Amendment 0005 SP0604-22-R-0421.pdf
PDF 189 KB Posted
- Attached to
- Eielson Air Force Base Small Micro-Reactor
- Solicitation number
- SP0604-22-R-0421
- Issued by
-
Defense Logistics Agency Energy
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
13 January 2023
4. REQUISITION/PURCHASE REQ.
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SP0604 7. ADMINISTERED BY (If other than Item 6) CODE
DEFENSE LOGISTOCS AGENCY- ENERGY
8725 JOHN J KINGMAN RD STE 3827
FT BELVOIR VA 22060-6222
USA
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
SP0604-22-R-0421
X
9B. DATED (SEE ITEM 11)
26 September 2022
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers to is extended, X is not extended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 (One) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Continuation Page
15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Andrea L Kincaid
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR
Eielson AFB Solar Electric RESA Amendment 0005 RFP SP0604-22-R-0421 Page 2 of 2
1. The changes set forth herein are incorporated into Solicitation SP0604-22-R-0421.
Section L
2. Page 90-91, Table 1. Availability Metric for Proposed Technology Solution is hereby deleted from Section
L.7.1.3.1(3)(i) moved under to Section L.7.1.3.1(3)(h).
3. Page 91, Section L.7.1.3.1(3)(h) is hereby amended:
From:
(h) The contractor shall also provide its plan to measure and verify availability metrics throughout the life of the contract. This includes the types of meters and supporting measurement and verification (M&V) systems that will be used to measure and report consumption, cost and outage data to the Government for ensuring cost and resilience performance is achieved.
To:
(j) The contractor shall also provide its plan to measure and verify availability metrics throughout the life of the contract. This includes the types of meters and supporting measurement and verification (M&V) systems that will be used to measure and report consumption, cost and outage data to the Government for ensuring cost and resilience performance is achieved.
4. Page 92, Section L.7.1.3.2 (b) (1-4) is hereby amended to the following:
(b) Force Majeure Event Plan
1) Describe how the Offeror plans to protect itself (both financially and in terms of physical assets) from a Force Majeure event that significantly affects the EPF.
2) Identify how the offeror will bring the EPF back into service expeditiously following any such Force
Majeure event.
3) Identify any intent to rely on the Federal Emergency Management Agency (FEMA) or other Government relief agencies for financial assistance in recovering from any Force Majeure Event and identify to what extent, if any, the Offeror would expect reimbursement under the contract.
4) Identify any catastrophic insurance.
Other Changes
5. The Amendment incorporates the following information:
• Requests for Information (Group 5) submitted to the solicitation, along with the Government’s response.
File details come from the government source that posted it. Updated .