ATTACHMENT 2 - Revised Equipment Specifications 02.24.2020.xls
XLS spreadsheet 152 KB Posted
- Attached to
- Color Small Format Reproduction Equipment Federal contract opportunity
- Solicitation number
- SP7000-19-R-1003
- Issued by
- Defense Logistics Agency
About this file
This document contains an attachment to a federal solicitation requesting proposals for color small format reproduction equipment and services. The Defense Logistics Agency seeks multiple award IDIQ contracts to purchase small-format color printers and scanners, as well as ongoing delivery, installation, maintenance, supplies, IT security, training, and administrative support services. Offerors must complete the template by proposing a single device within each of four usage bands between 35,000 and 200,000 copies per month, and describing features such as paper handling capabilities and integration with EFI software. The solicitation also requests estimates of quantities needed across 13 usage bands and configurations to be used for bid evaluation.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions for attachment 2- | ||
| Offerors will complete tabs, by typed response, only in the BLUE cells of each tab. | ||
| All proposed items will be priced by offerors in the solicitation- | ||
| "Section B - Schedule of Supplies-Services", Price Matrix. | ||
| No pricing should be entered on the tabs of this document. | ||
| Band 60 - Band 100 tabs: | ||
| -Complete each of the four (4) Usage Bands (UB) tabs herein, proposing one 1 basic | ||
| configuration device for each, as their response to Section 1.2 of the Statement of Work. | ||
| Multiple devices are not acceptable. | ||
| -Rows 5 through 11 (Bands 60-100) are spaces to propose one appropriate device for each usage band | ||
| and the required narrative regarding print controller integration. (from sections 1.2/1.6 in SOW) | ||
| -Various output/specification requirements will then be indicated in rows 44 through | ||
| 47 (Band 60) & rows 46 through 49(Band 70) & rows 54 through 58(Band 80) & rows 53 through 56(Band 100) for the corresponding proposed device. | ||
| -Next indicate Yes or No as to whether or not the device proposed can/cannot meet the | ||
| minimum features requirements in rows 16 through 42 (Band 60), 16 through 44 (Band 70), 16 through 52 (Band 80), 16 through 51 (Band 100) | ||
| by placing an 'x' in the appropriate column, | ||
| as well as proposing additional add-on components (binding options), and a removable | ||
| hard drive description, if applicable. | ||
| Min PC/Workstation Specs tab: | ||
| Complete by proposing a device and by placing an 'x' in the appropriate column, as | ||
| their response to Section 1.3 of the Statement of Work |
&LATTACHMENT 2&CEQUIPMENT SPECIFICATION REQUIREMENTS
SP7000-19-R-1003
Band 60
| USAGE BAND 60 | ||
| Low Volume Allowance 35K - High Volume Allowance 50K | ||
| Contractor will place responses in the Blue column to the right | Proposed Equipment | |
| Fill out the following as appropriate to propose a single UB60 device: | ||
| Make/Model Printer | ||
| Operating system for Printer | ||
| Make/Model Controller/RIP | ||
| Operating system for controller/RIP | ||
| Narrative to explain how Print Controller integrates with EFI’s DSF PDF and JDF output files. | ||
| Minimum Features Section | ||
| Yes | ||
| (x) | No |
(x)
| Offeror will respond by placing an 'x' in the Yes or No column for the following: |
| Power |
| Does device require connection to three phase power source? |
(If response is no, Energy Star Specification covers this product. Answer the next specification question in line 17; If response is yes, skip line 17 as Energy Star specification does not apply).
| Is product Energy Star Compliant? |
| Engine |
| 60 Simplex Color Copies (PPM/IPM) Per Minute text weight (20# Bond - 75g/m2) paper minimum |
| 60 Simplex B/WCopies (PPM/IPM) Per Minute text weight (20# Bond - 75g/m2) paper minimum |
| 20 Duplex Color Copies (PPM/IPM) Per Minute cover weight (110# index- 163g/m2) paper minimum |
| Device is of a single footprint design. |
| Prints on up to Min: 4.0" x 6.0" Max: 12" x 18" stock |
| Paper Handling of 20# bond (75g/m2) to 110# Index (163 g/m2). |
| Auto Duplex Printing |
| Minimum 300 DPI |
| Paper Feed Supply, minimum 1,000 sheets |
| Auto document Feeder for hardcopy originals |
| Supports Simple Image Quality Adjustment (SIQA) as a set of maintenance tools that automatically adjust the quality of the printed images generated by the printer in three types of adjustments: Image Transfer, Alignment, and Density Uniformity : These adjustments are done on the printer by the operator without the need for an onsite service technician or external workstaion |
| Minimum of three paper drawers. |
| Color Mode |
| Auto |
| Full Color |
| Black and White |
| Interface Considerations |
| Network ready |
| Handle Postscript, JDF, PCL,TIFF, PDF and ASCII. |
| Proposed machine posses integration capabability |
with the following binding options:
| Standard stacker stapler | ||
| Online booklet maker with face trim | ||
| High and Oversize Capacity paper feed - 2 each 2 tray Oversized High Cap Feeders | ||
| Online punch configuration available | ||
| Output or specifications for Proposed Equipment | Response | |
| Document Feeder/Scanner Speed | ||
| Document Feeder Attached or Remote | ||
| Document Feeder/Scanner minimum original size | ||
| Document Feeder/Scanner maximum original size | ||
| Security Features | ||
| Equipment and support available for testing and configuration. | ||
| Equipment fully compliant with DoD Security Technical Implementation Guides (STIG) (Ref: http://iase.disa.mil/stigs/stig/index.html) and free of vulnerabilities. | ||
| Equipment must provide the ability to turn on and off any non essential ports and protocols. | ||
| Equipment must use one of the following DLA approved operating systems: (Mark yes to one or no to all as appropriate). | ||
| Microsoft Windows 2016 Server | ||
| Microsoft Windows 10 Professional | ||
| Sun Solaris 11 | ||
| The equipment must be capable of meeting DOD information security specifications when interfacing with classified materials to ensure no remnants of the classified data exists after the classified process has been completed. | Description, if applicable | |
| Equipment must be capable of utilizing removable hard drives. | ||
| All equipment must provide for disk overwrite/purge/delete/erase in order to remove any remnant of processed data. | ||
| All devices/components shall be capable of auditing all administration/configuration changes and user submitted jobs including username, job type, and time. (Reference: http://iase.disa.mil/stigs/stig/span-stig-v1r1.pdf). All devices shall have the ability to export and archive audit logs. | ||
| Contractor shall patch all installed equipment within 30 days unless a shorter time period is mutually agreed upon. | ||
| Equipment must be capable of allowing passwords/pins to be changed. | ||
| Equipment must be capable of removing residual/latent data at the completion of a job. | ||
| Audit logs must be capable of auditing all administration/configuration changes and user submitted jobs including username, job type and time. | ||
| The equipment shall operate on and coexist on a network supporting any and all of the following: |
• Internet Protocol Version 4 (IPv4)
• Internet Protocol Version 6 (IPv6)
• Internet Protocol Version 4/6 Hybrid (IPv4/6) Additional Remarks/Notes/Comments, If Necessary
&CATTACHMENT 1a - EQUIPMENT SPECIFICATION REQUIREMENTS
BAND 8
&C&P &CATTACHMENT 1a - EQUIPMENT REQUIREMENTS FOR USAGE BAND
BAND 8
&C&P &CATTACHMENT 1a - EQUIPMENT REQUIREMENTS FOR USAGE BAND
BAND 8
&C&P
Band 70
| USAGE BAND 70 | ||
| Low Volume Allowance 50K-High Volume Allowance 70K | ||
| Contractor will place responses in the Blue column to the right | Proposed Equipment | |
| Fill out the following as appropriate to propose a single UB70 device: | ||
| Make/Model Printer | ||
| Operating system for Printer | ||
| Make/Model Controller/RIP | ||
| Operating system for controller/RIP | ||
| Narrative to explain how Print Controller integrates with EFI’s DSF PDF and JDF output files. | ||
| Minimum Features Section | ||
| Yes | ||
| (x) | No |
(x)
| Offeror will respond by placing an 'x' in the Yes or No column for the following: |
| Power |
| Does device require connection to three phase power source? |
(If response is no, Energy Star Specification covers this product. Answer the next specification question in line 17; If response is yes, skip line 17 as Energy Star specification does not apply).
| Is product Energy Star Compliant? | |
| Engine | |
| 70 Simplex Color Copies (PPM/IPM) Per Minute text weight (20# Bond - 75g/m2) paper minimum | |
| 70 Simplex B/W (PPM/IPM) Per Minute text weight (20# Bond - 75g/m2) paper minimum | |
| 35 Duplex Color Copies (PPM/IPM) Per Minute cover weight (110# Index - 163g/m2) paper minimum | |
| Device is of a single footprint design. | |
| Prints on up to Min: 4.0" x 6.0" Max: 12" x 18" stock | |
| Paper Handling of 20# bond (75g/m2) to 110# Index (163 g/m2). | |
| Auto Duplex Printing | |
| Minimum 300 DPI | |
| Paper Feed Supply, minimum 1,000 sheets | |
| Supports Simple Image Quality Adjustment (SIQA) as a set of maintenance tools that automatically adjust the quality of the printed images generated by the printer in three types of adjustments: Image Transfer, Alignment, and Density Uniformity : These adjustments are done on the printer by the operator without the need for an onsite service technician or external workstaion | |
| Auto document Feeder for hardcopy originals | |
| Minimum of three paper drawers. | |
| Color Mode | |
| Auto | |
| Full Color | |
| Black and White | |
| Interface Considerations | |
| Network ready | |
| Handle Postscript, JDF, PCL,TIFF, PDF and ASCII. | Proposed Equipment |
| Proposed machine posses integration capabability |
with the following binding options:
| Standard stacker stapler | |
| Online booklet maker with face trim. | |
| High and Oversize Capacity paper feed - 2 each 2 tray Oversized High Cap Feeders | |
| Online Z Folder | |
| High Capacity Stacker | |
| Online hole punch | |
| Output or specifications for Proposed Equipment | Response |
| Document Feeder/Scanner Speed | |
| Document Feeder Attached or Remote | |
| Document Feeder/Scanner minimum original size | |
| Document Feeder/Scanner maximum original size | |
| Security Features | |
| Equipment and support available for testing and configuration. | |
| Equipment fully compliant with DoD Security Technical Implementation Guides (STIG) (Ref: http://iase.disa.mil/stigs/stig/index.html) and free of vulnerabilities. | |
| Equipment must provide the ability to turn on and off any non essential ports and protocols. | |
| Equipment must use one of the following DLA approved operating systems: (Mark yes to one or no to all as appropriate). | |
| Microsoft Windows 2016 Server | |
| Microsoft Windows 10 professional | |
| Sun Solaris 11 | |
| The equipment must be capable of meeting DOD information security specifications when interfacing with classified materials to ensure no remnants of the classified data exists after the classified process has been completed. | |
| Equipment must be capable of utilizing removable hard drives. | |
| All equipment must provide for disk overwrite/purge/delete/erase in order to remove any remnant of processed data. | |
| All devices/components shall be capable of auditing all administration/configuration changes and user submitted jobs including username, job type, and time. (Reference: http://iase.disa.mil/stigs/stig/span-stig-v1r1.pdf). All devices shall have the ability to export and archive audit logs. | |
| Contractor shall patch all installed equipment within 30 days unless a shorter time period is mutually agreed upon. | |
| Equipment must be capable of allowing passwords/pins to be changed. | |
| Equipment must be capable of removing residual/latent data at the completion of a job. | |
| Document Services requires the capability to print documents from existing DLA Document Services machines provided they meet required contractor minimum specifications. | |
| Audit logs must be capable of auditing all administration/configuration changes and user submitted jobs including username, job type and time. | |
| The equipment shall operate on and coexist on a network supporting any and all of the following: |
• Internet Protocol Version 4 (IPv4)
• Internet Protocol Version 6 (IPv6)
• Internet Protocol Version 4/6 Hybrid (IPv4/6) Additional Remarks/Notes/Comments, If Necessary
&CATTACHMENT 1a - EQUIPMENT SPECIFICATION REQUIREMENTS
BAND 9
&C&P &CATTACHMENT 1a - EQUIPMENT REQUIREMENTS FOR USAGE BAND
BAND 9
&C&P &CATTACHMENT 1a - EQUIPMENT REQUIREMENTS FOR USAGE BAND
BAND 9
&C&P
Band 80
| USAGE BAND 80 | ||
| Low Volume Allowance 70K- High Volume Allowance 100K | ||
| Contractor will place responses in the Blue column to the right | Proposed Equipment | |
| Fill out the following as appropriate to propose a single UB80 device: | ||
| Make/Model Printer | ||
| Operating system for Printer | ||
| Make/Model Controller/RIP | ||
| Operating system for print server | ||
| Narrative to explain how Print Controller integrates with EFI’s DSF PDF and JDF output files. | ||
| Minimum Features Section | ||
| Offeror will respond by placing an 'x' in the Yes or No column for the following: | ||
| Power | Yes | |
| (x) | No |
(x) Does device require connection to three phase power source?
(If response is no, Energy Star Specification covers this product. Answer the next specification question in line 17; If response is yes, skip line 17 as Energy Star specification does not apply).
| Is product Energy Star Compliant? | ||
| Engine | ||
| 80 Simplex Color Copies (PPM/IPM) Per Minute text weight (20# Bond - 75g/m2) paper minimum | ||
| 80 Simplex B/W Copies (PPM/IPM) Per Minute text weight (20# Bond - 75g/m2) paper minimum | ||
| 40 Duplex Color Copies (PPM/IPM) Per Minute cover weight (90# Index - 163g/m2) paper minimum | ||
| Device is of a single footprint design. | ||
| Prints on minimum 5"x 8" to maximum 13"x26" inch stock - XLS option | ||
| Paper Handling of 20# bond (75g/m2) to 110# Index (350gsm) | ||
| Auto Duplex Printing | ||
| RIP resolution 1200 x 1200 by minimum 8 bit depth | ||
| Minimum 300 DPI (Dot's per inch) | ||
| Paper Feed Supply, minimum 3,000 sheets | ||
| Supports Simple Image Quality Adjustment (SIQA) as a set of maintenance tools that automatically adjust the quality of the printed images generated by the printer in three types of adjustments: Image Transfer, Alignment, and Density Uniformity : These adjustments are done on the printer by the operator without the need for an onsite service technician or external workstaion | ||
| Auto document Feeder for hardcopy originals | ||
| Minimum of three paper drawers. | ||
| dedicated envelope tray | ||
| Inserter for preprinted or non-printed pages. | ||
| Tab Insertion. | ||
| Color Mode | ||
| Auto | ||
| Full Color | ||
| Black and White | ||
| Interface Considerations | ||
| Network ready | ||
| Handle Postscript, JDF, PCL,TIFF, PDF and ASCII. | ||
| Proposed machine posses integration capabability | ||
| with the following binding options: | Proposed Equipment | |
| Standard stacker stapler (minimum 100 sheets) | ||
| High capacity stacker | ||
| Inserter/Interposer | ||
| Online booklet maker with face trim configuration available. | ||
| Trimmer/Buffer - 2 knife Trim | ||
| Online punch configuration available - Basic Punch - 2/3 hole | ||
| Online or Offline Automatic GBC 19 hole punch |
- GBCADVPUN, GBC Advanced Punch Pro
| Double punch (11 X 17 in two different locations ) | ||
| Online folder (Bi Fold at least) configuration available | ||
| High and Oversize Capacity paper feed - 2 each 2 tray Oversized High Cap Feeders optional | ||
| Output or specifications for Proposed Equipment | ||
| Dots per inch resolution of print engine | ||
| Document Feeder/Scanner Speed | ||
| Document Feeder Attached or Remote | ||
| Document Feeder/Scanner minimum original size | ||
| Document Feeder/Scanner maximum original size | ||
| Security Features | Yes | |
| (x) | No |
(x)
| Equipment and support available for testing and configuration. |
| Equipment fully compliant with DoD Security Technical Implementation Guides (STIG) (Ref: http://iase.disa.mil/stigs/stig/index.html) and free of vulnerabilities. |
| Equipment must provide the ability to turn on and off any non essential ports and protocols. |
| Equipment must use one of the following DLA approved operating systems: (Mark yes to one or no to all as appropriate). |
| Microsoft Windows 2016 Server |
| Microsoft Windows 10 |
| Sun Solaris 11 |
| The equipment must be capable of meeting DOD information security specifications when interfacing with classified materials to ensure no remnants of the classified data exists after the classified process has been completed. |
| Equipment must be capable of utilizing removable hard drives. |
| All equipment must provide for disk overwrite/purge/delete/erase in order to remove any remnant of processed data. |
| All devices/components shall be capable of auditing all administration/configuration changes and user submitted jobs including username, job type, and time. (Reference: http://iase.disa.mil/stigs/stig/span-stig-v1r1.pdf). All devices shall have the ability to export and archive audit logs. |
| Contractor shall patch all installed equipment within 30 days unless a shorter time period is mutually agreed upon. |
| Equipment must be capable of allowing passwords/pins to be changed. |
| Equipment must be capable of removing residual/latent data at the completion of a job. |
| Document Services requires the capability to print documents from existing DLA Document Services machines provided they meet required contractor minimum specifications. |
| Audit logs must be capable of auditing all administration/configuration changes and user submitted jobs including username, job type and time. |
| The equipment shall operate on and coexist on a network supporting any and all of the following: |
• Internet Protocol Version 4 (IPv4)
• Internet Protocol Version 6 (IPv6)
• Internet Protocol Version 4/6 Hybrid (IPv4/6) Additional Remarks/Notes/Comments, If Necessary
&CATTACHMENT 1a - EQUIPMENT SPECIFICATION REQUIREMENTS
BAND 10
&C&P &CATTACHMENT 1a - EQUIPMENT REQUIREMENTS FOR USAGE BAND
BAND 10
&C&P &CATTACHMENT 1a - EQUIPMENT REQUIREMENTS FOR USAGE BAND
BAND 10
&C&P
Band 100
| USAGE BAND 100 | ||
| Low Volume Allowance 100K- High Volume Allowance 200K | ||
| Contractor will place responses in the Blue column to the right | Proposed Equipment | |
| Fill out the following as appropriate to propose a single UB100 device: | ||
| Make/Model Printer | ||
| Operating system for Printer | ||
| Make/Model Controller/RIP | ||
| Operating system for print server | ||
| Narrative to explain how Print Controller integrates with EFI’s DSF PDF and JDF output files. | ||
| Minimum Features Section | ||
| Offeror will respond by placing an 'x' in the Yes or No column for the following: | ||
| Power | Yes | |
| (x) | No |
(x) Does device require connection to three phase power source?
(If response is no, Energy Star Specification covers this product. Answer the next specification question in line 17; If response is yes, skip line 17 as Energy Star specification does not apply).).
| Is product Energy Star Compliant? | ||
| Engine | ||
| 100 Simplex Color Copies (PPM/IPM) Per Minute text weight (20# Bond - 75g/m2) paper minimum | ||
| 100 Simplex B/W Copies (PPM/IPM) Per Minute text weight (20# Bond - 75g/m2) paper minimum | ||
| 50 Duplex Color Copies (PPM/IPM) Per Minute cover weight (90# Index - 163g/m2) paper minimum | ||
| Device is of a single footprint design. | ||
| Prints on minimum 5"x 8" to maximum 13"x26" inch stock - XLS option | ||
| Paper Handling of 20# bond (75g/m2) to 110# Index (350gsm) | ||
| Auto Duplex Printing | ||
| rip resolution 1200 by 1200 minimum 8 bit depth | ||
| dedicated envelope tray | ||
| Minimum 300 DPI (Dot's per inch) | ||
| Does equpment support an Automated Color Quality Suite (ACQS) along with Full Width Array (FWA) inline scanning assembly safeguard color quality and consistency throughout the run, ensuring every page of output matches the desired target and easily color calibrating the device.The Full Width Array automatically adjusts Image Transfer and Density Uniformity, fine-tuning and preventing issues before they occur to deliver optimized output. The Image-to-Media Alignment saves time and eliminates costly waste caused by registration errors or image skew—for perfect front-to-back registration regardless of media type or sheet size. | ||
| Paper Feed Supply, minimum 5,000 sheets | ||
| Minimum of five paper drawers. | ||
| Inserter for preprinted or non-printed pages. | ||
| Tab Insertion. | ||
| Color Mode | ||
| Auto | ||
| Full Color | ||
| Black and White | ||
| Interface Considerations | ||
| Network ready | ||
| Handle Postscript, JDF, PCL,TIFF, PDF and ASCII. | ||
| Proposed machine posses integration capabability | ||
| with the following binding options: | Proposed Equipment | |
| Standard stacker stapler (minimum 100 sheets) | ||
| High capacity stacker | ||
| Inserter/Interposer | ||
| Online booklet maker with face trim configuration available. | ||
| Trimmer/Buffer - 2 knife Trim | ||
| Online punch configuration available - Basic Punch - 2/3 hole | ||
| Online or Offline Automatic GBC 19 hole punch |
- GBCADVPUN, GBC Advanced Punch Pro
| double punch (11 X 17 in two different locations ) | ||
| Online folder (Bi Fold at least) configuration available | ||
| High and Oversize Capacity paper feed - 2 each 2 tray Oversized High Cap Feeders optional | ||
| Output or specifications for Proposed Equipment | ||
| Document Feeder/Scanner Speed | ||
| Document Feeder Attached or Remote | ||
| Document Feeder/Scanner minimum original size | ||
| Document Feeder/Scanner maximum original size | ||
| Security Features | Yes | |
| (x) | No |
(x)
| Equipment and support available for testing and configuration. |
| Equipment fully compliant with DoD Security Technical Implementation Guides (STIG) (Ref: http://iase.disa.mil/stigs/stig/index.html) and free of vulnerabilities. |
| Equipment must provide the ability to turn on and off any non essential ports and protocols. |
| Equipment must use one of the following DLA approved operating systems: (Mark yes to one or no to all as appropriate). |
| Microsoft Windows 2016 Server |
| Microsoft Windows 10 |
| Sun Solaris 11 |
| The equipment must be capable of meeting DOD information security specifications when interfacing with classified materials to ensure no remnants of the classified data exists after the classified process has been completed. |
| Equipment must be capable of utilizing removable hard drives. |
| All equipment must provide for disk overwrite/purge/delete/erase in order to remove any remnant of processed data. |
| All devices/components shall be capable of auditing all administration/configuration changes and user submitted jobs including username, job type, and time. (Reference: http://iase.disa.mil/stigs/stig/span-stig-v1r1.pdf). All devices shall have the ability to export and archive audit logs. |
| Contractor shall patch all installed equipment within 30 days unless a shorter time period is mutually agreed upon. |
| Equipment must be capable of allowing passwords/pins to be changed. |
| Equipment must be capable of removing residual/latent data at the completion of a job. |
| Document Services requires the capability to print documents from existing DLA Document Services machines provided they meet required contractor minimum specifications. |
| Audit logs must be capable of auditing all administration/configuration changes and user submitted jobs including username, job type and time. |
| The equipment shall operate on and coexist on a network supporting any and all of the following: |
• Internet Protocol Version 4 (IPv4)
• Internet Protocol Version 6 (IPv6)
• Internet Protocol Version 4/6 Hybrid (IPv4/6) Additional Remarks/Notes/Comments, If Necessary
&CATTACHMENT 1a - EQUIPMENT SPECIFICATION REQUIREMENTS
BAND 10
&C&P
Min PC-Workstation Specs
| Minimum PC/Workstation Specifications | Yes | |
| (x) | No |
(x)
| Manufacturer: | ||
| Processor: | 3.0 Ghz Quad Core,4M cache | |
| Memory: | 16 GB | |
| Keyboard: | Yes | |
| Monitor: | 24 inch widescreen w/ appropriate stand | |
| Video Card: | 1 GB, Dual DVI | |
| Tower Type: | Mini Tower 45 cm max height (allow for two 5.25 inch bays for optional removable drive location) | |
| Hard Drive: | 2 TB, 16MB Cache, 7200 RPM | |
| CD/DVD Drive: | 16x DVD+/- RW | |
| NIC: | Standard | |
| Operating System: | Windows 10 to be loaded by DLA Data Production Operations | |
| Speakers: | Internal | |
| Mouse: | Yes | |
| Service: | Next Business Day Onsite Service for 5 years *SOW section 1.4* | |
| Service: | Data Production Operations keeps all hard drives | |
| Removable Hard Drive Kit | ||
| (to be used for classified processing) | Yes | |
| (x) | No |
(x)
| Additional Hard | ||
| Drive: | 1 TB, 16MB Cache, 7200 RPM | |
| Additional features: | Removable 5.25 inch Hard Drive Tray and two drawers (one for classified, one for unclassified): | |
| *** Removable hard drives will be used to process classified documents. All data, including | ||
| Operating System and document data should be kept on either an unclassified or classified | ||
| drive. Operators should be able to easily remove the unclassified drive and replace with the | ||
| classified drive and visa versa. The equipment should feature durable equipment to prevent | ||
| breakage. | ||
| Additional Remarks/Notes/Comments, If Necessary |
&CATTACHMENT 1a - EQUIPMENT SPECIFICATION REQUIREMENTS
Quantities
| Usage Band | B&W PPM/IPM Estimated Range | Estimated Quantity Configuration One Purchase | Estimated Quantity Configuration Two Purchase | Estimated Quantity Configuration Three Purchase | Estimated Quantity Configuration Four Purchase | Estimated Quantity Configuration Five Purchase | Estimated Quantity Configuration Six Purchase | Total Estimated of Each Band |
| 8 | 95-105 | 27 | 50 | 25 | 8 | 0 | 9 | 119 |
| 9 | 105-120 | 2 | 20 | 15 | 1 | 0 | 12 | 50 |
| 10 | 120-138 | 15 | 27 | 39 | 2 | 4 | 7 | 94 |
| 11 | 138-150 | 7 | 7 | 5 | 0 | 1 | 2 | 22 |
| 12 | 150-180 | 2 | 2 | 2 | 0 | 0 | 1 | 7 |
| 13 | 285+ | 0 | 0 | 1 | 0 | 0 | 0 | 1 |
| TOTAL | 53 | 106 | 87 | 11 | 5 | 31 | 293 | |
| This table addresses the needed usage bands and estimated quantity of each. The quantities listed are estimates and will be used | ||||||||
| for bid calculation purposes. The quantities ordered for various configurations will not necessarilly reflect the quantities for the | ||||||||
| configurations presented in the table. The total Estimated Equipment Purchase is 293 Print Boxes. |
&C&12Attachment 2 - Equipment Requirements for Usage Bands &C&P &C&12Attachment 2 - Equipment Requirements for Usage Bands &C&P &C&12Attachment 2 - Equipment Requirements for Usage Bands &C&P
File details come from the government source that posted it. Updated .