This document is a Prime/Subcontractor Form for Volusia County, Florida, specifically for the Tax Collector Interior Renovations and Restoration project. The form is designed for contractors to list all proposed subcontractors for the project, with a requirement that prime contractors ensure subcontractors hold appropriate licenses and receive prior approval for any changes during project completion. The solicitation seeks a single contractor to perform demolition and construction activities at the DeLand office location, with detailed specifications provided in project documents.
The form includes multiple subcontractor disciplines such as Electrical, HVAC, Fire Alarm, Fire Protection, Plumbing, Carpentry, Millwork, Flooring, Demolition, and IT, allowing bidders to specify the dollar value and percentage of work for each discipline. The county will use this form to determine local bid preference in accordance with Section 2.8, D of the solicitation. Bidders are required to complete green-shaded areas with dollar values for prime and subcontractors, with the total percentage required to equal 100%. Failure to complete and return this form may result in a non-responsive bid.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prime Sub Form
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Electrical | $ - 0 | 0.00% | |
| HVAC | $ - 0 | 0.00% | |
| Fire Alarm | $ - 0 | 0.00% | |
| Fire Protection | $ - 0 | 0.00% | |
| Plumbing | $ - 0 | 0.00% | |
| Carpentry | $ - 0 | 0.00% | |
| Millwork | $ - 0 | 0.00% | |
| Flooring | $ - 0 | 0.00% | |
| Demo | $ - 0 | 0.00% | |
| IT | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
File details come from the government source that posted it. Updated .