SPECIAL_CONDITIONS_FOR_BIDDERS.docx
DOCX document 18 KB Posted
- Solicitation number
- 25-B-127LL
- Issued by
- Volusia County, Florida
About this file
The document is a Special Conditions for Bidders file for the Volusia County Tax Collector Interior Renovations project located in the DeLand office in Florida. The project involves interior renovation and restoration work within an active, occupied county building, with the contractor responsible for all demolition and construction activities. The scope includes coordinating working hours to minimize disruption, managing site logistics, securing storage and staging areas, implementing security protocols, and maintaining communication with county project managers through weekly progress meetings.
Key special conditions for the project include strict requirements for site management, including daily clean-up, protection of existing facilities, obtaining necessary permits, and maintaining emergency egress paths. The contractor must comply with county security protocols, coordinate with modular furniture vendors, provide temporary dust barriers, and restore any damaged areas to their original condition. Additional responsibilities include documenting existing conditions, submitting product data and shop drawings for approval, maintaining construction documents on-site, and providing as-built documentation upon project completion. The contractor will need to work within the constraints of an active government office, ensuring minimal disruption to ongoing county operations.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL CONDITIONS FOR BIDDERS
Volusia County Tax Collector Interior Renovations - DeLand Office
1. WORKING HOURS AND NOISE RESTRICTIONS
· Large-scale activities and disturbances must be coordinated around County's existing scheduled council days
· Working in an active and occupied County building requires minimizing disruption
· Excessive noise, debris, or disruptive construction activity will not be permitted
· Contractor may be asked to stop work immediately if disruptions occur and continue after business hours
2. SITE LOGISTICS AND STORAGE
· County Project Manager and awarded contractor will determine locations for:
· Contractor's dumpster
· Material and equipment storage areas
· Construction staging areas
· County will provide designated parking for contractor personnel
· Potential storage and staging areas are included in project attachments
3. SECURITY REQUIREMENTS
· All tools must remain secure while working in public areas
· Contractor must comply with County security protocols
· Coordinate with County's security vendor who will be installing:
· Access control devices
· Security camera systems
· Contractor responsible for necessary network drops as outlined in prints
4. COORDINATION REQUIREMENTS
· Coordinate with County's modular furniture vendor
· Schedule coordination meetings with County staff as required
· Maintain regular communication with Project Manager regarding schedule changes
· Attend weekly progress meetings as required by project team
5. PROTECTION OF EXISTING FACILITIES
· Protect all existing finishes, furniture, and equipment set to remain
· Provide temporary dust barriers and containment as needed
· Restore any damage to existing conditions to original state
· Maintain clear emergency egress paths at all times
6. CLEAN-UP REQUIREMENTS
· Daily clean-up of all work areas required
· Remove construction debris from public areas immediately
· Maintain cleanliness of pathways and common areas throughout project
· Final cleaning must meet County standards prior to acceptance
7. PERMITS AND INSPECTIONS
· Contractor responsible for obtaining all necessary permits
· Schedule all required inspections with proper authorities
· Provide copies of all permits and inspection reports to County Project Manager
· Address any code compliance issues promptly
8. PROJECT DOCUMENTATION
· Maintain current set of construction documents on-site
· Document existing conditions prior to start of work
· Submit product data and shop drawings for approval prior to ordering
· Provide as-built documentation upon project completion
File details come from the government source that posted it. Updated .