ATTACHMENT 4 Norwalk PPW 7.18.25.xlsx

XLSX spreadsheet 120 KB Posted

Attached to
SPE603-25-R-0503 DFSP Norwalk and DFSP San Pedro Environmental Services
Solicitation number
SPE603-25-R-0503
Issued by

About this file

This attachment is a comprehensive Price Proposal Worksheet for the DFSP Norwalk environmental services contract (Solicitation SPE603-25-R-0503), detailing an extensive range of line items across multiple contract performance categories. The worksheet includes granular pricing structures for reports and responses (such as project management plans, meeting minutes, and quarterly status reports), services (including various professional labor rates from environmental scientists to heavy equipment operators), drilling and well installation services, facility maintenance, miscellaneous equipment rentals, and analytical testing services.

The pricing document is structured with Contract Line Item Numbers (CLINs) 0001-0008, with an estimated annual utilities allowance of $2,500,000 for CLIN 0007. The estimated annual quantities vary widely across line items, ranging from 1 to 619 units for different services and tests. Notably, the worksheet includes specific pricing for emerging environmental concerns like PFAS (Per- and Polyfluoroalkyl Substances) testing and disposal, with line items for PFAS analysis in water and soil, and disposal of PFAS-contaminated materials. The document appears designed to provide comprehensive, flexible pricing for environmental remediation, monitoring, and maintenance services at the DFSP Norwalk facility.

View the file

Other files

File Type Posted
SF30 SPE60325R0503 0004 7.25.2025.pdf PDF
SPE60325R0503 RFP conformed Amd0004.pdf PDF
ATTACHMENT 9 SCA WD 2015-5613 REV 29 5.21.25.pdf PDF
SF30 SPE60325R0503 0003 7.21.2025.pdf PDF
ATTACHMENT 5 San Pedro PPW 7.21.25.xlsx XLSX spreadsheet
SPE60325R0503 RFP conformed Amd0003.pdf PDF
SF30 SPE60325R0503 0002.PDF PDF
SF30 SPE60325R0503 0001.PDF PDF
ATTACHMENT 9 - SCA WD 2015-5613 REV 28 12.23.2024.pdf PDF
ATTACHMENT 4 - Norwalk Price Proposal Worksheet 3.12.2025.xlsx XLSX spreadsheet
ATTACHMENT 1 - PWS Amendment 0001 3.14.2025.pdf PDF
SF30 SPE60325R0503 0001.PDF PDF
SPE60325R0503 DFSP Norwalk San Pedro Solicitation 1.29.2025.pdf PDF
ATTACHMENT 5 - San Pedro Price Proposal Worksheet 3.12.2025.xlsx XLSX spreadsheet
SPE60325R0503 0001 Clauses 3.19.2025 .pdf PDF
SECNAV_ 5512_fillable.pdf PDF
ATTACHMENT 4 - Norwalk Price Proposal Worksheet 1.29.2024.xlsx XLSX spreadsheet
ATTACHMENT 10 - QASP CA Env Services 1.6.2025.pdf PDF
ATTACHMENT 11 - SB Subcontracting Plan.pdf PDF
ATTACHMENT 5 - San Pedro Price Proposal Worksheet 1.29.2024.xlsx XLSX spreadsheet
ATTACHMENT 9 - SCA WD 2015-5613 REV 27 7.22.2024.pdf PDF
ATTACHMENT 3 - San Pedro FSA PWS 12.31.2024.pdf PDF
ATTACHMENT 6 - Past Performance Questionnaire.docx DOCX document
ATTACHMENT 12 - DFSP Norwalk Utilities_Redacted.pdf PDF
ATTACHMENT 13 - DFSP San Pedro Utilities_Redacted.pdf PDF
ATTACHMENT 1 - Final DFSP Norwalk San Pedro PWS 1.24.2025.pdf PDF
ATTACHMENT 8 - Joint Venture Consent Form.docx DOCX document
ATTACHMENT 2 - Norwalk FSA PWS 12.31.2024.pdf PDF
ATTACHMENT 7 - Past Performance Reference List.xlsx XLSX spreadsheet
SPE60325R0504 DFSP Norwalk San Pedro Solicitation 1.29.2025.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Norwalk CLINs 0001 - 0008

COMPANY & LOCATION:PROPOSAL VERSION NO.:
PREPARER NAME:DATE PREPARED:18-Jul-2025
REFERENCE ITEMCLINTYPEITEM DESCRIPTIONESTIMATED ANNUAL QUANTITYUNITUNIT PRICETotal Annual Price (Estimated Quantity x Unit Price)
REPORTS AND RESPONSE
0010001REPDraft Project Management Plan1EA$0.00
0020001REPFinal Project Management Plan1EA$0.00
0030001REPDFSP Norwalk and Tustin/El Toro Pipeline Kickoff Meeting Minutes2EA$0.00
0040001REPQuarterly Project Management Review Meeting Minutes4EA$0.00
0050001REPRegulatory Agency/Stakeholder Meeting Minutes2EA$0.00
0060001REPRAB or Public Meeting Minutes, Fact Sheet/Mailing1EA$0.00
0070001REPAnnual DLA Headquarters Briefing Meeting Minutes1EA$0.00
0080001REPContract Closure Meeting Minutes1EA$0.00
0090001REPMonthly Utility Invoicing Summary12EA$0.00
0100001REPDFSP Norwalk Remedial Systems Quarterly Status Report4EA$0.00
0110001REPEl Toro Pipeline Release Site LNAPL Gauging, Recovery and Disposal Annual Report1EA$0.00
0120001REPEl Toro Pipeline Release Site Remedial Systems Quarterly Status Report4EA$0.00
0130001REPDFSP Norwalk Semi-Annual Groundwater Monitoring Data Summary Report1EA$0.00
0140001REPDFSP Norwalk Semi-Annual Groundwater Monitoring Report1EA$0.00
0150001REPEl Toro Pipeline Release Site Semi-Annual Groundwater Monitoring Report for up to 20 Wells1EA$0.00
0160001REPEl Toro Pipeline Release Site Semi-Annual Groundwater Monitoring Report for up to 40 Wells1EA$0.00
0170002REPDFSP Norwalk Facility Compliance Quarterly Summary Report4EA$0.00
0180003REPDFSP Norwalk Facility Maintenance Quarterly Summary Report4EA$0.00
SERVICES
0190004-0006SVCAsbestos Site Supervisor or Safety Officer price per hour10EA$0.00
0200004-0006SVCAsbestos worker price per hour10EA$0.00
0210004-0006SVCBiologist/Botanist 1 price per hour15EA$0.00
0220004-0006SVCBiologist/Botanist 2 price per hour15EA$0.00
0230004-0006SVCBuyer price per hour91EA$0.00
0240004-0006SVCCertified Industrial Hygienist price per hour18EA$0.00
0250004-0006SVCChemist 1 price per hour58EA$0.00
0260004-0006SVCChemist 2 price per hour80EA$0.00
0270004-0006SVCChemist 3 price per hour81EA$0.00
0280004-0006SVCCost Accountant price per hour169EA$0.00
0290004-0006SVCDrafter (including CAD, hardware & software) price per hour94EA$0.00
0300004-0006SVCEngineer 1 (Staff) price per hour250EA$0.00
0310004-0006SVCEngineer 2 (Project) price per hour269EA$0.00
0320004-0006SVCEngineer 3 (Senior) price per hour269EA$0.00
0330004-0006SVCEnvironmental Scientist 1 price per hour619EA$0.00
0340004-0006SVCEnvironmental Scientist 2 price per hour619EA$0.00
0350004-0006SVCEnvironmental Scientist 3 price per hour269EA$0.00
0360004-0006SVCEnvironmental Technician price per hour269EA$0.00
0370004-0006SVCGeologist 1 price per hour406EA$0.00
0380004-0006SVCGeologist 2 price per hour381EA$0.00
0390004-0006SVCGeologist 3 price per hour306EA$0.00
0400004-0006SVCHealth and Safety Officer price per hour69EA$0.00
0410004-0006SVCHeavy Equipment operator price per hour263EA$0.00
0420004-0006SVCHydrogeologist 1 price per hour250EA$0.00
0430004-0006SVCHydrogeologist 2 price per hour159EA$0.00
0440004-0006SVCLaborer price per hour400EA$0.00
0450004-0006SVCProject Manager price per hour338EA$0.00
0460004-0006SVCQA/QC Officer price per hour116EA$0.00
0470004-0006SVCRemediation System Operator price per hour407EA$0.00
0480004-0006SVCSecretary price per hour276EA$0.00
0490004-0006SVCTranslator, English to Spanish20EA$0.00
0500004-0006SVCCourt reporter, public meeting transcript6EA$0.00
0510004-0006SVCSite Labor Foreman price per hour20EA$0.00
0520004-0006SVCToxicologist/risk assessor 1 price per hour40EA$0.00
0530004-0006SVCToxicologist/risk assessor 2 price per hour88EA$0.00
0540004-0006SVCToxicologist/risk assessor 3 price per hour125EA$0.00
0550004-0006SVCTraffic Control Engineer price per hour20EA$0.00
FACILITY MAINTENANCE
0560004-0006SVCLaborer/Contractor (Line riding, inspections)45EA$0.00
0570004-0006SVCElectrician101EA$0.00
0580004-0006SVCLaborer (e.g. trash picker)138EA$0.00
0590004-0006SVCMaintenance Mechanic76EA$0.00
DRILLING, WELL INSTALLATION, AND OTHER INVESTIGATION SERVICES
0600004-0006DRLMobilization/Demobilization Cost for horizontal directional drilling equipment (horizontal well install)1EA$0.00
0610004-0006DRLHorizontal directional drilling, blind terminus, 4 1/4" ID, up to 25 feet bgs (vadose zone), per lineal foot25EA$0.00
0620004-0006DRLHorizontal directional drilling, blind terminus, 4 1/4" ID, up to 55 feet bgs (saturated zone), per lineal foot25EA$0.00
0630004-0006DRLHorizontal directional drilling, blind terminus, 6 1/4" ID, up to 25 feet bgs (vadose zone), per lineal foot25EA$0.00
0640004-0006DRLHorizontal directional drilling, blind terminus, 6 1/4" ID, up to 55 feet bgs (saturated zone), per lineal foot25EA$0.00
0650004-0006DRLMobilization/Demobilization Cost for HSA drill rig (soil boring/probe/well install)2EA$0.00
0660004-0006DRLHSA boring, price of 2 1/4" ID, up to 20 feet1EA$0.00
0670004-0006DRLHSA boring, cost per foot of 2 1/4" ID, from 21 to 40 feet20FT$0.00
0680004-0006DRLHSA boring, cost per foot of 2 1/4" ID, 41 to 80 feet40FT$0.00
0690004-0006DRLHSA boring, cost per foot of 2 1/4" ID, 81 to 150 feet70FT$0.00
0700004-0006DRLHSA boring, price of 4 1/4" ID, up to 20 feet1EA$0.00
0710004-0006DRLHSA boring, cost per foot of 4 1/4" ID, from 21 to 40 feet20FT$0.00
0720004-0006DRLHSA boring, cost per foot of 4 1/4" ID, 41 to 80 feet20FT$0.00
0730004-0006DRLHSA boring, cost per foot of 4 1/4" ID, 81 to 150 feet70FT$0.00
0740004-0006DRLHSA boring, price of 8 1/4" ID, up to 20 feet1EA$0.00
0750004-0006DRLHSA boring, cost per foot of 8 1/4" ID, from 21 to 40 feet40FT$0.00
0760004-0006DRLHSA boring, cost per foot of 8 1/4" ID, 41 to 80 feet40FT$0.00
0770004-0006DRLHSA boring, cost per foot of 8 1/4" ID, 81 to 150 feet25FT$0.00
0780004-0006DRLMobilization/Demobilization Cost for Rotosonic drill rig (soil boring/probe/well install)1EA$0.00
0790004-0006DRLSonic boring, price of 4" ID, up to 20 feet1EA$0.00
0800004-0006DRLSonic boring, cost per foot of 4" ID, from 21 to 40 feet20FT$0.00
0810004-0006DRLSonic boring, cost per foot of 4" ID, 41 to 80 feet40FT$0.00
0820004-0006DRLSonic boring, cost per foot of 4" ID, 81 to 150 feet70FT$0.00
0830004-0006DRLSonic boring, price of 6" ID, up to 20 feet2EA$0.00
0840004-0006DRLSonic boring, cost per foot of 6" ID, from 21 to 40 feet10FT$0.00
0850004-0006DRLSonic boring, cost per foot of 6" ID, 41 to 80 feet20FT$0.00
0860004-0006DRLSonic boring, cost per foot of 6" ID, 81 to 150 feet18FT$0.00
0870004-0006DRLSonic boring, price of 8" ID, up to 20 feet1EA$0.00
0880004-0006DRLSonic boring, cost per foot of 8" ID, from 21 to 40 feet10FT$0.00
0890004-0006DRLSonic boring boring, cost per foot of 8" ID, 41 to 80 feet20FT$0.00
0900004-0006DRLSonic boring boring, cost per foot of 8" ID, 81 to 150 feet18FT$0.00
0910004-0006DRLSVE/Biosparging Well installation, cost of 2" SCH 40 PVC including all materials, up to 20 feet bgs1EA$0.00
0920004-0006DRLSVE/Biosparing Well installation, cost of 2" SCH 40 PVC including all materials, from 21 to 40 feet bgs5FT$0.00
0930004-0006DRLSVE/Biosparging Well installation, cost of 2" SCH 40 PVC including all materials, from 41 to 80 feet bgs10FT$0.00
0940004-0006DRLSVE/Biosparging Well installation, cost of 2" SCH 40 PVC including all materials, from 81 to 150 feet bgs18FT$0.00
0950004-0006DRLSVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, up to 20 feet bgs1EA$0.00
0960004-0006DRLSVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, from 21 to 40 feet bgs5FT$0.00
0970004-0006DRLSVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, from 41 to 80 feet bgs10FT$0.00
0980004-0006DRLSVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, from 81 to 150 feet bgs18FT$0.00
0990004-0006DRLSVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, up to 20 feet bgs1EA$0.00
1000004-0006DRLSVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, from 21 to 40 feet bgs5FT$0.00
1010004-0006DRLSVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, from 41 to 80 feet bgs10FT$0.00
1020004-0006DRLSVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, from 81 to 150 feet bgs18FT$0.00
1030004-0006DRLSVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, up to 20 feet bgs1EA$0.00
1040004-0006DRLSVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, from 21 to 40 feet bgs5FT$0.00
1050004-0006DRLSVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, from 41 to 80 feet bgs10FT$0.00
1060004-0006DRLSVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, from 81 to 150 feet bgs18FT$0.00
1070004-0006DRLSVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, up to 20 feet bgs1EA$0.00
1080004-0006DRLSVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, from 21 to 40 feet bgs5FT$0.00
1090004-0006DRLSVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, from 41 to 80 feet bgs10FT$0.00
1100004-0006DRLSVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, from 81 to 150 feet bgs18FT$0.00
1110004-0006DRLMonitoring well installation, cost of 2" SCH 40 PVC including all materials, up to 20 feet, in HSA or Sonic boring1EA$0.00
1120004-0006DRLMonitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 21 to 40 feet, in HSA or Sonic boring5FT$0.00
1130004-0006DRLMonitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 41 to 80 feet, in HSA or Sonic boring10FT$0.00
1140004-0006DRLMonitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 81 to 150 feet, in HSA or Sonic boring18FT$0.00
1150004-0006DRLMonitoring well installation, additional cost per foot, 2" 304 Stainless Steel in place of SCH 40 PVC, in HSA or Sonic boring20FT$0.00
1160004-0006DRLMonitoring well installation, cost per 4" SCH 40 PVC monitoring well up to 20 feet, in HSA or Sonic boring10EA$0.00
1170004-0006DRLMonitoring well installation, cost per 4" SCH 40 PVC monitoring well from 21 to 40 feet, in HSA or Sonic boring10FT$0.00
1180004-0006DRLMonitoring well installation, cost per 4" SCH 40 PVC monitoring well from 41 to 80 feet, in HSA or Sonic boring20FT$0.00
1190004-0006DRLMonitoring well installation, cost per 4" SCH 40 PVC monitoring well from 81 to 150 feet, in HSA or Sonic boring18FT$0.00
1200004-0006DRLMonitoring well installation, additional price per foot of 4" 304 Stainless Steel in place of SCH 40 PVC, in HSA or Sonic boring20FT$0.00
1210004-0006DRLMonitoring Well, Install flush mount box for 2" or 4" well1EA$0.00
1220004-0006DRLMonitoring Well, Install above grade (4x4 pad), steel casing1EA$0.00
1230004-0006DRLMobilization/Demobilization Cost, Well Decommissioning1EA$0.00
1240004-0006DRLDecommission 2" dia. vertical well, grout in place, remove top 5' of casing, cost per foot1250EA$0.00
1250004-0006DRLDecommission 4" dia. vertical well, grout in place, remove top 5' of casing, cost per foot1250EA$0.00
1260004-0006DRLDecommission 6" dia. vertical well, grout in place, remove top 5' of casing, cost per foot125EA$0.00
1270004-0006DRLDecommission 2" dia. vertical well, overdrill and grout, cost per foot1250EA$0.00
1280004-0006DRLDecommission 4" dia. vertical well, overdrill and grout, cost per foot1250EA$0.00
1290004-0006DRLDecommission 6" dia. vertical well, overdrill and grout, cost per foot125EA$0.00
1300004-0006DRLDecommission 4" dia. horizontal well, cost per lineal foot250EA$0.00
1310004-0006DRLDecommission 6" dia. horizontal well, cost per lineal foot250EA$0.00
1320004-0006DRLWell Development, 2" dia. including all equipment and supplies, per well1EA$0.00
1330004-0006DRLWell Development, 4" dia. including all equipment and supplies, per well5EA$0.00
1340004-0006DRLWell Inspection - Down Hole Camera Inspection, vertical well, to include report of findings, per Half Day0EA$0.00
1350004-0006DRLDPT (Direct Push Technology) Drilling, Mobilization/Demobilization price0EA$0.00
1360004-0006DRLDPT BORING, price per day, including all tooling0EA$0.00
1370004-0006DRLDPT SOIL SURVEY - Price per unit (10 points/unit) - up to 5 feet depth, per day1EA$0.00
1380004-0006DRLSOIL & GAS SURVEY - Price per unit (10 points/unit) - greater than 5 to 15 feet depth, DPT Rig, per day1EA$0.00
1390004-0006DRLSOIL & GAS SURVEY - Price per unit (10 points/unit) - up to 5 feet depth, hand auger, including report of findings1EA$0.00
1400004-0006DRLSOIL & GAS SURVEY - Price per unit (10 points/unit) - greater than 5 to 15 feet depth, hand auger, per day1EA$0.00
1410004-0006DRLSURVEY - Boring/Well location survey (price per 10)1EA$0.00
1420004-0006DRLSURVEY - Physical Survey price per half day (includes surveyor, crew, and equipment)1EA$0.00
1430004-0006DRLUTILITY CLEARANCE - Geophysical/GPR Survey, Price per unit (10,000 linear feet) to include in report of findings1EA$0.00
MISCELLANEOUS
1440004-0006MISBrass Long-shackle monitoring well locks, keyed alike, each3EA$0.00
1450004-0006MISCrane rental, price per day including fuel1EA$0.00
1460004-0006MISBackhoe Loader, 2WD, 14 ft boom, multipurpose bucket, per week3EA$0.00
1470004-0006MISBackhoe Loader, 4WD, 14 ft boom, multipurpose bucket, per week1EA$0.00
1480004-0006MISDisposal, Hazardous (for VOCs) per gallon28EA$0.00
1490004-0006MISDisposal, Hazardous (for heavy metals) per gallon28EA$0.00
1500004-0006MISDisposal, Hazardous (for VOCs) per Drum1EA$0.00
1510004-0006MISDisposal, Hazardous (for heavy metals) per Drum1EA$0.00
1520004-0006MISDisposal, Hazardous (for ignitability, corrosivity, or reactivity only) per gallon13EA$0.00
1530004-0006MISDisposal, Hazardous (for ignitability, corrosivity, or reactivity only) per drum1EA$0.00
1540004-0006MISDisposal, Hazardous (for PFAS solids/soil) per drum3EA$0.00
1550004-0006MISDisposal, Hazardous (for PFAS liquid) per drum3EA$0.00
1560004-0006MISDisposal, Hazardous (for spent granular activated carbon containing PFAS) per pound0EA$0.00
1570004-0006MISDisposal, Hazardous (for PFAS solids/soil/organoclay) per ton0EA$0.00
1580004-0006MISDisposal, Hazardous (for PFAS liquid) per bulk truck per gallon63EA$0.00
1590004-0006MISDisposal, Non-hazardous soil/solids, per Drum1EA$0.00
1600004-0006MISDisposal, Non-hazardous liquids, per Drum1EA$0.00
1610004-0006MISDisposal, Non-hazardous liquids, bulk truck per gallon250EA$0.00
1620004-0006MISDisposal, Non-hazardous solids/soil, per Ton233EA$0.00
1630004-0006MISDisposal, Non-hazardous (solids/soil with PFAS) per Drum6EA$0.00
1640004-0006MISDisposal, Non-hazardous (liquid with PFAS) per Drum6EA$0.00
1650004-0006MISDisposal, Non-hazardous (solids/soil with PFAS) per ton75EA$0.00
1660004-0006MISDisposal, Non-hazardous (liquid with PFAS) bulk truck per gallon500EA$0.00
1670004-0006MISDisposable Bailers, each10EA$0.00
1680004-0006MISDisposable Tubing (3/8-in, for a 500 foot roll)250EA$0.00
1690004-0006MISDrum, 55-Gallon DOT Approved, Steel or Plastic18EA$0.00
1700004-0006MISDump Truck, 5-7 CY, price per day including fuel4EA$0.00
1710004-0006MISEPA 5035 Sample Container or equivalent, per each 8260 analysis75EA$0.00
1720004-0006MISExcavator delivery1EA$0.00
1730004-0006MISExcavator, minimum 19,000-lbs up to 25,000-lbs, price per day including fuel1EA$0.00
1740004-0006MISExcavator, Mini-excavator (3500 lb.) delivery1EA$0.00
1750004-0006MISExcavator, Mini-excavator (3500 lb.) price per day including fuel1EA$0.00
1760004-0006MISFlame Ionization Detector price per day5EA$0.00
1770004-0006MISFrac Tank (double walled 20,000 gallon capacity) price per month1EA$0.00
1780004-0006MISFrac Tank delivery charge0EA$0.00
1790004-0006MISSubcontract Tank Cleaning (Frac Tank) - 1 each0EA$0.00
1800004-0006MISGenerator (4000 watt) price per day including fuel5EA$0.00
1810004-0006MISHDPE fittings (flanged and welded fittings and valves) - 1 LOT0EA$0.00
1820004-0006MISHDPE piping (1.5-in to 2-in diameter) per 10 feet0EA$0.00
1830004-0006MISHydroseeding - per 100 sf (includes all labor and materials using standard seed mixes)2EA$0.00
1840004-0006MISLawn mower, riding, rental price per day including fuel4EA$0.00
1850004-0006MISLawn mower, riding, enclosed, rental price per day including fuel4EA$0.00
1860004-0006MISLawn mower, walk-behind, rental price per day including fuel4EA$0.00
1870004-0006MISWeed abatement (For DFSP Norwalk only)2EA$0.00
1880004-0006MISMonitoring well skimming sock 1.5"x2', 20 per pack, including installation materials up to 70 ft3EA$0.00
1890004-0006MISOil/Water interface probe price per day5EA$0.00
1900004-0006MISOxygen Analyzer / Explosimeter Combustible Gas Monitor price per day1EA$0.00
1910004-0006MISPhotoionization Detector price per day5EA$0.00
1920004-0006MISPickup Truck (1/2 ton) price per day including fuel65EA$0.00
1930004-0006MISPVC Piping, 1" or 2" diameter, price per foot0EA$0.00
1940004-0006MISPVC Piping, 4" diameter, price per foot25EA$0.00
1950004-0006MISPVC Piping, 6" diameter, price per foot25EA$0.00
1960004-0006MISPressure washer (gas or electric) rental price per day including fuel1EA$0.00
1970004-0006MISRoll-Off Container with liner and cover, Delivery and monthly rental, 20 CY, price per bin3EA$0.00
1980004-0006MISRough Terrain/Off-Road Utility Vehicle (e.g. Gator) price per day including fuel1EA$0.00
1990004-0006MISSilt Fence price per 50 feet (Installed)1EA$0.00
2000004-0006MISSkid steer rental price per day including fuel1EA$0.00
2010004-0006MISStraw Bale, including installation5EA$0.00
2020004-0006MISStraw Wattle (8.5"x25' or equivalent), includes installation1EA$0.00
2030004-0006MISSuper Silt Fence price per 50 feet, includes installation1EA$0.00
2040004-0006MISTedlar Bags price per dozen3EA$0.00
2050004-0006MISTemporary Berms or Spill Containment (12'x50'), each0EA$0.00
2060004-0006MISTemporary restroom & sink, delivery, installed, with service price per week1EA$0.00
2070004-0006MISMeeting venue for public meetings, price per day including equipment and supplies0EA$0.00
2080004-0006MISHot & cold patch asphalt pavement repair, price per sq. ft., including service fee50EA$0.00
2090004-0006MISConcrete sidewalk and/or driveway repair, price per sq. ft., including service fee50EA$0.00
2100004-0006MISTraffic control, Traffic control devices (including arrow board and cones) 1 truck including fuel and 1 laborer price per day1EA$0.00
2110004-0006MISTroll 9500 Water Quality Meter w/200 feet of cable or equivalent, price per week1EA$0.00
2120004-0006MISUtility truck price per day including fuel9EA$0.00
2130004-0006MISVacuum truck (70 BBL), price per half day including fuel6EA$0.00
2140004-0006MISWater level meter price per day6EA$0.00
2150004-0006MISWater tank (single walled 2,500 gallon) price per month1EA$0.00
2160004-0006MISWater Tank delivery charge0EA$0.00
2170004-0006MISWater truck, price per day including fuel3EA$0.00
2180004-0006MISWell Caps (2-in and 4-in)5EA$0.00
2190004-0006MISDumpster/Bin 3-yd or 4-yd, per month6EA$0.00
ANALYTICAL TESTING
2200004-0006LABASTM D1298 API gravity liquid Petroleum Products0EA$0.00
2210004-0006LABCA-WET (STLC - extraction only)1EA$0.00
2220004-0006LABCA-WET (STLC - CCR Metals Title 22 - 6010/7470/7471 only)1EA$0.00
2230004-0006LABMethod 2130 Turbidity3EA$0.00
2240004-0006LABFixed gases by thermal conductivity detector (TCD)3EA$0.00
2250004-0006LABEPA 160.1 (Total Dissolved Solids (TDS))12EA$0.00
2260004-0006LABEPA 160.2 (Total Suspended Solids (TSS))12EA$0.00
2270004-0006LABEPA 300.0 (Anions including SO4, NO2, NO3, Cl)21EA$0.00
2280004-0006LABEPA 350.1 (Ammonia as Nitrogen)6EA$0.00
2290004-0006LABEPA 353.2 (Nitrate-Nitrite Nitrogen)23EA$0.00
2300004-0006LABEPA 352.1 (Nitrogen, Nitrate)23EA$0.00
2310004-0006LABEPA 351.4 (TKN)6EA$0.00
2320004-0006LABEPA 365.3 (Total Phosphorous)6EA$0.00
2330004-0006LABEPA 376.2 (Sulfide, Dissolved)6EA$0.00
2340004-0006LABEPA 410.4 (COD)6EA$0.00
2350004-0006LABEPA 1633 (PFAS in Water)130EA$0.00
2360004-0006LABEPA 1633 (PFAS in Soil)130EA$0.00
2370004-0006LABEPA 6010/7470/7471 (CCR Metals Title 22 - 6010/7470/7471)28EA$0.00
2380004-0006LABEPA 6010 (Individual Metal 6010)12EA$0.00
2390004-0006LABEPA 1010 (Ignitability)6EA$0.00
2400004-0006LABEPA 1311 (TCLP - extraction only)4EA$0.00
2410004-0006LABEPA 1311 (TCLP - Full Toxicity Characterization)4EA$0.00
2420004-0006LABEPA 1311/6010B/C/7471A (TCLP Metals)4EA$0.00
2430004-0006LABEPA 1311/8270C/D (TCLP SVOCs)4EA$0.00
2440004-0006LABEPA 1311/ZHE/8260B/C (TCLP VOCs)4EA$0.00
2450004-0006LABEPA 1664 (N-Hexane Extractable Material)6EA$0.00
2460004-0006LABEPA 1668A (PCB)5EA$0.00
2470004-0006LABEPA 7196A/7199 (Hexavalent Chromium)6EA$0.00
2480004-0006LABEPA 7470 / 7471 (Mercury)6EA$0.00
2490004-0006LABEPA 8015B/C (Extractables)28EA$0.00
2500004-0006LABEPA 8015B/C (Purgeables)28EA$0.00
2510004-0006LABEPA 8015B/C (Purgeables) with silica gel cleanup102EA$0.00
2520004-0006LABEPA 8015B/C Carbon Chain Speciation, C4-C44103EA$0.00
2530004-0006LABEPA 8081/A (Organochlorine Pesticides (OCP))4EA$0.00
2540004-0006LABEPA 8151A (Chlorinated Herbicides )4EA$0.00
2550004-0006LABEPA 8260B/5035 (VOCs 8260B/5035 +Oxygenates +TPHG)55EA$0.00
2560004-0006LABEPA 8260B/C (VOCs (BTEX/MTBE/Naphthalene only))35EA$0.00
2570004-0006LABEPA 8260B/C (Full list)8EA$0.00
2580004-0006LABEPA 8260M BTEX and oxygenates in air17EA$0.00
2590004-0006LABEPA 8270C/D (SVOCs)6EA$0.00
2600004-0006LABEPA 8270C/D SIM (PAH-SIM)6EA$0.00
2610004-0006LABEPA 9023 (Total Extractable Organic Halides (EOX))3EA$0.00
2620004-0006LABEPA 9045 (pH)6EA$0.00
2630004-0006LABEPA 9014 (Cyanide in water)3EA$0.00
2640004-0006LABOil Viscosity per ASTM D7152 - 11(2016)1EA$0.00
2650004-0006LABSM5210 (BOD)3EA$0.00
2660004-0006LABSM5310 B/C/D (TOC )20EA$0.00
2670004-0006LABSM5520B/G (Oil and Grease)6EA$0.00
2680004-0006LABSM5540 (Surfactant)6EA$0.00
2690004-0006LABTO-15 (VOCs) in Air, soil gas source, including summa can rental12EA$0.00
2700004-0006LABTO-15 (VOCs) in Air, soil gas source, including Tedlar bag6EA$0.00
2710004-0006LABTO-17 (VOCs) in Air, soil gas source, with sorbent tubes3EA$0.00
2720004-0006LABTO-3 (VOCs) in Air, soil gas source, including summa can rental6EA$0.00
2730004-0006LABTO-3 (VOCs) in Air, soil gas source, including Tedlar bag3EA$0.00
2740004-0006LABEPA 5.10, Alkalinity in water as CaCO320EA$0.00
2750004-0006LABEPA SW-846/Method 9035: Sulfate (SO42-), aqueous20EA$0.00
2760004-0006LABEPA 236.1: Dissolved ferrous iron, Fe 2+, 3+, aqueous20EA$0.00
2770004-0006LABEPA 15: Hydrogen sulfide (H2S), aqueous20EA$0.00
2780004-0006LABASTM D-2216/ EPA Method 8000C: Soil moisture5EA$0.00
UTILITIES
2790007Utilities (electricity, natural gas, water, sewer, etc.)$2,500,000.00
OTHER
2800008DERA Funded for PFAS Investigations/Remediation$0.00
281Decimal multiplier applied to unit price for Reference Items 215-270 for 24 hour expedited turn around time
282Decimal multiplier applied to unit price for Reference Items 215-270 for 72 hour expedited turn around time
283Decimal multiplier applied to unit price for Reference Items 215-270 for 5 day expedited turn around time
CLIN 0001-0006Yearly Estimated Price$0.00
CLIN 0001-0006Base Period Price$0.00
CLIN 0001-0006Option Period Price$0.00
CLIN 0007Utilities (electricity, natural gas, water, sewer, etc.)$2,500,000.00
CLIN 0008DERA Funded for PFAS Investigations/Remediation Base Period Price$0.00
CLIN 0008DERA Funded for PFAS Investigations/Remediation Option Period Price$0.00
Total Evaluated Price$2,500,000.00
Instructions to Complete Form: Offeror must fill out all cells shaded in green. Other cells are locked for editing. Offeror must identify all assumptions and exceptions in Section I of Technical Management Proposal.
NOTES
SVCServices
DRLDrilling and Well Installation
REPReport, Document, or Permit
MISMiscellaneous
LABLaboratory Services

DFSP Norwalk Price Proposal Worksheet SPE603-25-R-0503 ATTACHMENT #4

CLIN 0004

REFERENCE ITEMCLINTYPEITEM DESCRIPTIONESTIMATED ANNUAL QUANTITYUNITUNIT PRICETotal Annual Price (Estimated Quantity x Unit Price)
SERVICES
019SVCAsbestos Site Supervisor or Safety Officer price per hour10EA$ - 0$0.00
020SVCAsbestos worker price per hour10EA$ - 0$0.00
021SVCBiologist/Botanist 1 price per hour5EA$ - 0$0.00
022SVCBiologist/Botanist 2 price per hour5EA$ - 0$0.00
023SVCBuyer price per hour75EA$ - 0$0.00
024SVCCertified Industrial Hygienist price per hour10EA$ - 0$0.00
025SVCChemist 1 price per hour55EA$ - 0$0.00
026SVCChemist 2 price per hour75EA$ - 0$0.00
027SVCChemist 3 price per hour75EA$ - 0$0.00
028SVCCost Accountant price per hour150EA$ - 0$0.00
029SVCDrafter (including CAD, hardware & software) price per hour75EA$ - 0$0.00
030SVCEngineer 1 (Staff) price per hour231EA$ - 0$0.00
031SVCEngineer 2 (Project) price per hour250EA$ - 0$0.00
032SVCEngineer 3 (Senior) price per hour250EA$ - 0$0.00
033SVCEnvironmental Scientist 1 price per hour600EA$ - 0$0.00
034SVCEnvironmental Scientist 2 price per hour600EA$ - 0$0.00
035SVCEnvironmental Scientist 3 price per hour250EA$ - 0$0.00
036SVCEnvironmental Technician price per hour250EA$ - 0$0.00
037SVCGeologist 1 price per hour400EA$ - 0$0.00
038SVCGeologist 2 price per hour375EA$ - 0$0.00
039SVCGeologist 3 price per hour300EA$ - 0$0.00
040SVCHealth and Safety Officer price per hour50EA$ - 0$0.00
041SVCHeavy Equipment operator price per hour250EA$ - 0$0.00
042SVCHydrogeologist 1 price per hour250EA$ - 0$0.00
043SVCHydrogeologist 2 price per hour159EA$ - 0$0.00
044SVCLaborer price per hour250EA$ - 0$0.00
045SVCProject Manager price per hour300EA$ - 0$0.00
046SVCQA/QC Officer price per hour100EA$ - 0$0.00
047SVCRemediation System Operator price per hour375EA$ - 0$0.00
048SVCSecretary price per hour250EA$ - 0$0.00
049SVCTranslator, English to Spanish20EA$ - 0$0.00
050SVCCourt reporter, public meeting transcript6EA$ - 0$0.00
051SVCSite Labor Foreman price per hour20EA$ - 0$0.00
052SVCToxicologist/risk assessor 1 price per hour40EA$ - 0$0.00
053SVCToxicologist/risk assessor 2 price per hour88EA$ - 0$0.00
054SVCToxicologist/risk assessor 3 price per hour125EA$ - 0$0.00
055SVCTraffic Control Engineer price per hour20EA$ - 0$0.00
FACILITY MAINTENANCE
056SVCLaborer/Contractor (Line riding, inspections)45EA$ - 0$0.00
057SVCElectrician88EA$ - 0$0.00
058SVCLaborer (e.g. trash picker)125EA$ - 0$0.00
059SVCMaintenance Mechanic63EA$ - 0$0.00
DRILLING, WELL INSTALLATION, AND OTHER INVESTIGATION SERVICES
060DRLMobilization/Demobilization Cost for horizontal directional drilling equipment (horizontal well install)1EA$ - 0$0.00
061DRLHorizontal directional drilling, blind terminus, 4 1/4" ID, up to 25 feet bgs (vadose zone), per lineal foot25EA$ - 0$0.00
062DRLHorizontal directional drilling, blind terminus, 4 1/4" ID, up to 55 feet bgs (saturated zone), per lineal foot25EA$ - 0$0.00
063DRLHorizontal directional drilling, blind terminus, 6 1/4" ID, up to 25 feet bgs (vadose zone), per lineal foot25EA$ - 0$0.00
064DRLHorizontal directional drilling, blind terminus, 6 1/4" ID, up to 55 feet bgs (saturated zone), per lineal foot25EA$ - 0$0.00
065DRLMobilization/Demobilization Cost for HSA drill rig (soil boring/probe/well install)2EA$ - 0$0.00
066DRLHSA boring, price of 2 1/4" ID, up to 20 feet1EA$ - 0$0.00
067DRLHSA boring, cost per foot of 2 1/4" ID, from 21 to 40 feet20FT$ - 0$0.00
068DRLHSA boring, cost per foot of 2 1/4" ID, 41 to 80 feet40FT$ - 0$0.00
069DRLHSA boring, cost per foot of 2 1/4" ID, 81 to 150 feet70FT$ - 0$0.00
070DRLHSA boring, price of 4 1/4" ID, up to 20 feet1EA$ - 0$0.00
071DRLHSA boring, cost per foot of 4 1/4" ID, from 21 to 40 feet20FT$ - 0$0.00
072DRLHSA boring, cost per foot of 4 1/4" ID, 41 to 80 feet20FT$ - 0$0.00
073DRLHSA boring, cost per foot of 4 1/4" ID, 81 to 150 feet70FT$ - 0$0.00
074DRLHSA boring, price of 8 1/4" ID, up to 20 feet1EA$ - 0$0.00
075DRLHSA boring, cost per foot of 8 1/4" ID, from 21 to 40 feet40FT$ - 0$0.00
076DRLHSA boring, cost per foot of 8 1/4" ID, 41 to 80 feet40FT$ - 0$0.00
077DRLHSA boring, cost per foot of 8 1/4" ID, 81 to 150 feet25FT$ - 0$0.00
078DRLMobilization/Demobilization Cost for Rotosonic drill rig (soil boring/probe/well install)1EA$ - 0$0.00
079DRLSonic boring, price of 4" ID, up to 20 feet1EA$ - 0$0.00
080DRLSonic boring, cost per foot of 4" ID, from 21 to 40 feet20FT$ - 0$0.00
081DRLSonic boring, cost per foot of 4" ID, 41 to 80 feet40FT$ - 0$0.00
082DRLSonic boring, cost per foot of 4" ID, 81 to 150 feet70FT$ - 0$0.00
083DRLSonic boring, price of 6" ID, up to 20 feet2EA$ - 0$0.00
084DRLSonic boring, cost per foot of 6" ID, from 21 to 40 feet10FT$ - 0$0.00
085DRLSonic boring, cost per foot of 6" ID, 41 to 80 feet20FT$ - 0$0.00
086DRLSonic boring, cost per foot of 6" ID, 81 to 150 feet18FT$ - 0$0.00
087DRLSonic boring, price of 8" ID, up to 20 feet1EA$ - 0$0.00
088DRLSonic boring, cost per foot of 8" ID, from 21 to 40 feet10FT$ - 0$0.00
089DRLSonic boring boring, cost per foot of 8" ID, 41 to 80 feet20FT$ - 0$0.00
090DRLSonic boring boring, cost per foot of 8" ID, 81 to 150 feet18FT$ - 0$0.00
091DRLSVE/Biosparging Well installation, cost of 2" SCH 40 PVC including all materials, up to 20 feet bgs1EA$ - 0$0.00
092DRLSVE/Biosparing Well installation, cost of 2" SCH 40 PVC including all materials, from 21 to 40 feet bgs5FT$ - 0$0.00
093DRLSVE/Biosparging Well installation, cost of 2" SCH 40 PVC including all materials, from 41 to 80 feet bgs10FT$ - 0$0.00
094DRLSVE/Biosparging Well installation, cost of 2" SCH 40 PVC including all materials, from 81 to 150 feet bgs18FT$ - 0$0.00
095DRLSVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, up to 20 feet bgs1EA$ - 0$0.00
096DRLSVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, from 21 to 40 feet bgs5FT$ - 0$0.00
097DRLSVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, from 41 to 80 feet bgs10FT$ - 0$0.00
098DRLSVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, from 81 to 150 feet bgs18FT$ - 0$0.00
099DRLSVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, up to 20 feet bgs1EA$ - 0$0.00
100DRLSVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, from 21 to 40 feet bgs5FT$ - 0$0.00
101DRLSVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, from 41 to 80 feet bgs10FT$ - 0$0.00
102DRLSVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, from 81 to 150 feet bgs18FT$ - 0$0.00
103DRLSVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, up to 20 feet bgs1EA$ - 0$0.00
104DRLSVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, from 21 to 40 feet bgs5FT$ - 0$0.00
105DRLSVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, from 41 to 80 feet bgs10FT$ - 0$0.00
106DRLSVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, from 81 to 150 feet bgs18FT$ - 0$0.00
107DRLSVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, up to 20 feet bgs1EA$ - 0$0.00
108DRLSVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, from 21 to 40 feet bgs5FT$ - 0$0.00
109DRLSVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, from 41 to 80 feet bgs10FT$ - 0$0.00
110DRLSVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, from 81 to 150 feet bgs18FT$ - 0$0.00
111DRLMonitoring well installation, cost of 2" SCH 40 PVC including all materials, up to 20 feet, in HSA or Sonic boring1EA$ - 0$0.00
112DRLMonitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 21 to 40 feet, in HSA or Sonic boring5FT$ - 0$0.00
113DRLMonitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 41 to 80 feet, in HSA or Sonic boring10FT$ - 0$0.00
114DRLMonitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 81 to 150 feet, in HSA or Sonic boring18FT$ - 0$0.00
115DRLMonitoring well installation, additional cost per foot, 2" 304 Stainless Steel in place of SCH 40 PVC, in HSA or Sonic boring20FT$ - 0$0.00
116DRLMonitoring well installation, cost per 4" SCH 40 PVC monitoring well up to 20 feet, in HSA or Sonic boring10EA$ - 0$0.00
117DRLMonitoring well installation, cost per 4" SCH 40 PVC monitoring well from 21 to 40 feet, in HSA or Sonic boring10FT$ - 0$0.00
118DRLMonitoring well installation, cost per 4" SCH 40 PVC monitoring well from 41 to 80 feet, in HSA or Sonic boring20FT$ - 0$0.00
119DRLMonitoring well installation, cost per 4" SCH 40 PVC monitoring well from 81 to 150 feet, in HSA or Sonic boring18FT$ - 0$0.00
120DRLMonitoring well installation, additional price per foot of 4" 304 Stainless Steel in place of SCH 40 PVC, in HSA or Sonic boring20FT$ - 0$0.00
121DRLMonitoring Well, Install flush mount box for 2" or 4" well1EA$ - 0$0.00
122DRLMonitoring Well, Install above grade (4x4 pad), steel casing1EA$ - 0$0.00
123DRLMobilization/Demobilization Cost, Well Decommissioning1EA$ - 0$0.00
124DRLDecommission 2" dia. vertical well, grout in place, remove top 5' of casing, cost per foot1250EA$ - 0$0.00
125DRLDecommission 4" dia. vertical well, grout in place, remove top 5' of casing, cost per foot1250EA$ - 0$0.00
126DRLDecommission 6" dia. vertical well, grout in place, remove top 5' of casing, cost per foot125EA$ - 0$0.00
127DRLDecommission 2" dia. vertical well, overdrill and grout, cost per foot1250EA$ - 0$0.00
128DRLDecommission 4" dia. vertical well, overdrill and grout, cost per foot1250EA$ - 0$0.00
129DRLDecommission 6" dia. vertical well, overdrill and grout, cost per foot125EA$ - 0$0.00
130DRLDecommission 4" dia. horizontal well, cost per lineal foot250EA$ - 0$0.00
131DRLDecommission 6" dia. horizontal well, cost per lineal foot250EA$ - 0$0.00
132DRLWell Development, 2" dia. including all equipment and supplies, per well1EA$ - 0$0.00
133DRLWell Development, 4" dia. including all equipment and supplies, per well5EA$ - 0$0.00
134DRLWell Inspection - Down Hole Camera Inspection, vertical well, to include report of findings, per Half Day0EA$ - 0$0.00
135DRLDPT (Direct Push Technology) Drilling, Mobilization/Demobilization price0EA$ - 0$0.00
136DRLDPT BORING, price per day, including all tooling0EA$ - 0$0.00
137DRLDPT SOIL SURVEY - Price per unit (10 points/unit) - up to 5 feet depth, per day1EA$ - 0$0.00
138DRLSOIL & GAS SURVEY - Price per unit (10 points/unit) - greater than 5 to 15 feet depth, DPT Rig, per day1EA$ - 0$0.00
139DRLSOIL & GAS SURVEY - Price per unit (10 points/unit) - up to 5 feet depth, hand auger, including report of findings1EA$ - 0$0.00
140DRLSOIL & GAS SURVEY - Price per unit (10 points/unit) - greater than 5 to 15 feet depth, hand auger, per day1EA$ - 0$0.00
141DRLSURVEY - Boring/Well location survey (price per 10)1EA$ - 0$0.00
142DRLSURVEY - Physical Survey price per half day (includes surveyor, crew, and equipment)1EA$ - 0$0.00
143DRLUTILITY CLEARANCE - Geophysical/GPR Survey, Price per unit (10,000 linear feet) to include in report of findings1EA$ - 0$0.00
MISCELLANEOUS
144MISBrass Long-shackle monitoring well locks, keyed alike, each3EA$ - 0$0.00
145MISCrane rental, price per day including fuel0EA$ - 0$0.00
146MISBackhoe Loader, 2WD, 14 ft boom, multipurpose bucket, per week0EA$ - 0$0.00
147MISBackhoe Loader, 4WD, 14 ft boom, multipurpose bucket, per week0EA$ - 0$0.00
148MISDisposal, Hazardous (for VOCs) per gallon28EA$ - 0$0.00
149MISDisposal, Hazardous (for heavy metals) per gallon28EA$ - 0$0.00
150MISDisposal, Hazardous (for VOCs) per Drum1EA$ - 0$0.00
151MISDisposal, Hazardous (for heavy metals) per Drum1EA$ - 0$0.00
152MISDisposal, Hazardous (for ignitability, corrosivity, or reactivity only) per gallon13EA$ - 0$0.00
153MISDisposal, Hazardous (for ignitability, corrosivity, or reactivity only) per drum1EA$ - 0$0.00
154MISDisposal, Hazardous (for PFAS solids/soil) per drum3EA$ - 0$0.00
155MISDisposal, Hazardous (for PFAS liquid) per drum3EA$ - 0$0.00
156MISDisposal, Hazardous (for spent granular activated carbon containing PFAS) per pound0EA$ - 0$0.00
157MISDisposal, Hazardous (for PFAS solids/soil/organoclay) per ton0EA$ - 0$0.00
158MISDisposal, Hazardous (for PFAS liquid) per bulk truck per gallon63EA$ - 0$0.00
159MISDisposal, Non-hazardous soil/solids, per Drum1EA$ - 0$0.00
160MISDisposal, Non-hazardous liquids, per Drum1EA$ - 0$0.00
161MISDisposal, Non-hazardous liquids, bulk truck per gallon250EA$ - 0$0.00
162MISDisposal, Non-hazardous solids/soil, per Ton233EA$ - 0$0.00
163MISDisposal, Non-hazardous (solids/soil with PFAS) per Drum6EA$ - 0$0.00
164MISDisposal, Non-hazardous (liquid with PFAS) per Drum6EA$ - 0$0.00
165MISDisposal, Non-hazardous (solids/soil with PFAS) per ton75EA$ - 0$0.00
166MISDisposal, Non-hazardous (liquid with PFAS) bulk truck per gallon500EA$ - 0$0.00
167MISDisposable Bailers, each10EA$ - 0$0.00
168MISDisposable Tubing (3/8-in, 500ft)250EA$ - 0$0.00
169MISDrum, 55-Gallon DOT Approved, Steel or Plastic14EA$ - 0$0.00
170MISDump Truck, 5-7 CY, price per day including fuel0EA$ - 0$0.00
171MISEPA 5035 Sample Container or equivalent, per each 8260 analysis75EA$ - 0$0.00
172MISExcavator delivery0EA$ - 0$0.00
173MISExcavator, minimum 19,000-lbs up to 25,000-lbs, price per day including fuel0EA$ - 0$0.00
174MISExcavator, Mini-excavator (3500 lb.) delivery0EA$ - 0$0.00
175MISExcavator, Mini-excavator (3500 lb.) price per day including fuel0EA$ - 0$0.00
176MISFlame Ionization Detector price per day5EA$ - 0$0.00
177MISFrac Tank (double walled 20,000 gallon capacity) price per month1EA$ - 0$0.00
178MISFrac Tank delivery charge0EA$ - 0$0.00
179MISSubcontract Tank Cleaning (Frac Tank) - 1 each0EA$ - 0$0.00
180MISGenerator (4000 watt) price per day including fuel5EA$ - 0$0.00
181MISHDPE fittings (flanged and welded fittings and valves) - 1 LOT0EA$ - 0$0.00
182MISHDPE piping (1.5-in to 2-in diameter) per 10 feet0EA$ - 0$0.00
183MISHydroseeding - per 100 sf (includes all labor and materials using standard seed mixes)2EA$ - 0$0.00
184MISLawn mower, riding, rental price per day including fuel1EA$ - 0$0.00
185MISLawn mower, riding, enclosed, rental price per day including fuel1EA$ - 0$0.00
186MISLawn mower, walk-behind, rental price per day including fuel1EA$ - 0$0.00
187MISWeed abatement (For DFSP Norwalk only)1EA$ - 0$0.00
188MISMonitoring well skimming sock 1.5"x2', 20 per pack, including installation materials up to 70 ft3EA$ - 0$0.00
189MISOil/Water interface probe price per day5EA$ - 0$0.00
190MISOxygen Analyzer / Explosimeter Combustible Gas Monitor price per day1EA$ - 0$0.00
191MISPhotoionization Detector price per day5EA$ - 0$0.00
192MISPickup Truck (1/2 ton) price per day including fuel65EA$ - 0$0.00
193MISPVC Piping, 1" or 2" diameter, price per foot0EA$ - 0$0.00
194MISPVC Piping, 4" diameter, price per foot25EA$ - 0$0.00
195MISPVC Piping, 6" diameter, price per foot25EA$ - 0$0.00
196MISPressure washer (gas or electric) rental price per day including fuel1EA$ - 0$0.00
197MISRoll-Off Container with liner and cover, Delivery and monthly rental, 20 CY, price per bin3EA$ - 0$0.00
198MISRough Terrain/Off-Road Utility Vehicle (e.g. Gator) price per day including fuel1EA$ - 0$0.00
199MISSilt Fence price per 50 feet (Installed)1EA$ - 0$0.00
200MISSkid steer rental price per day including fuel1EA$ - 0$0.00
201MISStraw Bale, including installation5EA$ - 0$0.00
202MISStraw Wattle (8.5"x25' or equivalent), includes installation1EA$ - 0$0.00
203MISSuper Silt Fence price per 50 feet, includes installation1EA$ - 0$0.00
204MISTedlar Bags price per dozen3EA$ - 0$0.00
205MISTemporary Berms or Spill Containment (12'x50'), each0EA$ - 0$0.00
206MISTemporary restroom & sink, delivery, installed, with service price per week1EA$ - 0$0.00
207MISMeeting venue for public meetings, price per day including equipment and supplies0EA$ - 0$0.00
208MISHot & cold patch asphalt pavement repair, price per sq. ft., including service fee50EA$ - 0$0.00
209MISConcrete sidewalk and/or driveway repair, price per sq. ft., including service fee50EA$ - 0$0.00
210MISTraffic control, Traffic control devices (including arrow board and cones) 1 truck including fuel and 1 laborer price per day1EA$ - 0$0.00
211MISTroll 9500 Water Quality Meter w/200 feet of cable or equivalent, price per week1EA$ - 0$0.00
212MISUtility truck price per day including fuel4EA$ - 0$0.00
213MISVacuum truck (70 BBL), price per half day including fuel6EA$ - 0$0.00
214MISWater level meter price per day6EA$ - 0$0.00
215MISWater tank (single walled 2,500 gallon) price per month1EA$ - 0$0.00
216MISWater Tank delivery charge0EA$ - 0$0.00
217MISWater truck, price per day including fuel3EA$ - 0$0.00
218MISWell Caps (2-in and 4-in)5EA$ - 0$0.00
219MISDumpster/Bin 3-yd or 4-yd, per month3EA$ - 0$0.00
ANALYTICAL TESTING
220LABASTM D1298 API gravity liquid Petroleum Products0EA$ - 0$0.00
221LABCA-WET (STLC - extraction only)1EA$ - 0$0.00
222LABCA-WET (STLC - CCR Metals Title 22 - 6010/7470/7471 only)1EA$ - 0$0.00
223LABMethod 2130 Turbidity3EA$ - 0$0.00
224LABFixed gases by thermal conductivity detector (TCD)3EA$ - 0$0.00
225LABEPA 160.1 (Total Dissolved Solids (TDS))9EA$ - 0$0.00
226LABEPA 160.2 (Total Suspended Solids (TSS))9EA$ - 0$0.00
227LABEPA 300.0 (Anions including SO4, NO2, NO3, Cl)18EA$ - 0$0.00
228LABEPA 350.1 (Ammonia as Nitrogen)3EA$ - 0$0.00
229LABEPA 353.2 (Nitrate-Nitrite Nitrogen)20EA$ - 0$0.00
230LABEPA 352.1 (Nitrogen, Nitrate)20EA$ - 0$0.00
231LABEPA 351.4 (TKN)3EA$ - 0$0.00
232LABEPA 365.3 (Total Phosphorous)3EA$ - 0$0.00
233LABEPA 376.2 (Sulfide, Dissolved)3EA$ - 0$0.00
234LABEPA 410.4 (COD)3EA$ - 0$0.00
235LABEPA 1633 (PFAS in Water)125EA$ - 0$0.00
236LABEPA 1633 (PFAS in Soil)125EA$ - 0$0.00
237LABEPA 6010/7470/7471 (CCR Metals Title 22 - 6010/7470/7471)25EA$ - 0$0.00
238LABEPA 6010 (Individual Metal 6010)9EA$ - 0$0.00
239LABEPA 1010 (Ignitability)3EA$ - 0$0.00
240LABEPA 1311 (TCLP - extraction only)1EA$ - 0$0.00
241LABEPA 1311 (TCLP - Full Toxicity Characterization)1EA$ - 0$0.00
242LABEPA 1311/6010B/C/7471A (TCLP Metals)1EA$ - 0$0.00
243LABEPA 1311/8270C/D (TCLP SVOCs)1EA$ - 0$0.00
244LABEPA 1311/ZHE/8260B/C (TCLP VOCs)1EA$ - 0$0.00
245LABEPA 1664 (N-Hexane Extractable Material)3EA$ - 0$0.00
246LABEPA 1668A (PCB)2EA$ - 0$0.00
247LABEPA 7196A/7199 (Hexavalent Chromium)3EA$ - 0$0.00
248LABEPA 7470 / 7471 (Mercury)3EA$ - 0$0.00
249LABEPA 8015B/C (Extractables)25EA$ - 0$0.00
250LABEPA 8015B/C (Purgeables)25EA$ - 0$0.00
251LABEPA 8015B/C (Purgeables) with silica gel cleanup99EA$ - 0$0.00
252LABEPA 8015B/C Carbon Chain Speciation, C4-C44100EA$ - 0$0.00
253LABEPA 8081/A (Organochlorine Pesticides (OCP))1EA$ - 0$0.00
254LABEPA 8151A (Chlorinated Herbicides )1EA$ - 0$0.00
255LABEPA 8260B/5035 (VOCs 8260B/5035 +Oxygenates +TPHG)50EA$ - 0$0.00
256LABEPA 8260B/C (VOCs (BTEX/MTBE/Naphthalene only))30EA$ - 0$0.00
257LABEPA 8260B/C (Full list)3EA$ - 0$0.00
258LABEPA 8260M BTEX and oxygenates in air12EA$ - 0$0.00
259LABEPA 8270C/D (SVOCs)1EA$ - 0$0.00
260LABEPA 8270C/D SIM (PAH-SIM)1EA$ - 0$0.00
261LABEPA 9023 (Total Extractable Organic Halides (EOX))3EA$ - 0$0.00
262LABEPA 9045 (pH)3EA$ - 0$0.00
263LABEPA 9014 (Cyanide in water)3EA$ - 0$0.00
264LABOil Viscosity per ASTM D7152 - 11(2016)1EA$ - 0$0.00
265LABSM5210 (BOD)3EA$ - 0$0.00
266LABSM5310 B/C/D (TOC )20EA$ - 0$0.00
267LABSM5520B/G (Oil and Grease)6EA$ - 0$0.00
268LABSM5540 (Surfactant)6EA$ - 0$0.00
269LABTO-15 (VOCs) in Air, soil gas source, including summa can rental12EA$ - 0$0.00
270LABTO-15 (VOCs) in Air, soil gas source, including Tedlar bag6EA$ - 0$0.00
271LABTO-17 (VOCs) in Air, soil gas source, with sorbent tubes3EA$ - 0$0.00
272LABTO-3 (VOCs) in Air, soil gas source, including summa can rental6EA$ - 0$0.00
273LABTO-3 (VOCs) in Air, soil gas source, including Tedlar bag3EA$ - 0$0.00
274LABEPA 5.10, Alkalinity in water as CaCO320EA$ - 0$0.00
275LABEPA SW-846/Method 9035: Sulfate (SO42-), aqueous20EA$ - 0$0.00
276LABEPA 236.1: Dissolved ferrous iron, Fe 2+, 3+, aqueous20EA$ - 0$0.00
277LABEPA 15: Hydrogen sulfide (H2S), aqueous20EA$ - 0$0.00
278LABASTM D-2216/ EPA Method 8000C: Soil moisture5EA$ - 0$0.00
CLIN 0004 Yearly$0.00
CLIN 0004 Base 4-Year$0.00
CLIN 0004 Base 4-Year + 6 month option$0.00

CLIN 0005

REFERENCE ITEMCLINTYPEITEM DESCRIPTIONESTIMATED ANNUAL QUANTITYUNITUNIT PRICETotal Annual Price (Estimated Quantity x Unit Price)
SERVICES
019SVCAsbestos Site Supervisor or Safety Officer price per hour0EA$ - 0$0.00
020SVCAsbestos worker price per hour0EA$ - 0$0.00
021SVCBiologist/Botanist 1 price per hour5EA$ - 0$0.00
022SVCBiologist/Botanist 2 price per hour5EA$ - 0$0.00
023SVCBuyer price per hour3EA$ - 0$0.00
024SVCCertified Industrial Hygienist price per hour3EA$ - 0$0.00
025SVCChemist 1 price per hour3EA$ - 0$0.00
026SVCChemist 2 price per hour5EA$ - 0$0.00
027SVCChemist 3 price per hour6EA$ - 0$0.00
028SVCCost Accountant price per hour6EA$ - 0$0.00
029SVCDrafter (including CAD, hardware & software) price per hour6EA$ - 0$0.00
030SVCEngineer 1 (Staff) price per hour6EA$ - 0$0.00
031SVCEngineer 2 (Project) price per hour6EA$ - 0$0.00
032SVCEngineer 3 (Senior) price per hour6EA$ - 0$0.00
033SVCEnvironmental Scientist 1 price per hour6EA$ - 0$0.00
034SVCEnvironmental Scientist 2 price per hour6EA$ - 0$0.00
035SVCEnvironmental Scientist 3 price per hour6EA$ - 0$0.00
036SVCEnvironmental Technician price per hour6EA$ - 0$0.00
037SVCGeologist 1 price per hour6EA$ - 0$0.00
038SVCGeologist 2 price per hour6EA$ - 0$0.00
039SVCGeologist 3 price per hour6EA$ - 0$0.00
040SVCHealth and Safety Officer price per hour6EA$ - 0$0.00
041SVCHeavy Equipment operator price per hour0EA$ - 0$0.00
042SVCHydrogeologist 1 price per hour0EA$ - 0$0.00
043SVCHydrogeologist 2 price per hour0EA$ - 0$0.00
044SVCLaborer price per hour50EA$ - 0$0.00
045SVCProject Manager price per hour13EA$ - 0$0.00
046SVCQA/QC Officer price per hour3EA$ - 0$0.00
047SVCRemediation System Operator price per hour19EA$ - 0$0.00
048SVCSecretary price per hour13EA$ - 0$0.00
049SVCTranslator, English to Spanish0EA$ - 0$0.00
050SVCCourt reporter, public meeting transcript0EA$ - 0$0.00
051SVCSite Labor Foreman price per hour0EA$ - 0$0.00
052SVCToxicologist/risk assessor 1 price per hour0EA$ - 0$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .