Question and Answers

View the file

Other files

File Type Posted
SP3300-17-R-5010_0008.pdf PDF
Industry_Questions_and_Government_Responses.docx DOCX document
RFP_SP3300-17-R-5010_Sections_B-M_Amendment_0007.docx DOCX document
Industry_Questions_and_Government_Responses.docx DOCX document
J.33,_DDNB_Training_as_of_Aug_14_2017.xlsx XLSX spreadsheet
J.1_Section_C_-_PWS_with_amendment_0007_changes.docx DOCX document
RFP_SP3300-17-R-5010_Sections_B-M_with_Amendment_0007_Changes.docx DOCX document
SP3300-17-R-5010_0007.pdf PDF
SP3300-17-R-5010_0006.pdf PDF
J.5,_CLIN_X008_Labor_Rate_Table.xlsx XLSX spreadsheet
Industry_Questions_and_Government_Responses.docx DOCX document
J.16_TE_2.1_Definitions_Acronyms_and_Abbreviations.docx DOCX document
J.30_TE_5.9_DSS_Load_and_Maintain.docx DOCX document
J.18_TE_3.2_Government_Training_.docx DOCX document
J.33,_DDNB_Training_as_of_Aug_2_2017.xlsx XLSX spreadsheet
J.4_Meclift_and_HATS_waiting_data.xlsx XLSX spreadsheet
RFP_SP3300-17-R-5010_Sections_B-M_Amendment_0006.docx DOCX document
J.20_TE_4.1_Contractor_Training.docx DOCX document
J.35,_Proposed_Training_Hours_for_Management,_Support_and_Distribution_Areas.xlsx XLSX spreadsheet
RFP_SP3300-17-R-5010_Sections_B-M_with_Amendment_0006_Changes.docx DOCX document
J.1_Section_C_-_PWS_with_amendment_0006_changes.docx DOCX document
J.2_Section_C-N_-_PWS_with_amendment_0006_changes.docx DOCX document
J.32_TE_6.2_Guard_Services_SOP.docx DOCX document
SP3300-17-R-5010_0005.pdf PDF
SP3300-17-R-5010_0004.pdf PDF
RFP_SP3300-17-R-5010_Sections_B-M_with_Amendment_0004_Changes.docx DOCX document
J.1_Section_C_-_PWS_with_amendment_0004_changes.docx DOCX document
Attendance_Sheet.xlsx XLSX spreadsheet
Pre_Proposal_Conference_Presentation.pptx PPTX presentation
SP3300-17-R-5010_0003.pdf PDF
DLA_Distribution_Command_Presentation.PPTX PPTX presentation
SP3300-17-R-5010_0002.pdf PDF
J.1_Section_C_-_PWS.docx DOCX document
J.4_GE.xlsx XLSX spreadsheet
J.33_Draft_Distribution_Ops_Training_Schedule_June_15_2017.xlsx XLSX spreadsheet
A018_-_DBA_Insurance_Reporting_CLIN_X007.pdf PDF
J.6_IT_and_Misc_equipment.xlsx XLSX spreadsheet
J.32_TE_5.6_Guard_Services_SOP.docx DOCX document
RFP_SP3300-17-R-5010_Sections_B-M_with_Amendment_0002_Changes.docx DOCX document
J.34_Proposed_Productive_Hours_6-21-17.xlsx XLSX spreadsheet
J.2_Section_C-N_-_PWS.docx DOCX document
Updated_DDNB_Preproposal_Conference_Instructions.docx DOCX document
RFP_Revised_Page_73.pdf PDF
SP3300-17-R-5010_0001.pdf PDF
RFP_Revised_Page_72.pdf PDF
J.36_Subcontracting_Plan_Template_Updated_1.15.16.docx DOCX document
J.4_GE_MHE_(Meclift_and_other_forklifts_etc).zip ZIP file
J.8_Past_Performance_Questionnaire.docx DOCX document
Notice_Regarding_Restricted_Access.docx DOCX document
J.34,_DDNB_Proposed_Productive_Hours_2-27-17.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DDNB Pre Proposal Conference – Question and Answer 6/29/2017

Question
Answer
1.
Can the Government define the difference between storage shed-open sides (outdoor uncovered) vice storage shed-open sides (outdoor covered)?
The definition will be provided via amendment, along with clarification of the requirement.
2.
Are the (4) HATS currently delivered and installed?
Yes
3.
If so, how are the costs covered for movement of the HATS in the case of new construction? Who is responsible?
This will be answered via amendment.
4.
Is it mandatory to have both indoor and outdoor facilities in a single location or multiple locations acceptable?
It is not mandatory.
5.
Is the K12 gate currently installed at the current facility?
No. But they will be installed before transition begins.
6.
The guard SOP requires British regiment Gurkhas of Indian or Nepalese nationality. Can DLA advise what other nationalities have been previously approved?
None.
7.
If our space solution includes an annex location, is a separate communications room required if the two locations can be connected via fiber optic line?
The Government will consult with the information operations group and provide an answer via an amendment.
8.
What are the expectations for surge & sustainment? What percent increase for how long as a guide?
This information is not available. This will be addressed via a request for quote when a task order is issued, if the government opts to utilize CLIN X008 for support.
9.
How does DLA define the weight bands for workload? Can DLA provide volume (Qty of lines or other metric) for each weight band?
The definition of weight bands can be found in TE 2.1. The volume can be found in TEs 5.1 and 5.2.