Amendment 0006 SP0604-22-R-0421.pdf

PDF 216 KB Posted

Attached to
Eielson Air Force Base Small Micro-Reactor
Solicitation number
SP0604-22-R-0421
Issued by

View the file

Other files

File Type Posted
Eielson AFB RFI - Group 6.pdf PDF
SMNR SP060422R0421 Final Amd 0006.pdf PDF
Eielson AFB RFI - Group 5.pdf PDF
SMNR SP060422R0421 Final Amd 0005.pdf PDF
Amendment 0005 SP0604-22-R-0421.pdf PDF
SMNR SP060422R0421 Final Amd 0004.pdf PDF
Eielson AFB RFI - Group 4.pdf PDF
JR8- 1996 ROD USAF and EPA on Remediation.pdf PDF
JR4.1 - INRMP Map.pdf PDF
Amendment 0004 SP0604-22-R-0421.pdf PDF
Attachment PR14 - Boring and Soil Information.pdf PDF
Amendment 0003 SP0604-22-R-0421.pdf PDF
Eielson AFB RFI - Group 3.pdf PDF
SMNR SP060422R0421 Final Amd 0003.pdf PDF
Attachment PR11 SWG Layout.pdf PDF
Attachment PR10 Micro Reactor Suitable Locations.pdf PDF
Attachment PR9 GEN Switchgear Bldg. Cable Tray.pdf PDF
Amendment 0002 SP0604-22-R-0421.pdf PDF
Attachment PR12 Base Maps and Drawings.pdf PDF
SMNR SP060422R0421 Final Amd 0002.pdf PDF
Eielson AFB RFI - Group 2.pdf PDF
PR 1 NRC Regulations and Standards_Micro-reactor Rev 1.pdf PDF
Attachment PR13 Gen Single Line.pdf PDF
JA8 Past Performance Information Questionnaire Rev 2.pdf PDF
Attatchment PR8 - No ML21145A106.pdf PDF
Final Pre-Proposal Conference Brief.pdf PDF
Amendment 0001 SP0604-22-R-0421.pdf PDF
Eielson AFB RFI - Group 1.pdf PDF
Eielson AFB Preproposal Conference - List of Attendees.pdf PDF
NRC Licensing Process Overview.pdf PDF
SMNR SP060422R0421 - Amd 1.pdf PDF
JR2 DTM 09-012 Rev 1.pdf PDF
JA7 Production and Pricing Schedule Rev 1.xlsx XLSX spreadsheet
SMNR SP060422R0421 Final Rev 1.pdf PDF
JA8 Past Performance Information Questionnaire Rev 1.pdf PDF
JA9 Teaming Agreement Rev 1.pdf PDF
PR5 Utility Feeders EAFB Layout.pdf PDF
JA10_NDA_Offeror_and_Nongovernment_Advisor.docx DOCX document
JA3 Wage Grade Determination.pdf PDF
JR4 INRMP 30JUNE2017.pdf PDF
PR4 EAFB 1-line (BASE).pdf PDF
JE1 Termination Ceiling Schedule.pdf PDF
JR5 ICRMP 11MAR19.pdf PDF
JR6 AFGM 2021-32-01.pdf PDF
JA1 DRAFT Lease EAFB 20220926.pdf PDF
JA7 Production and Pricing Schedule.xlsx XLSX spreadsheet
JA8 Past Performance Information Questionnaire.pdf PDF
JA5 System Security Plan.docx DOCX document
PR2 Site Map Micro Reactor Locations v2.pdf PDF
JA9 Teaming Agreement.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

20 January 2023

4. REQUISITION/PURCHASE REQ.

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SP0604 7. ADMINISTERED BY (If other than Item 6) CODE

DEFENSE LOGISTOCS AGENCY- ENERGY

8725 JOHN J KINGMAN RD STE 3827

FT BELVOIR VA 22060-6222

USA

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

SP0604-22-R-0421

X

9B. DATED (SEE ITEM 11)

26 September 2022

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers to is extended, X is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 (One) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Continuation Page

15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Andrea L Kincaid

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR

Eielson AFB Solar Electric RESA Amendment 0006 RFP SP0604-22-R-0421 Page 2 of 2

1. The changes set forth herein are incorporated into Solicitation SP0604-22-R-0421.

Section C

2. Page 18-19, Section C.11.2 Minimum Annual Production – Electricity, Table 5 – CLIN 0001 Electracy

Production is hereby updated to the following:

Table 5—CLIN 0001 Electricity Production Year Minimum annual production (in kWh) Annual production amount (in kWh)

1 Construction Construction 2 Construction (to be completed at time of award) 3 Construction 4 Construction 5 Construction 6 Construction 7 Construction 8 35,040,000 9 35,040,000 10 35,040,000 11 35,040,000 12 35,040,000 13 35,040,000 14 35,040,000 15 35,040,000 16 35,040,000 17 35,040,000 18 35,040,000 19 35,040,000 20 35,040,000 21 35,040,000 22 35,040,000 23 35,040,000 24 35,040,000 25 35,040,000 26 35,040,000 27 35,040,000

*Construction period subject to change given offeror’s proposal.

Other Changes

3. The Amendment incorporates the following information:

• Requests for Information (Group 6) submitted to the solicitation, along with the Government’s response.