Special_Conditions.pdf
PDF 158 KB Posted
- Solicitation number
- 25-B-127LL
- Issued by
- Volusia County, Florida
About this file
This document is an Exhibit "B" Special Conditions document for Volusia County's Tax Collector Interior Renovations and Restoration project, specifically Contract No. C-2038. The special conditions outline critical operational requirements for the contractor, including working hours, site logistics, security protocols, coordination expectations, and project management guidelines. The document provides detailed instructions covering eight key areas: working hours and noise restrictions, site logistics and storage, security requirements, coordination requirements, protection of existing facilities, clean-up requirements, permits and inspections, and project documentation.
The special conditions emphasize minimizing disruption to an active, occupied County building, with specific requirements such as coordinating large-scale activities around existing county schedules, maintaining secure tools and work areas, complying with County security protocols, and ensuring daily clean-up of work areas. The contractor will be responsible for obtaining necessary permits, scheduling inspections, maintaining on-site documentation, and providing as-built documentation upon project completion. Additional requirements include protecting existing facilities, maintaining clear emergency egress paths, and meeting the County's final cleaning standards prior to project acceptance.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract No. C-2038 ITB No.25-B-127LL
SC 1
EXHIBIT “B”
SPECIAL CONDITIONS
The following special conditions are supplementing, not replacing nor deleting the corresponding paragraphs in the general conditions.
1. WORKING HOURS AND NOISE RESTRICTIONS
• Large-scale activities and disturbances must be coordinated around the County’s existing scheduled council days
• Working in an active and occupied County building requires minimizing disruption
• Excessive noise, debris, or disruptive construction activity will not be permitted
• Contractor may be asked to stop work immediately if disruptions occur and continue after business hours
2. SITE LOGISTICS AND STORAGE
• County Project Manager and awarded contractor will determine locations for:
o Contractor's dumpster o Material and equipment storage areas o Construction staging areas
• County will provide designated parking for contractor personnel
• Potential storage and staging areas are included in project attachments
3. SECURITY REQUIREMENTS
• All tools must remain secure while working in public areas
• Contractor must comply with County security protocols
• Coordinate with County's security vendor who will be installing:
o Access control devices o Security camera systems
• Contractor responsible for necessary network drops as outlined in prints
4. COORDINATION REQUIREMENTS
• Coordinate with County's modular furniture vendor
• Schedule coordination meetings with County staff as required
• Maintain regular communication with Project Manager regarding schedule changes
• Attend weekly progress meetings as required by project team
5. PROTECTION OF EXISTING FACILITIES
• Protect all existing finishes, furniture, and equipment set to remain
• Provide temporary dust barriers and containment as needed
• Restore any damage to existing conditions to original state
• Maintain clear emergency egress paths at all times
Contract No. C-2038 ITB No.25-B-127LL
SC 2
6. CLEAN-UP REQUIREMENTS
• Daily clean-up of all work areas required
• Remove construction debris from public areas immediately
• Maintain cleanliness of pathways and common areas throughout project
• Final cleaning must meet County standards prior to acceptance
7. PERMITS AND INSPECTIONS
• Contractor responsible for obtaining all necessary permits
• Schedule all required inspections with proper authorities
• Provide copies of all permits and inspection reports to County Project Manager
• Address any code compliance issues promptly
8. PROJECT DOCUMENTATION
• Maintain current set of construction documents on-site
• Document existing conditions prior to start of work
• Submit product data and shop drawings for approval prior to ordering
• Provide as-built documentation upon project completion
| 1. WORKING HOURS AND NOISE RESTRICTIONS |
| 2. SITE LOGISTICS AND STORAGE |
| 3. SECURITY REQUIREMENTS |
| 4. COORDINATION REQUIREMENTS |
| 5. PROTECTION OF EXISTING FACILITIES |
| 6. CLEAN-UP REQUIREMENTS |
| 7. PERMITS AND INSPECTIONS |
| 8. PROJECT DOCUMENTATION |