Department of the Air Force
Eielson AFB Microreactor Pilot Pre-Proposal Conference
12 October 2022
Welcome & Kickoff
Ms. Ashley Sadorra, CTR Office of Deputy Assistant Secretary of the Air Force for Environment, Safety and Infrastructure (SAF/IEE Energy)
Agenda 0900-0930 Registration Opens
Attendees process through base security and travel to Eielson AFB (Yukon Club)
0930-0935 Welcome & Kickoff, Administration Ms. Judith Willis, Office of Deputy Assistant Secretary of the Air Force for Environment, Safety and Infrastructure (SAF/IEE Energy) (5 mins)
0935-1005 Eielson AFB Microreactor Pilot Overview Ms. Nancy Balkus, Deputy Assistant Secretary of the Air Force for Environment, Safety and Infrastructure (SAF/IEE) - Opening Remarks (5 mins)
Col Tony Alvarado, 354 MSG/CC - Mission Brief (15 mins)
Lt Col Christopher Higgins & Ms. Alexa Greene, 354 CES - Siting & Environmental Brief (10 mins)
1005-1115 RFP Scope of Work & Land Lease Focused Presentation Ms. Charlene Woods, DLA Energy - RFP Scope (45 mins)
Mr. Tom Brown, Air Force Civil Engineer Center, Installations Directorate (AFCEC/CID) - Real Estate Brief (10 mins)
Mr. David Mairs, Air Force Civil Engineer Center, Installations Directorate (AFCEC/CIU) - Lease Brief (10 mins)
Agenda 1115-1230 General Questions from the Audience & Networking Opportunity
Questions to be Recorded Ms. Charlene Woods, DLA Energy
1230-1400 Lunch Break
1400-1600 Coal Plant Overview & Site Visit Bus Tour of available land lease sites, power control center (operations room), & coal plant Guide: Lt Col Christopher Higgins, 354 CES/CC
1600-1615 Break (Yukon Club)
1615-1655 Open Forum for Questions Questions to be Recorded Ms. Charlene Woods, DLA Energy; Ms. Judith Willis, SAF/IEE Energy; Mr. David Mairs, AFCEC/CIU;
Ms. Leslie Brown, SAF/GCN; & Lt Col Christopher Higgins, 354 CES/CC
1655-1700 Closing Remarks & Conference Conclusion Ms. Nancy Balkus, SAF/IEE
Speaker Introductions:
Ms. Nancy Balkus
Deputy Assistant Secretary of the Air Force for Environment, Safety and Infrastructure (SAF/IEE)
Speaker Introductions:
Col Tony Alvarado
354 MSG/CC
Speaker Introductions:
Lt Col Christopher Higgins & Ms. Alexa
Greene
354 CES
Speaker Introductions:
Ms. Charlene Woods
DLA Energy
Speaker Introductions:
Mr. Tom Brown
Air Force Civil Engineer Center, Installations Directorate (AFCEC/CID)
Speaker Introductions:
Mr. David Mairs
Air Force Civil Engineer Center, Installations Directorate (AFCEC/CIU)
Eielson AFB Microreactor Pilot Overview
Opening Remarks
Ms. Nancy Balkus Deputy Assistant Secretary of the Air
Force for Environment, Safety and Infrastructure
•P r e p a r e - D e p l o y - E n a b l e•UNCLASSIFIED//FOU O
354 FW Mission Brief Valor in Combat
Why Are We Here?
Brig Gen Billy Mitchell, 1935
2022 National Defense Strategy
“The Department will act urgently to sustain and strengthen deterrence, with the People’s Republic of China (PRC) as our most consequential strategic competitor and the pacing challenge for the Department”
DEFENSE OBJECTIVES
- Defending the homeland
- Deterring strategic attacks
- Deterring aggression, prioritizing the PRC challenge in the Indo-Pacific
- Building a resilient Joint Force and defense ecosystem
2020 USAF Arctic Strategy
“Russia is an Arctic nation…China is not an Arctic nation.
“As strategic as the Arctic is to power projection, it is equally critical to deterrence and U.S. defense.”
14,500’ Runway
Ramp Space for 160+ Fighter Aircraft 40+ Heavy Aircraft
Or Bombers
~ 200 Billeting & Temp Dorm Rooms
48M Gallon JP-8 Storage Capacity
Joint Mobility Center
Enhance. A Closer Look at our Infrastructure
Central Heating & Power Plant
Family Members: 2,700 Civilians / Contractors: 500 Alaska Air National Guard: 775
Active Duty: 3,151 Family Members: 6,479 Civilians & Contractors 3,426 Tenant Units 77 Retirees 2,391 Yearly Economic impact: $1.2B
Who We Are – Our Team and Demographics
CAO 25 May 2022
Our Partners on Eielson
168th Wing
Det 460 Air Force Technical Applications Center
(AFTAC)
66th Training Squadron
210th Rescue Squadron
354th Fighter Wing Mission
Mission
• The 354th FW provides USINDOPACOM combat-ready fifth-generation airpower, advanced airpower integration training, and strategic arctic airpower basing.
Vision
• The world’s premier fighter wing—ready to compete, deter, and win the high-end fight with a diverse, ready, innovative, and lethal force!
Deploy, Train, Project
354th Fighter Wing LOEs
Deploy
Deploy Lethal Fifth Generation Combat Airpower
Train
Train Advanced Airpower Operations
Project Project Strategic Airpower
Deploy, Train, Project
Deliver F-35 Combat Capability
Eielson Aircraft: 2020 to 2022
Train and Integrate Advanced Operations
JPARC Interior= 101,705,728 acres (120,000 sqNM)
NTTR = 12,000 sqNM
Valiant Shield
Train and Integrate Advanced Operations
Cope North Red Flag Alaska
Project Strategic Airpower
Heritage of Eielson & Pioneers Before Us
Valor in Combat!
•I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Siting & Environmental Mrs. Alexa Greene, 354 CES
12 October 2022
Overall Potential Site Area
Site Conditions
Wetlands:
Much of the open area behind the cooling pond and tank farms are wetlands and/or within the
100-yr floodplain.
Contamination:
PFAS plume exists from the outer edge of the tank farm to the west/northwest in groundwater.
Recently, EPA just issued updated draft LHA values for PFOA and PFOS, which lowers it down to a nearly non-detect level.
If siting is selected down in the main industrial areas, work plans and saps will be required as there are multiple overlying contaminated sites in most of the green regions. Consider innovative construction and building up versus out in this area.
Green regions to the east end of the flightline are less likely to be impacted by contamination in groundwater and soil. If the site is selected in this region, we will need to verify that the plume hasn't changed for PFAS in this direction.
Part of the green region going north towards Quarry hill may be viable as there is limited contamination in this zone (most of it is near the explosive quantity distance arc).
Other:
The area around the schools and the power plant frequently have intense fogging in the winter due to the moisture in the emissions from the power plant
RFP Scope of Work & Land Lease Focused Presentation
WARFIGHTER ALWAYS
The Nation’s Combat Logistics Support Agency E s t a b l i s h e d 1 9 6 1
•DEFENSE LOGISTICS AGENCY
•DLA
DLA Energy Installation Energy Eielson AFB Pre-
Proposal Conference Small Micro-Reactor
(SMR)
Charlene Woods
Contract Specialist October 12, 2022
WARFIGHTER ALWAYSWARFIGHTER ALWAYS 35Source: N/A As of Civilian Date: September 27, 2022
Agenda
• Who we are and our mission
• DLA Energy Installation Energy contract programs
• SMR General requirements
• Request for Proposal overview
• Milestones
• Points of Contact
WARFIGHTER ALWAYSWARFIGHTER ALWAYS
DLA Energy Overview
• Mission: To enable mission readiness by providing globally resilient energy solutions to the Warfighter and Whole of Government
• Vision: The trusted leader in innovative energy solutions aligned with the speed of change.
36Source: N/A
Installation Energy
• Actively administering over $5.0 billion in natural gas, electricity, coal, large scale renewable energy and Energy Savings Performance Contracts for over 200 customers (DoD and Federal Civilian)
• Major focus areas include:
– Execution of resilient energy and energy conservation requirements utilizing power purchase agreements, ESPCs and UESCs
– Execution of agreements for implementation of electricity demand response at federal facilities
– Transitioning portfolio to carbon pollution-free electricity (CFE)
37Source: N/A
SMR General Requirements
• Fixed-site micro-reactor to deliver 1-5MW of power for no less than 2 years without refueling
• Be licensed by NRC prior to operation
• Operate in subarctic climate at AF installation in Alaska. Meet all
Federal and State environmental laws and regulations
• Contract period: up to 30 years
• Interconnect with existing infrastructure
• Meet NIST, DoD and other cybersecurity standards
38Source: N/A
Request for Proposal
• Resilient Energy Supply Agreement for the provisioning, production, purchase and delivery of electricity and steam generated by an on-site Small Modular Reactor at Eielson AFB
– Contractor procures/finances/installs/owns/operates/maintains the energy production facility
– Government purchases electricity and steam at fixed price per kWh/per Mlbs.
– 20-year generation/purchase term; seven (7) year construction period and three (3) year demolition period
– Use of property conveyed via separate real estate agreement
39Source: N/A
• Government estimates the project size: 5 MW
40Source: N/A
• Includes Interconnection Discussions with Golden Valley Electric Association
• Requirements for construction will adhere to Code of Federal Regulations, Title 10-Energy for nuclear development
• Developer will work with NRC on NEPA, licensing and testing for operating permit.
– Will be included in executed contract
• Energy security and resilience included
• General Terms and Conditions outlined within the RFP
– Contractor-specific T&Cs can be submitted with the proposal for government’s review and consideration
• Only the Contracting Officer can affect changes
41Source: N/A
• The proposed evaluation factors are:
– Factor 1: Technical Approach
– Factor 2: Technical Risk
– Factor 3: Past Performance
– Factor 4: Price
• Non-price evaluation factors are listed in descending order of importance. When combined, the non-price evaluation factors are approximately equal in importance as price.
42Source: N/A
• Providers shall prepare the proposal according to the titles and page limits of each volume described below:
• Offeror shall prepare and submit one hard copy of Volumes I through IV of its proposal in separate three-ring binders and an electronic version.
– Price proposal files shall be submitted in PDF format & text searchable
• All amendments must be signed and returned.
43Source: N/A
Milestones
• RFP issuance: September 26, 2022
• Pre-proposal conference: October 12, 2022
• Cut-off for RFP questions: November 15, 2022
• RFP closing: November 29, 2022, 14:00 EST
• Any proposal received after this time is considered late and will not be accepted.
• Issue Notice of Intent of Award: est. June 2023
44Source: N/A
Points of Contact
• DLA Energy Installation Energy, Fort Belvoir, VA
• Andrea Kincaid, 571.363.8231, andrea.kincaid@dla.mil
• Charlene Woods, 571.767.8583, charlene.woods@dla.mil
45Source: N/A
WARFIGHTER ALWAYSWARFIGHTER ALWAYS 46
Real Estate Brief
Mr. Tom Brown Air Force Civil Engineer Center, Installations Directorate (AFCEC/CID)
Air Force Civil Engineer Center
Battle Ready… Built R ight!
Dave Mairs
AFCEC/CIUE
13 Oct 22
Nuclear Microreactor Energy Assurance
Lease Opportunity at Eielson AFB, AK
Your Success is Our Mission!
Purpose
To provide information about the Air Force Enhanced Use Lease and Energy Assurance Lease (EAL) program
Overview
■ EUL/EAL Program Goal / Objectives
■ What is an EUL/EAL
■ AF EUL/EAL Program
■ Benefits and Successes
■ EUL/EAL Solicitation
■ Qualified Lessee Selection
■ Keys to Success
■ Summary
What is an EUL/EAL?
An EUL/EAL is a lease agreement between the Air Force (AF) and a third-party for the development of non-excess, underutilized AF-managed land located at an AF installation; leased installation property must be Federally-owned Lessee is responsible for project utilities, infrastructure and services and may be taxed by state and local governments Developer (lessee) is responsible for design, construction, maintenance and operation of improvements to the leased property DAF receives cash rent payments and In-kind consideration (IKC) in return for right to develop leased property (greater than appraised Fair Market Value)
Energy Assurance Leases (EALs) are executed under the EUL program
AF EUL/EAL Program Goal of AF EUL Program: Monetize non-excess
AF real estate where and when it makes sense Maximize benefit/return to AF Compatibility with AF mission required Long-term project viability – must be self-sustaining from an operations and maintenance stand point.
Identifies and develops real property value-based transactions (VBTs), EULs and EALs and manages the portfolio
Provides long-term oversight to ensure both the AF and Lessee comply with statutory requirements of 10 USC § 2667 and lease documents
Goal of AF EALs: to provide installations with energy security and resiliency ensuring a reliable source of power during emergencies and power outages
15 active EULs & EALs (signed leases)
Total value received:
$110.2M (cash & IKC)
$180.3M estimated total Net Present Value (NPV)
5 EALs and 1 Energy-EUL in project development EALs provide energy resiliency to an installation (first right to power during emergencies or power outages)
Commercial and/or Private Partnership Required!
Benefits Air Force
■ EULs - Consideration (cash rent) can be used to recapitalize AF facilities and infrastructure while supporting AF initiatives
■ Can reduce installation operating costs
■ EALs - AF receives energy resiliency or other energy related benefits
■ EULs and EALs - Facilitate community collaboration and relations
Developer
■ Financially beneficial business deal
■ Potential tax incentives and proximity to utilities
■ Ensures a single and stable Lessee and ensures project site security with installation security
■ Generates and sells power to the Air Force
■ Local Community and State
■ Supports base, local, and State economic development; increases tax base (EULs and EALs) and generates jobs
Successes Commercial EUL projects in the AF portfolio
Hotels Business Parks Sports Complex Solar photovoltaic solar arrays Waste Reclamation Facilities Mixed-use commercial development
IKC received by AF installations Fitness Center - Nellis AFB, NV Security Gate - Hill AFB, UT Security Forces Bldg - Hill AFB, UT Fire Fighting Training Facility - Eglin AFB, FL Joint use airport - Eglin AFB, FL Sustainment, repair and maintenance (SRM) projects – multiple bases Energy Resiliency (first right to power in emergencies and power outages) - Tyndall
AFB, FL
Summary Goal of AF EUL and EAL Program:
EULs: Monetize non-excess AF real estate where and when it makes sense
EALs: Energy resiliency via first right to back up power during emergencies or power outages and/or other energy-related benefits
Projects involve the lease of Government-owned and AF-managed real estate to a private developer or utility company for commercial development in return for energy resiliency
Contact Information
EUL Program Contacts:
■ Mr. Dave Mairs, Program Manager EUL Execution Branch, Real Estate Development Division Air Force Civil Engineer Center (AFCEC/CIUE) Email: david.mairs@us.af.mil Telephone: 361-290-3400
■ Ms. Julia Cantrell Chief, EUL Execution Branch, Real Estate Development Division Air Force Civil Engineer Center (AFCEC/CIUE) Email: julia.cantrell@us.af.mil Telephone: 210-322-4699 mailto:julia.cantrell@us.af.mil
Your Success is Our M ission!
Questions & Networking
Ms. Charlene Woods
Lunch Break 1230-1400
Coal Plant Overview
Eielson AFB’s Central Heat & Power Plant
Process Overview
400#; 650 degree steam
100#; 450 degree steam
GVEA
10 MW (1988)
5 MW (1969)
5 MW (1956)
2.5 MW (1952)
2.5 MW (1952)
Boiler #6
Boiler #5
Boiler #3
Boiler #1
Boiler #2
Boiler #4
Operations (1 Supv) (5 Person Ops Crew 24/7)
Boiler Side 3 Positions Required by AFI 36-1068
- 1 – WG-10 Boiler Operator
- 1 – WG-08 Boiler Ops Asst
- 1 – WG-05 Ash Puller
TG Side
- 1 – WG-10 Power Cont
Supervision
- 1 – WS-09 Shift Supv
150,000 SqFt Facility
- 17 Out Bldgs/Structures
- 100ft Basement to Roof of main bldg (Supv & Asst are eyes/ears for entire area inside fence line)
Eielson AFB’s Central Heat & Power Plant
Maintenance (1 Supv)
- 6 Boiler Mechs (1 WL)
- 3 Pipefitters
- 5 Controls Techs (1 WL)
- 2 Materials Expediters
- 1 Welder
- 1 Electrician
95+% of facility/equipment maintenance done in-house
Coal and Rail (1 Supv)
- 8 Coal and Rail Ops (1 WL)
- 2 Locomotive Engineers
- 1 Locomotive Mech
3 Locomotives 12 Miles of track 24 Switches 18 Crossings
Plant Layout - Staffing
Plant Growth
Top Row
-New Boiler Ammonia Injection -New Boiler Sorbent Injection -New Boiler Chemical Processing -Plant Electrical Distribution Switchgear
Bottom Row
-Continuous Emissions Monitoring System
-Updated Plant Controls Network
Central Heat & Power Plant Workforce Overview
Current Workforce (Funded)
Operations = 26 Positions
- 5 person ops crews for 24/7 plant operations X 5 (WG-05 OT fills 5th crew)
- 1 Water Treatment/Lab Tech (WG-08)
- 1 Operations Supervisor
Coal & Rail = 12 Positions
- 8 Coal and Rail Ops (1 WL)
- 2 Locomotive Engineers
- 1 Locomotive Mech
- 1 Coal & Rail Supervisor
Maintenance = 19 Positions
- 6 Boiler Mechs (1 WL)
- 3 Pipefitters
- 5 Controls Techs (1 WL)
- 2 Materials Expediters
- 1 Welder
- 1 Electrician
- 1 Maintenance Supervisor
Operations: 24/7 Staffing; performs all boiler ops, turbine ops, water/condensate, and ash pulling operations.
Unfunded = 5 WG-08 Boiler Ops Asst and 1 WG-05 Boiler Ops Helper
Coal & Rail: Perform all coal operations to include coal purchasing, reception, processing, and ash removal. Performs all locomotive and rail operations, inspections, and preventative maintenance.
Unfunded = 1 WG-11 Locomotive Mech, 1 WL-08 Work Lead and 5 WG-08 Coal and Rail Ops
Maintenance: Keep a 67 year old plant running smoothly! Mix of old mechanical systems and modern tech heavy systems.
Unfunded = 2 WG-11 Controls Techs, 2 WG-11 Electricians, 3 WG-10 Boiler Mechs and 1 WG-10 Pipefitter
Current Shortfall
Full fill of 6 person Ops Crews 5 WG-08 and 1 WG-05
Provides for safe and efficient ops of a plant that’s changed significantly.
New Total: 32 Funded Positions
Full fill of Coal & Rail Positions 1 WG-11, 1 WL-08 and 5 WG-08
Increased plant demand from mission growth = more coal and a night shift to meet boiler requirements.
New Total: 19 Funded Positions
Partial increase 1 WG-11 Control Tech, 1 WG-11 Electrician and 2 WG-10 Boiler Mechs
Tailored to meet MX needs from plant modernization and ops tempo increase.
New Total: 23 Funded Positions
Central Heat & Power Plant Infrastructure and Distribution
100#; 450 degree steam Supplied to base Condensate returned to CH&PP 5-7% Loss
Electrical Distribution 7200 Phase to Phase \4160 Phase to ground Delta
Coal Plant Site Visit
Lt Col Christopher Higgins
354 CES/CC
Break 1600-1615
Questions & Networking
Ms. Charlene Woods, DLA Energy Ms. Judith Willis, SAF/IEE Energy
Mr. David Mairs, AFCEC/CIU Ms. Leslie Brown, SAF/GCN
Lt Col Christopher Higgins, 354 CES/CC
Closing Remarks
Ms. Nancy Balkus Deputy Assistant Secretary of the Air
Force for Environment, Safety and Infrastructure
| Slide Number 1 |
| Slide Number 2 |
| Agenda |
| Agenda |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Why Are We Here? |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Train and Integrate Advanced Operations |
| Train and Integrate Advanced Operations |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
| Overall Potential Site Area |
| Site Conditions |
| Slide Number 33 |
| DLA Energy�Installation Energy�Eielson AFB Pre-Proposal Conference�Small Micro-Reactor (SMR) |
| Agenda |
| DLA Energy Overview |
| DLA Energy�Installation Energy |
| SMR General Requirements |
| Request for Proposal |
| Request for Proposal |
| Request for Proposal |
| Request for Proposal |
| Request for Proposal |
| Milestones |
| Points of Contact |
| Slide Number 46 |
| Slide Number 47 |
| Slide Number 48 |
| Purpose |
| Overview |
| What is an EUL/EAL? |
| AF EUL/EAL Program |
| Benefits |
| Successes |
| Summary |
| Contact Information |
| Slide Number 57 |
| Slide Number 58 |
| Slide Number 59 |
| Slide Number 60 |
| Slide Number 61 |
| Slide Number 62 |
| Slide Number 63 |
| Slide Number 64 |
| Slide Number 65 |
| Eielson AFB’s�Central Heat & Power Plant Infrastructure and Distribution� |
| Slide Number 67 |
| Slide Number 68 |
| Slide Number 69 |
| Slide Number 70 |