JE1 Termination Ceiling Schedule.pdf

PDF 151 KB Posted

Attached to
Eielson Air Force Base Small Micro-Reactor
Solicitation number
SP0604-22-R-0421
Issued by

View the file

Other files

File Type Posted
Eielson AFB RFI - Group 6.pdf PDF
Amendment 0006 SP0604-22-R-0421.pdf PDF
SMNR SP060422R0421 Final Amd 0006.pdf PDF
Eielson AFB RFI - Group 5.pdf PDF
SMNR SP060422R0421 Final Amd 0005.pdf PDF
Amendment 0005 SP0604-22-R-0421.pdf PDF
SMNR SP060422R0421 Final Amd 0004.pdf PDF
Eielson AFB RFI - Group 4.pdf PDF
JR8- 1996 ROD USAF and EPA on Remediation.pdf PDF
JR4.1 - INRMP Map.pdf PDF
Amendment 0004 SP0604-22-R-0421.pdf PDF
Attachment PR14 - Boring and Soil Information.pdf PDF
Amendment 0003 SP0604-22-R-0421.pdf PDF
Eielson AFB RFI - Group 3.pdf PDF
SMNR SP060422R0421 Final Amd 0003.pdf PDF
Attachment PR11 SWG Layout.pdf PDF
Attachment PR10 Micro Reactor Suitable Locations.pdf PDF
Attachment PR9 GEN Switchgear Bldg. Cable Tray.pdf PDF
Amendment 0002 SP0604-22-R-0421.pdf PDF
Attachment PR12 Base Maps and Drawings.pdf PDF
SMNR SP060422R0421 Final Amd 0002.pdf PDF
Eielson AFB RFI - Group 2.pdf PDF
PR 1 NRC Regulations and Standards_Micro-reactor Rev 1.pdf PDF
Attachment PR13 Gen Single Line.pdf PDF
JA8 Past Performance Information Questionnaire Rev 2.pdf PDF
Attatchment PR8 - No ML21145A106.pdf PDF
Final Pre-Proposal Conference Brief.pdf PDF
Amendment 0001 SP0604-22-R-0421.pdf PDF
Eielson AFB RFI - Group 1.pdf PDF
Eielson AFB Preproposal Conference - List of Attendees.pdf PDF
NRC Licensing Process Overview.pdf PDF
SMNR SP060422R0421 - Amd 1.pdf PDF
JR2 DTM 09-012 Rev 1.pdf PDF
JA7 Production and Pricing Schedule Rev 1.xlsx XLSX spreadsheet
SMNR SP060422R0421 Final Rev 1.pdf PDF
JA8 Past Performance Information Questionnaire Rev 1.pdf PDF
JA9 Teaming Agreement Rev 1.pdf PDF
PR5 Utility Feeders EAFB Layout.pdf PDF
JA10_NDA_Offeror_and_Nongovernment_Advisor.docx DOCX document
JA3 Wage Grade Determination.pdf PDF
JR4 INRMP 30JUNE2017.pdf PDF
PR4 EAFB 1-line (BASE).pdf PDF
JR5 ICRMP 11MAR19.pdf PDF
JR6 AFGM 2021-32-01.pdf PDF
JA1 DRAFT Lease EAFB 20220926.pdf PDF
JA7 Production and Pricing Schedule.xlsx XLSX spreadsheet
JA8 Past Performance Information Questionnaire.pdf PDF
JA5 System Security Plan.docx DOCX document
PR2 Site Map Micro Reactor Locations v2.pdf PDF
JA9 Teaming Agreement.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit JE1: Termination Ceiling Schedule

Eielson AFB SMR SP0604-22-R-0421 Page 1

EARLY TERMINATION –CLIN 0001 Electricity

The Termination Ceiling Schedule with respect to the EPF under the contract shall be calculated in accordance with the following schedule. At Expiration of the contract, the amount in Column 1 (Early Termination Fee) shall be deemed to be zero (0) and the amount in Column 2 (Estimated Minimum Option Price) shall be the amount applicable for the year then ending.

Early Termination Occurs in Year:

Column 1:

Early Termination

Fee (including costs of removal )

Column 2:

Estimated

Minimum Option Price

(owner takes title) Construction Period Construction Period Construction Period Construction Period Construction Period Construction Period Construction Period

Exhibit JE1: Termination Ceiling Schedule

Eielson AFB SMR SP0604-22-R-0421 Page 2

EARLY TERMINATION –CLIN 0002 Steam

The Termination Ceiling Schedule with respect to the EPF under the contract shall be calculated in accordance with the following schedule. At Expiration of the contract, the amount in Column 1 (Early Termination Fee) shall be deemed to be zero (0) and the amount in Column 2 (Estimated Minimum Option Price) shall be the amount applicable for the year then ending.

Early Termination Occurs in Year:

Column 1:

Early Termination

Fee (including costs of removal )

Column 2:

Estimated

Minimum Option Price

(owner takes title) Construction Period Construction Period Construction Period Construction Period Construction Period Construction Period Construction Period

The Termination Ceiling Schedule with respect to the EPF under the contract shall be calculated in accordance with the following schedule. At Expiration of the contract, the amount in Column 1 (Early Termination Fee) shall be deemed to be zero (0) and...
The Termination Ceiling Schedule with respect to the EPF under the contract shall be calculated in accordance with the following schedule. At Expiration of the contract, the amount in Column 1 (Early Termination Fee) shall be deemed to be zero (0) and...

File details come from the government source that posted it. Updated .