J.34,_DDNB_Proposed_Productive_Hours_2-27-17.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
DLA Distribution Bahrain, Southwest Asia Contractor Owned Contractor Operated (COCO) Distribution Center
Solicitation number
SP330017R5010
Issued by

About this file

J.34, DDNB Proposed Productive Hours 2-27-17

View the file

Other files

File Type Posted
SP3300-17-R-5010_0008.pdf PDF
Industry_Questions_and_Government_Responses.docx DOCX document
RFP_SP3300-17-R-5010_Sections_B-M_Amendment_0007.docx DOCX document
Industry_Questions_and_Government_Responses.docx DOCX document
J.33,_DDNB_Training_as_of_Aug_14_2017.xlsx XLSX spreadsheet
J.1_Section_C_-_PWS_with_amendment_0007_changes.docx DOCX document
RFP_SP3300-17-R-5010_Sections_B-M_with_Amendment_0007_Changes.docx DOCX document
SP3300-17-R-5010_0007.pdf PDF
SP3300-17-R-5010_0006.pdf PDF
J.5,_CLIN_X008_Labor_Rate_Table.xlsx XLSX spreadsheet
Industry_Questions_and_Government_Responses.docx DOCX document
J.16_TE_2.1_Definitions_Acronyms_and_Abbreviations.docx DOCX document
J.30_TE_5.9_DSS_Load_and_Maintain.docx DOCX document
J.18_TE_3.2_Government_Training_.docx DOCX document
J.33,_DDNB_Training_as_of_Aug_2_2017.xlsx XLSX spreadsheet
J.4_Meclift_and_HATS_waiting_data.xlsx XLSX spreadsheet
RFP_SP3300-17-R-5010_Sections_B-M_Amendment_0006.docx DOCX document
J.20_TE_4.1_Contractor_Training.docx DOCX document
J.35,_Proposed_Training_Hours_for_Management,_Support_and_Distribution_Areas.xlsx XLSX spreadsheet
RFP_SP3300-17-R-5010_Sections_B-M_with_Amendment_0006_Changes.docx DOCX document
J.1_Section_C_-_PWS_with_amendment_0006_changes.docx DOCX document
J.2_Section_C-N_-_PWS_with_amendment_0006_changes.docx DOCX document
J.32_TE_6.2_Guard_Services_SOP.docx DOCX document
SP3300-17-R-5010_0005.pdf PDF
SP3300-17-R-5010_0004.pdf PDF
RFP_SP3300-17-R-5010_Sections_B-M_with_Amendment_0004_Changes.docx DOCX document
J.1_Section_C_-_PWS_with_amendment_0004_changes.docx DOCX document
Question_and_Answers.docx DOCX document
Attendance_Sheet.xlsx XLSX spreadsheet
Pre_Proposal_Conference_Presentation.pptx PPTX presentation
SP3300-17-R-5010_0003.pdf PDF
DLA_Distribution_Command_Presentation.PPTX PPTX presentation
SP3300-17-R-5010_0002.pdf PDF
J.1_Section_C_-_PWS.docx DOCX document
J.4_GE.xlsx XLSX spreadsheet
J.33_Draft_Distribution_Ops_Training_Schedule_June_15_2017.xlsx XLSX spreadsheet
A018_-_DBA_Insurance_Reporting_CLIN_X007.pdf PDF
J.6_IT_and_Misc_equipment.xlsx XLSX spreadsheet
J.32_TE_5.6_Guard_Services_SOP.docx DOCX document
RFP_SP3300-17-R-5010_Sections_B-M_with_Amendment_0002_Changes.docx DOCX document
J.34_Proposed_Productive_Hours_6-21-17.xlsx XLSX spreadsheet
J.2_Section_C-N_-_PWS.docx DOCX document
Updated_DDNB_Preproposal_Conference_Instructions.docx DOCX document
RFP_Revised_Page_73.pdf PDF
SP3300-17-R-5010_0001.pdf PDF
RFP_Revised_Page_72.pdf PDF
J.36_Subcontracting_Plan_Template_Updated_1.15.16.docx DOCX document
J.4_GE_MHE_(Meclift_and_other_forklifts_etc).zip ZIP file
J.8_Past_Performance_Questionnaire.docx DOCX document
Notice_Regarding_Restricted_Access.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Proposed Productive Labor Hours
Instructions: See Section L of the RFP. *Note - The standard mearsurement of time to be used for the Standard Times in Column D shall be number of hours e.g. 5 minutes =.0833 hours. All figures shall be rounded to the tenthousandths decimal place.
Offerors may add rows to this document to account for tasks to be performed by more than one specific labor category.
PWS ParagraphProposed Labor CategorySpecific Activity and Labor Category ResponsibilitiesTime StandardY1 3mo TransitionY1 Workload (9mo)Y1 (9M0) HoursY2 WorkloadY2 HoursY3 WorkloadY3 HoursY4 WorkloadY4 HoursY5 WorkloadY5 Hours
C-1.3.1 Key Personnel
C-1.3.1 Key Personnel: Site Manager (Bahrain)
C-1.3.1 Key Personnel: Alternate Site Manager (Bahrain)
C-1.3.1 Key Personnel: Quality Control Specialist
C-1.3.1 Key Personnel: Supply Systems Analyst
C-1.3.1 Key Personnel: Transportation Manager
C-1.3.1 Key Personnel: Safety and Occupational Health (SOH) Representative
C-1.3.1 Key Personnel:Inventory Manager
C-1.3.1 Key Personnel:Security Manager

C-1.3.1 Key Personnel: Site Manager (Oman)

C-1.8 Transition Plan
Transition Team/SMEs (not to include Key Personnel)
C-4.6 Training
SMEs (not to include Key Personnel)
Section C-5 Specific Tasks
*Offerors shall factor in the processes described in C-5.2.5.1 through C-5.2.5.13, Additional Receiving Requirements, in their prpoposed time standards for the Non-Procurement and New Procurement receiving tasks listed below in section C-5.2*
Section C-5.2 Receiving
C-5.2.1 In-Bound Traffic Management*
C-5.2.2 Off-Load and Tally: Weight Band 1
C-5.2.2 Off-Load and Tally: Weight Band 2
C-5.2.2 Off-Load and Tally: Weight Band 3
C-5.2.2 Off-Load and Tally: Weight Band 4
C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (Customer Returns): Weight Band 1
C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (Customer Returns): Weight Band 2
C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (Customer Returns): Weight Band 3
C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (Customer Returns): Weight Band 4
C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (STOs/RDOs): Weight Band 1
C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (STOs/RDOs): Weight Band 2
C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (STOs/RDOs): Weight Band 3
C-5.2.3 /C-5.2.4.2 Non-Procurement Receipts (STOs/RDOs): Weight Band 4
C-5.2.3/C-5.2.4.3 New Procurement (NP): Weight Band 1
C-5.2.3/C-5.2.4.3 New Procurement (NP): Weight Band 2
C-5.2.3/C-5.2.4.3 New Procurement (NP): Weight Band 3
C-5.2.3/C-5.2.4.3 New Procurement (NP): Weight Band 4
Total C-5.2 Receiving Hours
Total C-5.2 Receiving FTEs
*Offerors shall factor in the processes described in C-5.3.4, Additional Storage Requirements, and in C-5.3.9, Additional Issue Requirements, in their prpoposed time standards for tasks listed below for section C-5.3*
Section C-5.3 Warehousing
C-5.3.1 Stow of Receipts: Weight Band 1
C-5.3.1 Stow of Receipts: Weight Band 2
C-5.3.1 Stow of Receipts: Weight Band 3
C-5.3.1 Stow of Receipts: Weight Band 4
C-5.3.3 Visual Inspections
C-5.3.3 Cyclic Inspections
C-5.3.3.1 Special Inspections
C-5.3.7 Rewarehousing: Weight Band 1
C-5.3.7 Rewarehousing: Weight Band 2
C-5.3.7 Rewarehousing: Weight Band 3
C-5.3.7 Rewarehousing: Weight Band 4
C-5.3.5 Autocad Planographs/DSS Location Identification/Storage Space Management Report*
C-5.3.8 Issue of Material (On-base): Weight Band 1
C-5.3.8 Issue of Material (On-Base): Weight Band 2
C-5.3.8 Issue of Material (On-Base): Weight Band 3
C-5.3.8 Issue of Material (On-Base): Weight Band 4
C-5.3.8 Issue of Material (Off-Base): Weight Band 1
C-5.3.8 Issue of Material (Off-Base): Weight Band 2
C-5.3.8 Issue of Material (Off-Base): Weight Band 3
C-5.3.8 Issue of Material (Off-Base): Weight Band 4
C-5.3.8 Issue of Material (Transshipments On-Base): Weight Band 1
C-5.3.8 Issue of Material (Transshipments On-Base): Weight Band 2
C-5.3.8 Issue of Material (Transshipments On-Base): Weight Band 3
C-5.3.8 Issue of Material (Transshipments On-Base): Weight Band 4
C-5.3.8 Issue of Material (Transshipments Off-Base): Weight Band 1
C-5.3.8 Issue of Material (Transshipments Off-Base): Weight Band 2
C-5.3.8 Issue of Material (Transshipments Off-Base): Weight Band 3
C-5.3.8 Issue of Material (Transshipments Off-Base): Weight Band 4
C-5.3.8 Issue of Material (DROs): Weight Band 1
C-5.3.8 Issue of Material (DROs): Weight Band 2
C-5.3.8 Issue of Material (DROs): Weight Band 3
C-5.3.8 Issue of Material (DROs): Weight Band 4
C-5.3.8 Rewarehousing Picks
C-5.3.12 Shipment Preparation: Weight Band 1
C-5.3.12 Shipment Preparation: Weight Band 2
C-5.3.12 Shipment Preparation: Weight Band 3
C-5.3.12 Shipment Preparation: Weight Band 4
Total C-5.3 Warehousing Hours
Total C-5.3 Warehousing FTEs
Section C-5.4 Physical Inventory Control
C-5.4 Physical Inventory (1st & 2nd Counts)
C-5.4 3rd Count
C-5.4.1 Physical Inventory Control (F2B 1st Counts)
C-5.4.1 Physical Inventory Control (F2B 2nd Counts)
C-5.4.1 Physical Inventory Control (F2B TPIC M)
C-5.4.1 Physical Inventory Control (F2B 3rd Counts)
C-5.4.1 Physical Inventory Control (F2B Causative Research)
C-5.4.1.2 Causative Research
C-5.4.4 Location Surveys
Total C-5.4 Physical Inventory Control Hours
Total C-5.4 Physical Inventory Control FTEs
Section C-5.5 Transportation
C-5.5.2 Freight Terminal/Ship: Weight Band 3
C-5.5.2 Freight Terminal/Ship: Weight Band 4
Total C-5.5 Transportation Hours
Total C-5.5 Transportation FTEs
Section C-5.6 Packaging
C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): X-Small
C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM):Small
C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): Medium
C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): Large
C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): X-Large
C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): XX-Large
C-5.6 Remarks
C-5.6.3 Container Fabrication Support: Small
C-5.6.3 Container Fabrication Support: Medium
C-5.6.3 Container Fabrication Support: Large
C-5.6.3 Container Fabrication Support: X-Large
C-5.6.4 Specialized Container Fabrication Support
Total C-5.6 Packaging Hours
Total C-5.6 Packaging FTEs
J2 Requirements
C1.5.1N MPC Bahrain
C1.7N Guard Forces

C-6.6 Mandatory Reports/Other Administrative Duties

Total C-1 through C-6 & J2 Productive Hours
Total C-1 through C-6 & J2 FTEs