Attachment XI - 4CP Report Sample.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- ERCOT CFE Electricity 2023
- Solicitation number
- SPE60423R0400
- Issued by
-
Defense Logistics Agency Energy
About this file
This solicitation requests proposals for the supply of carbon pollution-free electricity and ancillary services to Department of Defense and other federal agency installations located in the Electric Reliability Council of Texas region. The Defense Logistics Agency Energy seeks offers for a three-year delivery period from January 2024 through January 2027 totaling an estimated 1,340,500,819 kilowatt hours. Awards will be either firm-fixed-price or fixed-price requirements contracts using real-time settlement point pricing. Interested parties should submit any questions by January 27, 2023 and are encouraged to submit responsive proposals for consideration.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Power Factor Solicitation SPE60423R0400 Attachment XI - 4CP Report Sample
| Actual Demand and kVar | |||
| Consumption | kVARH | ||
| Peak Interval | 2466.18 | <---Enter----> | 736.02 |
| Trans losses | 2555.16 | 739.70 | |
| Divide by: | 0.25 | 0.25 | |
| (> of 80% ratchet) | 10,221 | 13380 | 2,959 |
| Actual Demand and kVar | 9,865 | 3,345.00 | 2,944.0800 |
Squared: 104,461,480.51 8,754,497.44
Summed divisor squared: 113,215,978
Divisor 10,640
| Actual Power Factor: | 0.961 |
| Trans Voltage Adj PF, 3% per ONCOR |
Lynn, Bobby Mr CIV USA: NOTE:
| 8-4-2020: Meter is on Low-Side, per Section 6.2.3.2 of Tariff. | 0.932 | |
| Target Power Factor: | 0.95 |
Power Factor Adjustment Ratio: 1.01931
| *PF Billing KW is the Higher of the Actual or 80% of the PF adjusted Ratchet for the previous 11 months | 0.005 | ||
| ERROR:#REF! | PF Billing KW | PF Billing 4 CP | |
| 10418 | 9869 | ||
| ERROR:#REF! | |||
| Location Svc: WFH-1 | |||
| 0.030 | Trans Voltage Adjusted Power Factor (%) | ||
| 8795 | 80% x PF Adjusted Ratchet (without losses) | ||
| 9944 | PF Adjusted Ratchet (with losses) | ||
| 9865 | PF Adjusted Ratchet (without losses) | ||
| 9869 | PF Adjusted 4CP | ||
| 10221 | Actual | ||
| 10418 | PF Adjusted KW (no losses) | *If the ratch was not PF adj, then PF ratio would be 1 | |
| 10,470 | PF Adjusted KW (with losses) | *If Actual is Higher then it would be PF adjusted | |
| 8,795 | PREVIOUS Ratchet | *See PF Adjusted Ratchet Tab (for explanation) |
PF Adjusted 4CP Solicitation SPE60423R0400 Attachment XI - 4CP Report Sample
| Premise# 9416007 | |||||||
| Power Factor Calculator for June | Power Factor Calculator for July | ||||||
| Consumption | kVARH | Consumption | kVARH | ||||
| 6/23/21 17:00 | 1999.0691 | <---Values----> | 1355.8201 | 7/26/21 17:00 | 1963.1771 | <---Values----> | 1397.5801 |
| Divide by: | 0.25 | 0.25 | Divide by: | 0.25 | 0.25 | ||
| 7,996 | 5,423.2803 | 7,853 | 5,590.3203 |
| Squared: | 63,940,435.6255 | 29,411,968.9954 | Squared: | 61,665,030.4719 | 31,251,681.2802 | ||
| Summed divisor squared: | 93,352,405 | Summed divisor squared: | 92,916,712 | ||||
| Divisor | 9,662 | Divisor | 9,639 | ||||
| Actual Power Factor: | 0.8276087 | Actual Power Factor: | 0.8146528 | ||||
| Trans Voltage Adj PF, 3% per ONCOR | 0.80278 | Trans Voltage Adj PF, 3% per ONCOR | 0.79021 | ||||
| Target Power Factor: | 0.950 | Target Power Factor: | 0.950 | ||||
| Power Factor Adjustment Ratio: | 1.18339 | Power Factor Adjustment Ratio: | 1.20221 |
| Power Factor Calculator for August | Power Factor Calculator for September | ||||||
| Consumption | kVARH | Consumption | kVARH | ||||
| 8/24/21 17:00 | 2043.1893 | <---Values----> | 1501.3351 | 9/1/21 17:00 | 2218.9819 | <---Values----> | 1477.5299 |
| Divide by: | 0.25 | 0.25 | Divide by: | 0.25 | 0.25 | ||
| 8,173 | 6,005.3403 | 8,876 | 5,910.1196 |
| Squared: | 66,793,962.2116 | 36,064,112.3590 | Squared: | 78,782,092.8907 | 34,929,514.1591 | ||
| Summed divisor squared: | 102,858,075 | Summed divisor squared: | 113,711,607 | ||||
| Divisor | 10,142 | Divisor | 10,664 | ||||
| Actual Power Factor: | 0.8058 | Actual Power Factor: | 0.8323603 | ||||
| Trans Voltage Adj PF, 3% per ONCOR | 0.78167 | Trans Voltage Adj PF, 3% per ONCOR | 0.80739 | ||||
| Target Power Factor: | 0.950 | Target Power Factor: | 0.950 | ||||
| Power Factor Adjustment Ratio: | 1.21535 | Power Factor Adjustment Ratio: | 1.17663 |
| PF Adjusted 4CP Calculation: | |||
| Date and Time Interval | Peak kW | Power Factor Ratio | Total |
| 6/23/21 17:00 | 7996.28 | 1.1834 | 9,462.69 |
| 7/26/21 17:00 | 7852.71 | 1.2022 | 9,440.58 |
| 8/24/21 17:00 | 8172.76 | 1.2154 | 9,932.79 |
| 9/1/21 17:00 | 8875.93 | 1.1766 | 10,443.70 |
| PF Billing 4 CP(without losses) | 9,819.94 | ||
| PF Billing 4 CP(with losses) | 9,869.04 | ||
| Loss1--> | 0.005 | ||
| I N P U T D A T A F R O M O N C O R | |||
| DATE/TIME/GROUP | KWH | KVARs | <-- INFORMATION provided by Oncor |
| 6/23/21 17:00 | 1999.06909 | 1355.82007 | |
| 7/26/21 17:00 | 1963.17712 | 1397.58008 | |
| 8/24/21 17:00 | 2043.18933 | 1501.33508 | |
| 9/1/21 17:00 | 2218.98193 | 1477.52991 |
File details come from the government source that posted it. Updated .