J.34,_DDNB_Proposed_Productive_Hours_2-27-17.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- DLA Distribution Bahrain, Southwest Asia Contractor Owned Contractor Operated (COCO) Distribution Center
- Solicitation number
- SP330017R5010
- Issued by
-
Defense Logistics Agency Distribution
About this file
J.34, DDNB Proposed Productive Hours 2-27-17
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Proposed Productive Labor Hours | ||||||||||||||
| Instructions: See Section L of the RFP. *Note - The standard mearsurement of time to be used for the Standard Times in Column D shall be number of hours e.g. 5 minutes =.0833 hours. All figures shall be rounded to the tenthousandths decimal place. | ||||||||||||||
| Offerors may add rows to this document to account for tasks to be performed by more than one specific labor category. | ||||||||||||||
| PWS Paragraph | Proposed Labor Category | Specific Activity and Labor Category Responsibilities | Time Standard | Y1 3mo Transition | Y1 Workload (9mo) | Y1 (9M0) Hours | Y2 Workload | Y2 Hours | Y3 Workload | Y3 Hours | Y4 Workload | Y4 Hours | Y5 Workload | Y5 Hours |
| C-1.3.1 Key Personnel | ||||||||||||||
| C-1.3.1 Key Personnel: Site Manager (Bahrain) | ||||||||||||||
| C-1.3.1 Key Personnel: Alternate Site Manager (Bahrain) | ||||||||||||||
| C-1.3.1 Key Personnel: Quality Control Specialist | ||||||||||||||
| C-1.3.1 Key Personnel: Supply Systems Analyst | ||||||||||||||
| C-1.3.1 Key Personnel: Transportation Manager | ||||||||||||||
| C-1.3.1 Key Personnel: Safety and Occupational Health (SOH) Representative | ||||||||||||||
| C-1.3.1 Key Personnel:Inventory Manager | ||||||||||||||
| C-1.3.1 Key Personnel:Security Manager |
C-1.3.1 Key Personnel: Site Manager (Oman)
| C-1.8 Transition Plan |
| Transition Team/SMEs (not to include Key Personnel) |
| C-4.6 Training |
| SMEs (not to include Key Personnel) |
| Section C-5 Specific Tasks |
| *Offerors shall factor in the processes described in C-5.2.5.1 through C-5.2.5.13, Additional Receiving Requirements, in their prpoposed time standards for the Non-Procurement and New Procurement receiving tasks listed below in section C-5.2* |
| Section C-5.2 Receiving |
| C-5.2.1 In-Bound Traffic Management* |
| C-5.2.2 Off-Load and Tally: Weight Band 1 |
| C-5.2.2 Off-Load and Tally: Weight Band 2 |
| C-5.2.2 Off-Load and Tally: Weight Band 3 |
| C-5.2.2 Off-Load and Tally: Weight Band 4 |
| C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (Customer Returns): Weight Band 1 |
| C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (Customer Returns): Weight Band 2 |
| C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (Customer Returns): Weight Band 3 |
| C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (Customer Returns): Weight Band 4 |
| C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (STOs/RDOs): Weight Band 1 |
| C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (STOs/RDOs): Weight Band 2 |
| C-5.2.3/C-5.2.4.2 Non-Procurement Receipts (STOs/RDOs): Weight Band 3 |
| C-5.2.3 /C-5.2.4.2 Non-Procurement Receipts (STOs/RDOs): Weight Band 4 |
| C-5.2.3/C-5.2.4.3 New Procurement (NP): Weight Band 1 |
| C-5.2.3/C-5.2.4.3 New Procurement (NP): Weight Band 2 |
| C-5.2.3/C-5.2.4.3 New Procurement (NP): Weight Band 3 |
| C-5.2.3/C-5.2.4.3 New Procurement (NP): Weight Band 4 |
| Total C-5.2 Receiving Hours |
| Total C-5.2 Receiving FTEs |
| *Offerors shall factor in the processes described in C-5.3.4, Additional Storage Requirements, and in C-5.3.9, Additional Issue Requirements, in their prpoposed time standards for tasks listed below for section C-5.3* |
| Section C-5.3 Warehousing |
| C-5.3.1 Stow of Receipts: Weight Band 1 |
| C-5.3.1 Stow of Receipts: Weight Band 2 |
| C-5.3.1 Stow of Receipts: Weight Band 3 |
| C-5.3.1 Stow of Receipts: Weight Band 4 |
| C-5.3.3 Visual Inspections |
| C-5.3.3 Cyclic Inspections |
| C-5.3.3.1 Special Inspections |
| C-5.3.7 Rewarehousing: Weight Band 1 |
| C-5.3.7 Rewarehousing: Weight Band 2 |
| C-5.3.7 Rewarehousing: Weight Band 3 |
| C-5.3.7 Rewarehousing: Weight Band 4 |
| C-5.3.5 Autocad Planographs/DSS Location Identification/Storage Space Management Report* |
| C-5.3.8 Issue of Material (On-base): Weight Band 1 |
| C-5.3.8 Issue of Material (On-Base): Weight Band 2 |
| C-5.3.8 Issue of Material (On-Base): Weight Band 3 |
| C-5.3.8 Issue of Material (On-Base): Weight Band 4 |
| C-5.3.8 Issue of Material (Off-Base): Weight Band 1 |
| C-5.3.8 Issue of Material (Off-Base): Weight Band 2 |
| C-5.3.8 Issue of Material (Off-Base): Weight Band 3 |
| C-5.3.8 Issue of Material (Off-Base): Weight Band 4 |
| C-5.3.8 Issue of Material (Transshipments On-Base): Weight Band 1 |
| C-5.3.8 Issue of Material (Transshipments On-Base): Weight Band 2 |
| C-5.3.8 Issue of Material (Transshipments On-Base): Weight Band 3 |
| C-5.3.8 Issue of Material (Transshipments On-Base): Weight Band 4 |
| C-5.3.8 Issue of Material (Transshipments Off-Base): Weight Band 1 |
| C-5.3.8 Issue of Material (Transshipments Off-Base): Weight Band 2 |
| C-5.3.8 Issue of Material (Transshipments Off-Base): Weight Band 3 |
| C-5.3.8 Issue of Material (Transshipments Off-Base): Weight Band 4 |
| C-5.3.8 Issue of Material (DROs): Weight Band 1 |
| C-5.3.8 Issue of Material (DROs): Weight Band 2 |
| C-5.3.8 Issue of Material (DROs): Weight Band 3 |
| C-5.3.8 Issue of Material (DROs): Weight Band 4 |
| C-5.3.8 Rewarehousing Picks |
| C-5.3.12 Shipment Preparation: Weight Band 1 |
| C-5.3.12 Shipment Preparation: Weight Band 2 |
| C-5.3.12 Shipment Preparation: Weight Band 3 |
| C-5.3.12 Shipment Preparation: Weight Band 4 |
| Total C-5.3 Warehousing Hours |
| Total C-5.3 Warehousing FTEs |
| Section C-5.4 Physical Inventory Control |
| C-5.4 Physical Inventory (1st & 2nd Counts) |
| C-5.4 3rd Count |
| C-5.4.1 Physical Inventory Control (F2B 1st Counts) |
| C-5.4.1 Physical Inventory Control (F2B 2nd Counts) |
| C-5.4.1 Physical Inventory Control (F2B TPIC M) |
| C-5.4.1 Physical Inventory Control (F2B 3rd Counts) |
| C-5.4.1 Physical Inventory Control (F2B Causative Research) |
| C-5.4.1.2 Causative Research |
| C-5.4.4 Location Surveys |
| Total C-5.4 Physical Inventory Control Hours |
| Total C-5.4 Physical Inventory Control FTEs |
| Section C-5.5 Transportation |
| C-5.5.2 Freight Terminal/Ship: Weight Band 3 |
| C-5.5.2 Freight Terminal/Ship: Weight Band 4 |
| Total C-5.5 Transportation Hours |
| Total C-5.5 Transportation FTEs |
| Section C-5.6 Packaging |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): X-Small |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM):Small |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): Medium |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): Large |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): X-Large |
| C-5.6.1 Preservation, Packaging, Packing and Marking (PPPM): XX-Large |
| C-5.6 Remarks |
| C-5.6.3 Container Fabrication Support: Small |
| C-5.6.3 Container Fabrication Support: Medium |
| C-5.6.3 Container Fabrication Support: Large |
| C-5.6.3 Container Fabrication Support: X-Large |
| C-5.6.4 Specialized Container Fabrication Support |
| Total C-5.6 Packaging Hours |
| Total C-5.6 Packaging FTEs |
| J2 Requirements |
| C1.5.1N MPC Bahrain |
| C1.7N Guard Forces |
C-6.6 Mandatory Reports/Other Administrative Duties
| Total C-1 through C-6 & J2 Productive Hours |
| Total C-1 through C-6 & J2 FTEs |
File details come from the government source that posted it. Updated .