Attachment 7 - QAPs C and E_AMD 0006.pdf

PDF 16 MB Posted

Attached to
Rocky Mountain/West Coast Program
Solicitation number
SPE60226R0702
Issued by

About this file

This file is a PDF portfolio cover page displaying an Adobe Acrobat/Reader interface notification. The image shows a red and white document binder with the Adobe Acrobat logo, accompanied by text instructing users to open the PDF portfolio in Acrobat X or Adobe Reader X, or later versions for optimal viewing experience. A "Get Adobe Reader Now!" button is provided as a clickable link to download the required software.

This is not a substantive contract document but rather a technical instruction page. No contract details, requirements, timelines, pricing information, or agency information are present on this page.

View the file

Other files

File Type Posted
JA SOLE SOURCE_Redacted.pdf PDF
FPR_Summary of Awards.pdf PDF
SF30_SPE60226R0702 AMD 0007.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0007.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0006.pdf PDF
SF30_SPE60226R0702 AMD 0006.pdf PDF
SF30_SPE60226R0702 AMD 0005.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0005.pdf PDF
SF30_SPE60226R0702 AMD 0004.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0004.pdf PDF
SF30_SPE60226R0702 AMD 0003.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0003.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0002.pdf PDF
SF30_SPE60226R0702 AMD 0002.pdf PDF
Conformed Solicitation SPE602-26-R-0702_AMD 0001.pdf PDF
Attachment 13 - Contract Text-Supplement Crosswalk_AMD 0001.pdf PDF
SF30_SPE60226R0702 AMD 0001.pdf PDF
Attachment 4 - Map Coordinate Desk Guide.pdf PDF
Tab 09 - Solicitation SPE602-26-R-0702.pdf PDF
Attachment 5 - OET OSP Crosswalk 2026.pdf PDF
Attachment 6 - Solicitation Fill-Ins.pdf PDF
Attachment 9 - Equal Value Exchanges of Fuel.pdf PDF
Attachment 12 - ADDENDA TO FAR 52.pdf PDF
Attachment 13 - Contract Text-Supplement Crosswalk_FINAL.pdf PDF
Attachment 1 - Offer Submission.pdf PDF
Attachment 3 - OET Guidance 2026.pdf PDF
Attachment 7 - QAPs_C and_ E.pdf PDF
Attachment 11 - F76 Traceability Signature Page.pdf PDF
Attachment 2 - OET Overview 2026.pdf PDF
Attachment 8 - Small Business Subcontract Plan (DEC 2023).pdf PDF
Attachment 10 - BEM Overview 2025.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

PAGE 1 OF 3DLA FORM 1889, JUL 2023

Prescribed by: eSOP 4155.05-001 Sponsor: J3

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

PREVIOUS EDITION IS OBSOLETE Add Continuation Page

Print Form Email Form Clear

REV DESCRIPTION DATE APPROVED

ENERGY QAP C1.02 03/11/2025

REVISIONS

C1.02 GENERALIZED TECHNICAL GUIDANCE (MAR 2025)

(a) Geographic Requirements

a. Supplies delivered under this contract shall conform to all federal, state, and local environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. This includes delivery of fuel and documentation in a manner consistent with existing or future Title V (Clean Air Act) Permits. In the event that a federal, state, or local environmental requirement is more stringent than a similar requirement in a fuel specification contained in this contract, the Contractor shall deliver product that complies with the more stringent requirement. Product that fails to meet the more stringent environmental requirement will be considered nonconforming supply.

b. All supplies furnished under this contract shall fully meet the requirements of the applicable specification(s) as cited in the C QAPs included in this contract.

(b) Certificates of Analysis

a. The term “certificate of analysis” may also be referred to as “certificate of quality”, “quality report”, “COA”, “COQ”, “test report” or any laboratory report used to confirm QAP, specification or test method conformance.

b. Certificate(s) of analysis (COAs) submitted under this solicitation, shall not be older than 90 days from the issue date of this solicitation.

i. COAs older than 90 days may be requested for informational purposes.

c. COA(s) shall contain, at a minimum, the following information:

i. Sample test date

ii. Test result(s)

iii. Test method(s) for each test

iv. Signature or stamp by a laboratory or QC manager

DISTRIBUTION

STATEMENT - A

APPROVED FOR

PUBLIC RELEASE

DISTRIBUTION IS

"UNLIMITED"

DATE

03/13/2025

APPROVED BY

03/11/2025

REVIEWED BY

03/11/2025

PREPARED BY

DRAWING NUMBERSCALE

1:1

CODE ID NO.

52838

SIZE

A

NSN

ITEM

ENERGY QAP C1.02

DLA Land & Maritime DLA Troop Support DLA Aviation clear

DEFENSE LOGISTICS AGENCY, ENERGY

8725 JOHN J. KINGMAN RD

FORT BELVOIR, VIRGINIA 22060-6222

DLA Energy

PAGE 2 OF 3DLA FORM 1889, JUL 2023

d. Direct Delivery Fuels Purchase program only

i. Domestic locations and US territories: “Typicals” or ”specification sheets” are acceptable for the products listed below --

1. Aviation Fuel

2. Gasoline (including E85)

3. Diesel (including BDI/B20)

4. Heating oil

ii. Overseas locations: COAs are required for all overseas locations for all products.

iii. Marine Gasoil (MGO): A COA is required for all domestic and overseas MGO solicitations.

(c) ASSIST

a. Unless otherwise specified, current versions of defense or federal specifications, standards, military handbooks, commercial item descriptions, qualified product lists, and other related technical documents cited in this solicitation/contract can be accessed from the Department of Defense (DoD) Acquisition Streamlining and Standardization Information System (ASSIST) database at https://assist.dla.mil under or via ASSIST Quick Search at http://quicksearch.dla.mil. ASSIST is the official source for all Defense Standardization Program documents and contains the most current information on documents prepared by the DoD, as well as information on how to acquire referenced non-Government standards that have been adopted for DoD use.

i. Note that commercial or foreign specifications are not located on ASSIST and must be obtained from the relevant sponsoring organization (e.g. ASTM, SAE, API, ISO, etc.).

ii. Registered ASSIST account holders may establish profiles to receive automatic E-mail alerts when changes are planned or made to documents of interest by selecting criteria on the [Alert Portal Profile Maintenance] screens accessed from the [User Profile] menu. Users may also view or download a bi-monthly summary of changes to the ASSIST database under the [ASSIST Update] menu.

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION

(SQAP)

PAGE 3 OF 3DLA FORM 1889, JUL 2023

b. ASSIST Quick Search Instructions

i. Go to http://quicksearch.dla.mil

ii. Type in the numeric portion of the specification or Qualified Product List (QPL) into the “Document ID:” fillable area and click on the Search button.

iii. Look through the search results to find the desired document and click on the “Document ID”.

1. For specifications: click on the .pdf link under “Media”.

2. For QPL information: click on the “QPL-XXXXX” link located under the Document ID section.

a. On the next screen; within the “Revision History”, click on the “View QPD Data” which will take you to the Qualified Product Database.

b. Once you are in the Qualified Product Database, Click on the link in the “Govt Designation” Column to view qualified products.

c. To view qualified source plants, click on the Source Plants link under the Related Links column.

PAGE OF

DLA FORM 1889, JUL 2023

D L A FORM 0 0 1 3, AUGUST 20 22

Prescribed by: eSOP 4155.05-001 Sponsor: J3

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

DLA NOT FOR PRODUCTION

PREVIOUS EDITION IS OBSOLETE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

9.0.0.2.20100902.2.720808

Form ID - Form Title

Form ID - Form Title

Randy Davis

DLA DT

DLA DT

Current Page Number:

Total Number of Pages:

Click this button to Print this form.:

Click this button to Email form.:

btnClear:

Button1:

rev:

description: ENERGY QAP C1.02 revdate: 2025-03-11 revapproved:

revcomments:

apprdate: 2025-03-13 apprBy:

reviewdate: 2025-03-11 revBy:

prepdateA: 2025-03-11 prepbyA:

drawingNum:

scale: 1:1 codeIDNo: 52838 size: A nsn:

itemdesc: ENERGY QAP C1.02 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY, ENERGY line2: 8725 JOHN J. KINGMAN RD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 2.00000000

BANISZEWSKI.DANIE

L.J.1287388698

Digitally signed by

BANISZEWSKI.DANIEL.J.1287388698

Date: 2025.01.23 14:12:33 -07'00'

CATLIN.JOSHUA.D.127

6289540

CATLIN.JOSHUA.D.1276289540

Date: 2025.01.23 09:29:20 -05'00'

MACLANE.SKYLLAR.

BRYANNA.1252141827

MACLANE.SKYLLAR.BRYANNA.1252141827

Date: 2025.01.16 14:19:52 -05'00'

DISTRIBUTION STATEMENT-A: APPROVED FOR PUBLIC RELEASE:DISTRIBUTION IS UNLIMITED

C16.08-1 TURBINE FUEL, AVIATION (JET A) (DLA ENERGY JAN 2025)

NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE PRODUCT CODE

9130-00-359-2026 Turbine Fuel, Aviation, Jet A JAA

Supplies delivered under this contract shall conform to all Federal, State, and local environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. This includes delivery of fuel and documentation in a manner consistent with any existing or after-imposed Title V (Clean Air Act) Permits.

(a) PRODUCT REQUIREMENTS. Jet A shall conform to the requirements of the latest version of ASTM D 1655, Standard Specification for Aviation Turbine Fuels, except as modified below, at the custody transfer point.

(b) SPECIFICATION MODIFICATIONS

(1) Microseparometer (MSEP).

(i) The following MSEP ratings apply in the presence of the additives listed below. Values apply at point of manufacture:

Jet-A Additive MSEP Rating, min.

Fuel System Icing Inhibitor (FSII) 85

Corrosion Inhibitor/Lubricity Improver (CI/LI) 80 Fuel System Icing Inhibitor (FSII) and Corrosion

Inhibitor/Lubricity Improver (CI/LI)

(ii) MSEP shall be performed on unadditized Jet A that has a custody transfer point on the distribution system using, D7224 or D8073. If either method is not available testing may be conducted with D3948. Passing results (min 85) for D3948 will be considered acceptable. Test failures using D3948 shall be retested using D7224 or D8073. If fuel passes D7224 with a minimum limit of 85 or D8073 with a limit of 88, the fuel is acceptable with no further action.

(2) Fatty Acid Methyl Ester (FAME)

(i) For offerors that will be offering Jet A FOB Destination and/or Origin TT, which involves staging jet fuel at a terminal via a multi-product pipeline, a Certificate of Quality of the issue tank must include testing for FAME for Acceptance of the fuel. The Test method to be used is either IP 585, IP 583, IP 590, IP 599, or ASTM D 7797. The Referee Method is IP 585.

Current ASTM D1655 Jet A specification allows no more than 50 parts per million of FAME in jet fuel.

(c) ADDITIVES.

(1) Additives shall not be premixed with other additives before injection into the fuel.

(2) FUEL SYSTEM ICING INHIBITOR (FSII). When required by contract line item-

(i) FSII shall be added to the fuel and shall be Diethylene Glycol Monomethyl Ether (DIEGME) conforming to the latest version of ASTM D4171, Standard Specification for FSIIs, Type III or MIL-DTL-85470C, dated March 5, 2024, Inhibitor, Icing, Fuel System, High Flash, NATO Code Number S-1745.

(ii) FSII shall be added to the fuel so that the resulting concentration in the final blend is between 0.07% and 0.10% by volume.

(iii) When using the 20-ounce aerosol can to introduce FSII during over the wing refueling, determine the fuel quantity and calculate the amount of required additive. This additive shall be added gradually during filling to permit proper blending in the fuel. One can of aerosol additive will inhibit 180 gallons of fuel to 0.087 percent by volume. The use of aerosol FSII is not permitted for U.S. Navy aircraft refueling.

(3) CORROSION INHIBITOR/LUBRICITY IMPROVER (CI/LI). When required by contract line item-

(i) The additive must conform to MIL-PRF-25017H with Amendment 1, dated August 4, 2011, revalidated May 25, 2021, Inhibitor, Corrosion/Lubricity Improver, Fuel Soluble (NATO S-1747), found in ASSIST and shall be listed in the electronic Qualified Products List (QPL)-25017, located in the Qualified Products Database (QPD) found at https://qpldocs.dla.mil/. The concentration of CI/LI added to the fuel must be between the minimum effective concentration and the maximum allowable concentration as listed for the CI/LI in QPL-25017.

(4) STATIC DISSIPATER ADDITIVE (SDA). When required by contract line item-

(i) SDA shall be added to the fuel and the conductivity limits of 50 to 600 picosiemens per meter (pS/m) at ambient temperature or 29.4oC (85oF), whichever is lower, unless otherwise directed by the procuring activity.

(5) METAL DEACTIVATOR (MDA). MDA shall not be used unless the supplier has obtained PRIOR written consent from the procuring activity.

(6) Product shall be homogeneously mixed. Until all aviation turbine fuel tanks are coated, it is acceptable to perform stratification tests in lieu of circulating tanks to achieve homogeneity.

(d) SYNTHETIC BLEND COMPONENT (SBC) and CO-HYDROPROCESSED SYNTHESIZED KEROSENE

(1) If a fuel containing an SBC or a co-hydroprocessed synthesized kerosene is being offered, notification shall be made to the contracting point of contact with submission of relevant details regarding the blend percentage and which Annex of ASTM D7566 for the synthetic blend component used, and which feedstocks and co-processing percentage for co-hydroprocessed synthesized kerosene. Only synthetic blend components approved in ASTM D7566, MIL-DTL-83133, and MIL-DTL-5624 and co-hydroprocessed synthesized kerosene produced from approved feedstock and percentage in ASTM D1655, MIL-DTL-83133, and MIL-DTL-5624 shall be acceptable to the government

(e) REPORTS. Refer to the MATERIAL INSPECTION AND RECEIVING REPORT (QAP E40.01) contract provision for reporting requirements.

https://assistdocs.com/ https://qpldocs.dla.mil/

ENERGY QAP C16.08-1 Turbine Fuel Aviation (JAA) (JAN 2025).pdf

Supplies delivered under this contract shall conform to all Federal, State, and local environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. This includes delivery of fuel and documentation ...

(b) SPECIFICATION MODIFICATIONS

(ii) MSEP shall be performed on unadditized Jet A that has a custody transfer point on the distribution system using, D7224 or D8073. If either method is not available testing may be conducted with D3948. Passing results (min 85) for D3948 will be con...

(c) ADDITIVES.

BANISZEWSKI.DANIE

L.J.1287388698

Date: 2025.01.23 14:08:16 -07'00'

CATLIN.JOSHUA.D.127

6289540

CATLIN.JOSHUA.D.1276289540

Date: 2025.01.23 09:31:39 -05'00'

MACLANE.SKYLLAR.

BRYANNA.1252141827

Date: 2025.01.16 14:18:25 -05'00'

C16.09 TURBINE FUEL, AVIATION (JET Al) (DLA ENERGY JAN 2025)

NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE PRODUCT CODE

9130-00-753-5026 Turbine Fuel, Aviation, Jet A1 JAl

Supplies delivered under this contract shall conform to all Federal, State, and local environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. This includes delivery of fuel and documentation in a manner consistent with any existing or after-imposed Title V (Clean Air Act) Permits. The list of such requirements contained in this contract is not intended to be a complete list, and the Contractor shall be responsible for determining the existence of all such requirements. Selected regional environmental requirements are highlighted in the SPECIFICATIONS (CONT'D) clause. In the event that a Federal, State, or local environmental requirement is more stringent than a fuel specification contained in this contract, the Contractor shall deliver product that complies with the more stringent fuel specification. Product that fails to meet the more stringent fuel specification will be considered to be a nonconforming supply. Product(s) to be supplied shall fully meet the requirements of the applicable specification(s) as cited above. In the event that compliance with the more stringent fuel specification causes the contractor to incur additional costs, the contractor may request an equitable adjustment.

(a) PRODUCT REQUIREMENTS. Product shall conform to the latest version of ASTM Dl655: Standard Specification for Aviation Turbine Fuels with the following modifications. For European, Middle Eastern, and Asian Locations Only: product shall conform to the latest revision of Defence Standard 91-091.

(b) SPECIFICATION MODIFICATIONS.

(1) Microseparometer (MSEP).

(i) The following MSEP ratings apply in the presence of the additives listed below. Values apply at point of manufacture:

Jet A1 Additive MSEP Rating, min.

Fuel System Icing Inhibitor (FSII) 85 Corrosion Inhibitor/Lubricity Improver (CI/LI) 80

Fuel System Icing Inhibitor (FSII) and Corrosion Inhibitor/Lubricity Improver (CI/LI)

(A) MSEP shall be performed on unadditized Jet A that has a custody transfer point on the distribution system using, D7224 or D8073. If either method is not available testing may be conducted with D3948. Passing results (min 85) for D3948 will be considered acceptable. Test failures using D3948 shall be retested using D7224 or D8073. If fuel passes D7224 with a minimum limit of 85 or D8073 with a limit of 88, the fuel is acceptable with no further action.

(c) ADDITIVES: Additives shall not be premixed with other additives before injection into the fuel.

(1) FUEL SYSTEM ICING INHIBITOR (FSII). When FSII is required by contract line item

(i) The fuel shall contain 0.07 to 0.10 percent by volume FSII.

(ii) FSII shall be added to the fuel and shall be Diethylene Glycol Monomethyl Ether (DIEGME) conforming to the latest version of ASTM D4171, Standard Specification for FSIIs, Type III or MIL-DTL-85470C, dated March 5, 2024, Inhibitor, Icing, Fuel System, High Flash, NATO Code Number S-1745.

(iii) When using the 20-ounce aerosol can to introduce FSII during over the wing refueling, determine the fuel quantity and calculate the amount of required additive. This additive shall be added gradually during filling to permit proper blending in the fuel. One can of aerosol additive will inhibit 180 gallons of fuel to 0.087 percent by volume. The use of aerosol FSII is not permitted for U.S. Navy aircraft refueling.

(2) CORROSION INHIBITOR/LUBRICITY IMPROVER (CI/LI). When CI/LI is required by contract line item the additive shall conform to the latest revision of MIL-PRF-25017H with amendment 1 dated August 4,2011, revalidated May 25, 2021, and be listed in Qualified Products List (QPL)-25017. In order to obtain dosage data for QPL-25017 additives, access the Qualified Products Database (QPD)at https://qpldocs.dla.mil/. Do a search for QPL number 25017, and click the MIL-PRF-25017 Category 1 link. The dosage information is located in the "source notes" for each qualified additive as minimum effective and maximum allowable concentrations in grams per cubic meter (g/m3).

https://qpldocs.dla.mil/

(3) STATIC DISSIPATER ADDITIVE (SDA). When required by contract line item, SDA shall be added to the fuel and the conductivity limits of 50-600 picosiemens per meter (pS/m) at ambient temperature or 29.4˚C (85˚F), whichever is lower, unless otherwise directed by the procuring activity.

(4) METAL DEACTIVATOR ADDITIVE (MDA). MDA shall not be used unless the supplier has obtained written consent from the procuring activity and user.

(i) Product shall be homogeneously mixed. Until all aviation turbine fuel tanks are coated, it is acceptable to perform stratification test in lieu of circulating tanks to homogeneity.

(d) SYNTHETIC BLEND COMPONENT (SBC) and CO-HYDROPROCESSED SYNTHESIZED KEROSENE

(1) If a fuel containing an SBC or a co-hydroprocessed synthesized kerosene is being offered, notification shall be made to the contracting point of contact with submission of relevant details regarding the blend percentage and which Annex of ASTM D7566 for the synthetic blend component used, and which feedstocks and co-processing percentage for co-hydroprocessed synthesized kerosene. Only synthetic blend components approved in ASTM D7566, MIL-DTL-83133, and MIL-DTL-5624 and co-hydroprocessed synthesized kerosene produced from approved feedstock and percentage in ASTM D1655, MIL-DTL-83133, and MIL-DTL-5624 shall be acceptable to the government

ENERGY QAP C16.09 Turbine Fuel Aviation (Jet A1) (JAN 2025) .pdf

C16.09 TURBINE FUEL, AVIATION (JET Al) (DLA ENERGY JAN 2025)

(b) SPECIFICATION MODIFICATIONS.

KNAPP.RICHARD.BRU

CE.1027134021

KNAPP.RICHARD.BRUCE.1027134021

Date: 2024.04.11 12:46:02 -04'00'

MACLEAN.SARAH.A.1

400398441

MACLEAN.SARAH.A.1400398441

Date: 2024.04.11 12:22:48 -04'00'

KARRAS.JASON.EARL

E.1129188177

KARRAS.JASON.EARLE.1129188177

Date: 2024.04.11 12:28:51 -04'00'

TABLE I, Sample Retention1

LOCATION MINIMUM QUANTITY RETENTION PERIOD 1

Bulk Tank Cars/Tank Truck/Intermodal Container

Fuels 1 gallon (4 liters) 2 15 days for fuels Lubricating Oils 0.25 gallons (1 liter) 2 45 days for lubricating oils

Drums4 2 gallons (8 liter) (multi-drum composite) 3 45 days

Shipping Tank(s)

2 gallons (8 liters) for Aviation Turbine Fuels 1 gallon (4 liters) for all other Fuels, Lubricating Oils, and Additives

45 days

Tanker/Barge/Pipeline (Composite Line at Custody Transfer Point)

5 gallon (20 liters) for all fuel types 45 days

Tanker/Barge (Composite)

F.O.B. Origin 2 gallons (8 liters) for Aviation Turbine Fuels 1 gallon (4 liters) for all other fuels

45 days

F.O.B. Destination 2 gallons (8 liters) Until shore tests on-specification Tanker/Barge (Each Compartment)

F.O.B. Origin 0.25 gallon (1 liter) 45 days F.O.B. Destination 0.25 gallon (1 liter) Until shore test on-specification

NOTES:

1. Unless otherwise noted in this document or applicable contract, the retention period shall be for the stated number of days after the sample has been taken from the location indicated.

2. If the conveyance is compartmentalized, a proportional sample shall be taken from each compartment.

3. An 8-liter composite sample of each product lot shall be taken from a predetermined number of randomly selected drums IAW Table III of API MPSM, Chapter 8.1 (ASTM D 4057).

4. Applies to DLA Energy managed procurements of products shipped in drums. Does not apply to DLA Aviation managed procurements for packaged products.

TABLE II, Minimum Sampling and Testing Requirements for Petroleum Products Series 1, tankers and barges1

ITEM WHEN TO SAMPLE LOCATION OF SAMPLE TYPE OF SAMPLE2 TEST REQUIRED3

1.a

Prior to Loading

Before acceptance of new materiel and after establishment of new batch4 Each shore storage tank Single Tank Composite or All

Levels A5, 15

1.b After line pack but prior to loading As close to the custody transfer point as possible Line Sample C7,14 Dedicated System B-1 Non-Dedicated System

1.c D uring

Loading

Immediately after start of loading/shipment point as possible Line Sample C7

1.d After first in Vessel cargo compartment(s) Spot C7,14

1.e During loading point as possible Line Sample Hourly Visual6,8, Retain10

1.f fter Loading

After loading

Each vessel cargo compartment All Level (Combine All Levels into one Volumetric Composite Sample13)

C 6, 8, 11,14

Remainder of B-112

(Retain fuel for B-1 referee testing)

1. Additional requirements to include retain samples may be required. See Quality Assurance Provisions (C or E-QAP) for further details.

2. Refer to ASTM International D4057 for sampling procedures.

3. Test results shall be compared against the quality release certificate. Any discrepancies shall be identified, investigated, and resolved.

4. Upon procurement at refineries, blending installations, etc. and at main installations including national depots & ocean importing points on establishment of new batches.

5. Prior to performing A-level testing, the homogeneity of each batch shall be determined. Refer to paragraph (b)(1)(iii)(C) of this document for additional details.

6. Test for FSII and SDA only if line injected.

7. If sample fails appearance, perform particulate matter using approved methods as outlined in the applicable specification.

8. Lubricity also required for F-76 only if line injected, or determine LIA concentration by volumetric measurement/calculation.

9. First in shall be done after one (1) meter or after line displacement whichever is the greater.

10. For all tanker and barge, a flow-proportional sample taken in accordance with MPMS Chapter 8, Section 2, is preferred at the custody transfer point. However, manual samples taken in accordance with MPMS Chapter 8, Section 1 are acceptable if they are taken hourly throughout the shipment and that the quantity of the composite sample meets the requirements in Table I

11. Best practice is for B-1 test completion for FOB Origin Procurements (or Type A level testing when specified in contract for FOB Destination Procurements) prior to vessel release. Based on QAR decision, vessel may sail after C Tests to meet schedule requirements including to avoid predicted weather; remainder of B-1 tests to be completed before arrival at next load or discharge port. Test report will be provided to designated discharge port.

12. Type A level testing required for FOB Destination Procurements (unless otherwise specified by contract).

13. As defined by API MPMS Chapter 8-1, section 3.22.

14. For product verification purposes. Results of C-test must fall within reproducibility of source tank A-level results.

15. New cargo from same batch, within 30 days, will only require B-1 testing to verify previous A-level test results. B-1 level verification test results should fall withing reproducibility of source tank A-level results.

Series 2, pipeline, tank trucks, tank cars, iso-containers1,7

ITEM WHEN TO SAMPLE LOCATION OF SAMPLE TYPE OF SAMPLE 2 TEST REQUIRED3

2.a Prior to Shipm ent

Before acceptance of new materiel and after establishment of new batch4

Each Shipment Storage Tank Single Tank Composite or All Levels A9, 11

2.b After line pack but prior to loading/shipment

As close to the custody transfer point as possible Line Sample C5,6 Dedicated System

B-1 Non-Dedicated System

2.c D uring Shipm ent

Immediately after start of loading/shipment possible and downstream of the filter separator (if equipped)

Line Sample C5, 13

2.d Pipeline Only:

Hourly after start of loading or shipment10 possible and downstream of the filter separator (if equipped) Line Sample

Apperance5, 12

(Retain fuel for B-1 referee testing)

2.e

Daily on first fill and anytime a new tank is placed on issue (after line displacement) TT, TC, ISO, Refuelers or other over the road transportation modes only possible (Loading Rack or Fill Point) and downstream of the filter separator (if equipped)

Line Sample Color (by visual method) and Appearance5.

If visual fails perform C6

2.f fter Loading

Daily for each conveyance mode (Not required for pipeline operations)

Each Cargo Compartment or another point that provides a representative sample All Level

Appearance on each compartment

C on composite 5,6,8

2.g Drums Sample of each lot of product shall be taken from a predetermined number of randomly selected drums14

Multi-drum Composite C13

1. Additional contractual requirements to include retain samples may be required. See Contract Quality Assurance Plans (C or E-QAPs) for further details.

2. Refer to ASTM International D4057 for sampling procedures.

3. Test results shall be compared against the quality release certificate. Any discrepancies shall be identified, investigated, and resolved.

4. Upon procurement at refineries, blending installations, etc., and at main installations including national depots & ocean importing points on establishment of new batches.

5. Test for FSII and SDA only if line injected.

6. If sample fails appearance, perform particulate matter using approved methods as outlined in the applicable specification.

7. Type A level testing required for FOB Destination Procurements (unless otherwise specified by contract).

8. If the conveyance is compartmentalized, a proportional sample shall be taken from each compartment such that a total of one liter is collected from the conveyance.

9. Filtration time testing is required for JP-5 & JP-8 and shall meet contract requirement.

10. For pipeline shipments, a flow-proportional sample taken in accordance with MPMS Chapter 8, Section 2, is preferred at the custody transfer point. However, manual samples taken in accordance with MPMS Chapter 8, Section 1 are acceptable if they are taken hourly throughout the shipment and that the quantity of the composite sample meets the requirements in Table I.

11. Prior to performing A-level testing, the homogeneity of each batch shall be determined. Refer to paragraph (b)(1)(iii)(C) of this document for additional details.

12. Lubricity also required for F-76 only if line injected or determine LIA concentration by volumetric measurement/calculation.

13. For product verification purposes. Results of C-test must fall within reproducibility of source tank results.

14. A composite sample of 2 gallons (8 liters) for Aviation Turbine Fuels and 1 gallon (4 liters) for all other fuels for each lot of product shall be taken from a predetermined number of randomly selected drums. The total number of drums sampled per lot shall, at a minimum, be that cited in Table III of API MPMS chapter 8.1 (ASTM d 4057), but may be increased at the government's option.

Series 3, product receipt and discharges for tankers and barges (FOB Destination)

ITEM WHEN TO SAMPLE LOCATION OF SAMPLE TYPE OF SAMPLE TEST REQUIRED

3.a

Prior to D ischarge

Prior to discharge

From each vessel cargo compartment All Level Appearance and Density1

3.b From each vessel cargo compartment

All Level (Combine All Levels into one Volumetric Composite

Sample)

3.d

D

Within 30 minutes after start and each hour after until completion

Dock/Discharge Manifold Header Line Sample / Retain Perform Appearance test2,3 and then retain fuel for Referee testing

3.e fter

If remainder of fuel will be shipped to another DFSP

Each vessel compartment with fuel remaining on board All Level Retain until discharged at destination

1. Test for flash point on high flash cargo tanks if low and high flash cargoes are carried together aboard the same vessel without segregated venting systems.

2. For aviation fuel delivery, FSII and SDA shall be tested only if line injected. This requires an additional quart sample.

3. Test for additives if line injected downstream of the injector. (If line injecting LIA into F-76, test for lubricity.)

Series 4, product receipt from pipeline (FOB Destination)1

ITEM WHEN TO SAMPLE LOCATION OF SAMPLE TYPE OF SAMPLE TEST REQUIRED

4.c D

R eceipt

During pipeline receipt Custody transfer point Line Sample/Retain 5 Gallon Minimum2

4.d During pipeline receipt, immediately after start, Midpoint and 1 hour prior to completion3 possible Line C

4.g fter

R eceipt

After receipt of fuel Each receipt tank All level A

1. Refer to ASTM International D4057 for sampling procedures.

2. Retain for referee testing in the event a failure occurs on receipt tank. Retain sample for 45 days. Sampling is IAW API MPMS Chapter 8

3. Fuel from a new batch will be considered a new receipt for quality control purposes.

TABLE III, Definitions of Test Series

I. TYPE A: Includes all specification quality conformance tests plus any additional contractual requirements.

II. TYPE B-1 & C: As shown in the table below for each product. Properties and test methods will be in accordance with the product specification for each grade identified in the solicitation/contract.

AVGAS

AVIATION

TURBINE

MOGAS

DIESEL/

KEROSENE/

NAVAL DISTILLATE

LUBE OIL

TEST PROPERTIES B-1 C B-1 C B-1 C B-1 C B-1 C

Appearance/ workmanship

Particulate content * *8 *1 *8 Filtration Time * Color (visual) * * * * * * * * * Density/API Gravity/ Specific Gravity

Distillation * * * * Corrosion, Copper Strip * * Existent Gum * * Carbon Residue *1 Vapor Pressure * * Lead Content * *3 Freeze Point * Flash Point * * * * * FSII Content *

MSEP (JP-8, F-24, F-27,

Jet A & Jet A-1)

Conductivity (JP-5 & JP- 8, F-24, F-27 & Jet A-1)

*4

Thermal stability (B-1 requirement applies to JPTS and marine/multi-product mode receipt tank sample)

Sediment & Water Total Sediment aged Viscosity *7 Water Content * *8 *2 Emulsion *2 Foam Test * Knock Rating (RON / MON) *6 Lubricity *1

FAME *5 *1

Solid Contaminants *2

* The procedure to be used for conducting these tests will be as stated in the appropriate product specification and/or contract. For any products not covered under this table, contact Quality Assurance Representative for guidance.

NOTES:

1. F76 only.

2. Only if the specification has this requirement.

3. If contamination with leaded fuels is suspected.

4. If fuel contains conductivity additive, wait approximately 2 minutes after obtaining sample for charges in the fuel to dissipate before performing CU testing.

5. Only for product transported through multi-product systems, including marine transport.

6. Perform only if Lead Content is performed and fails and/or contamination with another product is suspected. In the case of pipeline, this test shall be performed when considered necessary.

7. For MIL-PRF-17331 and MIL-PRF-9000 viscosity is not required unless the tank has been in long term storage for 3 months.

8. Visual check.

TABLE IV, Conversion chart for tank trucks (TT) tank cars (TC), tank wagons (TW), tank & trailer (TRR), and intermodal containers (IMC)1, 2

Last Product Carried

PRODUCT TO BE LOADED5

Gasolines: MUR, MUM, MUP, EFM, E85, 100, 130, JAB

Aviation Turbine Fuels: JAA/A1, JP-8, F-24, JP-5, TS1, KS1/R/N, Aviation Turbine

Fuel3: JPTS

RP1/RP2 JP-10/PF1 Diesel Fuel: F-76 FSII Lubricating Oils

Diesel Fuels:

DF1, DF2,

DS1, DS2,

DSS, DSW,

BDI, MGO

Gasolines4 MUR, MUM, MUP, EFM, E85, 100, 130, JAB

Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry

Aviation Turbine Fuels4, 9

JAA/A1, JP-8, F-24,

JP-5, TS1, KS1/R/N,

Drain/Empty

Drain/Empty

Steam/Dry

Aviation Turbine Fuel3 JPTS Drain/Empty Drain/Empty Drain/Empty Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam Dry Steam/Dry

RP1/RP2 Steam/Dry Steam/Dry Steam/Dry Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry J10/PF-1 Steam Dry Steam/Dry Steam/Dry Steam Dry Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Petroleum Solvent or Paint Thinner Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry

Diesel Fuel: F-76 Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Drain/Empty Steam/Dry Steam/Dry Drain/Empty Diesel Fuels4 DF1, DF2, DS1, DS2, DSS, DSW, MGO

Steam/Dry Steam/Dry7 Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Drain/Empty

FSII (SIH) Drain/Empty Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Drain/Empty Steam/Dry Steam/Dry Lubricating Oils NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD NO LOAD Steam/Dry6 Steam/Dry Biodiesel Blends(<B15)4

DF1, DF2, DS1, DS2, DSS,

DSW

Steam/Dry7

NO LOAD

Biodiesel Blends(>B15):

DF1, DF2, DS1, DS2,

BDI

Steam/Dry8

Heavy Fuel Oils, Distillate Fuels4 FS1, FS2, FS4, FS5, FS6

Residual Fuel Oils:

ISO 8217, class F (IFOs)

Naphtha Drain/Empty Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry Steam/Dry

TABLE IV Continued, Conversion chart for tank trucks (TT) tank cars (TC), tank wagons (TW), tank & trailer (TRR), and intermodal containers (IMC)1, 2

1. For previous cargoes not listed, contact DLA Energy Quality Operations Division at DLAEnergyQualityOperations@dla.mil for acceptability/cleaning procedures.

2. General Instructions for Tank Cars and Trucks

a. Conveyances (all) shall be dry and free from loose rust, scale, and dirt

b. Saran lined equipment should not be steam cleaned; water wash should suffice.

c. Petroleum products shall not be loaded into the conveyances where the previous cargo was caustic, acid, or chlorinated solvents.

d. Tank trucks and cars in liquid fertilizer service shall not load aviation turbine fuels directly but shall carry out at least two loads of commercial gasoline prior to the aviation turbine fuel load.

e. Conversion of Government-owned tank cars from liquid fertilizer service to aviation turbine fuel service shall only be done when no other alternative exists. Tank cars being converted from liquid fertilizer service to a petroleum product shall be adequately cleaned to remove all traces of liquid fertilizer. At a minimum, the equipment must be steam cleaned; dried and must be free from loose rust, scale, and dirt. After cleaning, but before loading aviation turbine fuels, at least two loads of commercial gasoline shall be carried prior to loading aviation turbine fuel. Equipment with unlined compartments should have its compartments lined with an approved coating at this time. Conveyances carrying their initial load of aviation turbine fuel following conversion shall not be released from the loading until they have been sampled a minimum of 24 hours after loading. In accordance with MIL-STD-3004-1A, samples shall undergo type B-2 testing plus Thermal Stability Test (if required by the product specification). After type B-2 tests indicate compliance with specification requirements, the conveyance can be released pending results of the Thermal Stability tests. The conveyance shall not be unloaded until the loading point notifies the destination that the Thermal Stability test (when required) has passed. When the above condition applies, the DD-250, Wide Area Workflow (WAWF) Energy Receiving Report (ERR) or equivalent form shall be so noted.

3. To be loaded only in aluminum or stainless-steel conveyance, or other conveyance lined with an approved epoxy coating. If equipment is coated, clean with hot fresh water not exceeding 58°C (136°F) and dry thoroughly.

4. If previous cargo contained dye marker, all traces of color must be removed.

5. If product to be loaded does not contain dye, then the vehicle shall not contain any traces of dye prior to loading.

6. Drain/empty only when same specification product is being loaded.

7. Prior to loading the aviation fuels listed, the conveyance must have carried a previous non-FAME cargo and then be steam cleaned and dried. Trucks that have previously carried biodiesel create a risk of cross-contamination of aviation turbine fuel with residual biodiesel components. Diesel fuel may contain up to 5% FAME without reporting it as biodiesel.

Because of the difficulties in making a load-rack of the presence of FAME in the previous load, the more stringent “Steam/Dry is required.

8. Drain and empty if loading biodiesel blend.

9. Cargos carrying dyed kerosene shall use the steam/dry cleaning procedure.

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PDF (DLA)

DLA FORM 1889, OCT 2011

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev: 0 description: DLA ENERGY QAP E12 revdate: JUL 2015 revapproved: 30 JUL 2015 revcomments:

apprdate: 7/30/2015 apprBy:

reviewdate: 2015-07-30 revBy:

prepdateA: 2015-07-30 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: DLA ENERGY QAP E12 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN ROAD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev: 1 description: DLA ENERGY QAP E21.01 revdate: JUN 2015 revapproved: 26 JUN 2015 revcomments:

apprdate: 26 June 2015 apprBy:

reviewdate: 2015-06-26 revBy:

prepdateA: 2015-06-26 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: DLA ENERGY QAP E21.01 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN ROAD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000

DLA ENERGY QAP E22 9 Feb 2022 9 Feb 2022

ENERGY QAP E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY) (FEB 2022)

The following lists shall be used to identify the Government inspection office assigned inspection and/or acceptance responsibility for DLA Energy contracts in a particular geographic area. These contracts include, but are not limited to, those for bulk petroleum products and additives, into-plane refueling, petroleum storage and laboratory services, coal, aerospace energy (including compressed gases), and posts, camps, and stations. The area of inspection responsibility and corresponding office code are assigned in paragraphs (a) and (b). The address and phone number of each inspection office, by office code, is provided in paragraph (c). Unless a particular inspection office is identified in another part of the contract, the assignments in this QAP shall apply.

(a) AREAS OF RESPONSIBILITY AND OFFICE CODES WITHIN THE CONTINENTAL UNITED STATES

(CONUS):

Alabama 110 Maine 110 Oklahoma 110 Arizona 120 Maryland 110 Oregon 120 Arkansas 110 Massachusetts 110 Pennsylvania 110 California 120 Michigan 110 Rhode Island 110 Colorado 120 Minnesota 110 South Carolina 110 Connecticut 110 Mississippi 110 South Dakota 110 Delaware 110 Missouri 110 Tennessee 110 District of Columbia 110 Montana 120 Texas 110 I Florida 110 Nebraska 110 Utah 120 Georgia 110 Nevada 120 Vermont 110 Idaho 120 New Hampshire 110 Virginia 110 Illinois 110 New Jersey 110 Washington 120 Indiana 110 New Mexico 120 West Virginia 110 Iowa 110 New York 110 Wisconsin 110 Kansas 110 North Carolina 110 Wyoming 120 2

Kentucky 110 North Dakota 110 Louisiana 110 Ohio 110

EXCEPTIONS:

1 The El Paso, Texas, area is assigned to Code 120 (DLA Energy Americas West).

2 The Newcastle, Wyoming, area is assigned to Code 110 (DLA Energy Americas East).

DEFENSE LOGISTICS AGENCY ENERGY

8725 JOHN J. KINGMAN ROAD

DISTRIBUTION PREPARED BY DATE ITEM

STATEMENT -A DLA ENERGY QAP E22

APPROVED FOR REVIEWED BY DATE NSN CODE IDNO.

PUBLIC RELEASE MULTIPLE 52838

DISTRIBUTION IS APPROVED BY DATE SIZE SCALE DRAWING NUMBER

DLA FORM 1889, OCT 2011 PREVIOUS EDITION IS USABLE Add Continuation Page SHEET 1 OF 4 PDF(DLA)

(b) AREAS OF RESPONSIBILITY AND OFFICE CODES OUTSIDE THE CONTINENTAL UNITED STATES (OCONUS) (INCLUDING ALASKA AND HAWAIi):

Afghanistan 400 Cyprus 200 Malaysia 300 Singapore 300 Africa 200 3 Egypt 400 3 Maldives 300 South America 110 Alaska 130 Europe (Continental) 200 Malta 200 South Korea 300 Antarctica 300 Georgia 200 Mauritius 200 Sri Lanka 300 Armenia 200 Greenland 200 Mexico 110 Syria 400 Ascension Island 110 Hawaiian Islands 300 Midway Island 300 Taiwan 300 Australia 300 Hong Kong 300 Mongolia 300 Tajikistan 400 Azerbaijan 200 Iceland 200 Myanmar 300 Thailand 300 Azores 200 India 300 Nepal 300 Turkey 200 Bahrain 400 Indonesia 300 New Zealand 300 Turkmenistan 400 Bangladesh 300 Ireland 200 North Korea 300 United Arab Bermuda 110 Iran 400 Oman 400 Emirates 400 Bhutan 300 Iraq 400 Pacific Islands United Kingdom 200 Brunei 300 Israel 200 (Central & South) 300 Uzbekistan 400 Cambodia 300 Japan 300 Pakistan 400 Vietnam 300 Canada 1104 Jordan 400 Papua New Guinea 300 Wake Island 300 Canary Island 200 Kazakhstan 400 Philippines 300 Yemen 400 Caribbean Islands 110 Kuwait 400 Qatar 400 Central America 110 Kyrgyzstan 400 Russia 200 Chagos Archipelago 300 Laos 300 Ryukus Islands, Japan 300 China 300 Lebanon 400 Saudi Arabia 400 Comoros 200 Madagascar 200 Seychelles Is. 200

EXCEPTIONS:

3 Except for Egypt, which is assigned to DLA Energy Middle East (Code 400), all other countries in Africa fall under DLA Energy Europe (Code 200).

4 For Canada locations, contact DLA Energy Americas East (Code 110) to confirm coverage.

(c) INSPECTION OFFICES AND CODES.

110. DLA Energy Americas East ATTN: Quality Manager 5

Federal Building, Suite 1005 2320 LaBranch Street Houston, TX 77004-1091 Phone: (713) 332-4113

FAX: (713) 718-3891

(SOAP)

DISTRIBUTION STATEMENT -A

SIZE SCALE CODE IDNO.

DRAWING NUMBER

DLA FORM 1889, OCT 2011 PREVIOUS EDITION IS USABLE Add Continuation Page SHEET 2 OF 4 PDF(DLA)

120. DLA Energy Americas West

S , CA 90

Phone: (424) 347-3101/3102

FAX: (424) 347-3120

130. DLA Energy Americas North

1480 Sijan Street, Suite 300 Joint Base Elmendorf-Richardson, AK 99505 Phone: (907) 384-7180

FAX: (907) 384-1086

200. DLA Energy Europe and Africa

Military Mailing Address:

DLA Energy Petroleum Lab

CMR422

APO AE 09067-0422

Phone: 49-63 l-3406-2285/2286 6

FAX: 49-631-3406-2289 6

Commercial Shipping Address:

DLA Energy Petroleum Lab ATTN: Quality Manager Bldg. 320, Rhine Ordinance Barracks Am Opelkreisel 67663 Kaiserslautern, Germany

300. DLA Energy lndo-Pacific

Bldg. 17000, Room 21

APO AP 96543

Phone: (671) 366-7762

FAX: (671) 366-7767

[Location: Guam]

DLA FORM 1889, OCT 2011 PREVIOUS EDITION IS USABLE Add Continuation Page SHEET 3 OF 4 PDF(DLA)

400. DLA Energy Middle East

PSC 851, Box 180

FPO AP 09834-2800

Phone: 973-1785-6493 6

FAX: 973-1785-4650 6

[Location: Bahrain]

5 Designated location of the DLA Energy Regional Quality Manager/Pre-Award Survey Monitor.

6 Dial 011 before these numbers when calling from the U.S. When calling these numbers from outside the U.S., use the appropriate international long distance prefix for the country where the call originates.

DLA FORM 1889, OCT 2011 PREVIOUS EDITION IS USABLE Add Continuation Page SHEET 40F 4 PDF(DLA)

2022-02-09T15:07:40-0500

MILLS.KEITH.1050183110

2022-02-09T15:07:59-0500

MILLS.KEITH.1050183110

2022-02-14T08:44:39-0500

KNAPP.RICHARD.BRUCE.1027134021

Date1_af_date: 2/9/22

Date2_af_date: 2/9/22

Date3_af_date: 2/14/22

PDF (DLA)DLA FORM 1889, OCT 2011

SHEET 1 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page

Print Form Email Form Clear Export Data Import Data About Check for Newer Version Contact Us

ENERGY QAP E35 December 2011

E35 NONCONFORMING SUPPLIES AND SERVICES

(a) DEFINITION: As used in this contract provision:

Deviation is defined as a written authorization granted after contract award and prior to manufacture of an item, to depart from a particular performance or design requirement of a contract, specification, or referenced document, for a specific number of units or specific period of time, normally the duration of the contract.

Extraordinary situation means the matter cannot await resolution until the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded).

Waiver is defined as a written authorization granted after contract award to accept a configuration item or other designated item which, during production or after having been submitted for inspection, is found to depart from specified requirements, but nevertheless is considered suitable for use “as is” or after repair by an approved method. Approval is on a case-by-case basis and is normally for a set period of time.

(b) The Government may, at its discretion, accept nonconforming supplies or services. In such cases, the Contractor must obtain a deviation or waiver from the Contracting Officer prior to acceptance.

(c) The following procedures shall be used to request a deviation or waiver.

(1) Requests for deviations and waivers shall be submitted by the Contractor to the Contracting Officer with a copy to the appropriate Inspection Office referenced in the LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS or QUALITY REPRESENTATIVE contract provision of this contract. Each request shall provide the following information: Contractor name; name and contact information of the contractor's authorized negotiator; contract number; contract line item number and product nomenclature, clause or contract provision number, paragraph and subparagraph, as appropriate; the nature of the request; the reason for the request; the corrective action being taken by the Contractor to correct and prevent recurrence of the condition(s) causing the nonconformance; and an agreement to pay an equitable price reduction, estimated and proposed by DLA Energy, over and above the administrative fee, contingent on the impact of the specific circumstances on DLA Energy relative to approval of the deviation or waiver.

(2) In extraordinary situations, the Contractor may initially submit a verbal request for a waiver, but not a deviation, to the Contracting Officer.

Written requests shall be submitted to the Contracting Officer by the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded). If the Contracting Officer cannot be reached, the Duty Officer shall be contacted to provide the necessary information to the proper individuals as soon as possible. The Duty Officer's telephone number is (800) 286-7633 or (703) 767-8420.

(3) If a deviation or waiver is granted, the contract will be modified to accept the nonconforming supplies or services and to require the Contractor to provide an equitable price reduction or other adequate consideration commensurate with the deviation or waiver being granted. If the situation warrants, a deviation or waiver may be granted without prior agreement on price reduction or other consideration, subject to agreement by the Contractor, or its representative, to subsequent negotiation. Such an agreement, in addition to a brief description of the terms of the deviation or waiver, shall be documented on the shipping document or other appropriate correspondence. After negotiations, failure to agree on adequate consideration shall be a dispute concerning a question of fact within the meaning of the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS contract provision of this contract.

(4) If a deviation or waiver is granted and the nonconforming supplies are accepted, then in no event will consideration be less than $500, which covers administrative costs, plus any additional cost of Government reinspection or retest, if necessary.

5) If a deviation or waiver is granted modifying this contract, but the supplies accepted are subsequently determined to be in conformity with contract specifications, the Contractor shall still be obligated to pay the consideration originally…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .