ATTACHMENT 4 - Norwalk Price Proposal Worksheet 1.29.2024.xlsx
XLSX spreadsheet 117 KB Posted
- Solicitation number
- SPE603-25-R-0503
- Issued by
-
Defense Logistics Agency Energy
About this file
This is a pricing worksheet template for environmental services at DFSP Norwalk and related facilities. The worksheet contains 277 line items across multiple categories including Reports and Response (18 items), Services (37 items), Facility Maintenance (4 items), Drilling/Well Installation Services (84 items), Miscellaneous (75 items), and Analytical Testing (59 items).
The template includes estimated annual quantities for each line item and requires vendors to input unit prices, with automatic calculation of total annual prices. Key service categories include project management, environmental monitoring, well installation/decommissioning, laboratory testing (including PFAS analysis), facility maintenance, and disposal services. The worksheet is structured to capture pricing for a base 4-year period plus 6-month option period, with a utilities allowance of $2.5 million included. The document appears to be Attachment 4 to solicitation SPE603-25-R-0503 and requires vendors to complete all cells shaded in green while other cells are locked for editing.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Norwalk PPW
| COMPANY & LOCATION: | PROPOSAL VERSION NO.: | |
| PREPARER NAME: | DATE PREPARED: | 29-Jan-2025 |
| REFERENCE ITEM | CLIN | TYPE | ITEM DESCRIPTION | ESTIMATED ANNUAL QUANTITY | UNIT | UNIT PRICE | Total Annual Price (Estimated Quantity x Unit Price) |
| REPORTS AND RESPONSE | |||||||
| 001 | 0001 | REP | Draft Project Management Plan | 1 | EA | $0.00 | |
| 002 | 0001 | REP | Final Project Management Plan | 1 | EA | $0.00 | |
| 003 | 0001 | REP | DFSP Norwalk and Tustin/El Toro Pipeline Kickoff Meeting Minutes | 2 | EA | $0.00 | |
| 004 | 0001 | REP | Quarterly Project Management Review Meeting Minutes | 8 | EA | $0.00 | |
| 005 | 0001 | REP | Regulatory Agency/Stakeholder Meeting Minutes | 2 | EA | $0.00 | |
| 006 | 0001 | REP | RAB or Public Meeting Minutes, Fact Sheet/Mailing | 1 | EA | $0.00 | |
| 007 | 0001 | REP | Annual DLA Headquarters Briefing Meeting Minutes | 1 | EA | $0.00 | |
| 008 | 0001 | REP | Contract Closure Meeting Minutes | 1 | EA | $0.00 | |
| 009 | 0001 | REP | Monthly Utility Invoicing Summary | 12 | EA | $0.00 | |
| 010 | 0001 | REP | DFSP Norwalk Remedial Systems Quarterly Status Report | 4 | EA | $0.00 | |
| 011 | 0001 | REP | El Toro Pipeline Release Site LNAPL Gauging, Recovery and Disposal Annual Report | 1 | EA | $0.00 | |
| 012 | 0001 | REP | El Toro Pipeline Release Site Remedial Systems Quarterly Status Report | 4 | EA | $0.00 | |
| 013 | 0001 | REP | DFSP Norwalk Semi-Annual Groundwater Monitoring Data Summary Report | 1 | EA | $0.00 | |
| 014 | 0001 | REP | DFSP Norwalk Semi-Annual Groundwater Monitoring Report | 1 | EA | $0.00 | |
| 015 | 0001 | REP | El Toro Pipeline Release Site Semi-Annual Groundwater Monitoring Report for up to 20 Wells | 1 | EA | $0.00 | |
| 016 | 0001 | REP | El Toro Pipeline Release Site Semi-Annual Groundwater Monitoring Report for up to 40 Wells | 1 | EA | $0.00 | |
| 017 | 0002 | REP | DFSP Norwalk Facility Compliance Quarterly Summary Report | 4 | EA | $0.00 | |
| 018 | 0003 | REP | DFSP Norwalk Facility Maintenance Quarterly Summary Report | 4 | EA | $0.00 | |
| SERVICES | |||||||
| 019 | 0001 | SVC | Asbestos Site Supervisor or Safety Officer price per hour | 10 | EA | $0.00 | |
| 020 | 0001 | SVC | Asbestos worker price per hour | 10 | EA | $0.00 | |
| 021 | 0001 | SVC | Biologist/Botanist 1 price per hour | 15 | EA | $0.00 | |
| 022 | 0001 | SVC | Biologist/Botanist 2 price per hour | 15 | EA | $0.00 | |
| 023 | 0001 | SVC | Buyer price per hour | 90 | EA | $0.00 | |
| 024 | 0001 | SVC | Certified Industrial Hygienist price per hour | 18 | EA | $0.00 | |
| 025 | 0001 | SVC | Chemist 1 price per hour | 58 | EA | $0.00 | |
| 026 | 0001 | SVC | Chemist 2 price per hour | 80 | EA | $0.00 | |
| 027 | 0001 | SVC | Chemist 3 price per hour | 44 | EA | $0.00 | |
| 028 | 0001 | SVC | Cost Accountant price per hour | 170 | EA | $0.00 | |
| 029 | 0001 | SVC | Drafter (including CAD, hardware & software) price per hour | 100 | EA | $0.00 | |
| 030 | 0001 | SVC | Engineer 1 (Staff) price per hour | 300 | EA | $0.00 | |
| 031 | 0001 | SVC | Engineer 2 (Project) price per hour | 300 | EA | $0.00 | |
| 032 | 0001 | SVC | Engineer 3 (Senior) price per hour | 270 | EA | $0.00 | |
| 033 | 0001 | SVC | Environmental Scientist 1 price per hour | 620 | EA | $0.00 | |
| 034 | 0001 | SVC | Environmental Scientist 2 price per hour | 620 | EA | $0.00 | |
| 035 | 0001 | SVC | Environmental Scientist 3 price per hour | 270 | EA | $0.00 | |
| 036 | 0001 | SVC | Environmental Technician price per hour | 150 | EA | $0.00 | |
| 037 | 0001 | SVC | Geologist 1 price per hour | 400 | EA | $0.00 | |
| 038 | 0001 | SVC | Geologist 2 price per hour | 400 | EA | $0.00 | |
| 039 | 0001 | SVC | Geologist 3 price per hour | 300 | EA | $0.00 | |
| 040 | 0001 | SVC | Health and Safety Officer price per hour | 70 | EA | $0.00 | |
| 041 | 0001 | SVC | Heavy Equipment operator price per hour | 270 | EA | $0.00 | |
| 042 | 0001 | SVC | Hydrogeologist 1 price per hour | 250 | EA | $0.00 | |
| 043 | 0001 | SVC | Hydrogeologist 2 price per hour | 125 | EA | $0.00 | |
| 044 | 0001 | SVC | Laborer price per hour | 400 | EA | $0.00 | |
| 045 | 0001 | SVC | Project Manager price per hour | 350 | EA | $0.00 | |
| 046 | 0001 | SVC | QA/QC Officer price per hour | 120 | EA | $0.00 | |
| 047 | 0001 | SVC | Remediation System Operator price per hour | 400 | EA | $0.00 | |
| 048 | 0001 | SVC | Secretary price per hour | 300 | EA | $0.00 | |
| 049 | 0001 | SVC | Translator, English to Spanish | 20 | EA | $0.00 | |
| 050 | 0001 | SVC | Court reporter, public meeting transcript | 6 | EA | $0.00 | |
| 051 | 0001 | SVC | Site Labor Foreman price per hour | 20 | EA | $0.00 | |
| 052 | 0001 | SVC | Toxicologist/risk assessor 1 price per hour | 40 | EA | $0.00 | |
| 053 | 0001 | SVC | Toxicologist/risk assessor 2 price per hour | 100 | EA | $0.00 | |
| 054 | 0001 | SVC | Toxicologist/risk assessor 3 price per hour | 125 | EA | $0.00 | |
| 055 | 0001 | SVC | Traffic Control Engineer price per hour | 20 | EA | $0.00 | |
| FACILITY MAINTENANCE | |||||||
| 056 | 0001 | SVC | Laborer/Contractor (Line riding, inspections) | 45 | EA | $0.00 | |
| 057 | 0001 | SVC | Electrician | 100 | EA | $0.00 | |
| 058 | 0001 | SVC | Laborer (e.g. trash picker) | 138 | EA | $0.00 | |
| 059 | 0001 | SVC | Maintenance Mechanic | 75 | EA | $0.00 | |
| DRILLING, WELL INSTALLATION, AND OTHER INVESTIGATION SERVICES | |||||||
| 060 | 0001 | DRL | Mobilization/Demobilization Cost for horizontal directional drilling equipment (horizontal well install) | 1 | EA | $0.00 | |
| 061 | 0001 | DRL | Horizontal directional drilling, blind terminus, 4 1/4" ID, up to 25 feet bgs (vadose zone), per lineal foot | 25 | EA | $0.00 | |
| 062 | 0001 | DRL | Horizontal directional drilling, blind terminus, 4 1/4" ID, up to 55 feet bgs (saturated zone), per lineal foot | 25 | EA | $0.00 | |
| 063 | 0001 | DRL | Horizontal directional drilling, blind terminus, 6 1/4" ID, up to 25 feet bgs (vadose zone), per lineal foot | 25 | EA | $0.00 | |
| 064 | 0001 | DRL | Horizontal directional drilling, blind terminus, 6 1/4" ID, up to 55 feet bgs (saturated zone), per lineal foot | 25 | EA | $0.00 | |
| 065 | 0001 | DRL | Mobilization/Demobilization Cost for HSA drill rig (soil boring/probe/well install) | 1 | EA | $0.00 | |
| 066 | 0001 | DRL | HSA boring, price of 2 1/4" ID, up to 20 feet | 1 | EA | $0.00 | |
| 067 | 0001 | DRL | HSA boring, cost per foot of 2 1/4" ID, from 21 to 40 feet | 5 | FT | $0.00 | |
| 068 | 0001 | DRL | HSA boring, cost per foot of 2 1/4" ID, 41 to 80 feet | 10 | FT | $0.00 | |
| 069 | 0001 | DRL | HSA boring, cost per foot of 2 1/4" ID, 81 to 150 feet | 18 | FT | $0.00 | |
| 070 | 0001 | DRL | HSA boring, price of 4 1/4" ID, up to 20 feet | 1 | EA | $0.00 | |
| 071 | 0001 | DRL | HSA boring, cost per foot of 4 1/4" ID, from 21 to 40 feet | 5 | FT | $0.00 | |
| 072 | 0001 | DRL | HSA boring, cost per foot of 4 1/4" ID, 41 to 80 feet | 10 | FT | $0.00 | |
| 073 | 0001 | DRL | HSA boring, cost per foot of 4 1/4" ID, 81 to 150 feet | 18 | FT | $0.00 | |
| 074 | 0001 | DRL | HSA boring, price of 8 1/4" ID, up to 20 feet | 1 | EA | $0.00 | |
| 075 | 0001 | DRL | HSA boring, cost per foot of 8 1/4" ID, from 21 to 40 feet | 10 | FT | $0.00 | |
| 076 | 0001 | DRL | HSA boring, cost per foot of 8 1/4" ID, 41 to 80 feet | 20 | FT | $0.00 | |
| 077 | 0001 | DRL | HSA boring, cost per foot of 8 1/4" ID, 81 to 150 feet | 18 | FT | $0.00 | |
| 078 | 0001 | DRL | Mobilization/Demobilization Cost for Rotosonic drill rig (soil boring/probe/well install) | 1 | EA | $0.00 | |
| 079 | 0001 | DRL | Sonic boring, price of 4" ID, up to 20 feet | 1 | EA | $0.00 | |
| 080 | 0001 | DRL | Sonic boring, cost per foot of 4" ID, from 21 to 40 feet | 5 | FT | $0.00 | |
| 081 | 0001 | DRL | Sonic boring, cost per foot of 4" ID, 41 to 80 feet | 10 | FT | $0.00 | |
| 082 | 0001 | DRL | Sonic boring, cost per foot of 4" ID, 81 to 150 feet | 18 | FT | $0.00 | |
| 083 | 0001 | DRL | Sonic boring, price of 6" ID, up to 20 feet | 1 | EA | $0.00 | |
| 084 | 0001 | DRL | Sonic boring, cost per foot of 6" ID, from 21 to 40 feet | 10 | FT | $0.00 | |
| 085 | 0001 | DRL | Sonic boring, cost per foot of 6" ID, 41 to 80 feet | 20 | FT | $0.00 | |
| 086 | 0001 | DRL | Sonic boring, cost per foot of 6" ID, 81 to 150 feet | 18 | FT | $0.00 | |
| 087 | 0001 | DRL | Sonic boring, price of 8" ID, up to 20 feet | 1 | EA | $0.00 | |
| 088 | 0001 | DRL | Sonic boring, cost per foot of 8" ID, from 21 to 40 feet | 10 | FT | $0.00 | |
| 089 | 0001 | DRL | Sonic boring boring, cost per foot of 8" ID, 41 to 80 feet | 20 | FT | $0.00 | |
| 090 | 0001 | DRL | Sonic boring boring, cost per foot of 8" ID, 81 to 150 feet | 18 | FT | $0.00 | |
| 091 | 0001 | DRL | SVE/Biosparging Well installation, cost of 2" SCH 40 PVC including all materials, up to 20 feet bgs | 1 | EA | $0.00 | |
| 092 | 0001 | DRL | SVE/Biosparing Well installation, cost of 2" SCH 40 PVC including all materials, from 21 to 40 feet bgs | 5 | FT | $0.00 | |
| 093 | 0001 | DRL | SVE/Biosparging Well installation, cost of 2" SCH 40 PVC including all materials, from 41 to 80 feet bgs | 10 | FT | $0.00 | |
| 094 | 0001 | DRL | SVE/Biosparging Well installation, cost of 2" SCH 40 PVC including all materials, from 81 to 150 feet bgs | 18 | FT | $0.00 | |
| 095 | 0001 | DRL | SVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, up to 20 feet bgs | 1 | EA | $0.00 | |
| 096 | 0001 | DRL | SVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, from 21 to 40 feet bgs | 5 | FT | $0.00 | |
| 097 | 0001 | DRL | SVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, from 41 to 80 feet bgs | 10 | FT | $0.00 | |
| 098 | 0001 | DRL | SVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, from 81 to 150 feet bgs | 18 | FT | $0.00 | |
| 099 | 0001 | DRL | SVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, up to 20 feet bgs | 1 | EA | $0.00 | |
| 100 | 0001 | DRL | SVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, from 21 to 40 feet bgs | 5 | FT | $0.00 | |
| 101 | 0001 | DRL | SVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, from 41 to 80 feet bgs | 10 | FT | $0.00 | |
| 102 | 0001 | DRL | SVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, from 81 to 150 feet bgs | 18 | FT | $0.00 | |
| 103 | 0001 | DRL | SVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, up to 20 feet bgs | 1 | EA | $0.00 | |
| 104 | 0001 | DRL | SVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, from 21 to 40 feet bgs | 5 | FT | $0.00 | |
| 105 | 0001 | DRL | SVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, from 41 to 80 feet bgs | 10 | FT | $0.00 | |
| 106 | 0001 | DRL | SVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, from 81 to 150 feet bgs | 18 | FT | $0.00 | |
| 107 | 0001 | DRL | SVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, up to 20 feet bgs | 1 | EA | $0.00 | |
| 108 | 0001 | DRL | SVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, from 21 to 40 feet bgs | 5 | FT | $0.00 | |
| 109 | 0001 | DRL | SVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, from 41 to 80 feet bgs | 10 | FT | $0.00 | |
| 110 | 0001 | DRL | SVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, from 81 to 150 feet bgs | 18 | FT | $0.00 | |
| 111 | 0001 | DRL | Monitoring well installation, cost of 2" SCH 40 PVC including all materials, up to 20 feet, in HSA or Sonic boring | 1 | EA | $0.00 | |
| 112 | 0001 | DRL | Monitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 21 to 40 feet, in HSA or Sonic boring | 5 | FT | $0.00 | |
| 113 | 0001 | DRL | Monitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 41 to 80 feet, in HSA or Sonic boring | 10 | FT | $0.00 | |
| 114 | 0001 | DRL | Monitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 81 to 150 feet, in HSA or Sonic boring | 18 | FT | $0.00 | |
| 115 | 0001 | DRL | Monitoring well installation, additional cost per foot, 2" 304 Stainless Steel in place of SCH 40 PVC, in HSA or Sonic boring | 20 | FT | $0.00 | |
| 116 | 0001 | DRL | Monitoring well installation, cost per 4" SCH 40 PVC monitoring well up to 20 feet, in HSA or Sonic boring | 10 | EA | $0.00 | |
| 117 | 0001 | DRL | Monitoring well installation, cost per 4" SCH 40 PVC monitoring well from 21 to 40 feet, in HSA or Sonic boring | 10 | FT | $0.00 | |
| 118 | 0001 | DRL | Monitoring well installation, cost per 4" SCH 40 PVC monitoring well from 41 to 80 feet, in HSA or Sonic boring | 20 | FT | $0.00 | |
| 119 | 0001 | DRL | Monitoring well installation, cost per 4" SCH 40 PVC monitoring well from 81 to 150 feet, in HSA or Sonic boring | 18 | FT | $0.00 | |
| 120 | 0001 | DRL | Monitoring well installation, additional price per foot of 4" 304 Stainless Steel in place of SCH 40 PVC, in HSA or Sonic boring | 20 | FT | $0.00 | |
| 121 | 0001 | DRL | Monitoring Well, Install flush mount box for 2" or 4" well | 2 | EA | $0.00 | |
| 122 | 0001 | DRL | Monitoring Well, Install above grade (4x4 pad), steel casing | 2 | EA | $0.00 | |
| 123 | 0001 | DRL | Mobilization/Demobilization Cost, Well Decommissioning | 1 | EA | $0.00 | |
| 124 | 0001 | DRL | Decommission 2" dia. vertical well, grout in place, remove top 5' of casing, cost per foot | 1250 | EA | $0.00 | |
| 125 | 0001 | DRL | Decommission 4" dia. vertical well, grout in place, remove top 5' of casing, cost per foot | 1250 | EA | $0.00 | |
| 126 | 0001 | DRL | Decommission 6" dia. vertical well, grout in place, remove top 5' of casing, cost per foot | 125 | EA | $0.00 | |
| 127 | 0001 | DRL | Decommission 2" dia. vertical well, overdrill and grout, cost per foot | 1250 | EA | $0.00 | |
| 128 | 0001 | DRL | Decommission 4" dia. vertical well, overdrill and grout, cost per foot | 1250 | EA | $0.00 | |
| 129 | 0001 | DRL | Decommission 6" dia. vertical well, overdrill and grout, cost per foot | 125 | EA | $0.00 | |
| 130 | 0001 | DRL | Decommission 4" dia. horizontal well, cost per lineal foot | 250 | EA | $0.00 | |
| 131 | 0001 | DRL | Decommission 6" dia. horizontal well, cost per lineal foot | 250 | EA | $0.00 | |
| 132 | 0001 | DRL | Well Development, 2" dia. including all equipment and supplies, per well | 1 | EA | $0.00 | |
| 133 | 0001 | DRL | Well Development, 4" dia. including all equipment and supplies, per well | 5 | EA | $0.00 | |
| 134 | 0001 | DRL | Well Inspection - Down Hole Camera Inspection, vertical well, to include report of findings, per Half Day | 1 | EA | $0.00 | |
| 135 | 0001 | DRL | DPT (Direct Push Technology) Drilling, Mobilization/Demobilization price | 1 | EA | $0.00 | |
| 136 | 0001 | DRL | DPT BORING, price per day, including all tooling | 1 | EA | $0.00 | |
| 137 | 0001 | DRL | DPT SOIL SURVEY - Price per unit (10 points/unit) - up to 5 feet depth, per day | 2 | EA | $0.00 | |
| 138 | 0001 | DRL | SOIL & GAS SURVEY - Price per unit (10 points/unit) - greater than 5 to 15 feet depth, DPT Rig, per day | 2 | EA | $0.00 | |
| 139 | 0001 | DRL | SOIL & GAS SURVEY - Price per unit (10 points/unit) - up to 5 feet depth, hand auger, including report of findings | 2 | EA | $0.00 | |
| 140 | 0001 | DRL | SOIL & GAS SURVEY - Price per unit (10 points/unit) - greater than 5 to 15 feet depth, hand auger, per day | 2 | EA | $0.00 | |
| 141 | 0001 | DRL | SURVEY - Boring/Well location survey (price per 10) | 1 | EA | $0.00 | |
| 142 | 0001 | DRL | SURVEY - Physical Survey price per half day (includes surveyor, crew, and equipment) | 2 | EA | $0.00 | |
| 143 | 0001 | DRL | UTILITY CLEARANCE - Geophysical/GPR Survey, Price per unit (10,000 linear feet) to include in report of findings | 2 | EA | $0.00 | |
| MISCELLANEOUS | |||||||
| 144 | 0001 | MIS | Brass Long-shackle monitoring well locks, keyed alike, each | 3 | EA | $0.00 | |
| 145 | 0001 | MIS | Crane rental, price per day including fuel | 2 | EA | $0.00 | |
| 146 | 0001 | MIS | Backhoe Loader, 2WD, 14 ft boom, multipurpose bucket, per week | 3 | EA | $0.00 | |
| 147 | 0001 | MIS | Backhoe Loader, 4WD, 14 ft boom, multipurpose bucket, per week | 2 | $0.00 | ||
| 147 | 0001 | MIS | Backhoe Loader, 4WD, 14 ft boom, multipurpose bucket, per week | 2 | EA | $0.00 | |
| 148 | 0001 | MIS | Disposal, Hazardous (for VOCs) per gallon | 28 | EA | $0.00 | |
| 149 | 0001 | MIS | Disposal, Hazardous (for heavy metals) per gallon | 28 | EA | $0.00 | |
| 150 | 0001 | MIS | Disposal, Hazardous (for VOCs) per Drum | 1 | EA | $0.00 | |
| 151 | 0001 | MIS | Disposal, Hazardous (for heavy metals) per Drum | 1 | EA | $0.00 | |
| 152 | 0001 | MIS | Disposal, Hazardous (for ignitability, corrosivity, or reactivity only) per gallon | 13 | EA | $0.00 | |
| 153 | 0001 | MIS | Disposal, Hazardous (for ignitability, corrosivity, or reactivity only) per drum | 1 | EA | $0.00 | |
| 154 | 0001 | MIS | Disposal, Hazardous (for PFAS solids/soil) per drum | 3 | EA | $0.00 | |
| 155 | 0001 | MIS | Disposal, Hazardous (for PFAS liquid) per drum | 3 | EA | $0.00 | |
| 156 | 0001 | MIS | Disposal, Hazardous (for PFAS solids/soil) per ton | 13 | EA | $0.00 | |
| 157 | 0001 | MIS | Disposal, Hazardous (for PFAS liquid) per bulk truck per gallon | 63 | EA | $0.00 | |
| 158 | 0001 | MIS | Disposal, Non-hazardous soil/solids, per Drum | 1 | EA | $0.00 | |
| 159 | 0001 | MIS | Disposal, Non-hazardous liquids, per Drum | 1 | EA | $0.00 | |
| 160 | 0001 | MIS | Disposal, Non-hazardous liquids, bulk truck per gallon | 250 | EA | $0.00 | |
| 161 | 0001 | MIS | Disposal, Non-hazardous solids/soil, per Ton | 75 | EA | $0.00 | |
| 162 | 0001 | MIS | Disposal, Non-hazardous (solids/soil with PFAS) per Drum | 7 | EA | $0.00 | |
| 163 | 0001 | MIS | Disposal, Non-hazardous (liquid with PFAS) per Drum | 7 | EA | $0.00 | |
| 164 | 0001 | MIS | Disposal, Non-hazardous (solids/soil with PFAS) per ton | 75 | EA | $0.00 | |
| 165 | 0001 | MIS | Disposal, Non-hazardous (liquid with PFAS) bulk truck per gallon | 500 | EA | $0.00 | |
| 166 | 0001 | MIS | Disposable Bailers, each | 10 | EA | $0.00 | |
| 167 | 0001 | MIS | Disposable Tubing (3/8-in, 500ft) | 251 | EA | $0.00 | |
| 168 | 0001 | MIS | Drum, 55-Gallon DOT Approved, Steel or Plastic | 18 | EA | $0.00 | |
| 169 | 0001 | MIS | Dump Truck, 5-7 CY, price per day including fuel | 4 | EA | $0.00 | |
| 170 | 0001 | MIS | EPA 5035 Sample Container or equivalent, per each 8260 analysis | 75 | EA | $0.00 | |
| 171 | 0001 | MIS | Excavator delivery | 2 | EA | $0.00 | |
| 172 | 0001 | MIS | Excavator, minimum 19,000-lbs up to 25,000-lbs, price per day including fuel | 2 | EA | $0.00 | |
| 173 | 0001 | MIS | Excavator, Mini-excavator (3500 lb.) delivery | 2 | EA | $0.00 | |
| 174 | 0001 | MIS | Excavator, Mini-excavator (3500 lb.) price per day including fuel | 2 | EA | $0.00 | |
| 175 | 0001 | MIS | Flame Ionization Detector price per day | 5 | EA | $0.00 | |
| 176 | 0001 | MIS | Frac Tank (double walled 20,000 gallon capacity) price per month | 1 | EA | $0.00 | |
| 177 | 0001 | MIS | Frac Tank delivery charge | 1 | EA | $0.00 | |
| 178 | 0001 | MIS | Subcontract Tank Cleaning (Frac Tank) - 1 each | 1 | EA | $0.00 | |
| 179 | 0001 | MIS | Generator (4000 watt) price per day including fuel | 5 | EA | $0.00 | |
| 180 | 0001 | MIS | HDPE fittings (flanged and welded fittings and valves) - 1 LOT | 1 | EA | $0.00 | |
| 181 | 0001 | MIS | HDPE piping (1.5-in to 2-in diameter) per 10 feet | 1 | EA | $0.00 | |
| 182 | 0001 | MIS | Hydroseeding - per 100 sf (includes all labor and materials using standard seed mixes) | 2 | EA | $0.00 | |
| 183 | 0001 | MIS | Lawn mower, riding, rental price per day including fuel | 4 | EA | $0.00 | |
| 184 | 0001 | MIS | Lawn mower, riding, enclosed, rental price per day including fuel | 4 | EA | $0.00 | |
| 185 | 0001 | MIS | Lawn mower, walk-behind, rental price per day including fuel | 4 | EA | $0.00 | |
| 186 | 0001 | MIS | Weed abatement (For DFSP Norwalk only) | 2 | EA | $0.00 | |
| 187 | 0001 | MIS | Monitoring well skimming sock 1.5"x2', 20 per pack, including installation materials up to 70 ft | 3 | EA | $0.00 | |
| 188 | 0001 | MIS | Oil/Water interface probe price per day | 5 | EA | $0.00 | |
| 189 | 0001 | MIS | Oxygen Analyzer / Explosimeter Combustible Gas Monitor price per day | 2 | EA | $0.00 | |
| 190 | 0001 | MIS | Photoionization Detector price per day | 5 | EA | $0.00 | |
| 191 | 0001 | MIS | Pickup Truck (1/2 ton) price per day including fuel | 65 | EA | $0.00 | |
| 192 | 0001 | MIS | PVC Piping, 1" or 2" diameter, price per foot | 1 | EA | $0.00 | |
| 193 | 0001 | MIS | PVC Piping, 4" diameter, price per foot | 25 | EA | $0.00 | |
| 194 | 0001 | MIS | PVC Piping, 6" diameter, price per foot | 25 | EA | $0.00 | |
| 195 | 0001 | MIS | Pressure washer (gas or electric) rental price per day including fuel | 1 | EA | $0.00 | |
| 196 | 0001 | MIS | Roll-Off Container with liner and cover, Delivery and monthly rental, 20 CY, price per bin | 3 | EA | $0.00 | |
| 197 | 0001 | MIS | Rough Terrain/Off-Road Utility Vehicle (e.g. Gator) price per day including fuel | 1 | EA | $0.00 | |
| 198 | 0001 | MIS | Silt Fence price per 50 feet (Installed) | 1 | EA | $0.00 | |
| 199 | 0001 | MIS | Skid steer rental price per day including fuel | 2 | EA | $0.00 | |
| 200 | 0001 | MIS | Straw Bale, including installation | 5 | EA | $0.00 | |
| 201 | 0001 | MIS | Straw Wattle (8.5"x25' or equivalent), includes installation | 1 | EA | $0.00 | |
| 202 | 0001 | MIS | Super Silt Fence price per 50 feet, includes installation | 1 | EA | $0.00 | |
| 203 | 0001 | MIS | Tedlar Bags price per dozen | 3 | EA | $0.00 | |
| 204 | 0001 | MIS | Temporary Berms or Spill Containment (12'x50'), each | 1 | EA | $0.00 | |
| 205 | 0001 | MIS | Temporary restroom & sink, delivery, installed, with service price per week | 1 | EA | $0.00 | |
| 206 | 0001 | MIS | Meeting venue for public meetings, price per day including equipment and supplies | 1 | EA | $0.00 | |
| 207 | 0001 | MIS | Hot & cold patch asphalt pavement repair, price per sq. ft., including service fee | 50 | EA | $0.00 | |
| 208 | 0001 | MIS | Concrete sidewalk and/or driveway repair, price per sq. ft., including service fee | 50 | EA | $0.00 | |
| 209 | 0001 | MIS | Traffic control, Traffic control devices (including arrow board and cones) 1 truck including fuel and 1 laborer price per day | 1 | EA | $0.00 | |
| 210 | 0001 | MIS | Troll 9500 Water Quality Meter w/200 feet of cable or equivalent, price per week | 1 | EA | $0.00 | |
| 211 | 0001 | MIS | Utility truck price per day including fuel | 9 | EA | $0.00 | |
| 212 | 0001 | MIS | Vacuum truck (70 BBL), price per half day including fuel | 6 | EA | $0.00 | |
| 213 | 0001 | MIS | Water level meter price per day | 6 | EA | $0.00 | |
| 214 | 0001 | MIS | Water tank (single walled 2,500 gallon) price per month | 1 | EA | $0.00 | |
| 215 | 0001 | MIS | Water Tank delivery charge | 1 | EA | $0.00 | |
| 216 | 0001 | MIS | Water truck, price per day including fuel | 4 | EA | $0.00 | |
| 217 | 0001 | MIS | Well Caps (2-in and 4-in) | 5 | EA | $0.00 | |
| 218 | 0001 | MIS | Dumpster/Bin 3-yd or 4-yd, per month | 6 | EA | $0.00 | |
| ANALYTICAL TESTING | |||||||
| 219 | 0001 | LAB | ASTM D1298 API gravity liquid Petroleum Products | 1 | EA | $0.00 | |
| 220 | 0001 | LAB | CA-WET (STLC - extraction only) | 1 | EA | $0.00 | |
| 221 | 0001 | LAB | CA-WET (STLC - CCR Metals Title 22 - 6010/7470/7471 only) | 1 | EA | $0.00 | |
| 222 | 0001 | LAB | Method 2130 Turbidity | 3 | EA | $0.00 | |
| 223 | 0001 | LAB | Fixed gases by thermal conductivity detector (TCD) | 3 | EA | $0.00 | |
| 224 | 0001 | LAB | EPA 160.1 (Total Dissolved Solids (TDS)) | 12 | EA | $0.00 | |
| 225 | 0001 | LAB | EPA 160.2 (Total Suspended Solids (TSS)) | 12 | EA | $0.00 | |
| 226 | 0001 | LAB | EPA 300.0 (Anions including SO4, NO2, NO3, Cl) | 21 | EA | $0.00 | |
| 227 | 0001 | LAB | EPA 350.1 (Ammonia as Nitrogen) | 6 | EA | $0.00 | |
| 228 | 0001 | LAB | EPA 353.2 (Nitrate-Nitrite Nitrogen) | 23 | EA | $0.00 | |
| 229 | 0001 | LAB | EPA 352.1 (Nitrogen, Nitrate) | 23 | EA | $0.00 | |
| 230 | 0001 | LAB | EPA 351.4 (TKN) | 6 | EA | $0.00 | |
| 231 | 0001 | LAB | EPA 365.3 (Total Phosphorous) | 6 | EA | $0.00 | |
| 232 | 0001 | LAB | EPA 376.2 (Sulfide, Dissolved) | 6 | EA | $0.00 | |
| 233 | 0001 | LAB | EPA 410.4 (COD) | 6 | EA | $0.00 | |
| 234 | 0001 | LAB | Draft EPA 1633 (PFAS in Water) | 105 | EA | $0.00 | |
| 235 | 0001 | LAB | Draft EPA 1633 (PFAS in Soil) | 105 | EA | $0.00 | |
| 236 | 0001 | LAB | EPA 6010/7470/7471 (CCR Metals Title 22 - 6010/7470/7471) | 10 | EA | $0.00 | |
| 237 | 0001 | LAB | EPA 6010 (Individual Metal 6010) | 12 | EA | $0.00 | |
| 238 | 0001 | LAB | EPA 1010 (Ignitability) | 6 | EA | $0.00 | |
| 239 | 0001 | LAB | EPA 1311 (TCLP - extraction only) | 4 | EA | $0.00 | |
| 240 | 0001 | LAB | EPA 1311 (TCLP - Full Toxicity Characterization) | 4 | EA | $0.00 | |
| 241 | 0001 | LAB | EPA 1311/6010B/C/7471A (TCLP Metals) | 4 | EA | $0.00 | |
| 242 | 0001 | LAB | EPA 1311/8270C/D (TCLP SVOCs) | 4 | EA | $0.00 | |
| 243 | 0001 | LAB | EPA 1311/ZHE/8260B/C (TCLP VOCs) | 4 | EA | $0.00 | |
| 244 | 0001 | LAB | EPA 1664 (N-Hexane Extractable Material) | 6 | EA | $0.00 | |
| 245 | 0001 | LAB | EPA 1668A (PCB) | 4 | EA | $0.00 | |
| 246 | 0001 | LAB | EPA 7196A/7199 (Hexavalent Chromium) | 6 | EA | $0.00 | |
| 247 | 0001 | LAB | EPA 7470 / 7471 (Mercury) | 6 | EA | $0.00 | |
| 248 | 0001 | LAB | EPA 8015B/C (Extractables) | 50 | EA | $0.00 | |
| 249 | 0001 | LAB | EPA 8015B/C (Purgeables) | 50 | EA | $0.00 | |
| 250 | 0001 | LAB | EPA 8015B/C (Purgeables) with silica gel cleanup | 100 | EA | $0.00 | |
| 251 | 0001 | LAB | EPA 8015B/C Carbon Chain Speciation, C4-C44 | 100 | EA | $0.00 | |
| 252 | 0001 | LAB | EPA 8081/A (Organochlorine Pesticides (OCP)) | 4 | EA | $0.00 | |
| 253 | 0001 | LAB | EPA 8151A (Chlorinated Herbicides ) | 4 | EA | $0.00 | |
| 254 | 0001 | LAB | EPA 8260B/5035 (VOCs 8260B/5035 +Oxygenates +TPHG) | 100 | EA | $0.00 | |
| 255 | 0001 | LAB | EPA 8260B/C (VOCs (BTEX/MTBE/Naphthalene only)) | 100 | EA | $0.00 | |
| 256 | 0001 | LAB | EPA 8260B/C (Full list) | 100 | EA | $0.00 | |
| 257 | 0001 | LAB | EPA 8260M BTEX and oxygenates in air | 100 | EA | $0.00 | |
| 258 | 0001 | LAB | EPA 8270C/D (SVOCs) | 10 | EA | $0.00 | |
| 259 | 0001 | LAB | EPA 8270C/D SIM (PAH-SIM) | 10 | EA | $0.00 | |
| 260 | 0001 | LAB | EPA 9023 (Total Extractable Organic Halides (EOX)) | 3 | EA | $0.00 | |
| 261 | 0001 | LAB | EPA 9045 (pH) | 6 | EA | $0.00 | |
| 262 | 0001 | LAB | EPA 9014 (Cyanide in water) | 3 | EA | $0.00 | |
| 263 | 0001 | LAB | Oil Viscosity per ASTM D7152 - 11(2016) | 1 | EA | $0.00 | |
| 264 | 0001 | LAB | SM5210 (BOD) | 3 | EA | $0.00 | |
| 265 | 0001 | LAB | SM5310 B/C/D (TOC ) | 20 | EA | $0.00 | |
| 266 | 0001 | LAB | SM5520B/G (Oil and Grease) | 6 | EA | $0.00 | |
| 267 | 0001 | LAB | SM5540 (Surfactant) | 6 | EA | $0.00 | |
| 268 | 0001 | LAB | TO-15 (VOCs) in Air, soil gas source, including summa can rental | 12 | EA | $0.00 | |
| 269 | 0001 | LAB | TO-15 (VOCs) in Air, soil gas source, including Tedlar bag | 6 | EA | $0.00 | |
| 270 | 0001 | LAB | TO-17 (VOCs) in Air, soil gas source, with sorbent tubes | 3 | EA | $0.00 | |
| 271 | 0001 | LAB | TO-3 (VOCs) in Air, soil gas source, including summa can rental | 6 | EA | $0.00 | |
| 272 | 0001 | LAB | TO-3 (VOCs) in Air, soil gas source, including Tedlar bag | 3 | EA | $0.00 | |
| 273 | 0001 | LAB | EPA 5.10, Alkalinity in water as CaCO3 | 20 | EA | $0.00 | |
| 274 | 0001 | LAB | EPA SW-846/Method 9035: Sulfate (SO42-), aqueous | 20 | EA | $0.00 | |
| 275 | 0001 | LAB | EPA 236.1: Dissolved ferrous iron, Fe 2+, 3+, aqueous | 21 | EA | $0.00 | |
| 276 | 0001 | LAB | EPA 15: Hydrogen sulfide (H2S), aqueous | 20 | EA | $0.00 | |
| 277 | 0001 | LAB | ASTM D-2216/ EPA Method 8000C: Soil moisture | 5 | EA | $0.00 | |
| UTILITIES | |||||||
| 278 | 0007 | Utilities (electricity, natural gas, water, sewer, etc.) | $2,500,000.00 | ||||
| OTHER | |||||||
| 279 | 0008 | DERA Funded for PFAS Investigations/Remediation | $0.00 | ||||
| 280 | Decimal multiplier applied to unit price for Reference Items 215-270 for 24 hour expedited turn around time | ||||||
| 281 | Decimal multiplier applied to unit price for Reference Items 215-270 for 72 hour expedited turn around time | ||||||
| 282 | Decimal multiplier applied to unit price for Reference Items 215-270 for 5 day expedited turn around time | ||||||
| CLIN 0001-0006 | Yearly Estimated Price | $0.00 | |||||
| CLIN 0001-0006 | Base Period Price | $0.00 | |||||
| CLIN 0001-0006 | Option Period Price | $0.00 | |||||
| CLIN 0008 | DERA Funded for PFAS Investigations/Remediation Base Period Price | $0.00 | |||||
| CLIN 0008 | DERA Funded for PFAS Investigations/Remediation Option Period Price | $0.00 | |||||
| CLIN 0007 | Utilities (electricity, natural gas, water, sewer, etc.) | $2,500,000.00 | |||||
| Total Evaluated Price | $2,500,000.00 | ||||||
| Instructions to Complete Form: Offeror must fill out all cells shaded in green. Other cells are locked for editing. Offeror must identify all assumptions and exceptions in Section I of Technical Management Proposal. |
| NOTES | |
| SVC | Services |
| DRL | Drilling and Well Installation |
| REP | Report, Document, or Permit |
| MIS | Miscellaneous |
| LAB | Laboratory Services |
DFSP Norwalk Price Proposal Worksheet SPE603-25-R-0503 ATTACHMENT #4
CLIN 0004
| REFERENCE ITEM | CLIN | TYPE | ITEM DESCRIPTION | ESTIMATED ANNUAL QUANTITY | UNIT | UNIT PRICE | Total Annual Price (Estimated Quantity x Unit Price) |
| SERVICES | |||||||
| 019 | SVC | Asbestos Site Supervisor or Safety Officer price per hour | 40 | EA | $ - 0 | $0.00 | |
| 020 | SVC | Asbestos worker price per hour | 40 | EA | $ - 0 | $0.00 | |
| 021 | SVC | Biologist/Botanist 1 price per hour | 20 | EA | $ - 0 | $0.00 | |
| 022 | SVC | Biologist/Botanist 2 price per hour | 20 | EA | $ - 0 | $0.00 | |
| 023 | SVC | Buyer price per hour | 300 | EA | $ - 0 | $0.00 | |
| 024 | SVC | Certified Industrial Hygienist price per hour | 40 | EA | $ - 0 | $0.00 | |
| 025 | SVC | Chemist 1 price per hour | 218 | EA | $ - 0 | $0.00 | |
| 026 | SVC | Chemist 2 price per hour | 300 | EA | $ - 0 | $0.00 | |
| 027 | SVC | Chemist 3 price per hour | 300 | EA | $ - 0 | $0.00 | |
| 028 | SVC | Cost Accountant price per hour | 600 | EA | $ - 0 | $0.00 | |
| 029 | SVC | Drafter (including CAD, hardware & software) price per hour | 299 | EA | $ - 0 | $0.00 | |
| 030 | SVC | Engineer 1 (Staff) price per hour | 925 | EA | $ - 0 | $0.00 | |
| 031 | SVC | Engineer 2 (Project) price per hour | 1000 | EA | $ - 0 | $0.00 | |
| 032 | SVC | Engineer 3 (Senior) price per hour | 1000 | EA | $ - 0 | $0.00 | |
| 033 | SVC | Environmental Scientist 1 price per hour | 2400 | EA | $ - 0 | $0.00 | |
| 034 | SVC | Environmental Scientist 2 price per hour | 2400 | EA | $ - 0 | $0.00 | |
| 035 | SVC | Environmental Scientist 3 price per hour | 1000 | EA | $ - 0 | $0.00 | |
| 036 | SVC | Environmental Technician price per hour | 1000 | EA | $ - 0 | $0.00 | |
| 037 | SVC | Geologist 1 price per hour | 1600 | EA | $ - 0 | $0.00 | |
| 038 | SVC | Geologist 2 price per hour | 1500 | EA | $ - 0 | $0.00 | |
| 039 | SVC | Geologist 3 price per hour | 1200 | EA | $ - 0 | $0.00 | |
| 040 | SVC | Health and Safety Officer price per hour | 200 | EA | $ - 0 | $0.00 | |
| 041 | SVC | Heavy Equipment operator price per hour | 1000 | EA | $ - 0 | $0.00 | |
| 042 | SVC | Hydrogeologist 1 price per hour | 1000 | EA | $ - 0 | $0.00 | |
| 043 | SVC | Hydrogeologist 2 price per hour | 635 | EA | $ - 0 | $0.00 | |
| 044 | SVC | Laborer price per hour | 1000 | EA | $ - 0 | $0.00 | |
| 045 | SVC | Project Manager price per hour | 1200 | EA | $ - 0 | $0.00 | |
| 046 | SVC | QA/QC Officer price per hour | 400 | EA | $ - 0 | $0.00 | |
| 047 | SVC | Remediation System Operator price per hour | 1499 | EA | $ - 0 | $0.00 | |
| 048 | SVC | Secretary price per hour | 1000 | EA | $ - 0 | $0.00 | |
| 049 | SVC | Translator, English to Spanish | 80 | EA | $ - 0 | $0.00 | |
| 050 | SVC | Court reporter, public meeting transcript | 25 | EA | $ - 0 | $0.00 | |
| 051 | SVC | Site Labor Foreman price per hour | 80 | EA | $ - 0 | $0.00 | |
| 052 | SVC | Toxicologist/risk assessor 1 price per hour | 160 | EA | $ - 0 | $0.00 | |
| 053 | SVC | Toxicologist/risk assessor 2 price per hour | 350 | EA | $ - 0 | $0.00 | |
| 054 | SVC | Toxicologist/risk assessor 3 price per hour | 500 | EA | $ - 0 | $0.00 | |
| 055 | SVC | Traffic Control Engineer price per hour | 80 | EA | $ - 0 | $0.00 | |
| FACILITY MAINTENANCE | |||||||
| 056 | SVC | Laborer/Contractor (Line riding, inspections) | 180 | EA | $ - 0 | $0.00 | |
| 057 | SVC | Electrician | 350 | EA | $ - 0 | $0.00 | |
| 058 | SVC | Laborer (e.g. trash picker) | 500 | EA | $ - 0 | $0.00 | |
| 059 | SVC | Maintenance Mechanic | 250 | EA | $ - 0 | $0.00 | |
| DRILLING, WELL INSTALLATION, AND OTHER INVESTIGATION SERVICES | |||||||
| 060 | DRL | Mobilization/Demobilization Cost for horizontal directional drilling equipment (horizontal well install) | 2 | EA | $ - 0 | $0.00 | |
| 061 | DRL | Horizontal directional drilling, blind terminus, 4 1/4" ID, up to 25 feet bgs (vadose zone), per lineal foot | 100 | EA | $ - 0 | $0.00 | |
| 062 | DRL | Horizontal directional drilling, blind terminus, 4 1/4" ID, up to 55 feet bgs (saturated zone), per lineal foot | 100 | EA | $ - 0 | $0.00 | |
| 063 | DRL | Horizontal directional drilling, blind terminus, 6 1/4" ID, up to 25 feet bgs (vadose zone), per lineal foot | 100 | EA | $ - 0 | $0.00 | |
| 064 | DRL | Horizontal directional drilling, blind terminus, 6 1/4" ID, up to 55 feet bgs (saturated zone), per lineal foot | 100 | EA | $ - 0 | $0.00 | |
| 065 | DRL | Mobilization/Demobilization Cost for HSA drill rig (soil boring/probe/well install) | 8 | EA | $ - 0 | $0.00 | |
| 066 | DRL | HSA boring, price of 2 1/4" ID, up to 20 feet | 4 | EA | $ - 0 | $0.00 | |
| 067 | DRL | HSA boring, cost per foot of 2 1/4" ID, from 21 to 40 feet | 80 | FT | $ - 0 | $0.00 | |
| 068 | DRL | HSA boring, cost per foot of 2 1/4" ID, 41 to 80 feet | 160 | FT | $ - 0 | $0.00 | |
| 069 | DRL | HSA boring, cost per foot of 2 1/4" ID, 81 to 150 feet | 280 | FT | $ - 0 | $0.00 | |
| 070 | DRL | HSA boring, price of 4 1/4" ID, up to 20 feet | 4 | EA | $ - 0 | $0.00 | |
| 071 | DRL | HSA boring, cost per foot of 4 1/4" ID, from 21 to 40 feet | 80 | FT | $ - 0 | $0.00 | |
| 072 | DRL | HSA boring, cost per foot of 4 1/4" ID, 41 to 80 feet | 80 | FT | $ - 0 | $0.00 | |
| 073 | DRL | HSA boring, cost per foot of 4 1/4" ID, 81 to 150 feet | 280 | FT | $ - 0 | $0.00 | |
| 074 | DRL | HSA boring, price of 8 1/4" ID, up to 20 feet | 4 | EA | $ - 0 | $0.00 | |
| 075 | DRL | HSA boring, cost per foot of 8 1/4" ID, from 21 to 40 feet | 160 | FT | $ - 0 | $0.00 | |
| 076 | DRL | HSA boring, cost per foot of 8 1/4" ID, 41 to 80 feet | 160 | FT | $ - 0 | $0.00 | |
| 077 | DRL | HSA boring, cost per foot of 8 1/4" ID, 81 to 150 feet | 100 | FT | $ - 0 | $0.00 | |
| 078 | DRL | Mobilization/Demobilization Cost for Rotosonic drill rig (soil boring/probe/well install) | 4 | EA | $ - 0 | $0.00 | |
| 079 | DRL | Sonic boring, price of 4" ID, up to 20 feet | 4 | EA | $ - 0 | $0.00 | |
| 080 | DRL | Sonic boring, cost per foot of 4" ID, from 21 to 40 feet | 80 | FT | $ - 0 | $0.00 | |
| 081 | DRL | Sonic boring, cost per foot of 4" ID, 41 to 80 feet | 160 | FT | $ - 0 | $0.00 | |
| 082 | DRL | Sonic boring, cost per foot of 4" ID, 81 to 150 feet | 280 | FT | $ - 0 | $0.00 | |
| 083 | DRL | Sonic boring, price of 6" ID, up to 20 feet | 8 | EA | $ - 0 | $0.00 | |
| 084 | DRL | Sonic boring, cost per foot of 6" ID, from 21 to 40 feet | 40 | FT | $ - 0 | $0.00 | |
| 085 | DRL | Sonic boring, cost per foot of 6" ID, 41 to 80 feet | 80 | FT | $ - 0 | $0.00 | |
| 086 | DRL | Sonic boring, cost per foot of 6" ID, 81 to 150 feet | 70 | FT | $ - 0 | $0.00 | |
| 087 | DRL | Sonic boring, price of 8" ID, up to 20 feet | 2 | EA | $ - 0 | $0.00 | |
| 088 | DRL | Sonic boring, cost per foot of 8" ID, from 21 to 40 feet | 40 | FT | $ - 0 | $0.00 | |
| 089 | DRL | Sonic boring boring, cost per foot of 8" ID, 41 to 80 feet | 80 | FT | $ - 0 | $0.00 | |
| 090 | DRL | Sonic boring boring, cost per foot of 8" ID, 81 to 150 feet | 70 | FT | $ - 0 | $0.00 | |
| 091 | DRL | SVE/Biosparging Well installation, cost of 2" SCH 40 PVC including all materials, up to 20 feet bgs | 2 | EA | $ - 0 | $0.00 | |
| 092 | DRL | SVE/Biosparing Well installation, cost of 2" SCH 40 PVC including all materials, from 21 to 40 feet bgs | 20 | FT | $ - 0 | $0.00 | |
| 093 | DRL | SVE/Biosparging Well installation, cost of 2" SCH 40 PVC including all materials, from 41 to 80 feet bgs | 40 | FT | $ - 0 | $0.00 | |
| 094 | DRL | SVE/Biosparging Well installation, cost of 2" SCH 40 PVC including all materials, from 81 to 150 feet bgs | 70 | FT | $ - 0 | $0.00 | |
| 095 | DRL | SVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, up to 20 feet bgs | 2 | EA | $ - 0 | $0.00 | |
| 096 | DRL | SVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, from 21 to 40 feet bgs | 20 | FT | $ - 0 | $0.00 | |
| 097 | DRL | SVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, from 41 to 80 feet bgs | 40 | FT | $ - 0 | $0.00 | |
| 098 | DRL | SVE/Biosparging Well installation, cost of 3" SCH 40 PVC including all materials, from 81 to 150 feet bgs | 70 | FT | $ - 0 | $0.00 | |
| 099 | DRL | SVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, up to 20 feet bgs | 2 | EA | $ - 0 | $0.00 | |
| 100 | DRL | SVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, from 21 to 40 feet bgs | 20 | FT | $ - 0 | $0.00 | |
| 101 | DRL | SVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, from 41 to 80 feet bgs | 40 | FT | $ - 0 | $0.00 | |
| 102 | DRL | SVE/Biosparging Well installation, cost of 4" SCH 40 PVC including all materials, from 81 to 150 feet bgs | 70 | FT | $ - 0 | $0.00 | |
| 103 | DRL | SVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, up to 20 feet bgs | 2 | EA | $ - 0 | $0.00 | |
| 104 | DRL | SVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, from 21 to 40 feet bgs | 20 | FT | $ - 0 | $0.00 | |
| 105 | DRL | SVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, from 41 to 80 feet bgs | 40 | FT | $ - 0 | $0.00 | |
| 106 | DRL | SVE/Biosparging Well installation, cost of 6" SCH 40 PVC including all materials, from 81 to 150 feet bgs | 70 | FT | $ - 0 | $0.00 | |
| 107 | DRL | SVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, up to 20 feet bgs | 2 | EA | $ - 0 | $0.00 | |
| 108 | DRL | SVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, from 21 to 40 feet bgs | 20 | FT | $ - 0 | $0.00 | |
| 109 | DRL | SVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, from 41 to 80 feet bgs | 40 | FT | $ - 0 | $0.00 | |
| 110 | DRL | SVE/Biosparging Well installation, cost of 8" SCH 40 PVC including all materials, from 81 to 150 feet bgs | 70 | FT | $ - 0 | $0.00 | |
| 111 | DRL | Monitoring well installation, cost of 2" SCH 40 PVC including all materials, up to 20 feet, in HSA or Sonic boring | 2 | EA | $ - 0 | $0.00 | |
| 112 | DRL | Monitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 21 to 40 feet, in HSA or Sonic boring | 20 | FT | $ - 0 | $0.00 | |
| 113 | DRL | Monitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 41 to 80 feet, in HSA or Sonic boring | 40 | FT | $ - 0 | $0.00 | |
| 114 | DRL | Monitoring well installation, cost per foot of 2" SCH 40 PVC monitoring well from 81 to 150 feet, in HSA or Sonic boring | 70 | FT | $ - 0 | $0.00 | |
| 115 | DRL | Monitoring well installation, additional cost per foot, 2" 304 Stainless Steel in place of SCH 40 PVC, in HSA or Sonic boring | 80 | FT | $ - 0 | $0.00 | |
| 116 | DRL | Monitoring well installation, cost per 4" SCH 40 PVC monitoring well up to 20 feet, in HSA or Sonic boring | 40 | EA | $ - 0 | $0.00 | |
| 117 | DRL | Monitoring well installation, cost per 4" SCH 40 PVC monitoring well from 21 to 40 feet, in HSA or Sonic boring | 40 | FT | $ - 0 | $0.00 | |
| 118 | DRL | Monitoring well installation, cost per 4" SCH 40 PVC monitoring well from 41 to 80 feet, in HSA or Sonic boring | 80 | FT | $ - 0 | $0.00 | |
| 119 | DRL | Monitoring well installation, cost per 4" SCH 40 PVC monitoring well from 81 to 150 feet, in HSA or Sonic boring | 70 | FT | $ - 0 | $0.00 | |
| 120 | DRL | Monitoring well installation, additional price per foot of 4" 304 Stainless Steel in place of SCH 40 PVC, in HSA or Sonic boring | 80 | FT | $ - 0 | $0.00 | |
| 121 | DRL | Monitoring Well, Install flush mount box for 2" or 4" well | 5 | EA | $ - 0 | $0.00 | |
| 122 | DRL | Monitoring Well, Install above grade (4x4 pad), steel casing | 5 | EA | $ - 0 | $0.00 | |
| 123 | DRL | Mobilization/Demobilization Cost, Well Decommissioning | 2 | EA | $ - 0 | $0.00 | |
| 124 | DRL | Decommission 2" dia. vertical well, grout in place, remove top 5' of casing, cost per foot | 5000 | EA | $ - 0 | $0.00 | |
| 125 | DRL | Decommission 4" dia. vertical well, grout in place, remove top 5' of casing, cost per foot | 5000 | EA | $ - 0 | $0.00 | |
| 126 | DRL | Decommission 6" dia. vertical well, grout in place, remove top 5' of casing, cost per foot | 500 | EA | $ - 0 | $0.00 | |
| 127 | DRL | Decommission 2" dia. vertical well, overdrill and grout, cost per foot | 5000 | EA | $ - 0 | $0.00 | |
| 128 | DRL | Decommission 4" dia. vertical well, overdrill and grout, cost per foot | 5000 | EA | $ - 0 | $0.00 | |
| 129 | DRL | Decommission 6" dia. vertical well, overdrill and grout, cost per foot | 500 | EA | $ - 0 | $0.00 | |
| 130 | DRL | Decommission 4" dia. horizontal well, cost per lineal foot | 1000 | EA | $ - 0 | $0.00 | |
| 131 | DRL | Decommission 6" dia. horizontal well, cost per lineal foot | 1000 | EA | $ - 0 | $0.00 | |
| 132 | DRL | Well Development, 2" dia. including all equipment and supplies, per well | 4 | EA | $ - 0 | $0.00 | |
| 133 | DRL | Well Development, 4" dia. including all equipment and supplies, per well | 20 | EA | $ - 0 | $0.00 | |
| 134 | DRL | Well Inspection - Down Hole Camera Inspection, vertical well, to include report of findings, per Half Day | 1 | EA | $ - 0 | $0.00 | |
| 135 | DRL | DPT (Direct Push Technology) Drilling, Mobilization/Demobilization price | 1 | EA | $ - 0 | $0.00 | |
| 136 | DRL | DPT BORING, price per day, including all tooling | 1 | EA | $ - 0 | $0.00 | |
| 137 | DRL | DPT SOIL SURVEY - Price per unit (10 points/unit) - up to 5 feet depth, per day | 5 | EA | $ - 0 | $0.00 | |
| 138 | DRL | SOIL & GAS SURVEY - Price per unit (10 points/unit) - greater than 5 to 15 feet depth, DPT Rig, per day | 5 | EA | $ - 0 | $0.00 | |
| 139 | DRL | SOIL & GAS SURVEY - Price per unit (10 points/unit) - up to 5 feet depth, hand auger, including report of findings | 5 | EA | $ - 0 | $0.00 | |
| 140 | DRL | SOIL & GAS SURVEY - Price per unit (10 points/unit) - greater than 5 to 15 feet depth, hand auger, per day | 5 | EA | $ - 0 | $0.00 | |
| 141 | DRL | SURVEY - Boring/Well location survey (price per 10) | 4 | EA | $ - 0 | $0.00 | |
| 142 | DRL | SURVEY - Physical Survey price per half day (includes surveyor, crew, and equipment) | 5 | EA | $ - 0 | $0.00 | |
| 143 | DRL | UTILITY CLEARANCE - Geophysical/GPR Survey, Price per unit (10,000 linear feet) to include in report of findings | 5 | EA | $ - 0 | $0.00 | |
| MISCELLANEOUS | |||||||
| 144 | MIS | Brass Long-shackle monitoring well locks, keyed alike, each | 12 | EA | $ - 0 | $0.00 | |
| 145 | MIS | Crane rental, price per day including fuel | 1 | EA | $ - 0 | $0.00 | |
| 146 | MIS | Backhoe Loader, 2WD, 14 ft boom, multipurpose bucket, per week | 1 | EA | $ - 0 | $0.00 | |
| 147 | MIS | Backhoe Loader, 4WD, 14 ft boom, multipurpose bucket, per week | 1 | $ - 0 | $0.00 | ||
| 147 | MIS | Backhoe Loader, 4WD, 14 ft boom, multipurpose bucket, per week | 1 | EA | $ - 0 | $0.00 | |
| 148 | MIS | Disposal, Hazardous (for VOCs) per gallon | 110 | EA | $ - 0 | $0.00 | |
| 149 | MIS | Disposal, Hazardous (for heavy metals) per gallon | 110 | EA | $ - 0 | $0.00 | |
| 150 | MIS | Disposal, Hazardous (for VOCs) per Drum | 2 | EA | $ - 0 | $0.00 | |
| 151 | MIS | Disposal, Hazardous (for heavy metals) per Drum | 2 | EA | $ - 0 | $0.00 | |
| 152 | MIS | Disposal, Hazardous (for ignitability, corrosivity, or reactivity only) per gallon | 50 | EA | $ - 0 | $0.00 | |
| 153 | MIS | Disposal, Hazardous (for ignitability, corrosivity, or reactivity only) per drum | 2 | EA | $ - 0 | $0.00 | |
| 154 | MIS | Disposal, Hazardous (for PFAS solids/soil) per drum | 10 | EA | $ - 0 | $0.00 | |
| 155 | MIS | Disposal, Hazardous (for PFAS liquid) per drum | 10 | EA | $ - 0 | $0.00 | |
| 156 | MIS | Disposal, Hazardous (for PFAS solids/soil) per ton | 50 | EA | $ - 0 | $0.00 | |
| 157 | MIS | Disposal, Hazardous (for PFAS liquid) per bulk truck per gallon | 250 | EA | $ - 0 | $0.00 | |
| 158 | MIS | Disposal, Non-hazardous soil/solids, per Drum | 2 | EA | $ - 0 | $0.00 | |
| 159 | MIS | Disposal, Non-hazardous liquids, per Drum | 2 | EA | $ - 0 | $0.00 | |
| 160 | MIS | Disposal, Non-hazardous liquids, bulk truck per gallon | 1000 | EA | $ - 0 | $0.00 | |
| 161 | MIS | Disposal, Non-hazardous solids/soil, per Ton | 930 | EA | $ - 0 | $0.00 | |
| 162 | MIS | Disposal, Non-hazardous (solids/soil with PFAS) per Drum | 25 | EA | $ - 0 | $0.00 | |
| 163 | MIS | Disposal, Non-hazardous (liquid with PFAS) per Drum | 25 | EA | $ - 0 | $0.00 | |
| 164 | MIS | Disposal, Non-hazardous (solids/soil with PFAS) per ton | 300 | EA | $ - 0 | $0.00 | |
| 165 | MIS | Disposal, Non-hazardous (liquid with PFAS) bulk truck per gallon | 2000 | EA | $ - 0 | $0.00 | |
| 166 | MIS | Disposable Bailers, each | 40 | EA | $ - 0 | $0.00 | |
| 167 | MIS | Disposable Tubing (3/8-in, 500ft) | 1000 | EA | $ - 0 | $0.00 | |
| 168 | MIS | Drum, 55-Gallon DOT Approved, Steel or Plastic | 55 | EA | $ - 0 | $0.00 | |
| 169 | MIS | Dump Truck, 5-7 CY, price per day including fuel | 1 | EA | $ - 0 | $0.00 | |
| 170 | MIS | EPA 5035 Sample Container or equivalent, per each 8260 analysis | 300 | EA | $ - 0 | $0.00 | |
| 171 | MIS | Excavator delivery | 1 | EA | $ - 0 | $0.00 | |
| 172 | MIS | Excavator, minimum 19,000-lbs up to 25,000-lbs, price per day including fuel | 1 | EA | $ - 0 | $0.00 | |
| 173 | MIS | Excavator, Mini-excavator (3500 lb.) delivery | 1 | EA | $ - 0 | $0.00 | |
| 174 | MIS | Excavator, Mini-excavator (3500 lb.) price per day including fuel | 1 | EA | $ - 0 | $0.00 | |
| 175 | MIS | Flame Ionization Detector price per day | 20 | EA | $ - 0 | $0.00 | |
| 176 | MIS | Frac Tank (double walled 20,000 gallon capacity) price per month | 3 | EA | $ - 0 | $0.00 | |
| 177 | MIS | Frac Tank delivery charge | 1 | EA | $ - 0 | $0.00 | |
| 178 | MIS | Subcontract Tank Cleaning (Frac Tank) - 1 each | 1 | EA | $ - 0 | $0.00 | |
| 179 | MIS | Generator (4000 watt) price per day including fuel | 20 | EA | $ - 0 | $0.00 | |
| 180 | MIS | HDPE fittings (flanged and welded fittings and valves) - 1 LOT | 1 | EA | $ - 0 | $0.00 | |
| 181 | MIS | HDPE piping (1.5-in to 2-in diameter) per 10 feet | 1 | EA | $ - 0 | $0.00 | |
| 182 | MIS | Hydroseeding - per 100 sf (includes all labor and materials using standard seed mixes) | 8 | EA | $ - 0 | $0.00 | |
| 183 | MIS | Lawn mower, riding, rental price per day including fuel | 5 | EA | $ - 0 | $0.00 | |
| 184 | MIS | Lawn mower, riding, enclosed, rental price per day including fuel | 5 | EA | $ - 0 | $0.00 | |
| 185 | MIS | Lawn mower, walk-behind, rental price per day including fuel | 5 | EA | $ - 0 | $0.00 | |
| 186 | MIS | Weed abatement (For DFSP Norwalk only) | 3 | EA | $ - 0 | $0.00 | |
| 187 | MIS | Monitoring well skimming sock 1.5"x2', 20 per pack, including installation materials up to 70 ft | 10 | EA | $ - 0 | $0.00 | |
| 188 | MIS | Oil/Water interface probe price per day | 20 | EA | $ - 0 | $0.00 | |
| 189 | MIS | Oxygen Analyzer / Explosimeter Combustible Gas Monitor price per day | 5 | EA | $ - 0 | $0.00 | |
| 190 | MIS | Photoionization Detector price per day | 20 | EA | $ - 0 | $0.00 | |
| 191 | MIS | Pickup Truck (1/2 ton) price per day including fuel | 260 | EA | $ - 0 | $0.00 | |
| 192 | MIS | PVC Piping, 1" or 2" diameter, price per foot | 1 | EA | $ - 0 | $0.00 | |
| 193 | MIS | PVC Piping, 4" diameter, price per foot | 100 | EA | $ - 0 | $0.00 | |
| 194 | MIS | PVC Piping, 6" diameter, price per foot | 100 | EA | $ - 0 | $0.00 | |
| 195 | MIS | Pressure washer (gas or electric) rental price per day including fuel | 3 | EA | $ - 0 | $0.00 | |
| 196 | MIS | Roll-Off Container with liner and cover, Delivery and monthly rental, 20 CY, price per bin | 10 | EA | $ - 0 | $0.00 | |
| 197 | MIS | Rough Terrain/Off-Road Utility Vehicle (e.g. Gator) price per day including fuel | 2 | EA | $ - 0 | $0.00 | |
| 198 | MIS | Silt Fence price per 50 feet (Installed) | 4 | EA | $ - 0 | $0.00 | |
| 199 | MIS | Skid steer rental price per day including fuel | 5 | EA | $ - 0 | $0.00 | |
| 200 | MIS | Straw Bale, including installation | 20 | EA | $ - 0 | $0.00 | |
| 201 | MIS | Straw Wattle (8.5"x25' or equivalent), includes installation | 4 | EA | $ - 0 | $0.00 | |
| 202 | MIS | Super Silt Fence price per 50 feet, includes installation | 4 | EA | $ - 0 | $0.00 | |
| 203 | MIS | Tedlar Bags price per dozen | 10 | EA | $ - 0 | $0.00 | |
| 204 | MIS | Temporary Berms or Spill Containment (12'x50'), each | 1 | EA | $ - 0 | $0.00 | |
| 205 | MIS | Temporary restroom & sink, delivery, installed, with service price per week | 2 | EA | $ - 0 | $0.00 | |
| 206 | MIS | Meeting venue for public meetings, price per day including equipment and supplies | 1 | EA | $ - 0 | $0.00 | |
| 207 | MIS | Hot & cold patch asphalt pavement repair, price per sq. ft., including service fee | 200 | EA | $ - 0 | $0.00 | |
| 208 | MIS | Concrete sidewalk and/or driveway repair, price per sq. ft., including service fee | 200 | EA | $ - 0 | $0.00 | |
| 209 | MIS | Traffic control, Traffic control devices (including arrow board and cones) 1 truck including fuel and 1 laborer price per day | 4 | EA | $ - 0 | $0.00 | |
| 210 | MIS | Troll 9500 Water Quality Meter w/200 feet of cable or equivalent, price per week | 4 | EA | $ - 0 | $0.00 | |
| 211 | MIS | Utility truck price per day including fuel | 15 | EA | $ - 0 | $0.00 | |
| 212 | MIS | Vacuum truck (70 BBL), price per half day including fuel | 24 | EA | $ - 0 | $0.00 | |
| 213 | MIS | Water level meter price per day | 24 | EA | $ - 0 | $0.00 | |
| 214 | MIS | Water tank (single walled 2,500 gallon) price per month | 4 | EA | $ - 0 | $0.00 | |
| 215 | MIS | Water Tank delivery charge | 1 | EA | $ - 0 | $0.00 | |
| 216 | MIS | Water truck, price per day including fuel | 12 | EA | $ - 0 | $0.00 | |
| 217 | MIS | Well Caps (2-in and 4-in) | 20 | EA | $ - 0 | $0.00 | |
| 218 | MIS | Dumpster/Bin 3-yd or 4-yd, per month | 12 | EA | $ - 0 | $0.00 | |
| ANALYTICAL TESTING | |||||||
| 219 | LAB | ASTM D1298 API gravity liquid Petroleum Products | 1 | EA | $ - 0 | $0.00 | |
| 220 | LAB | CA-WET (STLC - extraction only) | 4 | EA | $ - 0 | $0.00 | |
| 221 | LAB | CA-WET (STLC - CCR Metals Title 22 - 6010/7470/7471 only) | 4 | EA | $ - 0 | $0.00 | |
| 222 | LAB | Method 2130 Turbidity | 12 | EA | $ - 0 | $0.00 | |
| 223 | LAB | Fixed gases by thermal conductivity detector (TCD) | 12 | EA | $ - 0 | $0.00 | |
| 224 | LAB | EPA 160.1 (Total Dissolved Solids (TDS)) | 36 | EA | $ - 0 | $0.00 | |
| 225 | LAB | EPA 160.2 (Total Suspended Solids (TSS)) | 36 | EA | $ - 0 | $0.00 | |
| 226 | LAB | EPA 300.0 (Anions including SO4, NO2, NO3, Cl) | 72 | EA | $ - 0 | $0.00 | |
| 227 | LAB | EPA 350.1 (Ammonia as Nitrogen) | 12 | EA | $ - 0 | $0.00 | |
| 228 | LAB | EPA 353.2 (Nitrate-Nitrite Nitrogen) | 80 | EA | $ - 0 | $0.00 | |
| 229 | LAB | EPA 352.1 (Nitrogen, Nitrate) | 80 | EA | $ - 0 | $0.00 | |
| 230 | LAB | EPA 351.4 (TKN) | 12 | EA | $ - 0 | $0.00 | |
| 231 | LAB | EPA 365.3 (Total Phosphorous) | 12 | EA | $ - 0 | $0.00 | |
| 232 | LAB | EPA 376.2 (Sulfide, Dissolved) | 12 | EA | $ - 0 | $0.00 | |
| 233 | LAB | EPA 410.4 (COD) | 12 | EA | $ - 0 | $0.00 | |
| 234 | LAB | Draft EPA 1633 (PFAS in Water) | 500 | EA | $ - 0 | $0.00 | |
| 235 | LAB | Draft EPA 1633 (PFAS in Soil) | 500 | EA | $ - 0 | $0.00 | |
| 236 | LAB | EPA 6010/7470/7471 (CCR Metals Title 22 - 6010/7470/7471) | 100 | EA | $ - 0 | $0.00 | |
| 237 | LAB | EPA 6010 (Individual Metal 6010) | 36 | EA | $ - 0 | $0.00 | |
| 238 | LAB | EPA 1010 (Ignitability) | 12 | EA | $ - 0 | $0.00 | |
| 239 | LAB | EPA 1311 (TCLP - extraction only) | 4 | EA | $ - 0 | $0.00 | |
| 240 | LAB | EPA 1311 (TCLP - Full Toxicity Characterization) | 4 | EA | $ - 0 | $0.00 | |
| 241 | LAB | EPA 1311/6010B/C/7471A (TCLP Metals) | 4 | EA | $ - 0 | $0.00 | |
| 242 | LAB | EPA 1311/8270C/D (TCLP SVOCs) | 4 | EA | $ - 0 | $0.00 | |
| 243 | LAB | EPA 1311/ZHE/8260B/C (TCLP VOCs) | 4 | EA | $ - 0 | $0.00 | |
| 244 | LAB | EPA 1664 (N-Hexane Extractable Material) | 12 | EA | $ - 0 | $0.00 | |
| 245 | LAB | EPA 1668A (PCB) | 6 | EA | $ - 0 | $0.00 | |
| 246 | LAB | EPA 7196A/7199 (Hexavalent Chromium) | 12 | EA | $ - 0 | $0.00 | |
| 247 | LAB | EPA 7470 / 7471 (Mercury) | 12 | EA | $ - 0 | $0.00 | |
| 248 | LAB | EPA 8015B/C (Extractables) | 100 | EA | $ - 0 | $0.00 | |
| 249 | LAB | EPA 8015B/C (Purgeables) | 100 | EA | $ - 0 | $0.00 | |
| 250 | LAB | EPA 8015B/C (Purgeables) with silica gel cleanup | 395 | EA | $ - 0 | $0.00 | |
| 251 | LAB | EPA 8015B/C Carbon Chain Speciation, C4-C44 | 400 | EA | $ - 0 | $0.00 | |
| 252 | LAB | EPA 8081/A (Organochlorine Pesticides (OCP)) | 4 | EA | $ - 0 | $0.00 | |
| 253 | LAB | EPA 8151A (Chlorinated Herbicides ) | 4 | EA | $ - 0 | $0.00 | |
| 254 | LAB | EPA 8260B/5035 (VOCs 8260B/5035 +Oxygenates +TPHG) | 200 | EA | $ - 0 | $0.00 | |
| 255 | LAB | EPA 8260B/C (VOCs (BTEX/MTBE/Naphthalene only)) | 120 | EA | $ - 0 | $0.00 | |
| 256 | LAB | EPA 8260B/C (Full list) | 12 | EA | $ - 0 | $0.00 | |
| 257 | LAB | EPA 8260M BTEX and oxygenates in air | 48 | EA | $ - 0 | $0.00 | |
| 258 | LAB | EPA 8270C/D (SVOCs) | 4 | EA | $ - 0 | $0.00 | |
| 259 | LAB | EPA 8270C/D SIM (PAH-SIM) | 4 | EA | $ - 0 | $0.00 | |
| 260 | LAB | EPA 9023 (Total Extractable Organic Halides (EOX)) | 12 | EA | $ - 0 | $0.00 | |
| 261 | LAB | EPA 9045 (pH) | 12 | EA | $ - 0 | $0.00 | |
| 262 | LAB | EPA 9014 (Cyanide in water) | 12 | EA | $ - 0 | $0.00 | |
| 263 | LAB | Oil Viscosity per ASTM D7152 - 11(2016) | 2 | EA | $ - 0 | $0.00 | |
| 264 | LAB | SM5210 (BOD) | 12 | EA | $ - 0 | $0.00 | |
| 265 | LAB | SM5310 B/C/D (TOC ) | 80 | EA | $ - 0 | $0.00 | |
| 266 | LAB | SM5520B/G (Oil and Grease) | 24 | EA | $ - 0 | $0.00 | |
| 267 | LAB | SM5540 (Surfactant) | 24 | EA | $ - 0 | $0.00 | |
| 268 | LAB | TO-15 (VOCs) in Air, soil gas source, including summa can rental | 48 | EA | $ - 0 | $0.00 | |
| 269 | LAB | TO-15 (VOCs) in Air, soil gas source, including Tedlar bag | 24 | EA | $ - 0 | $0.00 | |
| 270 | LAB | TO-17 (VOCs) in Air, soil gas source, with sorbent tubes | 12 | EA | $ - 0 | $0.00 | |
| 271 | LAB | TO-3 (VOCs) in Air, soil gas source, including summa can rental | 24 | EA | $ - 0 | $0.00 | |
| 272 | LAB | TO-3 (VOCs) in Air, soil gas source, including Tedlar bag | 12 | EA | $ - 0 | $0.00 | |
| 273 | LAB | EPA 5.10, Alkalinity in water as CaCO3 | 80 | EA | $ - 0 | $0.00 | |
| 274 | LAB | EPA SW-846/Method 9035: Sulfate (SO42-), aqueous | 80 | EA | $ - 0 | $0.00 | |
| 275 | LAB | EPA 236.1: Dissolved ferrous iron, Fe 2+, 3+, aqueous | 80 | EA | $ - 0 | $0.00 | |
| 276 | LAB | EPA 15: Hydrogen sulfide (H2S), aqueous | 80 | EA | $ - 0 | $0.00 | |
| 277 | LAB | ASTM D-2216/ EPA Method 8000C: Soil moisture | 20 | EA | $ - 0 | $0.00 |
| CLIN 0004 Yearly | $0.00 |
| CLIN 0004 Base 4-Year | $0.00 |
| CLIN 0004 Base 4-Year + 6 month option | $0.00 |
CLIN 0005
| REFERENCE ITEM | CLIN | TYPE | ITEM DESCRIPTION | ESTIMATED ANNUAL QUANTITY | UNIT | UNIT PRICE | Total Annual Price (Estimated Quantity x Unit Price) |
| SERVICES | |||||||
| 019 | SVC | Asbestos Site Supervisor or Safety Officer price per hour | 0 | EA | $ - 0 | $0.00 | |
| 020 | SVC | Asbestos worker price per hour | 0 | EA | $ - 0 | $0.00 | |
| 021 | SVC | Biologist/Botanist 1 price per hour | 20 | EA | $ - 0 | $0.00 | |
| 022 | SVC | Biologist/Botanist 2 price per hour | 20 | EA | $ - 0 | $0.00 | |
| 023 | SVC | Buyer price per hour | 10 | EA | $ - 0 | $0.00 | |
| 024 | SVC | Certified Industrial Hygienist price per hour | 10 | EA | $ - 0 | $0.00 | |
| 025 | SVC | Chemist 1 price per hour | 10 | EA | $ - 0 | $0.00 | |
| 026 | SVC | Chemist 2 price per hour | 20 | EA | $ - 0 | $0.00 | |
| 027 | SVC | Chemist 3 price per hour | 25 | EA | $ - 0 | $0.00 | |
| 028 | SVC | Cost Accountant price per hour | 25 | EA | $ - 0 | $0.00 | |
| 029 | SVC | Drafter (including CAD, hardware & software) price per hour | 25 | EA | $ - 0 | $0.00 | |
| 030 | SVC | Engineer 1 (Staff) price per hour | 25 | EA | $ - 0 | $0.00 | |
| 031 | SVC | Engineer 2 (Project) price per hour | 25 | EA | $ - 0 | $0.00 | |
| 032 | SVC | Engineer 3 (Senior) price per hour | 25 | EA | $ - 0 | $0.00 | |
| 033 | SVC | Environmental Scientist 1 price per hour | 25 | EA | $ - 0 | $0.00 | |
| 034 | SVC | Environmental Scientist 2 price per hour | 25 | EA | $ - 0 | $0.00 | |
| 035 | SVC | Environmental Scientist 3 price per hour | 25 | EA | $ - 0 | $0.00 | |
| 036 | SVC | Environmental Technician price per hour | 25 | EA | $ - 0 | $0.00 | |
| 037 | SVC | Geologist 1 price per hour | 25 | EA | $ - 0 | $0.00 | |
| 038 | SVC | Geologist 2 price per hour | 25 | EA | $ - 0 | $0.00 | |
| 039 | SVC | Geologist 3 price per hour | 25 | EA | $ - 0 | $0.00 | |
| 040 | SVC | Health and Safety Officer price per hour | 25 | EA | $ - 0 | $0.00 | |
| 041 | SVC | Heavy Equipment operator price per hour | 0 | EA | $ - 0 | $0.00 | |
| 042 | SVC | Hydrogeologist 1 price per hour | 0 | EA | $ - 0 | $0.00 | |
| 043 | SVC | Hydrogeologist 2 price per hour | 0 | EA | $ - 0 | $0.00 | |
| 044 | SVC | Laborer price per hour | 200 | EA | $ - 0 | $0.00 | |
| 045 | SVC | Project Manager price per hour | 50 | EA | $ - 0 | $0.00 | |
| 046 | SVC | QA/QC Officer price per hour | 10 | EA | $ - 0 | $0.00 | |
| 047 | SVC | Remediation System Operator price per hour | 75 | EA | $ - 0 | $0.00 | |
| 048 | SVC | Secretary price per hour | 50 | EA | $ - 0 | $0.00 | |
| 049 | SVC | Translator, English to Spanish | 0 | EA | $ - 0 | $0.00 | |
| 050 | SVC | Court reporter, public meeting transcript | 0 | EA | $ - 0 | $0.00 | |
| 051 | SVC | Site Labor Foreman price per hour | 0 | EA | $ - 0 | $0.00 | |
| 052 | SVC | Toxicologist/risk assessor 1 price per hour | 0 | EA | $ - 0 | $0.00 | |
| 053 | SVC | Toxicologist/risk assessor 2 price per hour | 0 | EA | $ - 0 | $0.00 | |
| 054 | SVC | Toxicologist/risk assessor 3 price per hour | 0 | EA | $ - 0 | $0.00 | |
| 055 | SVC | Traffic Control Engineer price per hour | 0 | EA | $ - 0 | $0.00 | |
| FACILITY MAINTENANCE | |||||||
| 056 | SVC | Laborer/Contractor (Line riding, inspections) | 0 | EA | $ - 0 | $0.00 | |
| 057 | SVC | Electrician | 0 | EA | $ - 0 | $0.00 | |
| 058 | SVC | Laborer (e.g. trash picker) | 0 | EA | $ - 0 | $0.00 | |
| 059 | SVC | Maintenance Mechanic | 0 | EA | $ - 0 | $0.00 | |
| DRILLING, WELL INSTALLATION, AND OTHER INVESTIGATION SERVICES | |||||||
| 060 | DRL | Mobilization/Demobilization Cost for horizontal directional drilling equipment (horizontal well install) | 0 | EA | $ - 0 | $0.00 | |
| 061 | DRL | Horizontal directional drilling, blind terminus, 4 1/4" ID, up to 25 feet bgs (vadose zone), per lineal foot | 0 | EA | $ - 0 | $0.00 | |
| 062 | DRL | Horizontal directional drilling, blind terminus, 4 1/4" ID, up to 55 feet bgs (saturated zone), per lineal foot | 0 | EA | $ - 0 | $0.00 | |
| 063 | DRL | Horizontal directional drilling, blind terminus, 6 1/4" ID, up to 25 feet bgs (vadose zone), per lineal foot | 0 | EA | $ - 0 | $0.00 | |
| 064 | DRL | Horizontal directional drilling, blind terminus, 6 1/4" ID, up to 55 feet bgs (saturated zone), per lineal foot | 0 | EA | $ - 0 | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .