SP330015R5009_Attachment_J.2_CDRL_A005_Attachment_3_QC_Summary_for_Controls_(3-25-15).xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Distribution Labor Support Services for DLA Distribution
Solicitation number
SP3300-15-R-5009
Issued by

About this file

Attachment J.2_CDRL A005_Attachment 3 QC Summary for Controls

View the file

Other files

File Type Posted
SP330015R5009_Sections_B-M_Conformed_thru_Amdt_0004.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A018_for_CFE_Reporting_(Labor)_Conformed_thru_Amdt_0004.pdf PDF
SP330015R5009_Attachment_J.16_Key_Personnel_TO_PWS_Conformed_thru_Amdt_0004.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A016_WPM_Report_Conformed_thru_Amdt_0004.pdf PDF
SP330015R5009_Attachment_J.2_CDRL_A001_for_Phase_In_Plan_(Labor)_Conformed_thru_Amdt_0004.pdf PDF
Amendment_0004_SP330015R5009.pdf PDF
SP330015R5009_Attachment_J.2_CDRL_A012_for_SSMR_(Labor)_Conformed_thru_Amdt_0004.pdf PDF
SP330015R5009_Attachment_J.17_Sample_TO_PWS_Conformed_thru_Amdt_0004.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A004_for_Equipment_Maintenance_Plan_(Labor)_Conformed_thru_Amdt_0004.pdf PDF
SP330015R5009_Attachment_J.1_PWS_9.2.15_Conformed_thru_Amdt_0004.docx DOCX document
Amendment_0003_SP330015R5009.pdf PDF
SP330015R5009_Attachment_J.1_PWS_8.27.15_Conformed_thru_Amendment_0003.docx DOCX document
SP330015R5009_Sections_B-M_Conformed_thru_Amdt_0003.docx DOCX document
SP330015R5009_Attachment_J.11_TE5.0_Conformed_thru_Amdt_0002.docx DOCX document
SP330015R5009_Attachment_J.8_TE3.2_Conformed_thru_Amdt_0002.docx DOCX document
Amendment_0002_SP330015R5009.pdf PDF
SP330015R5009_Sections_B-M_Conformed_thru_Amdt_0002.docx DOCX document
Distribution_Labor_Pre-Proposal_Briefing_Slides_8.19.15.pdf PDF
Pre-Proposal_Conf_Attendee_List_-_SP3300-15-R-5009.pdf PDF
Amend_0001_SP330015R5009.pdf PDF
SP330015R5009_PreProposal_Conference_Instructions_DLS.docx DOCX document
SP330015R5009_Attachment_J.16_Key_Personnel_TO_PWS.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A016_WPM_Report.pdf PDF
SP330015R5009_Attachment_J.2_CDRL_A014_Page_2.rtf RTF text file
SP330015R5009_Attachment_J.9_TE3.3.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A005_Attachment_2.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A020_for_Material_Support_CLIN.pdf PDF
SP330015R5009_Attachment_J.14_TE6.1.docx DOCX document
SP330015R5009_Attachment_J.4_PPQ.docx DOCX document
SP330015R5009_Attachment_J.12_TE5.4.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A009_for_Open_MROs_(Labor).pdf PDF
SP330015R5009_Attachment_J.10_TE4.1.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A004_for_Equipment_Maintenance_Plan_(Labor).pdf PDF
SP330015R5009_Attachment_J.2_CDRL_A008__for_Contractor_Provided_Equipment__Report_(Labor).pdf PDF
SP330015R5009_Attachment_J.2_CDRL_A002_for_SOH_Plan_and_Reporting(Labor).pdf PDF
SP330015R5009_Attachment_J.2_CDRL_A003_for_ESD_Plan(Labor).pdf PDF
SP330015R5009_Attachment_J.17_Sample_TO_PWS.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A005_for_QC_Plan_(Labor).pdf PDF
SP330015R5009_Attachment_J.2_CDRL_A001_for_Phase_In_Plan_(Labor).pdf PDF
SP330015R5009_Attachment_J.6_TE1.2.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A012_for_SSMR_(Labor).pdf PDF
SP330015R5009_Attachment_J.2_CDRL_A013_for_Restricted_Country_(Labor).pdf PDF
SP330015R5009_Attachment_J.13_TE5.5.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A017_for_CAC_Procedures_(Labor).pdf PDF
SP330015R5009_Attachment_J.1_PWS_7.22.15.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A010_for_GOCARE_(Labor).pdf PDF
SP330015R5009_Attachment_J.2_CDRL_A005_Page_2.docx DOCX document
SP330015R5009_Attachment_J.7_TE2.1.docx DOCX document
SP330015R5009_Sections_B-M_7.28.15.docx DOCX document
SP330015R5009_Attachment_J.2_CDRL_A006_for_Customer_Service_Support_Procedures_(Labor).pdf PDF
Show 40 more

Latest 50 of 65 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QC Plan Info - Dist Sites Test Plan - Distribution Sites

PCMProcessControl NameControl NumberDescriptionType Preventative (P) / Detective (D)Type Manual (M) / Automated (A)OrgNumber of Samples per QuarterKey or Non-Key
Distribution ProcessessWarehousingPickNon-KeyThe Distribution Worker locates and physically removes materiel from the storage location to perform the verification and validation. The Distribution Worker verifies and validates the pick ticket against the materiel by visually verifying the location, NSN, nomenclature, exception data, quantity, unit of issue and condition code. When applicable, the shelf life code and expiration date are also verified and validated. Note: Manufactured packed materiel is not required to be opened for quantity verification.PMDistribution Center45Key
Distribution ProcessessWarehousingPack6 KeyThe Distribution Worker completes a mandatory verification and validation of all materiel in the distribution pack process. This includes the verification of the National Stock Number (NSN), quantity, unit of issue, and condition code against the pack/close screen (BN2H) in DSS. When other pack screens are used such as Single Line Pack (BN2K), Split Pick Into Multiple Packs (B2BE), Consolidations Split Into Multiple Shipment Units (B2BG) and Build Pack Chain (BN1A), all materiel is verified against the pick ticket and the 1348-1A. Note: This Key Control (Key Control 12) does not apply to materiel that is “pick to pack” eligible.PMDistribution Center45Key
Distribution ProcessessWarehousingStow3 KeyPrior to the physical stow of materiel, the Distribution Worker verifies and validates the Putaway Label against the materiel by visually verifying the Putaway Control Number (PCN), National Stock Number (NSN), location, location data (status), quantity, shelf life code, expiration date, unit of issue, type storage code (TSC), and the visual appearance of the materiel condition.DMDistribution Center45Key
Distribution ProcessessReceivingPMR1 KeyThe Distribution Worker selects the correct Pre-Positioned Materiel Receipt (PMR) transaction (if available) in DSS by verifying the NSN and Document/Contract Number on the receiving documents (i.e.; DD Form 1348-1A). If a PMR is not available, the Distribution Worker verifies the Materiel Owner by utilizing a valid Owner RIC on the receiving documentation. If the Owner RIC is not available on the receiving document, the Distribution Worker will use the Service associated with the Shipper’s DoDAAC or the Service associated with the first letter of the Document Number on the receiving documentation. If receiving documentation is not available to determine the owner, the Distribution Worker assigns ownership to the Distribution Site's co-located Military Service RIC, utilizes WebFLIS to determine the source of Supply/Manager, or checks the NSN within DSS for any on-hand balances. If no owner determination can be made, as a last resort the Distribution Worker assigns the materiel to SMS owner. For all materiel received in without PMR, the Distribution Worker submits an informational SDR. If the materiel has no PMR and no/incomplete receiving documents, the Distribution Worker submits an SDR, resulting in suspension of the materiel within DSS and requires resolution from the Supply Center/Military Service.PMDistribution Center45Key
Distribution ProcessessReceivingKCC2 KeyThe Distribution Worker performs a KCC inspection of the materiel by validating the part number, physically counting the materiel, and visually inspecting the materiel for any damage or defects. The materiel quantity received is reconciled with the receiving document(s) which may include the Shipping Invoice, Packing List, DD Form 250 (Materiel Inspection and Receiving Report), DD Form 1348-1 (Issue Release/Receipt Document) or DD Form 1155 (Orders for Supplies or Services). The Distribution Worker enters the quantity received and Condition Code of the materiel using DSS screen RI92 (new procurement) or RI95 (customer return) to induct the materiel. The Distribution Worker signs the receiving document(s) as evidence of the reconciliation performed. The DSS receipt record also includes the user ID of the worker who receipted the materiel along with a date and time stampPMDistribution Center45Key
ReceivingReceivingDim & WeighNon-KeyAs part of the induction process, the Materiel Examiner and Identifier/Distribution Worker performs a measurement to ensure the dimensions of the received inventory match the information in DSS.DMDistribution Center45Key
Distribution ProcessessPhysical InventoryCAV9 KeyAll inventory adjustments that did not meet the threshold levels for causative research on the P-118 Table and did not require an IAV are listed in the CAV report. When an adjustment occurs, an Inventory Adjustment Voucher (IAV) for condition 4-7 or an entry on the Consolidated Adjustment Voucher (CAV) for condition 1-4 is created. Exclusive to condition 4, an IAV or an entry on the CAV is created based on the MILSTRAP condition of discrepancy sample methodology. Any adjustment that meets the criteria for a mandatory IAV will not appear on the CAV. On a monthly basis the Accountable Officer reviews the CAV report for any items that may warrant additional research such as offsetting gains and losses, suspicious items, and/or recurring trends. Based on this review, the AO either approves the adjustments within DSS or reclassifies as IAVs which will result in Causative Research.DMDistribution Center3Key
Distribution ProcessessPhysical InventoryIAV Package10 KeyOn a recurring basis, the Inventory Office (IO) performs causative research on inventory adjustments identified for further review in accordance with MILSTRAP Chapter 7 using the Inventory Adjustment Voucher (IAV) generated automatically within DSS. The purpose of causative research is to determine the cause of the adjustment and correct any deficiencies identified. The research is a complete review of all transactions (to include supporting source documentation, catalog change actions and shipment discrepancy files to be completed within 45 days from the date of the original adjustment. Upon completion of the research, the IO prepares and submits a package for review and approval to a designated authority based on the extended dollar value of the adjustment. The Causative Research Package includes the completed IAV and supporting DSS documentation (location transaction histories, issues, receipts, etc.) and may result in an adjustment reversal and, when warranted, reversal of other erroneous transactions that lead to the out of balance condition. The package is reviewed by the designated approval authority based on the adjustment amount. If the package cannot be approved, it will be returned to the preparer to provide additional information or conduct further research. The Causative Research Package is not closed out until it is approved.DMDistribution Center45Key
Distribution ProcessessPhysical InventoryIAV Review and Completion11 KeyThe Reviewing Authority is required to determine all adjustments have been reviewed for completeness and timeliness by reviewing on a monthly basis that all Causative Research packages are completed within 45 days.DMDistribution Center45Key

This Page is for Information Only

QC Summary Results - Dist Sites Summary Test Results for Internal Controls that have a Direct Impact on the Financial Record Distribution Sites

(Results for ____________________ Distribution Center)
PCMProcessControl NameControl NumberMimumumNumber of Samples RequiredNumber of Samples TestedNumber PassedNumber FailedDeficiency Summary
P_P2S_7 Distribution ProcessesMRO/WarehousingPickNon-Key45
P_P2S_7 Distribution ProcessesMRO/WarehousingPackNon-Key45
P_P2S_7 Distribution ProcessesMRO/WarehousingStowNon-Key45
P_P2S_7 Distribution ProcessesReceivingPMR1 Key45
P_P2S_7 Distribution ProcessesReceivingKCC2 Key45
P_P2S_7 Distribution ProcessesReceivingDim & WeighNon-Key45
Physical InventoryInventory Adjustment Voucher (IAV)IAV Package10 Key45
Physical InventoryInventory Adjustment Voucher (IAV)IAV Review and Completion11 Key45
Attachment 3 CDRL 0005

File details come from the government source that posted it. Updated .