This Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract is the third amendment to solicitation SPE603-25-R-0503 for environmental services at two Defense Fuel Support Point (DFSP) facilities in California. The amendment updates multiple contract details, including revising the base and optional extension periods for both Norwalk and San Pedro locations to start in August 2025, with base periods running through July/August 2029 and optional extensions through January/February 2030.
Key changes include updating the Service Contract Act Wage Determination to Revision 29, correcting price proposal worksheets for both locations, and modifying various contract sections to reflect the new start dates. The solicitation remains for environmental remediation, compliance, and facility maintenance services, with the government anticipating two separate indefinite-delivery, indefinite-quantity firm fixed-price contracts. The procurement is unrestricted under NAICS code 562910 (Remediation Services) and aims to achieve site closure while protecting human health and the environment at the Norwalk and San Pedro fuel support points.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE603 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60325R0503
X
2025 JAN 28
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
BULK PETROLEUM SERVICES
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 4 PAGES
SPE60325R0503 - 0003
The purpose of Amendment 0003 to solicitation SPE603-25-R-0503 is to make the following changes:
A.Update ATTACHMENT 9 – SCA WD 2015-5613 from REV 28 (12.23.2024) to REV 29 (05.21.2025)
B.Provide a corrected ATTACHMENT 4 Norwalk Price Proposal Worksheet.
C.Provide a corrected ATTACHMENT 5 San Pedro Price Proposal Worksheet.
D.Revise the Solicitation as follows (a revised copy of the solicitation with changes highlighted is attached):
1)Revise B35 SERVICES TO BE FURNISHED AND PRICES (ENVIRONMENTAL) (DLA ENERGY MAR 2009), Paragraph E: Change the quantities in Reference Item 004 to 4, in Reference Item 013 to 2, Reference Item 014 to 2
2)Revise B35 SERVICES TO BE FURNISHED AND PRICES (ENVIRONMENTAL) (DLA ENERGY MAR 2009), Paragraph H From:
Base Period: July 1, 2025 – June 30, 2029 Option Period: July 1, 2029 – December 31, 2029
To:
NORWALK
Base Period: August 1, 2025 – July 31, 2029 Optional Extension Period: August 1, 2029 – January 31, 2030
SAN PEDRO
Base Period: August 11, 2025 - August 10, 2029 Optional Extension Period: August 11, 2029 – February 10, 2030
3)Revise F-0001 F4 DELIVERY AND ORDERING PERIODS (DLA ENERGY JUN 2002)(a) From:
(1) Ordering period begins: July 1, 2025 and ends: June 30, 2029.
(2) Delivery period begins: July 1, 2025 and ends: 30 days after end of ordering period.
To:
NORWALK
(1) Anticipated Ordering period begins: August 1, 2025 and ends: July 31, 2029.
(2) Anticipated Delivery period begins: August 1, 2025 and ends: July 31, 2030.
SAN PEDRO
(1) Anticipated Ordering period begins: August 11, 2025 and ends: August 10, 2029.
(2) Anticipated Delivery period begins: August 11, 2025 and ends: August 10, 2030.
4)Revise FAR 52.216-18 ORDERING (AUG 2020) From:
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from date of contract award through June 30, 2029.
To:
DFSP NORWALK
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from date of contract award through July 31, 2029.
DFSP SAN PEDRO
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from date of contract award through August 10, 2029.
5)Revise FAR 52.216-22 INDEFINITE QUANTITY (OCT 1995) From:
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after June 30, 2029.
To:
DFSP NORWALK
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after July 31, 2030.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 3 OF 4 PAGES
DFSP SAN PEDRO
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after August 10, 2030.
6)Update Section J Attachment 9 to ATTACHMENT 9 – SCA WD 2015-5613 REV 29 (05.21.2025).
E.All changes to the solicitation clauses and provisions are highlighted in the attached “SPE60325R0503 RFP conformed Amd0003”.
F.All other terms and conditions shall remain the same.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 4 PAGES
Attachments
List of Attachments
Description File Name
ATTACH_ATTACHMENT_
4_Norwalk_PPW_7_18_25
ATTACHMENT 4 Norwalk PPW 7.18.25.xlsx
ATTACH_ATTACHMENT_
5_San_Pedro_PPW_7_21
_25
ATTACHMENT 5 San Pedro PPW 7.21.25.xlsx
ATTACH_ATTACHMENT_
9___SCA_WD_2015_5613
_REV_29_05_21_2025
ATTACHMENT 9 - SCA
WD 2015-5613 REV 29
05.21.2025.pdf
ATTACH_SPE60325R050
3_RFP_conformed_Amd00
SPE60325R0503 RFP
conformed Amd0003.pdf
File details come from the government source that posted it. Updated .