SF30_SPE60226R0702 AMD 0007.pdf

PDF 190 KB Posted

Attached to
Rocky Mountain/West Coast Program
Solicitation number
SPE60226R0702
Issued by

About this file

This is Amendment No. 007 to Solicitation SPE602-26-R-0702 issued by DLA Energy for bulk petroleum products, effective September 18, 2026. The amendment modifies the original solicitation dated February 2, 2026, and is not extended, meaning the receipt deadline for offers remains unchanged.

The amendment incorporates FAR 52.219-7 Notice of Partial Small Business Set-Aside (November 2020) with DLA Deviation August 2026, then removes it in a subsequent change. It also incorporates FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors (Deviation 2026-O0040, Revision 1) effective April 2026. The amendment establishes transportation system restrictions for seven pipeline and tanker systems, specifying minimum and maximum throughput volumes in US gallons for each: DFSP Alamagordo (6,048,000–26,280,000 USG), Pasco to Spokane Products Pipeline (24,192,000–30,240,000 USG), SFPP East (32,760,000–38,808,000 USG), SFPP North (55,440,000–140,112,000 USG), SFPP West (110,880,000–273,672,000 USG), Salt Lake Products Pipeline (11,088,000–22,176,000 USG), and FOB Origin Tanker (201,600,000–262,080,000 USG). The conformed solicitation copy has been posted to SAM.gov. Offerors must acknowledge receipt of this amendment prior to the original solicitation deadline by returning completed items or acknowledging receipt on submitted offers.

View the file

Other files

File Type Posted
JA SOLE SOURCE_Redacted.pdf PDF
FPR_Summary of Awards.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0007.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0006.pdf PDF
Attachment 7 - QAPs C and E_AMD 0006.pdf PDF
SF30_SPE60226R0702 AMD 0006.pdf PDF
SF30_SPE60226R0702 AMD 0005.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0005.pdf PDF
SF30_SPE60226R0702 AMD 0004.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0004.pdf PDF
SF30_SPE60226R0702 AMD 0003.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0003.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0002.pdf PDF
SF30_SPE60226R0702 AMD 0002.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0001.pdf PDF
Attachment 13 - Contract Text-Supplement Crosswalk_AMD 0001.pdf PDF
SF30_SPE60226R0702 AMD 0001.pdf PDF
Attachment 3 - OET Guidance 2026.pdf PDF
Attachment 7 - QAPs_C and_ E.pdf PDF
Attachment 8 - Small Business Subcontract Plan (DEC 2023).pdf PDF
Attachment 5 - OET OSP Crosswalk 2026.pdf PDF
Attachment 11 - F76 Traceability Signature Page.pdf PDF
Tab 09 - Solicitation SPE602-26-R-0702.pdf PDF
Attachment 9 - Equal Value Exchanges of Fuel.pdf PDF
Attachment 12 - ADDENDA TO FAR 52.pdf PDF
Attachment 4 - Map Coordinate Desk Guide.pdf PDF
Attachment 1 - Offer Submission.pdf PDF
Attachment 6 - Solicitation Fill-Ins.pdf PDF
Attachment 13 - Contract Text-Supplement Crosswalk_FINAL.pdf PDF
Attachment 10 - BEM Overview 2025.pdf PDF
Attachment 2 - OET Overview 2026.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE602 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60226R0702

X

2026 FEB 02

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

BULK PETROLEUM PRODUCT

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

09/18/2026

See Attached Continuation Sheet(s).

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. FAR 52.219-7 NOTICE OF PARTIAL SMALL BUSINESS SET-ASIDE (NOV 2020)

(DLA DEVIATION AUG 2026) has been incorporated.

B. FAR 52.219-7 NOTICE OF PARTIAL SMALL BUSINESS SET-ASIDE (NOV 2020)

has been removed.

C. FAR 52.222-90, ADDRESSING DEI DISCRIMINATION BY FEDERAL

CONTRACTORS (DEVIATION 2026-O0040, REVISION 1)(APR 2026) has been incorporated by reference.

D. Transportation System Restrictions:

(a) Transport system DFSP ALAMAGORDO (JET INFRASTRUCTURE) minimum throughput is 6,048,000 USG and maximum throughput is 26,280,000 USG.

(b) Transport system PASCO TO SPOKANE PRODUCTS PIPELINE SYSTEM minimum throughput is 24,192,000 USG and maximum throughput is 30,240,000

USG.

(c) Transport System SANTA FE PACIFIC PIPELINE (SFPP) EAST minimum throughput is 32,760,000 USG and maximum throughput is 38,808,000 USG.

(d) Transport System SANTA FE PACIFIC PIPELINE (SFPP) NORTH minimum throughput is 55,440,000 USG and maximum throughput is 140,112,000 USG.

(e) Transport System SANTA FE PACIFIC PIPELINE (SFPP) WEST minimum throughput is 110,880,000 USG and maximum throughput is 273,672,000 USG.

(f) Transport System SALT LAKE PRODUCTS PIPELINE SYSTEM minimum throughput is 11,088,000 USG and maximum throughput is 22,176,000 USG.

(g) Transport System FOB ORIGIN TANKER minimum throughput is 201,600,000

USG and maximum throughput is 262,080,000 USG.

E. A conformed copy of Solicitation SPE602-26-R-0702 has been posted to www.SAM.gov.

http://www.sam.gov/

File details come from the government source that posted it. Updated .