ATTACHMENT 3 - CLIN_Structure_Color_IDIQ.xlsx

XLSX spreadsheet 79 KB Posted

Attached to
Color Small Format Reproduction Equipment Federal contract opportunity
Solicitation number
SP7000-19-R-1003
Issued by
Defense Logistics Agency

About this file

This is a solicitation for multiple indefinite delivery/indefinite quantity contracts to provide small format color reproduction equipment and associated services to the Defense Logistics Agency. The ongoing services sought include delivery, installation, maintenance, repair, consumable supplies excluding paper, networking functionality, IT security accreditation and technical support, training, meetings, reports, and administration regarding the equipment. Offerors are required to provide pricing for equipment, components, maintenance, software, overages, and device removal in the pricing matrices included as attachments. The contracts would have a five-year ordering period consisting of an initial basic ordering period of months 1-60 followed by option periods of months 61-120.

View the file

Other files for this federal contract opportunity

Other files attached to Color Small Format Reproduction Equipment, newest first.
File Type Posted
Amendment 8 SP7000-19-R-1003-0008.pdf PDF
Amendment 7 SP7000-19-R-1003-0007.pdf PDF
ATTACHMENT 3 - CLIN_Structure_Color_IDIQ (04.03.20)-.xlsx XLSX spreadsheet
Amendment 6 SP7000-19-R-1003-0006.pdf PDF
ATTACHMENT 3 - CLIN_Structure_Color_IDIQ (04.02.20).xlsx XLSX spreadsheet
Amendment 5 SP7000-19-R-1003-0005.pdf PDF
ATTACHMENT 3 - CLIN_Structure_Color_IDIQ (04.01.20).xlsx XLSX spreadsheet
Amendment 4 SP7000-19-R-1003-0004 03.31.2020.pdf PDF
ATTACHMENT 3 - CLIN_Structure_Color_IDIQ (003)03.31.2020 (003) -Final.xlsx XLSX spreadsheet
Amendment 3 SP7000-19-R-1003-0003.pdf PDF
ATTACHMENT 3 - Government Rd 2 Answers 03.17.2020.pdf PDF
ATTACHMENT 2 - Equipment Specifications 03.13.2020.xls XLS spreadsheet
Amendment 2 SP7000-19-R-1003.pdf PDF
ATTACHMENT 3 - Government Rd 1 Answers 02.27.2020.pdf PDF
ATTACHMENT 5 - New Provision-Clause.pdf PDF
ATTACHMENT 2 - Revised Equipment Specifications 02.24.2020.xls XLS spreadsheet
ATTACHMENT 3 - Government Rd 1 Answers 02.25.2020.pdf PDF
ATTACHMENT 1 - Revised Statment of Work 02.25.2020.pdf PDF
ATTACHMENT 4 - Revised Facility Locations 02.24.2020.xls XLS spreadsheet
Amendment 1 SP7000-19-R-1003.pdf PDF
ATTACHMENT 4 - Facility Locations 20200109.xls XLS spreadsheet
ATTACHMENT 2 - Equipment Specifications 081919.xls XLS spreadsheet
ATTACHMENT 1 - Statment of Work 20200124.pdf PDF
ATTACHMENT 5 - Statement of Compliance.pdf PDF
ATTACHMENT 7 - Procurex Reverse Auction Instructions.pdf PDF
SP7000-19-R-1003 Request for Proposal 20200124.pdf PDF
ATTACHMENT 6 - Offeror Representations and Certifications (FAR 52.212-3).docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Completion of Pricing Matrices.
Introduction:
-Each of ten tabs herein labeled "Months *-* Matrix" represents a 12-month ordering period price matrix,
requiring offeror entry of pricing for supplies/services. The calculations resulting from the prices entered
on each matrix will generate totals that will flow to the "Contract Total" tab.
-The first 5 Tabs covering months 1-60 will flow to clins 0001 through 0013 in the basic ordering period,
which includes purchase of devices, components, maintenance, software, overages and device removal.
-Offerors can track their "Estimated Contract Total With Option" in cell G65 of the "Contract Total" tab.
This will be the total used for price analysis among offers.
Pricing:
-Pricing for each supply/service is separated by usage bands; 60,70,80,100, except for the following:
1) Additional equipment/software purchased; 2) Additional add-on component maintenance;
3) Additional equipment/software maintenance.
Offeror Pricing will be entered as follows:
-Offerors will only type entries in column "E" of each tab, colored in BLUE. The Government wishes all
items to be priced, regardless of the number indicated in the "Estimated Quantity" column.
(A) First 5 tabs covering the basic 60 month ordering period (Months 1-60):
1. Equipment Purchase---(Ref. E-1 thru E-5 on matrices) A single unit price corresponding to each basic
device that was detailed in offerors response to attachment 2.
--A single price for each component or configuration option listed.
2. Add'l Equip/Software--(Ref. E-7 on matrix) A single unit price for document scanners & PC/workstation
(PC/workstation and Non or Flatbed Scanner price should include next business day maintenance for 5 years.)
3. Basic Maintenance--(Ref. M-1 on matrix) A single monthly price for each Maintenance option listed.
--(Ref. M-2 on matrix) A single monthly price for maintenance on document
scanners and additional add-on components, if applicable.
4. Add'l Equip/Software--(Ref. M-3 on matrix) A single annual maint price per document software license.
Maintenance
5. Extended Hours Maintenance--(Ref. M-4 on matrix) Weekly extended hours maintenance prices as detailed
for a 2nd and 3rd shift; and weekend units priced as 'each'.
6. Overages--(Ref. O-1 on matrix) A single unit price for each overage click past the monthly
allowance for all devices in each of their respective usage bands.

ATTACHMENT 3 CLIN STRUCTURE

COLOR IDIQ

SP7000-19-R-1003

Contract Total

Schedule of Supplies/Services
CLINDESCRIPTIONEST. QTYU/IU/PESTIMATED TOTAL PRICE1-1213-2425-3637-4849-60
BASIC ORDERING PERIOD - MONTHS 1-60
EQUIPMENT PURCHASE with Components
See attachment 2 - [Equipment Specification Requirements], for a description of requirements for each usage band.
See attachment 3 - [Configuration Options] for a list of possible configurations.
USAGE BAND 60

Typical Monthly Volume Range 25K to 50K

0001Estimated Purchase of Usage Band 60 Machines with components
(See Ref. E-1 on applicable "Months __-__Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
USAGE BAND 70

Typical Monthly Volume Range 35K to 65K

0002Estimated Purchase of Usage Band 70 Machines with components
(See Ref. E-2 on applicable "Months __-__Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
USAGE BAND 80

Typical Monthly Volume Range 50K to 100K

0003Estimated Purchase of Usage Band 80 Machines with components
(See Ref. E-3 on applicable "Months __-__Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
USAGE BAND 100

Typical Monthly Volume Range 100K to 200K

0004Estimated Purchase of Usage Band 100 Machines with components
(See Ref. E-4 on applicable "Months __-__Matrix" for a breakdown of this clin.)1LO$0$0$0.00$0.00$0.00$0.00$0.00
Total Estimated equipment purchase with components.$0$0.00$0.00$0.00$0.00$0.00
Additional Equipment/Software Purchase
See attachment 2 - [Equipment Specification Requirements], for a description of requirements that make up this CLIN. Items are not tied to a specific usage band.
0005Document Scanner, PC/Work Station, Document Software
(See Ref. E-7 on applicable "Months __-__ Matrix" for a breakdown of this clin.)1LOERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

Overall Total Estimated Equipment/Software Purchase. ERROR:#REF!

MAINTENANCE PURCHASE
BASIC MAINTENANCE
Basic Maintenance; all Usage Bands, all Machines
0007Estimated Purchase of Maintenance Services for all Usage Bands, all Machines.

(See Ref. M-1 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)

1LOERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Basic Maintenance; all Additional Add-on Components
0008Estimated Purchase of Maintenance Services for Additional Add-on Components

(See Ref. M-2 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)

1LOERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Additional Software Maintenance
0009Estimated Document Software Maintenance.
(See Ref. M-3 on applicable "Months __-__ Matrix" for a breakdown of this clin.)1LOERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Extended Hours Maintenance
Extended Hours Maintenance, all Usage Bands, all Machines
0010Estimated Purchase of Extended Hours Maintenance Services for all Machines
(See Ref. M-4 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)1LOERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Total Estimated Maintenance PurchaseERROR:#REF!
OVERAGES
OVERAGE CLICK CHARGES, ALL USAGE BANDS
0011Estimated Purchase of Overage Charges for All Usage Bands, All Machines

(See Ref. O-1 on applicable "Months __-__ Matrix" sheet for a breakdown of this clin.)

1 LO ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF! ERROR:#REF!

Estimated Basic Contract Total - Months 1-60 ERROR:#REF!

Schedule of Supplies/Services Page &Pof &N

SA4705-10-R-0130 &D

Months 1-12 Matrix

PRICE MATRIX
Ref.DescriptionEstimated QuantityU/IUnit PriceEstimated

Total Price Ordering Period - Months 1-12

Equipment Purchase
E-1USAGE BAND 60

Typical Monthly Volume Range 25K to 50K See attachment 2 - [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 60 Machine, Basic Configuration
(see attachment 3 - [Configuration Options] for Basic configuration Description)20EA$0.0020
Components configured with a Usage Band 60 machine
Purchase of Removable Hard Drives option for usage band 60 machine.
3EA$0.003
Purchase of Online Booklet Maker w/face trim add-on to usage band 60 machine.
20EA$0.0020
Purchase of Online Hole Punch add-on to usage band 60 machine.
1EA$0.001
Purchase of Online Z Folder add-on to usage band 60 machine.
1EA$0.001
Purchase of Oversize Capacity paper feed add-on to usage band 60 machine..
2EA$0.002
Purchase of High Capacity paper feed add-on to usage band 60 machine.1EA$0.001
Total estimated Usage Band 60 equipment purchase with components.
(Carried over to clin 0001 on basic contract.)$0.00

E-2 USAGE BAND 70

Typical Monthly Volume Range 35K to 65K See attachment 2 - [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage band 70 Machine, Basic Configuration
(see attachment 3 - [Configuration Options] for Basic configuration Description)15EA$0.0015
Components configured with a Usage band 70 machine

(see attachment 1b- [Configuration Specifications] for a list of possible configurations)

Purchase of Removable Hard Drives option for usage band 70 machine.
2EA$0.002
Purchase of Online Booklet Maker w/face trim add-on to usage band 70 machine.
15EA$0.0015
Purchase of Online Hole Punch add-on to usage band 70 machine.
1EA$0.001
Purchase of Online Z Folder add-on to usage band 70 machine.
1EA$0.001
Purchase of Oversize Capacity paper feed add-on to usage band 70 machine..
4EA$0.004
Purchase of High Capacity paper feed add-on to usage band 70 machine.1EA$0.001
Purchase of High Capacity Stacker add-on to usage band 70 machine.1EA$0.001
Total estimated Usage band 70 equipment purchase with components.
(Carried over to clin 0002 on basic contract.)$0.00

E-3 USAGE BAND 80

Typical Monthly Volume Range 50K to 100K See attachment 2 - [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage band 80 Machine, Basic Configuration
(see attachment 3 - [Configuration Options] for Basic configuration Description)10EA$0.0010
Components configured with a Usage band 80 machine
Purchase of Removable Hard Drives option for usage band 80 machine.
3EA$0.003
Purchase of Booklet Maker w/face trim add-on to usage band 80 machine.
10EA$0.0010
Purchase of Online Hole Punch add-on to usage band 80 machine. Basic Punch - 2/3 hole.
1EA$0.001
Purchase of Online GBC Automatic Hole Punch add-on to usage band 80 machine.1EA$0.001
Purchase of Online Folder bi-fold add-on to usage band 80 machine.
1EA$0.001
Purchase of Oversize Capacity paper feed add-on to usage band 80 machine.
4EA$0.004
Purchase of Trimmer/Buffer - 2 knife trim add-on to usage band 80 machine.
0EA$0.000
Purchase of High Capacity paper feed add-on to usage band 80 machine.1EA$0.001
Purchase of High Capacity Stacker add-on to usage band 80 machine.4EA$0.004
Total estimated Usage band 80 equipment purchase with components.
(Carried over to clin 0003 on basic contract.)$0.00

E-4 USAGE BAND 100

Typical Monthly Volume Range 100K to 200K See attachment 2 - [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage band 100 Machine, Basic Configuration
(see attachment 3 - [Configuration Options] for Basic configuration Description)10EA$0.0010
Components configured with a Usage band 100 machine
Purchase of Removable Hard Drives option for usage band 100 machine.
2EA$0.002
Purchase of Booklet Maker w/face trim add-on to usage band 100 machine.
10EA$0.0010
Purchase of Online Hole Punch add-on to usage band 100 machine. Basic Punch - 2/3 hole.
1EA$0.001
Purchase of Online GBC Automatic Hole Punch add-on to usage band 100 machine.1EA$0.001
Purchase of Online Folder bi-fold add-on to usage band 100 machine.
0EA$0.000
Purchase of Oversize Capacity paper feed add-on to usage band 100 machine.
1EA$0.001
Purchase of Trimmer/Buffer - 2 knife trim add-on to usage band 100 machine.
1EA$0.001
Purchase of High Capacity paper feed add-on to usage band 100 machine.1EA$0.001
Purchase of High Capacity Stacker add-on to usage band 100 machine.5EA$0.005
Total estimated Usage band 100 equipment purchase with components.
(Carried over to clin 0004 on basic contract.)$0.00

Total Estimated Equipment Purchase with Components. $0.00

Additional Equipment /Software Purchase
E-7See attachment 2 - [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band.
Additional Training Session1EA$0.001
Flatbed or Non Flatbed Document Scanner (price includes equipment and next business day onsite maintenance for 5 years)10EA$0.0010
PC Work Station (price includes equipment and next business day onsite maintenance for 5 years)10EA$0.0010
PC/Work Station Removable Hard Drive Kit3EA$0.003
Document Management Software (per license fee)20EA$0.0020
Total Estimated Additional Equipment/Software Purchase.
(Carried over to clin 0007 on Basic contract.)$0.00
Maintenance
M-1BASIC MAINTENANCE (8am-5pm, Mon-Fri).
(Includes All Consumable Supplies Except Paper)

(see attachment 3 - [Configuration Options] for Basic configuration Description)

Usage band 60 Machinesmachines in serviceType only in tan column
Basic Color Maint., Basic configuration of Usage band 60 machine.
25,000 pgs/month Allowance. (# of machines ( 13 ) x 12 mo) = Est. Quantity of Months.156MO$0.003220
Basic B&W Maint., Basic configuration of Usage band 60 machine.
5,000 pgs/month Allowance. (# of machines ( 7 ) x 12 mo) = Est. Quantity of Months.84MO$0.002
Basic Color Maint., Basic configuration of Usage band 60 machine.
50,000 pgs/month Allowance. (# of machines ( 13 ) x 12 mo) = Est. Quantity of Months.156MO$0.00323
Basic B&W Maint., Basic configuration of Usage band 60 machine.
10,000 pgs/month Allowance. (# of machines ( 7 ) x 12 mo) = Est. Quantity of Months.84MO$0.002
Total Estimated Usage band 60 maintenance.$0.0034
Usage band 70 Machinesmachines in service
Basic Color Maint., configuration of Usage band 70 machine.
35,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72MO$0.001515
Basic B&W Maint., Basic configuration of Usage band 70 machine.
7,500 pgs/month Allowance. (# of machines ( 3 ) x 12 mo) = Est. Quantity of Months.36MO$0.002
Basic Color Maint., configuration of Usage band 70 machine.
65,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72MO$0.00
Basic B&W Maint., Basic configuration of Usage band 70 machine.
9,000 pgs/month Allowance. (# of machines ( 3 ) x 12 mo) = Est. Quantity of Months.36MO$0.00
Total Estimated Usage band 70 maintenance.$0.0017
Usage band 80 Machinesmachines in service
Basic Color Maint., Basic configuration of Usage band 80 machine.
50,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72MO$0.002910
Basic B&W Maint., Basic configuration of Usage band 80 machine.
10,000 pgs/month Allowance. (# of machines ( 4 ) x 12 mo) = Est. Quantity of Months.48MO$0.004
Basic Color Maint., Basic configuration of Usage band 80 machine.
100,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72MO$0.00
Basic B&W Maint., Basic configuration of Usage band 80 machine.
15,000 pgs/month Allowance. (# of machines ( 4 ) x 12 mo) = Est. Quantity of Months.48MO$0.00
Total Estimated Usage band 80 maintenance.$0.0033
Usage band 100 Machinesmachines in service
Basic Color Maint., Basic configuration of Usage band 100 machine.
100,000 pgs/month Allowance. (# of machines ( 8 ) x 12 mo) = Est. Quantity of Months.96MO$0.00710
Basic B&W Maint., Basic configuration of Usage band 100 machine.
15,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months.24MO$0.002
Basic Color Maint., Basic configuration of Usage band 100 machine.
200,000 pgs/month Allowance. (# of machines ( 8 ) x 12 mo) = Est. Quantity of Months.96MO$0.00
Basic B&W Maint., Basic configuration of Usage band 100 machine.
30,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months.24MO$0.00
Total Estimated Usage band 100 maintenance.$0.009
Total Estimated Basic Maintenance, all Usage Bands, all Machines. (Carried over to clin 0008 on Basic contract.)$0.00ERROR:#REF!
M-2Basic Maintenance; Additional Add-on Components
Enter a single monthly maintenance price for each component, if applicable.
Maintenance for Document Scanner
(Qty of components ( 10 ) x 12 months) = Estimated Quantity of Months.120MO$0.0011
Maintenance for Booklet Maker w/face trim add-on.
(Qty of components ( 58 ) x 12 months) = Estimated Quantity of Months.696MO$0.00ERROR:#REF!
Maintenance for GBC Advanced Hole Punch add-on.
(Qty of components ( 6 ) x 12 months) = Estimated Quantity of Months.72MO$0.00ERROR:#REF!
Maintenance for Folder add-on.
(Qty of components ( 3 ) x 12 months) = Estimated Quantity of Months.36MO$0.00ERROR:#REF!
Maintenance for High and Oversize Capacity paper feed add-on.
(Qty of components ( 20 ) x 12 months) = Estimated Quantity of Months.240MO$0.00ERROR:#REF!
Maintenance for Trimmer/Buffer - 2 knife trim add-on.
(Qty of components ( 2 ) x 12 months) = Estimated Quantity of Months.24MO$0.00ERROR:#REF!
Maintenance for High Capacity Stacker add-on. (Qty of components ( 14 ) x 12 months) = Estimated Quantity of Months.168MO$0.00
Total Estimated Basic Maintenance, all additional add-on Components
(Carried over to clin 0009 on Basic contract.)$0.00ERROR:#REF!
Additional Software Maintenance
M-3See attachment 2 - [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band.
Maintenance- Document Management Software (per license fee)30YR$0.0020
Total Estimated Additional Software Maintenance.
(Carried over to clin 0010 on Basic contract.)$0.00
M-4EXTENDED HOURS MAINTENANCE
Extended Hours Maintenance; Usage band 60
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 8 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 8 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 8 machine.

15EA$0.00
Total Estimated Usage band 60 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage band 70
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 9 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 9 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 9 machine.

15EA$0.00
Total Estimated Usage band 70 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage band 80
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 10 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 10 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 10 machine.

15EA$0.00
Total Estimated Usage band 80 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage band 100
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 11 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 11 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 11 machine.

15EA$0.00
Total Estimated Usage band 100 Extended Hours maintenance.$0.00
Total Estimated Extended Hours Maintenance, all Usage Bands
(Carried over to clin 0011 on Basic contract.)$0.00

O-1 Overage Click Charges (see instructions tab for pricing instructions)

Usage band 60
Color Overage click Charges for all Usage band 60 machines, all Copy Allowances.
Estimated Quantity for the Year.75,000,000EA$0.0020
B&W Overage click Charges for all Usage band 60 machines, all Copy Allowances.
Estimated Quantity for the Year.10,000,000EA$0.00
Usage band 70
Color Overage click Charges for all Usage band 70 machines, all Copy Allowances.
Estimated Quantity for the Year.50,000,000EA$0.0015
B&W Overage click Charges for all Usage band 70 machines, all Copy Allowances.
Estimated Quantity for the Year.10,000,000EA$0.00
Usage band 80
Color Overage click Charges for all Usage band 80 machines, all Copy Allowances.
Estimated Quantity for the Year.50,000,000EA$0.0010
B&W Overage click Charges for all Usage band 80 machines, all Copy Allowances.
Estimated Quantity for the Year.10,000,000EA$0.00
Usage band 100
Color Overage click Charges for all Usage band 100 machines, all Copy Allowances.
Estimated Quantity for the Year.50,000,000EA$0.0010
B&W Overage click Charges for all Usage band 100 machines, all Copy Allowances.
Estimated Quantity for the Year.10,000,000EA$0.00
Total Estimated Overage Click Charges, all Usage Bands
(Carried over to clin 0012 on Basic contract.)$0.0055

Schedule of Supplies/Services Page &Pof &N

SA4705-10-R-0130 &D

Months 13-24 Matrix

PRICE MATRIX
Ref.DescriptionEstimated QuantityU/IUnit PriceEstimated

Total Price Ordering Period - Months 13-24

Equipment Purchase
E-1USAGE BAND 60

Typical Monthly Volume Range 25K to 50K See attachment 2 - [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 60 Machine, Basic Configuration
(see attachment 3 - [Configuration Options] for Basic configuration Description)20EA$0.0020
Components configured with a Usage Band 60 machine
Purchase of Removable Hard Drives option for usage band 60 machine.
3EA$0.003
Purchase of Online Booklet Maker w/face trim add-on to usage band 60 machine.
20EA$0.0020
Purchase of Online Hole Punch add-on to usage band 60 machine.
1EA$0.001
Purchase of Online Z Folder add-on to usage band 60 machine.
1EA$0.001
Purchase of Oversize Capacity paper feed add-on to usage band 60 machine..
2EA$0.002
Purchase of High Capacity paper feed add-on to usage band 60 machine.1EA$0.001
Total estimated Usage Band 60 equipment purchase with components.
(Carried over to clin 0001 on basic contract.)$0.00

E-2 USAGE BAND 70

Typical Monthly Volume Range 35K to 65K See attachment 2 - [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage band 70 Machine, Basic Configuration
(see attachment 3 - [Configuration Options] for Basic configuration Description)15EA$0.0015
Components configured with a Usage band 70 machine

(see attachment 1b- [Configuration Specifications] for a list of possible configurations)

Purchase of Removable Hard Drives option for usage band 70 machine.
2EA$0.002
Purchase of Online Booklet Maker w/face trim add-on to usage band 70 machine.
15EA$0.0015
Purchase of Online Hole Punch add-on to usage band 70 machine.
1EA$0.001
Purchase of Online Z Folder add-on to usage band 70 machine.
1EA$0.001
Purchase of Oversize Capacity paper feed add-on to usage band 70 machine..
4EA$0.004
Purchase of High Capacity paper feed add-on to usage band 70 machine.1EA$0.001
Purchase of High Capacity Stacker add-on to usage band 70 machine.1EA$0.001
Total estimated Usage band 70 equipment purchase with components.
(Carried over to clin 0002 on basic contract.)$0.00

E-3 USAGE BAND 80

Typical Monthly Volume Range 50K to 100K See attachment 2 - [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage band 80 Machine, Basic Configuration
(see attachment 3 - [Configuration Options] for Basic configuration Description)10EA$0.0010
Components configured with a Usage band 80 machine
Purchase of Removable Hard Drives option for usage band 80 machine.
3EA$0.003
Purchase of Booklet Maker w/face trim add-on to usage band 80 machine.
10EA$0.0010
Purchase of Online Hole Punch add-on to usage band 80 machine. Basic Punch - 2/3 hole.
1EA$0.001
Purchase of Online GBC Automatic Hole Punch add-on to usage band 80 machine.1EA$0.001
Purchase of Online Folder bi-fold add-on to usage band 80 machine.
1EA$0.001
Purchase of Oversize Capacity paper feed add-on to usage band 80 machine.
4EA$0.004
Purchase of Trimmer/Buffer - 2 knife trim add-on to usage band 80 machine.
0EA$0.000
Purchase of High Capacity paper feed add-on to usage band 80 machine.1EA$0.001
Purchase of High Capacity Stacker add-on to usage band 80 machine.4EA$0.004
Total estimated Usage band 80 equipment purchase with components.
(Carried over to clin 0003 on basic contract.)$0.00

E-4 USAGE BAND 100

Typical Monthly Volume Range 100K to 200K See attachment 2 - [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage band 100 Machine, Basic Configuration
(see attachment 3 - [Configuration Options] for Basic configuration Description)10EA$0.0010
Components configured with a Usage band 100 machine
Purchase of Removable Hard Drives option for usage band 100 machine.
2EA$0.002
Purchase of Booklet Maker w/face trim add-on to usage band 100 machine.
10EA$0.0010
Purchase of Online Hole Punch add-on to usage band 100 machine. Basic Punch - 2/3 hole.
1EA$0.001
Purchase of Online GBC Automatic Hole Punch add-on to usage band 100 machine.1EA$0.001
Purchase of Online Folder bi-fold add-on to usage band 100 machine.
0EA$0.000
Purchase of Oversize Capacity paper feed add-on to usage band 100 machine.
1EA$0.001
Purchase of Trimmer/Buffer - 2 knife trim add-on to usage band 100 machine.
1EA$0.001
Purchase of High Capacity paper feed add-on to usage band 100 machine.1EA$0.001
Purchase of High Capacity Stacker add-on to usage band 100 machine.5EA$0.005
Total estimated Usage band 100 equipment purchase with components.
(Carried over to clin 0004 on basic contract.)$0.00

Total Estimated Equipment Purchase with Components. $0.00

Additional Equipment /Software Purchase
E-7See attachment 2 - [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band.
Additional Training Session1EA$0.001
Flatbed or Non Flatbed Document Scanner (price includes equipment and next business day onsite maintenance for 5 years)10EA$0.0010
PC Work Station (price includes equipment and next business day onsite maintenance for 5 years)10EA$0.0010
PC/Work Station Removable Hard Drive Kit3EA$0.003
Document Management Software (per license fee)20EA$0.0020
Total Estimated Additional Equipment/Software Purchase.
(Carried over to clin 0007 on Basic contract.)$0.00
Maintenance
M-1BASIC MAINTENANCE (8am-5pm, Mon-Fri).
(Includes All Consumable Supplies Except Paper)

(see attachment 3- [Configuration Options] for Basic configuration Description)

Usage band 60 Machinesmachines in serviceType only in tan column
Basic Color Maint., Basic configuration of Usage band 60 machine.
25,000 pgs/month Allowance. (# of machines ( 13 ) x 12 mo) = Est. Quantity of Months.156MO$0.003220
Basic B&W Maint., Basic configuration of Usage band 60 machine.
5,000 pgs/month Allowance. (# of machines ( 7 ) x 12 mo) = Est. Quantity of Months.84MO$0.002
Basic Color Maint., Basic configuration of Usage band 60 machine.
50,000 pgs/month Allowance. (# of machines ( 13 ) x 12 mo) = Est. Quantity of Months.156MO$0.00323
Basic B&W Maint., Basic configuration of Usage band 60 machine.
10,000 pgs/month Allowance. (# of machines ( 7 ) x 12 mo) = Est. Quantity of Months.84MO$0.002
Total Estimated Usage band 60 maintenance.$0.0034
Usage band 70 Machinesmachines in service
Basic Color Maint., configuration of Usage band 70 machine.
35,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72MO$0.001515
Basic B&W Maint., Basic configuration of Usage band 70 machine.
7,500 pgs/month Allowance. (# of machines ( 3 ) x 12 mo) = Est. Quantity of Months.36MO$0.002
Basic Color Maint., configuration of Usage band 70 machine.
65,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72MO$0.00
Basic B&W Maint., Basic configuration of Usage band 70 machine.
9,000 pgs/month Allowance. (# of machines ( 3 ) x 12 mo) = Est. Quantity of Months.36MO$0.00
Total Estimated Usage band 70 maintenance.$0.0017
Usage band 80 Machinesmachines in service
Basic Color Maint., Basic configuration of Usage band 80 machine.
50,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72MO$0.002910
Basic B&W Maint., Basic configuration of Usage band 80 machine.
10,000 pgs/month Allowance. (# of machines ( 4 ) x 12 mo) = Est. Quantity of Months.48MO$0.004
Basic Color Maint., Basic configuration of Usage band 80 machine.
100,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72MO$0.00
Basic B&W Maint., Basic configuration of Usage band 80 machine.
15,000 pgs/month Allowance. (# of machines ( 4 ) x 12 mo) = Est. Quantity of Months.48MO$0.00
Total Estimated Usage band 80 maintenance.$0.0033
Usage band 100 Machinesmachines in service
Basic Color Maint., Basic configuration of Usage band 100 machine.
100,000 pgs/month Allowance. (# of machines ( 8 ) x 12 mo) = Est. Quantity of Months.96MO$0.00710
Basic B&W Maint., Basic configuration of Usage band 100 machine.
15,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months.24MO$0.002
Basic Color Maint., Basic configuration of Usage band 100 machine.
200,000 pgs/month Allowance. (# of machines ( 8 ) x 12 mo) = Est. Quantity of Months.96MO$0.00
Basic B&W Maint., Basic configuration of Usage band 100 machine.
30,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months.24MO$0.00
Total Estimated Usage band 100 maintenance.$0.009
Total Estimated Basic Maintenance, all Usage Bands, all Machines. (Carried over to clin 0008 on Basic contract.)$0.00ERROR:#REF!
M-2Basic Maintenance; Additional Add-on Components
Enter a single monthly maintenance price for each component, if applicable.
Maintenance for Document Scanner
(Qty of components ( 10 ) x 12 months) = Estimated Quantity of Months.120MO$0.0011
Maintenance for Booklet Maker w/face trim add-on.
(Qty of components ( 58 ) x 12 months) = Estimated Quantity of Months.696MO$0.00ERROR:#REF!
Maintenance for GBC Advanced Hole Punch add-on.
(Qty of components ( 6 ) x 12 months) = Estimated Quantity of Months.72MO$0.00ERROR:#REF!
Maintenance for Folder add-on.
(Qty of components ( 3 ) x 12 months) = Estimated Quantity of Months.36MO$0.00ERROR:#REF!
Maintenance for High and Oversize Capacity paper feed add-on.
(Qty of components ( 20 ) x 12 months) = Estimated Quantity of Months.240MO$0.00ERROR:#REF!
Maintenance for Trimmer/Buffer - 2 knife trim add-on.
(Qty of components ( 2 ) x 12 months) = Estimated Quantity of Months.24MO$0.00ERROR:#REF!
Maintenance for High Capacity Stacker add-on. (Qty of components ( 14 ) x 12 months) = Estimated Quantity of Months.168MO$0.00
Total Estimated Basic Maintenance, all additional add-on Components
(Carried over to clin 0009 on Basic contract.)$0.00ERROR:#REF!
Additional Software Maintenance
M-3See attachment 2 - [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band.
Maintenance- Document Management Software (per license fee)30YR$0.0020
Total Estimated Additional Software Maintenance.
(Carried over to clin 0010 on Basic contract.)$0.00
M-4EXTENDED HOURS MAINTENANCE
Extended Hours Maintenance; Usage band 60
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 8 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 8 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 8 machine.

15EA$0.00
Total Estimated Usage band 60 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage band 70
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 9 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 9 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 9 machine.

15EA$0.00
Total Estimated Usage band 70 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage band 80
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 10 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 10 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 10 machine.

15EA$0.00
Total Estimated Usage band 80 Extended Hours maintenance.$0.00
Extended Hours Maintenance; Usage band 100
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 11 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 11 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price for "EA" = a single (48hr) weekend unit, as needed, per UB 11 machine.

15EA$0.00
Total Estimated Usage band 100 Extended Hours maintenance.$0.00
Total Estimated Extended Hours Maintenance, all Usage Bands
(Carried over to clin 0011 on Basic contract.)$0.00

O-1 Overage Click Charges

Usage band 60
Color Overage click Charges for all Usage band 60 machines, all Copy Allowances.
Estimated Quantity for the Year.75,000,000EA$0.0020
B&W Overage click Charges for all Usage band 60 machines, all Copy Allowances.
Estimated Quantity for the Year.10,000,000EA$0.00
Usage band 70
Color Overage click Charges for all Usage band 70 machines, all Copy Allowances.
Estimated Quantity for the Year.50,000,000EA$0.0015
B&W Overage click Charges for all Usage band 70 machines, all Copy Allowances.
Estimated Quantity for the Year.10,000,000EA$0.00
Usage band 80
Color Overage click Charges for all Usage band 80 machines, all Copy Allowances.
Estimated Quantity for the Year.50,000,000EA$0.0010
B&W Overage click Charges for all Usage band 80 machines, all Copy Allowances.
Estimated Quantity for the Year.10,000,000EA$0.00
Usage band 100
Color Overage click Charges for all Usage band 100 machines, all Copy Allowances.
Estimated Quantity for the Year.50,000,000EA$0.0010
B&W Overage click Charges for all Usage band 100 machines, all Copy Allowances.
Estimated Quantity for the Year.10,000,000EA$0.00
Total Estimated Overage Click Charges, all Usage Bands
(Carried over to clin 0012 on Basic contract.)$0.0055

Schedule of Supplies/Services Page &Pof &N

SA4705-10-R-0130 &D

Months 25-36 Matrix

PRICE MATRIX
Ref.DescriptionEstimated QuantityU/IUnit PriceEstimated

Total Price Ordering Period - Months 25-36

Equipment Purchase
E-1USAGE BAND 60

Typical Monthly Volume Range 25K to 50K See attachment 2 - [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage Band 60 Machine, Basic Configuration
(see attachment 3 - [Configuration Options] for Basic configuration Description)20EA$0.0020
Components configured with a Usage Band 60 machine
Purchase of Removable Hard Drives option for usage band 60 machine.
3EA$0.003
Purchase of Online Booklet Maker w/face trim add-on to usage band 60 machine.
20EA$0.0020
Purchase of Online Hole Punch add-on to usage band 60 machine.
1EA$0.001
Purchase of Online Z Folder add-on to usage band 60 machine.
1EA$0.001
Purchase of Oversize Capacity paper feed add-on to usage band 60 machine..
2EA$0.002
Purchase of High Capacity paper feed add-on to usage band 60 machine.1EA$0.001
Total estimated Usage Band 60 equipment purchase with components.
(Carried over to clin 0001 on basic contract.)$0.00

E-2 USAGE BAND 70

Typical Monthly Volume Range 35K to 65K See attachment 2 - [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage band 70 Machine, Basic Configuration
(see attachment 3 - [Configuration Options] for Basic configuration Description)15EA$0.0015
Components configured with a Usage band 70 machine

(see attachment 1b- [Configuration Specifications] for a list of possible configurations)

Purchase of Removable Hard Drives option for usage band 70 machine.
2EA$0.002
Purchase of Online Booklet Maker w/face trim add-on to usage band 70 machine.
15EA$0.0015
Purchase of Online Hole Punch add-on to usage band 70 machine.
1EA$0.001
Purchase of Online Z Folder add-on to usage band 70 machine.
1EA$0.001
Purchase of Oversize Capacity paper feed add-on to usage band 70 machine..
4EA$0.004
Purchase of High Capacity paper feed add-on to usage band 70 machine.1EA$0.001
Purchase of High Capacity Stacker add-on to usage band 70 machine.1EA$0.001
Total estimated Usage band 70 equipment purchase with components.
(Carried over to clin 0002 on basic contract.)$0.00

E-3 USAGE BAND 80

Typical Monthly Volume Range 50K to 100K See attachment 2 - [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage band 80 Machine, Basic Configuration
(see attachment 3 - [Configuration Options] for Basic configuration Description)10EA$0.0010
Components configured with a Usage band 80 machine
Purchase of Removable Hard Drives option for usage band 80 machine.
3EA$0.003
Purchase of Booklet Maker w/face trim add-on to usage band 80 machine.
10EA$0.0010
Purchase of Online Hole Punch add-on to usage band 80 machine. Basic Punch - 2/3 hole.
1EA$0.001
Purchase of Online GBC Automatic Hole Punch add-on to usage band 80 machine.1EA$0.001
Purchase of Online Folder bi-fold add-on to usage band 80 machine.
1EA$0.001
Purchase of Oversize Capacity paper feed add-on to usage band 80 machine.
4EA$0.004
Purchase of Trimmer/Buffer - 2 knife trim add-on to usage band 80 machine.
0EA$0.000
Purchase of High Capacity paper feed add-on to usage band 80 machine.1EA$0.001
Purchase of High Capacity Stacker add-on to usage band 80 machine.4EA$0.004
Total estimated Usage band 80 equipment purchase with components.
(Carried over to clin 0003 on basic contract.)$0.00

E-4 USAGE BAND 100

Typical Monthly Volume Range 100K to 200K See attachment 2 - [Equipment Specification Requirements], for a description of requirements for this usage band.

Purchase of Usage band 100 Machine, Basic Configuration
(see attachment 3 - [Configuration Options] for Basic configuration Description)10EA$0.0010
Components configured with a Usage band 100 machine
Purchase of Removable Hard Drives option for usage band 100 machine.
2EA$0.002
Purchase of Booklet Maker w/face trim add-on to usage band 100 machine.
10EA$0.0010
Purchase of Online Hole Punch add-on to usage band 100 machine. Basic Punch - 2/3 hole.
1EA$0.001
Purchase of Online GBC Automatic Hole Punch add-on to usage band 100 machine.1EA$0.001
Purchase of Online Folder bi-fold add-on to usage band 100 machine.
0EA$0.000
Purchase of Oversize Capacity paper feed add-on to usage band 100 machine.
1EA$0.001
Purchase of Trimmer/Buffer - 2 knife trim add-on to usage band 100 machine.
1EA$0.001
Purchase of High Capacity paper feed add-on to usage band 100 machine.1EA$0.001
Purchase of High Capacity Stacker add-on to usage band 100 machine.5EA$0.005
Total estimated Usage band 100 equipment purchase with components.
(Carried over to clin 0004 on basic contract.)$0.00

Total Estimated Equipment Purchase with Components. $0.00

Additional Equipment /Software Purchase
E-7See attachment 2 - [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band.
Additional Training Session1EA$0.001
Flatbed or Non Flatbed Document Scanner (price includes equipment and next business day onsite maintenance for 5 years)10EA$0.0010
PC Work Station (price includes equipment and next business day onsite maintenance for 5 years)10EA$0.0010
PC/Work Station Removable Hard Drive Kit3EA$0.003
Document Management Software (per license fee)20EA$0.0020
Total Estimated Additional Equipment/Software Purchase.
(Carried over to clin 0007 on Basic contract.)$0.00
Maintenance
M-1BASIC MAINTENANCE (8am-5pm, Mon-Fri).
(Includes All Consumable Supplies Except Paper)

(see attachment 3 - [Configuration Options] for Basic configuration Description)

Usage band 60 Machinesmachines in serviceType only in tan column
Basic Color Maint., Basic configuration of Usage band 60 machine.
25,000 pgs/month Allowance. (# of machines ( 13 ) x 12 mo) = Est. Quantity of Months.156MO$0.003220
Basic B&W Maint., Basic configuration of Usage band 60 machine.
5,000 pgs/month Allowance. (# of machines ( 7 ) x 12 mo) = Est. Quantity of Months.84MO$0.002
Basic Color Maint., Basic configuration of Usage band 60 machine.
50,000 pgs/month Allowance. (# of machines ( 13 ) x 12 mo) = Est. Quantity of Months.156MO$0.00323
Basic B&W Maint., Basic configuration of Usage band 60 machine.
10,000 pgs/month Allowance. (# of machines ( 7 ) x 12 mo) = Est. Quantity of Months.84MO$0.002
Total Estimated Usage band 60 maintenance.$0.0034
Usage band 70 Machinesmachines in service
Basic Color Maint., configuration of Usage band 70 machine.
35,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72MO$0.001515
Basic B&W Maint., Basic configuration of Usage band 70 machine.
7,500 pgs/month Allowance. (# of machines ( 3 ) x 12 mo) = Est. Quantity of Months.36MO$0.002
Basic Color Maint., configuration of Usage band 70 machine.
65,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72MO$0.00
Basic B&W Maint., Basic configuration of Usage band 70 machine.
9,000 pgs/month Allowance. (# of machines ( 3 ) x 12 mo) = Est. Quantity of Months.36MO$0.00
Total Estimated Usage band 70 maintenance.$0.0017
Usage band 80 Machinesmachines in service
Basic Color Maint., Basic configuration of Usage band 80 machine.
50,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72MO$0.002910
Basic B&W Maint., Basic configuration of Usage band 80 machine.
10,000 pgs/month Allowance. (# of machines ( 4 ) x 12 mo) = Est. Quantity of Months.48MO$0.004
Basic Color Maint., Basic configuration of Usage band 80 machine.
100,000 pgs/month Allowance. (# of machines ( 6 ) x 12 mo) = Est. Quantity of Months.72MO$0.00
Basic B&W Maint., Basic configuration of Usage band 80 machine.
15,000 pgs/month Allowance. (# of machines ( 4 ) x 12 mo) = Est. Quantity of Months.48MO$0.00
Total Estimated Usage band 80 maintenance.$0.0033
Usage band 100 Machinesmachines in service
Basic Color Maint., Basic configuration of Usage band 100 machine.
100,000 pgs/month Allowance. (# of machines ( 8 ) x 12 mo) = Est. Quantity of Months.96MO$0.00710
Basic B&W Maint., Basic configuration of Usage band 100 machine.
15,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months.24MO$0.002
Basic Color Maint., Basic configuration of Usage band 100 machine.
200,000 pgs/month Allowance. (# of machines ( 8 ) x 12 mo) = Est. Quantity of Months.96MO$0.00
Basic B&W Maint., Basic configuration of Usage band 100 machine.
30,000 pgs/month Allowance. (# of machines ( 2 ) x 12 mo) = Est. Quantity of Months.24MO$0.00
Total Estimated Usage band 100 maintenance.$0.009
Total Estimated Basic Maintenance, all Usage Bands, all Machines. (Carried over to clin 0008 on Basic contract.)$0.00ERROR:#REF!
M-2Basic Maintenance; Additional Add-on Components
Enter a single monthly maintenance price for each component, if applicable.
Maintenance for Document Scanner
(Qty of components ( 10 ) x 12 months) = Estimated Quantity of Months.120MO$0.0011
Maintenance for Booklet Maker w/face trim add-on.
(Qty of components ( 58 ) x 12 months) = Estimated Quantity of Months.696MO$0.00ERROR:#REF!
Maintenance for GBC Advanced Hole Punch add-on.
(Qty of components ( 6 ) x 12 months) = Estimated Quantity of Months.72MO$0.00ERROR:#REF!
Maintenance for Folder add-on.
(Qty of components ( 3 ) x 12 months) = Estimated Quantity of Months.36MO$0.00ERROR:#REF!
Maintenance for High and Oversize Capacity paper feed add-on.
(Qty of components ( 20 ) x 12 months) = Estimated Quantity of Months.240MO$0.00ERROR:#REF!
Maintenance for Trimmer/Buffer - 2 knife trim add-on.
(Qty of components ( 2 ) x 12 months) = Estimated Quantity of Months.24MO$0.00ERROR:#REF!
Maintenance for High Capacity Stacker add-on. (Qty of components ( 14 ) x 12 months) = Estimated Quantity of Months.168MO$0.00
Total Estimated Basic Maintenance, all additional add-on Components
(Carried over to clin 0009 on Basic contract.)$0.00ERROR:#REF!
Additional Software Maintenance
M-3See attachment 2 - [Equipment Specification Requirements], for a description of requirements for the following items. Items are not tied to a specific usage band.
Maintenance- Document Management Software (per license fee)30YR$0.0020
Total Estimated Additional Software Maintenance.
(Carried over to clin 0010 on Basic contract.)$0.00
M-4EXTENDED HOURS MAINTENANCE
Extended Hours Maintenance; Usage band 60
Extended Hours, Repair Maintenance coverage, 1 additional shift, Monday-Friday.

(5pm-12am or 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 8 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, 2 additional shifts, Monday-Friday.

(5pm-12am and 12am-8am. Assignment information to be indicated in the task order).

To be priced/purchased by the week, as needed, per UB 8 machine.

15WK$0.00
Extended Hours, Repair Maintenance coverage, Saturday/Sunday only. (12am-12am)

Assignment information to be indicated in the task order.

Price…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .