NOTES:
1. CONTRACTORS MUST VISIT THE SITE PRIOR TO
BID TO DETERMINE THE AMOUNT OF WORK
REQUIRED. SITE WORK DURING DESIGN WAS
LIMITED DUE TO COVID-19 AND CONDITIONS
SHOWN ARE BASED UPON EXISTING
DRAWINGS.
2. COORDINATE SYSTEM SHUT DOWN A MINIMUM
OF ONE WEEK IN ADVANCE WITH OWNER.
COORDINATE ALL WORK, INCLUDING SHUT
DOWNS, WITH THE ARCHITECTURAL PHASING
PLAN.
3. ALL PENETRATIONS BOTH NEW AND EXISTING
NEED TO BE PROPERLY FILLED AND SEALED.
4. REFER TO COVERSHEET FOR ADDITIONAL
INFORMATION.
5. TEMPORARY CONNECTIONS CAN BE MADE
WITH FLEXIBLE PIPING OR OTHER METHODS
TO ALLOW PLUMBING WORK TO BE
ACCOMPLISHED. METHOD FOR CUTTING INTO
PIPING SHOULD PROVIDE MINIMAL DOWNTIME
OF THE SYSTEM AND BE REVIEWED AND
DISCUSSED WITH THE OWNER. COORDINATE
TEMPORARY CONNECTION METHOD USED
WITH OWNER.
NOT FOR
PERMITTING OR
CONSTRUCTION
NOT FOR
PERMITTING OR
CONSTRUCTION
T
TT
T
T T
T T T
T
Na N M L
2.8
3.7
4.6
5.5
6.3
K J H G F
7.2
8.3
9.1
122222
3"HCR
1 1/2"HWS
1 1/2"HWR
1 1/2"HWS
1 1/2"HWR
3/4"HWS
3/4"HWR
3/4"HWS
3/4"HWR
REMOVE EXISTING
ABANDONED
PIPING BACK TO
WALL AND CAP.
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E VAV-E VAV-E
VAV-E
3"HCR DN
VAV-E
3"HCR
REMOVE AND STORE THE
EXISTING THERMOSTAT
AND WIRING, BRACKETS,
AND ACCESSORIES FOR
RELOCATION.
VAV-E
VAV-E
3/4"HWR
3/4"HWS
DEMO AS SHOWN
ON PLAN AND
PREARE FOR NEW
CONNECTION.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/7
/2
:0
:5
P M
LEVEL 04 - MECHANICAL PIPING DEMOLITION
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MD103
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
N
O R HT
1/8" = 1'-0"1
LEVEL 04 - MECHANICAL PIPING DEMOLITION
GENERAL SHEET NOTES:
1. COORDINATE SYSTEM SHUT DOWN A MINIMUM
OF ONE WEEK IN ADVANCE WITH OWNER.
COORDINATE ALL WORK, INCLUDING SHUT
DOWNS, WITH THE ARCHITECTURAL PHASING
PLAN.
2. REMOVE ALL ABANDONED PIPING, HANGERS,
AND CONTROLS. VERIFY ITEMS ARE NO
LONGER IN USE PRIOR TO REMOVAL.
3. ALL PENETRATIONS BOTH NEW AND EXISTING
NEED TO BE PROPERLY FILLED AND SEALED.
4. REFER TO COVERSHEET FOR ADDITIONAL
INFORMATION.
5. REMOVE ANY ABANDONED LINES FOUND
AFTER CEILING HAS BEEN REMOVED.
6. POSSIBILITY OF ASBESTOS CONTAINING
MATERIALS(ACM) ON FITTINGS OR VAV
VALUES. COORDINATE WITH CONTRACTING
OFFICER REPRESENTATIVE(COR) IF ACM IS
FOUND.
7. PIPING TO INDIVIDUAL VAV BOXES IS 3/4" IN
SIZE UNLESS NOTED OTHERWISE.
8. REMOVE ALL THE EXISTING THERMOSTATS
AND ASSOCIATED WIRING LOCATED WITHIN
AREA OF WORK.
KEYNOTES:
1. REMOVE PIPING BACK TO MAIN AND CAP.
2. REMOVE PIPING BACK TO MAIN AND PREPARE
FOR NEW CONNECTION.
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
NOT FOR
PERMITTING OR
CONSTRUCTION
NOT FOR
T T
T T T
T
T T
T T
T
T
T
T
T
T
T
T
T
T
T
NaN M L
2.8
3.7
4.6
5.5
6.3
K J H G F E
CLINIC OFFICE
A200
CLINIC OFFICE
A203
CLINIC OFFICE
A204
CLINIC OFFICE
A202
OBSERVATION
A201B CORRIDOR 2
C2A02
PSYCH. RES
A201
PSYCH. RES
A206
EXIST. STRG
A206A
CORRIDOR 1
C2A01 PSYCH. RES
A205
EXIST. ELEC
A207
CORRIDOR 3
C2A04
CORRIDOR 4
C2A03
TMS ROOM
A208
TMS ROOM
A210
EXIST. SOC WRK
A212
EXIST. SOC WRK
A213
CORRIDOR 5
C2A05
CARE COORDINATOR
A209
CARE COORDINATOR
A211
STAFF RESTROOM
A214
HAC
A215
EXIST. IT
A217
WOMEN'S
A221
MEN'S
A222
EXIST. ELEC. CLO.
A216
CORRIDOR 6
C2A07
CORRIDOR 8
C2A08
GROUP ROOM WAITING AREA
A226
WAITING 2
A224
WAITING 1
A223
WORK AREA
A223B
COPIER/PAPER STORAGE AREA
A223C
MAIL AREA
A223D
CHECKOUT/CHECK IN
A223A
GROUP ROOM
A219
GROUP ROOM
A218
GROUP ROOM
A220
VESTIBULE
A200A
1 1/4"HWR
4"HWS
02-03-VAV-06
02-05-VAV-02
02-05-VAV-04
02-05-VAV-03
02-05-VAV-01
02-03-VAV-03
02-03-VAV-01
02-03-VAV-02
VAV-E VAV-E VAV-E
VAV-E
02-03-VAV-01 02-05-VAV-01
02-03-VAV-03
02-05-VAV-03
02-05-VAV-02
02-05-VAV-04 02-05-VAV-05
02-03-VAV-06
02-03-VAV-12
02-03-VAV-09
02-03-VAV-10
VAV-E
VAV-E VAV-E
02-05-VAV-05
02-05-VAV-06
02-03-VAV-09
02-03-VAV-10
02-03-VAV-11
2 1/2"HWR
2 1/2"HWR
3"HWS
1 1/4"HWS
1 1/4"HWR
1 1/4"HWR
4"HWS
1 1/4"HWS
1 1/4"HWR
3"HWS
3"HWS
02-03-VAV-08
02-03-VAV-12
02-03-VAV-02
3/4"HWS
3/4"HWR
02-03-VAV-05
LIQ UP
SUC UP
SSU-1
02-03-VAV-07
3"HWR
2 1/2"HWS
SUC
LIQ
02-03-VAV-05
SSU-1
3"HWR
1"HWR
1"HWS
02-03-VAV-08
02-03-VAV-04
3/4"HWR
3/4"HWS
02-03-VAV-07
MOUNT UNIT AS HIGH AS
POSSIBLE. COORDINATE EXACT
LOCATION AND ELEVATION WITH
IT EQUIPMENT, CABLE TRAY, AND
FIRE PROTECTION PIPING.
02-03-VAV-06
1 1/4"HWR
1 1/4"HWS
"H
W S
1"HWS
1"HWR
1"HWS
1"HWR
1"HWR
1"HWS
TERMINATE CONDENSATE
DRAIN PIPING TO UTILITY
BOX (P-808).
02-03-VAV-11
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/7
/2
:0
:5
P M
LEVEL 02 - MECHANICAL PIPING
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MP101
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
N
O R HT
1/8" = 1'-0"1
LEVEL 02 - MECHANICAL PIPING
GENERAL SHEET NOTES:
1. COORDINATE SYSTEM SHUT DOWN A MINIMUM
OF ONE WEEK IN ADVANCE WITH OWNER.
COORDINATE ALL WORK, INCLUDING SHUT
DOWNS, WITH THE ARCHITECTURAL PHASING
PLAN.
2. MAIN CORRIDOR FROM NORTH WING EXIT TO
PAST ELEVATOR LOBBY AND INTO WEST WING
INCLUDING CORRIDOR TO STAIRWELL MUST
REMAIN USABLE DURING NORMAL HOURS
(07:00 - 17:00). REFER TO ARCHITECTURAL
PHASING PLAN FOR MORE INFORMATION.
COORDINATE WORK WITH OWNER.
3. ALL PENETRATIONS BOTH NEW AND EXISTING
NEED TO BE PROPERLY FILLED AND SEALED.
4. REFER TO COVERSHEET FOR ADDITIONAL
INFORMATION.
5. PIPING TO INDIVIDUAL VAV BOXES IS 3/4" IN
SIZE UNLESS NOTED OTHERWISE.
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
NOT FOR
PERMITTING OR
CONSTRUCTION
NOT FOR
A312 A318A A318 A322 A323
A321A
A319
A317
C A
A353A354
D334A
D335D334
D333BD333A
A356
A358
D333
A318
A320
A314
C3A6
C3A4
A
A316 A321
B302
B315 B316 B317 B318
B303 B301 B300
B323 B322
B321
B320
B338
B347
B345
A A
B344
B342
B341
C3B5
B304A B302A
B340
B315BB315A
B316A
B316B
B317A B318A
B301AB303A
C3B4
B339
B
A300
D332
STR #1
#2#3 #1
#7
D N
U P
U P
NaN M L
2.8
3.7
4.6
5.5
6.3
K J H G F E
COORDINATE WITH OTHER
SYSTEMS IN THE PLENUM.
VAV-E
VAV-E
VAV-E VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
3/4"HWS
3/4"HWR
3/4"HWS
3/4"HWR
3/4"HWR
3/4"HWS3/4"HWS
3/4"HWR
4"HWS
3"HWR
3/4"HWR
3/4"HWS
3/4"HWS
3/4"HWR
1"HWS
1"HWR
3"HWR
3"HWS
1 1/4"HWR
1 1/4"HWS
3"HWS
3"HWR
3/4"HWS
3/4"HWR
1"HWS
1"HWR
3/4"HWS
3/4"HWR
1"HWR
1"HWS
"H
W R
"H
W S
3/4"HWR
3/4"HWS
1"HWR
1"HWS
LIQ DN
SUC DN
LIQ UP TO CU-1
SUC UP TO CU-1
REMOVE TEMPORARY CONNECTIONS
AND INSTALL NEW PIPING AS
REQUIRED FOR PLUMBING WORK.
COORDINATE WORK WITH PLUMBING
WORK AND OWNER.
NC
3" HCR UP
3"HCR
VAV-E
COORDINATE SYSTEM REMOVAL AND
REPLACEMENT IN THIS AREA WITH
PIPING FOR NEW DUCTWORK REQUIRED
FOR 2ND FLOOR RENOVATION.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/7
/2
:0
:0
P M
LEVEL 03 - MECHANICAL PIPING
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MP102
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
N
O R HT
1/8" = 1'-0"1
LEVEL 03 - MECHANICAL PIPING
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
GENERAL SHEET NOTES:
1. CONTRACTORS MUST VISIT THE SITE PRIOR TO
BID TO DETERMINE THE AMOUNT OF WORK
REQUIRED. SITE WORK DURING DESIGN WAS
LIMITED DUE TO COVID-19 AND CONDITIONS
SHOWN ARE BASED UPON EXISTING
DRAWINGS.
2. COORDINATE SYSTEM SHUT DOWN A MINIMUM
OF ONE WEEK IN ADVANCE WITH OWNER.
COORDINATE ALL WORK, INCLUDING SHUT
DOWNS, WITH THE ARCHITECTURAL PHASING
PLAN.
3. ALL PENETRATIONS BOTH NEW AND EXISTING
NEED TO BE PROPERLY FILLED AND SEALED.
4. REFER TO COVERSHEET FOR ADDITIONAL
INFORMATION.
NOT FOR
PERMITTING OR
CONSTRUCTION
NOT FOR
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
Na N M L
2.8
3.7
4.6
5.5
6.3
K J H G F E
7.2
8.3
9.1
EMG/SCI
NURSE NAVIGATOR
PAIN & PMR VVC/TM
PAIN BH
PAIN PHARM
PAIN EXAM ROOM 2
PAIN EXAM ROOM 3
PAIN EXAM ROOM 4
WORKSTATION
TOILET
PAIN SWAMP
EXISTING ELEC.
492A
SOILED HOLDING
TOILET
PAIN EXAM
PM&R SWAMP
PM&R EXAM ROOM 4
PM&R EXAM ROOM 3
PM&R EXAM ROOM 1
PM&R EXAM ROOM 2
MSA CHECKIN/OUT
PROCEDURE ROOM
CLEAN SUPPLY
PROCEDURE ROOM
OIT
CORRIDOR
C498
Room
A200BBBRoom
A200CCC
NURSES
CORRIDOR
C498
CORRIDOR
C496
CORRIDOR
C499
C O
R R
ID
O
R
C
04-04-VAV-03
04-04-VAV-01
04-04-VAV-02
04-04-VAV-11
04-04-VAV-1204-04-VAV-13
04-04-VAV-14
04-04-VAV-15
04-04-VAV-06
3" HCR DN
3"HCR
04-04-VAV-05
04-04-VAV-1304-04-VAV-14
04-04-VAV-12
04-04-VAV-11
04-04-VAV-07
04-04-VAV-06
04-04-VAV-04
04-04-VAV-02
1 1/4"HWR
1 1/4"HWS
04-04-VAV-09
1 1/2"HWS
1 1/2"HWR
1 1/2"HWS
1 1/2"HWR
04-04-VAV-15
04-04-VAV-03
EF-61EF-61
CU-1
LIQ DN
SUC DN
CU-204-04-VAV-07
04-04-VAV-08
SSU-2
LIQ
SUC1 1/2"HWS
1 1/2"HWR
04-04-VAV-10
04-04-VAV-10
SSU-2
04-04-VAV-01
04-04-VAV-04
3"HCR
3"HCR
04-04-VAV-08
3/4"HWS
3/4"HWR
3/4"HWR
3/4"HWS
MOUNT UNIT AS HIGH AS
POSSIBLE. COORDINATE
EXACT LOCATION AND
ELEVATION WITH IT
EQUIPMENT, CABLE TRAY,
AND FIRE PROTECTION
PIPING.
3/4"HWR
3/4"HWS
1 1/4"HWR
1 1/4"HWS
1 1/4"HWR
1 1/4"HWS
ROUTE PIPING UP EXTERIOR WALL
TO ELEVATION ABOVE FOURTH
FLOOR CEILING PRIOR TO
PENETRATING EXTERIOR WALL.
RELOCATED
THERMOSTAT
NEW PIPING AND
INSULATION TO
MATCH THE EXISTING.
TERMINATE CONDENSATE
DRAIN PIPING TO UTILITY
BOX (P-808).
3/4"DPP
04-04-VAV-05
04-04-VAV-0904-04-VAV-09
VAV-E
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/7
/2
:0
:0
P M
LEVEL 04 - MECHANICAL PIPING
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MP103
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
N
O R HT
1/8" = 1'-0"1
LEVEL 04 - MECHANICAL PIPING
GENERAL SHEET NOTES:
1. COORDINATE SYSTEM SHUT DOWN A MINIMUM
OF ONE WEEK IN ADVANCE WITH OWNER.
COORDINATE ALL WORK, INCLUDING SHUT
DOWNS, WITH THE ARCHITECTURAL PHASING
PLAN.
2. ALL PENETRATIONS BOTH NEW AND EXISTING
NEED TO BE PROPERLY FILLED AND SEALED.
3. REFER TO COVERSHEET FOR ADDITIONAL
INFORMATION.
4. PIPING TO INDIVIDUAL VAV BOXES IS 3/4" IN
SIZE UNLESS NOTED OTHERWISE.
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
NOT FOR
PERMITTING OR
CONSTRUCTION
NOT FOR
INSULATION
STEEL PIPE SADDLE, AND
INSULATION SHIELD TACK
WELDED TO PIPE, FILL
SADDLE WITH
INSULATION.
LUG, COUPLING,
OR HUB
RISER CLAMP
INSULATION AND NEOPRENE
MOUNTS PER
SPECIFICATIONS.
INSULATION
SEAL OPENING,
FIRESTOP IF REQUIRED.
THREADED ROD.(TYP.)
OVERSIZE HANGER TO ALLOW
LONGITUDINAL PIPE EXPANSION
AND PIPE INSULATION TO PASS
THROUGH UNBROKEN. (TYP.)
UNI-STRUT OR EQUIVALENT
HIGH DENSITY INSULATION INSERT
AS REQUIRED IN SPECIFICATIONS.
THREADED ROD.(TYP.)
FLOOR
PIPE INSULATION(TYP.)
INSULATION SHIELD (TYP.)
INSULATION SHIELD
INSTALL CLAMP ON ALL
PIPES LESS THAN 4"Ø
THREADED ROD
INSULATION
CLEVIS HANGER
HIGH DENSITY INSULATION INSERT
AS REQUIRED IN SPECIFICATIONS.
NOTES:
1. REFER TO SPECIFICATION SECTIONS 23 05 11 AND 23 07 11 FOR ADDITIONAL
INFORMATION.
INSULATION SHIELD (TYP.)
INSTALL AN ESCUTCHEON AROUND PIPES
EXPOSED IN FINISHED ROOMS. FOR ALL
INSULATED PIPING INSTALL A PLASTIC JACKET
EXTENDING 6" BEYOND THE WALL TO PROTECT
INSULATION FROM DAMAGE.
MAKE A SMOOTH ROUND OPENING IN
WALL SLIGHTLY LARGER THAN OUTSIDE
DIAMETER OF THE PIPE AND INSULATION.
ADD A BEAD OF NON-HARDENING
CAULK IN THE ANNULAR SPACE.
NOTES:
1. THIS DETAIL APPLIES TO ALL PIPES. THE INTENTION IS TO
CONTINUE THE INSULATION AND VAPOR BARRIER THROUGH
ALL PENETRATIONS. PERMIT THERMAL EXPANSION WITHOUT
DAMAGING INSULATION, AND TO SEAL AIRTIGHT AROUND
INSULATED AND UNINSULATED PIPES FOR NOISE
TRANSMISSION CONTROL.
2. FLOOR OPENINGS ARE SIMILAR SEE SPECIFICATION SECTION
23 05 11 FOR DIFFERENCES BETWEEN FLOOR AND WALL
PENETRATIONS.
3. SEE SPECIFICATION SECTION 23 05 11 AND 23 07 11 FOR
ADDITIONAL INFORMATION.
FIRE SEALANT
FIRE SEALANT
NOTE 2
NOTE 3
PENETRATING ITEM
NOTE 4
NOTE 3
NOTE 4
PENETRATING ITEM
NOTE 2
NOTE 3
RATED WALL
(CONSTRUCTION
VARIES)
RATED FLOOR
(CONSTRUCTION
VARIES)
NOTES:
1. THIS GENERAL DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS
OR FLOORS. THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW
LONGITUDINAL MOVEMENT. REFER TO SPECIFICATION SECTION 07 84 00 FOR
SELECTION OF THROUGH PENETRATION FIRE STOPPING.
2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE
DRILL. EACH CONTRACTOR FURNISHES SLEEVE TO G.C., COORDINATES SLEEVE
LOCATIONS AND DEBURS SLEEVE. G.C. BUILDS SLEEVE INTO WALL OR FLOOR
ALLOWING NO GAP AROUND SLEEVE. IF SLEEVE IS NOT PROVIDED WHEN WALL
OR FLOOR IS BUILT, CONTRACTOR SHALL INSTALL SLEEVE. SLEEVE SIZE SHALL
ALLOW ANNULAR SPACE REQUIRED BY THE SELECTED FIRE STOP SYSTEM.
3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED
FOR FIRE STOP SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM
APPLICATION LISTING. SECURE TO WALL OR FLOOR TO ALLOW LONGITUDINAL
MOVEMENT OF PENETRATING ITEM WITHOUT MOVEMENT OF FIRE BARRIER.
4. WATERTIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL
ANGLE FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP.
PLACE A BEAD OF WATERPROOF SEALANT BETWEEN FLOOR AND BOTTOM OF
ANGLE FRAME. SECURE TO FLOOR WITH MASONRY ANCHORS IN CORNERS AND
ON 12" MAXIMUM CENTERS. MULTIPLE PENETRATING ITEMS MAY BE ENCLOSED
IN ONE FRAME.
9-24 MBH AIR COOLED
CONDENSING UNIT
5/16" ZINC-PLATED LAG
SCREWS. (TYP. 4)
MOUNTING FEET (TYP.)
INSULATION AND
ROOFING
ROOF STRUCTURE
PREFABRICATED EQUIPMENT
SUPPORT CURB (TYP). VERIFY
ROOFING MATERIAL AND PROVIDE
WITH OR WITHOUT CANT AS
REQUIRED.
TOP OF CURB
NOTES:
1. VERIFY DIAMETER OF ANCHOR BOLT REQUIRED TO FIT WITHIN
MOUNTING FEET ANCHOR HOLES.
CURB HEIGHT 24"
ABOVE ROOF
DECK
VIBRATION PAD (TYP.)
PIPING
BATT INSULATION. PROVIDE
THICKNESS TO MATCH ROOF
INSULATION. MINIMUM OF 6" THICK
18 GAUGE GALVANIZED
SHEETMETAL
BOX WITH SOLDERED JOINTS.
FASTEN TO CURB WITH
CADMIUM PLATED SCREWS 12" O.C..
PREFABRICATED CURB
WITH WOOD NAILER.
CARRY ROOFING UP UNDER
COUNTER FLASHING.
RAISED CANT TO MATCH THICKNESS
OF ROOF DECK INSULATION.
(BUILT-UP ROOF ONLY)
COVER BOTTOM OF CURB
OPENING WITH MINIMUM
18 GAUGE SHEETMETAL.
GALVANIZED SHEETMETAL CAP.
CROSS BREAK TO PROVIDE
DRAINAGE/ FASTEN CAP TO
BOX WITH SHEETMETAL
SCREWS. SEAL JOINT WITH
SILICONE CAULKING.
PIPE SLEEVE SOLDERED
TO SHEET METAL BOX.
SEAL PIPING WATERTIGHT
BY CAULKING BETWEEN
PIPE & SHEETMETAL
SLEEVE WITH SILICONE
CAULK.
CURB HEIGHT 24"
ABOVE ROOF DECK
FRAMING, ROOF, &
ROOFING BY G.C.
10"MIN
MIN.
6"
CONCRETE
WALL
HYDROSTATIC SEAL ASSEMBLY
(LINK-SEAL) SEE SPECS.
SECTION 23 05 11 AND 23 07 11
FOR ADDITIONAL INFORMATION.
PIPE THRU WALL
INSTALL ASSEMBLY SO BOLT
HEADS ARE ACCESSIBLE FROM
INSIDE FOR DISASSEMBLY.
WALL SLEEVE. SEE SPECS.
SECTION 23 05 11 AND 23 21 13
APPLY CAULK FLUSH WITH
OUTSIDE SURFACE FOR
FINISHED APPEARANCE IN
WALLS ABOVE GRADE.
NOTES:
1. CONTRACTOR MAY FABRICATE PIPE SLEEVE.
2. SEAL SELECTION BASED ON OUTSIDE DIAMETER OF PIPE THRU
WALL AND INSIDE DIAMETER OF SLEEVE.
3. SLEEVE NOT REQUIRED FOR CORE DRILLED PENETRATIONS.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/7
/2
:0
:0
P M
MECHANICAL PIPING DETAILS
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MP300
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
NO SCALE1
PIPE SUPPORT DETAIL
NO SCALE2
PIPE THROUGH NON-FIRE RATED WALL
NO SCALE3
RATED FIRE BARRIER PENETRATION
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
NO SCALE4
CONDENSING UNIT ROOF SUPPORT
NO SCALE5
REFRIGERANT PIPING WEATHERPROOFING (BUILT-UP ROOF)
NO SCALE6
EXTERIOR WALL PENETRATION
NOT FOR
PERMITTING OR
CONSTRUCTION
NOT FOR
HWR
HWS
HEATING WATER FLOW DIAGRAM SYMBOL LIST
SYMBOL: DESCRIPTION:
HEATING WATER RETURNHWR
HEATING WATER SUPPLYHWS
COLD WATER - POTABLECW
PITCH PIPE IN DIRECTION
DIRECTION OF FLOW IN PIPE
FLEXIBLE CONNECTION
PRESSURE/TEMPERATURE TEST PLUG
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
METERM
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
SUCTION DIFFUSER WITH SUPPORT FOOT
AUTOMATIC AIR VENT
MANUAL AIR VENT W/ BALL VALVE
DRAIN WITH HOSE CONNECTION, CAP
& BALL VALVE
TEMPERATURE SENSOR WITH WELL
T
THERMOMETER WITH WELL (FILLED TYPE)
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
THROTTLING VALVE
BALANCING VALVE
CONTROL VALVE (TWO-WAY)
"WYE" - STRAINER
"WYE" - STRAINER W/SHUTOFF VALVE
AND HOSE CONNECTION WITH CAP
CHECK VALVE
SAFETY/RELIEF VALVE
PRESSURE REDUCING VALVE (LIQUID/GAS)
UNION/FLANGE
CONTROL VALVE (THREE-WAY)
H W
R
H W
S
3/4" SHUTOFF VALVE WITH
3/4" MALE HOSE THREAD
ADAPTER AND CAP AT
LOWEST POINT (TYP.)
MANUAL AIR VENT AT
HIGH POINT OF PIPING
NEXT TO COIL (TYP.)
(NOT ALL MAY APPLY)
VAV REHEAT
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/7
/2
:0
:1
P M
MECHANICAL PIPING DIAGRAMS
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MP400
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
NO SCALE1
HEATING WATER FLOW DIAGRAM
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
NOT FOR
PERMITTING OR
CONSTRUCTION
NOT FOR
DIRECTION OF AIR FLOW
FLEXIBLE DUCT
MANUAL VOLUME DAMPER
RISE IN DIRECTION OF AIR FLOWR
DUCT CAP
DROP IN DIRECTION OF AIR FLOWD
DUCT DOWN
DUCT UP
SUPPLY/OUTSIDE AIR DUCT SECTION
RETURN AIR DUCT SECTION
EXHAUST/RELIEF AIR DUCT SECTION
4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION
CD-1
6/115
AIR TERMINAL PROPERTIES SYMBOL
NECK SIZE/CFM
TERMINAL AIR BOX (REFER TO SCHEDULE)###
### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)
HUMIDIFIERH
OPPOSED BLADE DAMPER (REFER TO SCHEDULE)
PARALLEL BLADE DAMPER (REFER TO SCHEDULE)
DIFFERENTIAL PRESSURE SENSOR
CARBON MONOXIDE SENSORC
CARBON DIOXIDE SENSORC2
HUMIDISTAT SENSORH
HUMIDISTAT/SENSOR (DUCT MOUNTED)H
OCCUPANCY SENSORO
PRESSURE SENSOR/MONITORP
PRESSURE SENSOR (DUCT MOUNTED)P
THERMOSTAT/SENSORT
TEMPERATURE SENSOR (DUCT MOUNTED)T
THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET
VENTILATION SYMBOL LIST
SYMBOL: DESCRIPTION:
AIRFLOW MEASUREMENT SYMBOL
XX - AHU SYMBOL
Y - SEQUENTIAL NUMBER
XX-Y
NOT ALL SYMBOLS MAY APPLY.
SERIES FAN POWERED TERMINAL AIR BOX w/REHEAT COIL
(REFER TO SCHEDULE)
PARALLEL FAN POWERED TERMINAL AIR BOX w/REHEAT
COIL (REFER TO SCHEDULE)
AREA NOT IN SCOPE
VENTILATION ABBREVIATION KEY
ABBR: DESCRIPTION:
DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")
DIFFERENTIAL PRESSURE SWITCHDPS
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
NC NEW CONNECTION
CFSD CONTROL/FIRE/SMOKE DAMPER
EA EXHAUST/RELIEF AIR
FD FIRE DAMPER
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FSD FIRE/SMOKE DAMPER
MA MIXED AIR
OA OUTSIDE AIR
RA RETURN AIR
SA SUPPLY AIR
SD SMOKE DAMPER
TRANSFER DUCTTD
UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)
CFSD-E EXISTING CONTROL FIRE SMOKE DAMPER
FD-E EXISTING FIRE DAMPER
FSD-E EXISTING FIRE SMOKE DAMPER
SD-E EXISTING SMOKE DAMPER
TERMINAL AIR BOXTAB
TYPICALTYP
CEILING DIFFUSER - EXISTINGCD-E
N.C. NORMALLY CLOSED
NOT IN CONTRACTNIC
NORMALLY OPENN.O.
NOT ALL MAY APPLY
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
T101
SIM
DETAIL REFERRED TO BY ELEVATION
SHEET DETAIL IS LOCATED ON
INDICATES SIMILAR DETAIL
REFERENCED IN MULTIPLE LOCATIONS
SIM
INDICATES SIMILAR DETAIL
REFERENCED IN MULTIPLE LOCATIONS
LEVEL NAME
10' - 0" HEIGHT ABOVE
PROJECT 0' - 0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N
O R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
NEW WORK BY THIS CONTRACTOR
(DARK SOLID LINE)
NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR
(DARK LONG DASHED LINE)
NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN
(LIGHT SOLID LINE)
EXISTING TO BE REMOVED BY THIS CONTRACTOR
(DARK SHORT DASHED LINE)
LINE TYPE KEY:
TEMPERATURE CONTROLS CONTRACTORT.C.C.
SECURITY CONTRACTORS.C.
AUDIO/VISUAL CONTRACTORA.V.C.
FIRE PROTECTION CONTRACTORF.P.C.
AUTOMATIC TEMPERATURE CONTROL CONTRACTORA.T.C.
HEATING CONTRACTORH.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
VENTILATION CONTRACTORV.C.
ELECTRICAL CONTRACTORE.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONSTRUCTION MANAGERC.M.
NOT ALL MAY APPLY
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, AND PIPING.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
G.C. FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE G.C. OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR
STARTERS, SWITCHES, AND DISCONNECTS.
16. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, VENTILATION, AND PIPING.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK
AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF
WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE G.C. OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM OWNER AT LEAST ONE WEEK IN ADVANCED BEFORE SHUTTING
DOWN ANY SYSTEM FOR ANY REASON. DEPENDING ON TIME OF YEAR, WORK MAY BE
AFTER HOURS OR WEEKEND. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO
REMAIN UNTIL NEW SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
12. CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL DRAWINGS, NOT JUST THEIR TRADES.
1. THE SIZE OF EACH BRANCH DUCT TO A TERMINAL AIR BOX (TAB) SHALL MATCH THE TAB’S
INLET SIZE UNLESS THE BRANCH IS GREATER THAN 6 FEET IN LENGTH, IN WHICH CASE THE
BRANCH SHOULD BE INCREASED ONE DUCT SIZE, OR AS NOTED OTHERWISE.
2. ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES AND WHEN IN CLOSE PROXIMITY TO
EACH OTHER.
3. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.
4. EXISTING AIR INLET AND OUTLET CFM SHOWN ON DRAWINGS ARE FROM EXISTING
DRAWINGS, AND ARE FOR REFERENCE ONLY. CONTRACTOR SHALL USE PRE-BALANCE
VALUES, AND NOT EXISTING CFM SHOWN ON DRAWINGS.
5. CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSURE
CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND ALL
TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEALED
AS SPECIFIED FOR NEW DUCTWORK.
VENTILATION GENERAL NOTES:
1. BEFORE ANY DEMOLITION WORK IS BEGUN A COMPLETE AIR BALANCE TEST SHALL BE
PERFORMED BY THE TESTING, ADJUSTING AND BALANCING (TAB) CONTRACTOR ON
EXISTING AIR HANDLERS AND EXHAUST FANS SERVING THE AREAS AFFECTED BY
CONSTRUCTION. EQUIPMENT TO BE DEMOLISHED DOES NOT REQUIRE TESTING. PROVIDE
AIR BALANCE TESTING ONLY ON EQUIPMENT THAT WILL CONTINUE TO BE USED TO SERVE
RENOVATED AREAS AFTER THE CONSTRUCTION PHASE IS COMPLETED.
2. PROVIDE DUCT TRAVERSE READINGS AT LOCATIONS DESIGNATED ON THE DRAWINGS BY
THE "AIRFLOW MEASUREMENT SYMBOL". THOSE MEASUREMENTS SHALL BE INCLUDED IN
THE PRE DEMOLITION REPORT AND SHALL BE DESIGNATED WITH THE IDENTIFIER AS
MARKED ON THE DRAWINGS. READINGS SHALL BE DESIGNATED WITH THE ROOM NAME AND
NUMBER AS MARKED ON THE DRAWINGS. IF FLOOR PLANS DO NOT HAVE UNIQUE ROOM
NAMES AND NUMBERS, TAB CONTRACTOR SHALL INCLUDE FLOOR PLAN WITH UNIQUE
NUMBER DESIGNATIONS ASSIGNED TO READINGS THAT MATCH THOSE USED IN THE FINAL
PRE-DEMOLITION REPORT. DRAWINGS THAT ARE HAND-MARKED WITH RED INK ARE
ACCEPTABLE, PROVIDED THEY ARE LEGIBLE.
3. IN THE EVENT A DUCT TRAVERSE LOCATION AS MARKED ON THIS PLAN IS INACCESSIBLE
FOR MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN
ALTERNATE LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES AND/OR READINGS AS
REQUIRED TO DETERMINE THE AIRFLOW READING WHERE THE DUCT TRAVERSE SYMBOL IS
SHOWN. IN THE EVENT TRAVERSES ARE TAKEN AT ALTERNATE LOCATION(S), TAB
CONTRACTOR SHALL INCLUDE A DRAWING THAT SHOWS THE LOCATIONS WHERE THE
ACTUAL MEASUREMENTS WERE TAKEN.
4. TAKE A DUCT STATIC PRESSURE READING AT EACH LOCATION WHERE A DUCT TRAVERSE
READING IS TAKEN AND INCLUDE IN THE FINAL PRE-DEMOLITION TAB REPORT.
5. TAB CONTRACTOR SHALL COMPILE AND SUBMIT FOUR COPIES OF THE FINAL PRE-
DEMOLITION REPORT WITHIN 10 WORKING DAYS AFTER THE FIELD MEASUREMENTS ARE
COMPLETED. FINAL TAB REPORT SHALL BE SUBMITTED FOR REVIEW TO THE
ARCHITECT/ENGINEER. TESTING SHALL INCLUDE ALL ITEMS REQUIRED IN THE
SPECIFICATIONS.
6. TAB CONTRACTOR SHALL PROVIDE DUCT TRAVERSE READINGS AT LOCATIONS
DESIGNATED ON THE DRAWINGS BY THE "AIRFLOW MEASUREMENT SYMBOL". THOSE
MEASUREMENTS SHALL BE INCLUDED IN THE POST-CONSTRUCTION REPORT AND SHALL BE
DESIGNATED WITH THE IDENTIFIER AS MARKED ON THE CONSTRUCTION DRAWINGS. GRILLE
AND DIFFUSER READINGS SHALL BE DESIGNATED WITH THE ROOM NAME AND NUMBER AS
MARKED ON THE DRAWINGS. IF THE DRAWINGS DO NOT HAVE UNIQUE ROOM NAMES AND
NUMBERS, TAB CONTRACTOR SHALL INCLUDE FLOOR PLANS WITH UNIQUE NUMBER
DESIGNATIONS ASSIGNED TO TRAVERSES, GRILLES, AND DIFFUSERS THAT MATCH THOSE
USED IN THE FINAL PRE-DEMOLITION REPORT. SIMILAR ROOM NAMES, NUMBERS, OR
DESIGNATIONS SHALL BE USED TO SIMPLIFY THE CROSS- REFERENCING OF READINGS
TAKEN BETWEEN PRE-DEMOLITION AND POST-CONSTRUCTION REPORTS.
7. BALANCING CONTRACTOR SHALL PRE-BALANCE ALL EXISTING SYSTEMS TO REMAIN PER
SPECIFICATION SECTION 23 05 93. BALANCE READINGS WILL BE REQUIRED AT AIR OUTLETS
AND DUCT TRAVERSES TO VERIFY EXISTING AIRFLOW TO UNAFFECTED SPACES.
TAB PRE-DEMOLITION NOTES:
1. AFTER CONSTRUCTION ACTIVITIES ARE COMPLETE, TESTING, ADJUSTING (TAB) AND
BALANCING CONTRACTOR SHALL REBALANCE AIR HANDLING UNITS AND EXHAUST FANS AS
REQUIRED TO ACHIEVE THE NEW AIRFLOW VALUES SHOWN ON THE CONSTRUCTION
DRAWINGS.
2. AREAS SERVED BY THIS EQUIPMENT WHICH WERE NOT RENOVATED SHALL BE RE-
BALANCED TO THE AIRFLOW RATES MEASURED BEFORE THE RENOVATION OCCURRED
(REFER TO THE FINAL PRE- DEMOLITION REPORT).
3. IF DUCT TRAVERSE LOCATION AS MARKED ON THE DRAWINGS IS INACCESSIBLE FOR
MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN ALTERNATE
LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES AND/OR GRILLE READINGS AS
REQUIRED TO DETERMINE THE FLOW RATE. IN THE EVENT TRAVERSES ARE TAKEN AT AN
ALTERNATE LOCATION(S), TAB CONTRACTOR SHALL INCLUDE A DRAWING THAT SHOWS THE
LOCATIONS WHERE THE ACTUAL MEASUREMENTS WERE TAKEN.
4. A DUCT STATIC PRESSURE READING SHALL BE TAKEN AT EACH LOCATION WHERE A DUCT
TRAVERSE READING IS TAKEN AND SHALL BE INCLUDED IN THE FINAL POST-CONSTRUCTION
TAB REPORT.
5. TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST-
CONSTRUCTION TAB REPORT AS REQUIRED BY SECTION 23 05 93.
6. THE FINAL POST CONSTRUCTION REPORT SHALL INCLUDE ALL ITEMS REQUIRED IN THE
SPECIFICATIONS.
TAB POST-CONSTRUCTION NOTES:
THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR
SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL
MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.
ALL FLOOR, ASSEMBLIES SHALL BE DESIGNATED AS 2 HOUR FIRE, BARRIERS, UNLESS NOTED
OTHERWISE ON THE PLANS. RATINGS WERE ACQUIRED FROM THE ARCHITECTURAL PLANS
DATED 03/05/2021.
FIRE / SMOKE BARRIER DESIGNATIONS
2 HOUR OCCUPANCY/AREA SEPARATION FIRE
BARRIER
2 HOUR BUILDING SEPARATION FIRE BARRIER
1 HOUR VERT. OPG. (SHAFT) FIRE BARRIER
2 HOUR HORIZONTAL EXIT (& REFUGE AREA)
FIRE BARRIER
1 HOUR HAZ./INCIDENTAL USE FIRE BARRIER
NR-RESIST SMK HAZ./INCIDENTAL USE SMOKE
PARTITIONS (SPRINKLERED)
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/7
/2
:0
:1
P M
VENTILATION COVERSHEET
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MH000
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
NOT FOR
T T
T T
T T
T
T
T
T
NaN M L
2.8
3.7
4.6
5.5
6.3
K J H G F E
40x14
28x14
20x12 RA
12x14
26x15 x2
30x8 x1
24x13
26x13
30x8
18x818x717x7
14x4 x4
18ø 18ø
8x4
8x4
VAV-E
VAV-E
VAV-E
18ø ø x8
20x818x8 x4 x4 x4
19x7ø x ø
40x14 17x8ø BELOW
13x6
14x10ø ø ø
16x7ø13x6ø x x 6 14x6
12x10
12x10 x ø x5
14x8
26x13
2 2
40x14
16ø
40x14
17ø 16ø
18x8
36x10
26x10
18x8
21x5
21x5
VAV-E
VAV-E
VAV-E
VAV-E VAV-E
VAV-E VAV-E
VAV-E
x1
20x10
22x10
28x14 ø
17x8ø
12x5 x
30x6
VAV-EVAV-EVAV-E
x1 x1 ø x1
40x10
40x22 x1 ø
27x10 x1 ø
25x8
42x14
17x72 x1
37x10
21x8
30x8 x1
18ø ø
29x7 x x
29x7
27x10
FSD-E
FSD-E
FSD-E
FSD-E
27ø
FSD-E
40x20
14x10ø
13x6
12x8
16x7ø x ø
30x6
20x10
16x6
10ø
13x5
12x5
8x8
18x7 18x6
16ø
6x6
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E
12x8
30x14
16x516x5
10x4
9x4
12x10
8x8
10x10
20x5 x
10x8
SD-E
SD-E
SD-E
RG-E
RG-E
RG-E
RG-E
RG-E
SD-E
SD-E
RG-E
RG-E
LD-E
LD-E
LD-E
LD-E
LD-E
LD-E
LD-E LD-E
LD-E
LD-E
LD-E
LD-E
LD-E
LD-E
RG-E
RG-E
RG-E
RG-E
LD-E
LD-E
LD-E
EG-1LD-E
LD-E
RG-E
RG-E
RG-E
RG-E
RG-E
RG-E
RG-E
RG-E
RG-E
RG-E
RG-E
RG-E
SD-E
SD-E
SD-E
SD-E
SD-E
RG-E
SD-E
LD-E
SD-E
LD-E
RG-E
RG-E
SD-E
RG-E
LD-E
SD-E
SD-E
LD-E LD-E LD-E LD-E
LD-E
LD-E
LD-E LD-E
LD-E LD-E
RG-E
EG-E EG-E
SD-E
SD-E
SD-E
SD-E
SD-E SD-E
SD-E
RG-E
SD-E
SD-E
SD-E
RG-E
RG-E
RG-E
RG-E
RG-E
LD-E
RG-E
RG-E
RG-E
RG-E
LD-E
LD-E
RG-E
LD-E
LD-E
SG-E
LD-E
x
18x6
18ø
24x10
8x4 UP
8x4 UP
9x6. TYP ALL
13x4 UP TYP. ALL
28x14 UP
8x4
8x4 UP
8x4 UP
RG-E
18x8
RG-E
x
SD-E SD-E
SD-E
SD-E
10x4 10x4
RG-E
SD-E
SD-E
RG-E
12x10
34x9
RG-E
10x4
VAV-E
10x4
EG-E
8x6/0
12x8
VAV-E
SD-E
SD-E
14x6ø
8ø
VAV-E
14x8
19Ø UP TO
AC-S4
19Ø UP TO
AC-S5
40x22 UP
TO ER-5
27Ø UP
TO AC-S3
42x14 TO ER-3
40x20 UP
EXISTING 8X4 DUCT STUB
PROVIDING 170CFM EACH.
(TYPICAL 12)
EXISTING 8x4
DUCT STUB DN
28x11ø 32x12ø BELOW
9ø
13x6
2 2
2 32X10 RA UP
32x10
EXISTING
CAPPED
DUCT
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/7
/2
:0
:0
P M
LEVEL 02 - VENTILATION DEMOLITION
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MD201
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
N
O R HT
1/8" = 1'-0"1
LEVEL 02 - VENTILATION DEMOLITION
GENERAL SHEET NOTES:
1. COORDINATE SYSTEM SHUT DOWN A MINIMUM
OF ONE WEEK IN ADVANCE WITH OWNER.
COORDINATE ALL WORK, INCLUDING SHUT
DOWNS, WITH THE ARCHITECTURAL PHASING
PLAN.
2. MAIN CORRIDOR FROM NORTH WING EXIT TO
PAST ELEVATOR LOBBY AND INTO WEST WING
INCLUDING CORRIDOR TO STAIRWELL MUST
REMAIN USABLE DURING NORMAL HOURS
(07:00 - 17:00). REFER TO ARCHITECTURAL
PHASING PLAN FOR MORE INFORMATION.
COORDINATE WORK WITH OWNER.
3. REFER TO COVER SHEET FOR ADDITIONAL
INFORMATION.
4. REFER TO DETAIL, SCHEDULE AND
CONTROLS DIAGRAMS FOR ADDITIONAL
INFORMATION.
5. REMOVE ALL ABANDONED DUCTWORK,
HANGERS, AND CONTROLS. VERIFY ITEMS ARE
NO LONGER IN USE PRIOR TO REMOVAL.
6. ALL PENETRATIONS BOTH NEW AND EXISTING
NEED TO BE PROPERLY FILLED AND SEALED.
7. REMOVE ALL VAV BOXES AND ASSOCIATED
DOWNSTREAM DUCTWORK, DIFFUSERS,
CONTROLS, HANGERS, AND SUPPORTS WITHIN
THE AREA OF SCOPE. REMOVE UPSTREAM
DUCTORK TO VAV SYSTEM UP TO MAINS AS
SHOWN ON FLOOR PLAN.
8. REMOVE ANY ABANDONED DUCT FOUND
AFTER CEILING IS BEING REMOVED.
9. POSSIBILITY OF ASBESTOS CONTAINING
MATERIALS(ACM) ON FITTINGS OR VAV
VALUES. COORDINATE WITH CONTRACTING
OFFICER REPRESENTATIVE(COR) IF ACM IS
FOUND.
KEYNOTES:
1. REMOVE DUCTWORK, VAV BOX, DIFFUSERS,
AND ASSOCIATED ACCESSORIES UP TO THIS
POINT AND PREPARE FOR NEW CONNECTION.
2. REMOVE DUCTWORK, DIFFUSERS, AND
ASSOCIATED ACCESSORIES UP TO THIS POINT
AND CAP.
3. REMOVE DUCTWORK, DIFFUSERS, AND
ASSOCIATED ACCESSORIES UP TO THIS POINT
AND PREPARE FOR NEW CONNECTION.
4. MEASURE EXISTING CFM AND RECORD.
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
DEMO EXISTING DUCTWORK COMING THROUGH
THE FLOOR FROM THE 1ST FLOOR CEILING AND
CAP THE DUCTS ON 1ST FLOOR. PATCH AND
REPAIR THE FLOOR AS REQUIRED TO MATCH THE
FINISH WITH THE REST OF THE FLOOR.
REMOVE EXISTING DUCT
STUB FOR 3RD FLOOR AND
SEAL OPENINGS AS
REQUIRED TO MAINTAIN
RATING. (TYP. ALL)
REMOVE BOXES, BRACKETS, CONTROLS,
ACCESSORIES, ETC. (TYP.)
Marc.T.Harris Snapshot
A312 A318A A318 A322 A323
A321A
A319
A317
C A
A353A354
D334A
D335D334
D333BD333A
A356
A358
D333
A318
A320
A314
C3A6
C3A4
A
A316 A321
B302
B316 B317 B318
B303 B301 B300
B323
B320
B347
B345
A A
B344
B342
B341
C3B5
B304A
B340
B315B
B316A
B316B
B317A B318A
B301AB303A
D332
STR #1
#2#3 #1
#7
D N
U P
U P
NaN M L
2.8
3.7
4.6
5.5
6.3
K J H G F E
COORDINATE SYSTEM REMOVAL AND
REPLACEMENT IN THIS AREA WITH
VENTILATION FOR NEW DUCTWORK AND
REFRIGERANT PIPING AS REQUIRED FOR
SECOND FLOOR RENOVATION.
8x8
12x12
CD-E
EG-E
20x12
26x9ø
16x6
10x12
VAV-E
x9 ø R
A
14x8 EA
30x16ø VAV-E
18x11 x1
22x9 26x9ø x9 ø x8 x1
22x14
22x14
26x12
26x16ø
20x9ø
20x9ø
16x12
13x610x8
10x10
12x12
8x8
8x8
10x6
14ø14x12
16x6
12x6
16x10 11ø
10x10
14x10 8x6
15ø5 x1
36x12
14x12
24x10
10x12
11ø
8ø
11ø
15ø
VAV-E
10x8
12x6
16x6
16x6
32x12ø
10x8
EG-E
CD-E
CD-ESD-E
SD-E
CD-E
CD-E
RG-E
RG-E
RG-E
CD-E
CD-E
RG-E
RG-E
RG-E
RG-E
RG-E
SG-E
EG-E
EG-E
CD-E
CD-E
CD-E
EG-E EG-E
RG-E RG-E
RG-E
RG-E
EG-E
EG-E
CD-E
CD-E
CD-E
CD-E
CD-E
CD-E
EG-E
EG-E
EG-E
EG-E
26ø ø
20ø
8x8
12ø
10ø
VAV-E VAV-E
16x10
30x8
16x14
16x10
VAV-E
12x10
10x10
VAV-E
x1
12x10
14x12
14x10 14x12
12x12 x8
VAV-E
VAV-E
VAV-E
VAV-E
VAV-EVAV-E
VAV-E
VAV-E
VAV-E
8x8
12ø
26x14ø
14x8
19ø
LD-E
8ø
SD-E
50x14
RG-E
40x6
28x14
22x824x10
SG-E
18x6
19Ø DN
19Ø DN
40x22 DN
27Ø DN
42x14 DN
40x20 DN
VAV-E
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/7
/2
:0
:1
P M
LEVEL 03 - VENTILATION DEMOLITION
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MD202
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
N
O R HT
1/8" = 1'-0"1
LEVEL 03 - VENTILATION DEMOLITION
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
GENERAL SHEET NOTES:
1. CONTRACTORS MUST VISIT THE SITE PRIOR TO
BID TO DETERMINE THE AMOUNT OF WORK
REQUIRED. SITE WORK DURING DESIGN WAS
LIMITED DUE TO COVID-19 AND CONDITIONS
SHOWN ARE BASED UPON EXISTING
DRAWINGS.
2. COORDINATE SYSTEM SHUT DOWN A MINIMUM
OF ONE WEEK IN ADVANCE WITH OWNER.
COORDINATE ALL WORK, INCLUDING SHUT
DOWNS, WITH THE ARCHITECTURAL PHASING
PLAN.
3. ALL PENETRATIONS BOTH NEW AND EXISTING
NEED TO BE PROPERLY FILLED AND SEALED.
4. REFER TO COVERSHEET FOR ADDITIONAL
INFORMATION.
5. TEMPORARY CONNECTIONS CAN BE MADE
WITH FLEXIBLE DUCTWORK OR OTHER
METHODS TO ALLOW PLUMBING WORK TO BE
ACCOMPLISHED. METHOD FOR CUTTING INTO
DUCTWORK SHOULD PROVIDE MINIMAL
DOWNTIME OF THE SYSTEM AND BE
REVIEWED AND DISCUSSED WITH THE OWNER.
COORDINATE TEMPORARY CONNECTION
MEHOD USED WITH OWNER.
KEYNOTE:
1. REMOVE DUCTWORK AS INDICATED FOR
PLUMBING WORK. PROVIDE TEMPORARY
CONNECTIONS AS REQUIRED TO MAINTAIN
SYSTEM OPERATION DURING CONSTRUCTION.
COORDINATE WORK WITH PLUMBING WORK
AND OWNER. REFER TO GENERAL NOTES.
2. MEASURE EXISTING CFM AND RECORD.
TT
T
T T
T T T
T
Na N M L
2.8
3.7
4.6
5.5
6.3
K J H G F DE
7.2
8.3
9.1
12x8 x
26x12 x x 2 1 x x
16x10 x x x
24x1822x12
8x6
26x12 x
8x6 ø
RG-E
22x6
RG-E
x
RG-E
CD-E
CD-E
CD-E
CD-E
CD-E
CD-E
EG-E
CD-E
EG-E
CD-E EG-E
RG-E
CD-E
14x12
CD-E
CD-E
CD-E
CD-E
28x16
EXISTING 24"Ø SA UP (AC-S4)
EXISTING 24x18 RA
VAV-E
14x12
12x10
12x10
12x10
12x10
14x12 14x1210x10
10x6
10x6
14x12
10x6 12x8
FSD-E
FSD-E
FSD-E
14x12
12x10
17x13
18x12
8x8
REMOVE DUCTWORK, VAV BOX, DIFFUSERS,
AND ASSOCIATED ACCESSORIES UP TO THIS
POINT AND PREPARE FOR NEW CONNECTION.
REMOVE DUCTWORK, DIFFUSERS,
AND ASSOCIATED ACCESSORIES UP TO THIS
POINT AND PREPARE FOR NEW CONNECTION.
REMOVE THE EXHAUST
DUCTWORK, DIFFUSERS, AND
ASSOCIATED ACCESSORIES BACK
TO THE SHAFT AND CAP.
EXISTING 12x10 EA UP
EXISTING 12x10 EA UP
EXISTING 12x10 EA UP
EXISTING 12x10 EA UP
EXISTING 12x10 EA UP
EG-E
CD-E
CD-E
SD-E-E
10ø
8ø
VAV-E
36x30 RA TO ER-4
30x30 RA
16ø
Ø19 SA UP & DN (AC-S2)
DEMO AS SHOWN ON PLAN AND CAP.
REMOVE AND STORE THE EXISTING
THERMOSTAT AND WIRING, BRACKETS, AND
ACCESSORIES FOR RELOCATION.
RECORD EXISTING CFM.
REMOVE DUCTWORK, DIFFUSERS, TRANSITIONS,
AND ASSOCIATED ACCESSORIES UP TO THE
MAIN DUCT IN SHAFT AND PREPARE FOR NEW
CONNECTION.
MEASURE EXISTING
CFM AND RECORD
12x10 12x12 12x10 12x10 12x10
FSD-E
FSD-E
VAV-E
VAV-E
VAV-E
VAV-E
VAV-E VAV-E VAV-E
VAV-E
VAV-E
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
NOT FOR
PERMITTING OR
CONSTRUCTION
Sprinklered
Fully Sprinklered
C R e v it L o c a l F ile s \M
E P
T
.0
B H
C lin ic R e n o v a ti o n
C
A n u j.
S
.S h a rm a .r v t
/7
/2
:0
:1
P M
LEVEL 04 - VENTILATION DEMOLITION
SCOPRZ ANUSHA
BID DOCUMENTS 589A4-19-103
1-MD203
Columbia Harry S. Truman Memorial
Veterans Hospital
Columbia, Missouri
05/13/2021
N
O R HT
1/8" = 1'-0"1
LEVEL 04 - VENTILATION DEMOLITION
GENERAL SHEET NOTES:
1. COORDINATE SYSTEM SHUT DOWN A MINIMUM
OF ONE WEEK IN ADVANCE WITH OWNER.
COORDINATE ALL WORK, INCLUDING SHUT
DOWNS, WITH THE ARCHITECTURAL PHASING
PLAN.
2. REFER TO COVER SHEET FOR ADDITIONAL
INFORMATION.
3. REFER TO DETAIL, SCHEDULE AND
CONTROLS DIAGRAMS FOR ADDITIONAL
INFORMATION.
4. REMOVE ALL ABANDONED DUCTWORK,
HANGERS, AND CONTROLS. VERIFY ITEMS ARE
NO LONGER IN USE PRIOR TO REMOVAL.
5. ALL PENETRATIONS BOTH NEW AND EXISTING
NEED TO BE PROPERLY FILLED AND SEALED.
6. REMOVE ANY ABANDONED LINES FOUND
AFTER CEILING IS BEING REMOVED.
7. POSSIBILITY OF ASBESTOS CONTAINING
MATERIALS(ACM) ON FITTINGS OR VAV
VALUES. COORDINATE WITH CONTRACTING
OFFICER REPRESENTATIVE(COR) IF ACM IS
FOUND.
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.01Revisions: Date:
T T
T T T
T
T T
T T
T
T
T
T
T
T
T
T
T
T
T
NaN M L
2.8
3.7
4.6
5.5
6.3
K J H G F E
CLINIC OFFICE
A200
CLINIC OFFICE
A203
CLINIC OFFICE
A204
CLINIC OFFICE
A202
OBSERVATION
A201B CORRIDOR 2
C2A02
PSYCH. RES
A201
PSYCH. RES
A206
EXIST. STRG
A206A
CORRIDOR 1
C2A01 PSYCH. RES
A205
EXIST. ELEC
A207
CORRIDOR 3
C2A04
CORRIDOR 4
C2A03
TMS ROOM
A208
TMS ROOM
A210
EXIST. SOC WRK
A212
EXIST. SOC WRK
A213
CORRIDOR 5
C2A05
CARE COORDINATOR
A209
CARE COORDINATOR
A211
STAFF RESTROOM
A214
HAC
A215
EXIST. IT
A217
WOMEN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .